Вы находитесь на странице: 1из 4

Location:

BORED PILE
GEOTECHNICAL DESIGN
(TENSION CAPACITY)

Design by

ZONE 2

TST

Borehole:

Checked by

BH6
Pile Type:

JAKIM - Precinct 3, Putrajaya

Date

TC

8/6/2013

PILE DATA
Pile diameter, B =

Pile Base Area, Ab =

0.90 m

Cut Off Level = 19.850 RL.m


Ignored top friction =

Perimeter =

Concrete Comp. Strength, fcu =

0.636 m2
2.827 m

35 MPa

Pile Structural Capacity =

5567 kN

Pile Working Load, Pw =

548.00 kN

ADOPTED DESIGN PARAMETERS


Ks =

3 kPa --->

Ks =

2.5 kPa --->

Ks =

2 kPa --->

(SPT, N < 50)

Max. soil ultimate skin friction =

(50 SPT, N <100)

400 kPa

FOS for Skin Friction =

Max. rock ultimate skin friction =

800 kPa

FOS for End Bearing =

Max. ultimate end bearing =

4000 kPa

(SPT, N > 100)

Rock Head Level =

DESIGN SUMMARY
Rock Socket Length =
N/A m

3.50 RL.m

Total Length = 15.50 m

Pile Toe Level =

Soil Length =

4.35 m

15.50 m

Pile Tension Capacity =

585 kN

TABULATED DESIGN CALCULATION


SHAFT FRICTION
Layer

Apply SI Data at
Soil Layer

SI - Data

Skin
Unit
friction
Skin
Shaft Area
Coeff. Friction

END BEARING

Ultimate
Skin
Friction

Total
Ultimate
Skin
Friction

End
Bearing
Coeff.

Unit End
Bearing

Ultimate
End
Bearing

Allowable
Bearing
Capacity

at

SPT, N

RQD

From

To

Thk.

Ks

fs

As

qs

Qs

Kb

fb

Qb

Qa

RL.m

Blows

(%)

(RL.m)

(RL.m)

(m)

(kPa)

(kPa)

(m2)

(kN)

(kN)

(kPa)

(kPa)

(kN)

(kN)

28.00

0 -

28.000

27.250

0.000

3.0

0.000

0.00

0.00

0.00

0.00

0.00

26.5

5 -

27.250

25.750

0.000

3.0

15

0.000

0.00

0.00

0.00

0.00

0.00

25

7 -

25.750

24.250

0.000

3.0

21

0.000

0.00

0.00

0.00

0.00

0.00

23.5

10 -

24.250

22.750

0.000

3.0

30

0.000

0.00

0.00

0.00

0.00

0.00

22

7 -

22.750

21.250

0.000

3.0

21

0.000

0.00

0.00

0.00

0.00

0.00

20.5

9 -

21.250

19.750

0.100

3.0

27

0.283

7.63

7.63

0.00

0.00

2.54

19

9 -

19.750

18.250

1.500

3.0

27

4.241

114.51

122.15

0.00

0.00

40.72

17.5

8 -

18.250

16.750

1.500

3.0

24

4.241

101.79

223.93

0.00

0.00

74.64

16

8 -

16.750

15.250

1.500

3.0

24

4.241

101.79

325.72

0.00

0.00

108.57

10

14.5

9 -

15.250

13.750

1.500

3.0

27

4.241

114.51

440.23

0.00

0.00

146.74

11

13

12 -

13.750

12.250

1.500

3.0

36

4.241

152.68

592.91

0.00

0.00

197.64

12

11.5

9 -

12.250

10.750

1.500

3.0

27

4.241

114.51

707.42

0.00

0.00

235.81

13

10

22 -

10.750

9.250

1.500

3.0

66

4.241

279.92

987.34

0.00

0.00

329.11

14

8.5

19 -

9.250

7.750

1.500

3.0

57

4.241

241.75

1229.09

0.00

0.00

409.70

15

12 -

7.750

6.250

1.500

3.0

36

4.241

152.68

1381.77

0.00

0.00

460.59

16

5.5

9 -

6.250

4.750

1.500

3.0

27

4.241

114.51

1496.28

0.00

0.00

498.76

17

91 -

4.750

3.500

1.250

2.5

227.5

3.534

804.05

2300.33

0.00

0.00

766.78

18

3.5 D. ROCK

3.500

2.000

1.500 -

800

4.241

3392.92

5693.25

0.00

4000

2544.69

2007.35

19

2 ROCK

2.000

0.500

1.500 -

800

4.241

3392.92

9086.17

0.00

4000

2544.69

3138.32

20

0.5 ROCK

0.500

-1.000

1.500 -

800

4.241

3392.92

12479.09

0.00

4000

2544.69

4269.30

21

-1 ROCK

-1.000

-2.500

1.500 -

800

4.241

3392.92

15872.01

0.00

4000

2544.69

5400.27

22

-2.5 ROCK

-2.500

-4.000

1.500 -

800

4.241

3392.92

19264.93

0.00

4000

2544.69

6531.24

23

-4 ROCK

-4.000

-5.500

1.500 -

800

4.241

3392.92

22657.85

0.00

4000

2544.69

7662.22

24

-5.5 ROCK

-5.500

-7.000

1.500 -

800

4.241

3392.92

26050.77

0.00

4000

2544.69

8793.19

25

-7 ROCK

-7.000

-8.500

1.500 -

800

4.241

3392.92

29443.69

0.00

4000

2544.69

9924.16

Notes:
- "D. ROCK" or "ROCK" denotes Siltstone or Sandstone

Pile
marking
(m)

Comp Cap.
(kN)

P060(T)
P060(A)
P075
P075(A)
P075(B)
P090(T)
P100(T)
P120(T)
P135(T)
P150(T)
P160
TC

2121
2121
3313
3866
3866
4771
5890
8482
10735
13254
15080
548

COL
19.5
26
19.5
19.5
26
19.25
19
19
19
18.75
18.5
19.85

Diameter
(mm)
600
600
750
750
750
900
1000
1200
1350
1500
1600
900

Rebar
Length
(m)

Bar Size

No. of
Bars

Link

Location
Zone 1
Zone 2
Zone 3
Zone 4

Borehole
BH5
BH6
BH8
BH7

BORED PILE GEOTECHNICAL COMPRESSION CAPACITY


(WITHIN-24-HOUR INSTALLATION)
Project

: Platinum Park Phase 3

Design by

: TST

Date

Pile Design Ref.

Zone

Boredhole Ref. :

Pile Marking

: TC

Affected Pile No.

Pile diameter =
Working capacity =
Cut Off Level (RL.m) =
Ignored top friction =

0.90 m

Unit Pile Self Weight =

548 kN

Pile Base Area =

19.850

Unit Skin Friction Area =

0.00 m

#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52

SI - Data

15.268 kN/m

Structural Capacity =

0.636 m2
2.827 m2/m

Concrete Grade =

at

SPT-N

RQD

from

RL.m
28
26.5
25
23.5
22
20.5
19
17.5
16
14.5
13
11.5
10
8.5
7
5.5
4
3.5
2
0.5
-1
-2.5
-4
-5.5
-7
-8.5
-10
-11.5
-13
-14.5
-16
-17.5
-19
-20.5
-22
-23.5
-25
-26.5
-28
-29.5
-31
-32.5
-34
-35.5
-37
0
0
0
Err:502
Err:502
Err:502
Err:502

Blows

RL.m
28
27.25
25.75
24.25
22.75
21.25
19.75
18.25
16.75
15.25
13.75
12.25
10.75
9.25
7.75
6.25
4.75
3.5
2
0.5
-1
-2.5
-4
-5.5
-7
-8.5
-10
-11.5
-13
-14.5
-16
-17.5
-19
-20.5
-22
-23.5
-25
-26.5
-28
-29.5
-31
-32.5
-34
-35.5
-37
-18.5
0
0
Err:502
Err:502
Err:502
Err:502

0 5 7 10 7 9 9 8 8 9 12 9 22 19 12 9 91 D. ROCK ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
ROCK
0
0
0
0
0
0
0

0
0
0
0
0
0
0

to
RL.m
27.25
25.75
24.25
22.75
21.25
19.75
18.25
16.75
15.25
13.75
12.25
10.75
9.25
7.75
6.25
4.75
3.5
2
0.5
-1
-2.5
-4
-5.5
-7
-8.5
-10
-11.5
-13
-14.5
-16
-17.5
-19
-20.5
-22
-23.5
-25
-26.5
-28
-29.5
-31
-32.5
-34
-35.5
-37
-18.5
0
0
Err:502
Err:502
Err:502
Err:502
0

Ks

Thk.
m
0.000
0.000
0.000
0.000
0.000
0.100
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.250
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
1.500
0.000
0.000
0.000
Err:502
Err:502
Err:502
Err:502
Err:502

2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
2.0
3.0
3.0
3.0
3.0
3.0
3.0
Err:502
Err:502
Err:502
Err:502
3.0

fs
kN/m2
0
10
14
20
14
18
18
16
16
18
24
18
44
57
36
27
60
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0
0
Err:502
Err:502
Err:502
Err:502
0

As
m2
0.000
0.000
0.000
0.000
0.000
0.283
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
3.534
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
4.241
0.000
0.000
0.000
Err:502
Err:502
Err:502
Err:502
Err:502

FOS for End Bearing =

Core Recovery =

qs
kN
0.00
0.00
0.00
0.00
0.00
5.09
76.34
67.86
67.86
76.34
101.79
76.34
186.61
241.75
152.68
114.51
212.06
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
0.00
0.00
Err:502
Err:502
Err:502
Err:502
Err:502

Rock Level =

3.500 RL.m
14.2 m

End Bearing
Total
Ultimate
Skin
Friction

Soil
friction
Coeff.

Qs

Kb

kN
0.00
0.00
0.00
0.00
0.00
5.09
81.43
149.29
217.15
293.49
395.28
471.62
658.23
899.97
1052.65
1167.16
1379.22
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Unit End
Bearing
fb

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1.00
2.00
3.00
4.00

Pile Toe Level =

5.650 RL.m

Socket Length =

0.0 m

Pile
Ultimate Comp.
Working
End
Bearing Capacity
Qb

kN/m2

526.33
15
16.00
0.00
0.00
21.67
13.50
0.57

Total Pile Length =

5567 kN

FOS for Friction =

35

Soil
Unit
Ultimate
Frictional
friction
Skin
Skin
Area
Coeff. Friction
Friction

Soil Layer

BH6

#REF!

Frictional Resistance
Layer

6-Aug-2013

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

kN
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Qw
kN
0.00
0.00
0.00
0.00
0.00
2.54
40.72
74.64
108.57
146.74
197.64
235.81
329.11
449.99
526.33
583.58
689.61
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Вам также может понравиться