Date:

OF MONTHLY SAFETY COMMITTEE MEETING


Present:
l. Mr. P. P. Titare
2. Mr.Ravi Pednakcl'
3. Mr. Anil Rai
4. Mr.M.1 .Sebastian
5. Mr Deshpande
6. Mr.B.R Ranvir
7. Mr. Vincet P. Kamant
8. Mr. Uttam Chavan
9. Mr.R.P.Yadav
10. Mr.Sashikant R.Navalaker
II Mr.Jeetendra Kumar
12. Mr. N. K.
13. Mr.Chetan khedekar
14. Mr.Ajit
(Manager.HSE)
(Dy.Manager Ele.)
( Sr
(Sr.Admin officer)
(Surveyor)
2.
Job performer
location of
at site
It is required to use
works inside
tunnel.
for him & his Immediately
workforce.
Status
increase.
Under
Process.
o l ~ ~ 0
6. Issue procedures of Rain
to issue
internal
competency
certificates
on the basis
of his
examination
by
you before
his
and as per
his
run "",pn(',; certi ficate to
of operators for
proc<::,;ss,
~ ' ~ :
7. Housekeeping and health &
standard at site,
8. Traffic control Management
due to heavy vehicles movement at
site for removal of Muck.
ventilation inside tunnel.
MEETING
It is most to
maintain good &
healthy cultures by
job as per
observation of HSE
and Admin. The
Admin has to
take care Health &
Hygiene standard
especially during
Monsoon
Sufficient Traffic
control persons is
required with need
base PPE's
(Reflective Jacket,
Shoes I Gum
Red & Green Flag)
with internal Training
to avoid any Incident/
Accident
Muck removal.
Ventilation system to
be increase for
carryoLit works
properly inside
tunnel.
All Job Immediate On gal liP.,
performers! effect
dept. Head!
Admin /
HSE.
Proce!')s,
Admin /
I ASAP.
P.M./G.M.
Mechanical Under
dept.
ASAP
Process.
UNITY - IVRCL JOINT VENTURE
KAPURBAWDIBHANDUPTUNNEL
MINUTES OF SAFETY COMMITTEE
MEETING
NEW POINTS of Meeting
Points discussed
IS
to be all type operators by
mechanical 13th pal1y
through mech. Department for
safely
& \vorkers at site, Cas per
requirement)
for any
Instructed
G,M. to Mechanical
his
Job performer
Immediately
Undl:r
Proe
but 10 be
improve,
Process.
Under
PI''lJUes",
above facilitie.
any
emergency inside
In to issue the
competency
certificates for
operators on internal
basis on the base of
practical examination
'I
.. .
L;I./i Ti:D
UNITY - IVRCL JOINT VENTURE
KAPURBAWDI BHANDUP TUNNEL PROJECT
., .....,


.
" .. . ... " MINUTES OF SAFETY COMMITTEE
MEETING
tunnel.
-
7. Protection of mess / net near stacker. Instructed concern
dept for action by our
P.M.! G.M.
Civil/
Mechanical .
Immediately
8. Need improvement of housekeeping
inside& outside tunnel.
Instructed all
execution team to
keep neat & clean all
construction sites on
daily basis.
Job performer Immediately. Ongo ins
but to b '
improv "
9. All rejected gum boot replacement
for implementation,
Instructed by P.M, /
G.M. to Purchase
dept for action.
Purchase
dept/ Stores
dept.
Immediately Und 'I'
Process.
10. Rescue cabin to be check by
authorized person.
It is required to
identify the condition
of rescue cabin for
provide safety
precaution in
emergency.
Mechanical / E
lectricallHSE
Immediately Und <: 1'
Process.
II. Drug / Alcohol detector is to be
purchase as approval given in
Purchase dept.
It is required to
identi fy the
workforce about his
fitness for work
insi de tunnel as a
confined space
works.
Purchase
dept.
Immediately Und c l'
Proce ss,
12 Contaminated water observed near
main gate.( oil mixed water)
It is observed that
oily water found near
main gate to asphalt
road, P.M.! G,M.
instructed Mr. Rajesh
Deshpandey to take
corrective action for
avoid any
environmental issues.
Civil dept. Jmmediately. Undc l'
observatill
n.
Prepared By Reviewed By
Approved By /
HSE Personal
Sign:

Manager HSE

Sign :
Q

5;go.
/'
V
.tV'
_J}y_o_5_--",