Climbing scaffolds KGF 240 and KGF 180

Designed for safety on high structures.

product range 5.10

Edition 05/2002 PERI GmbH Postfach 12 64 89259 Weissenhorn Tel.: 0 73 09 / 9 50 -0 Fax: 0 73 09 / 9 51 -0 info@peri.de www.peri.de

Other PERI climbing formwork and platform systems: - CB 240 and CB 160 climbing scaffolds - SKSF 240 and SKS 180 Dam climbing formwork - FB 180 Folding platform - ASG 160 Working and protection scaffold - ACS Self-climbing formwork

Important notes: Our products are to be used in accordance with the relevant national and European safety regulations. The illustrations in this brochure are photographs of real site situations. Safety or formwork anchor details are therefore not to be taken as a definitive guide to the way the equipment is to be used. Safety precautions and allowable loads are to be strictly observed. Separate structural calculations are required for any deviations from the standard design data. The information contained herein is subject to technical change in the interests of progress.

Contents
KGF 240 and KG 180 Safety at any height Economical with all projects Examples of executed projects The offset climbing scaffold brackets with the non-trip platform Load calculations and climbing cycle sequences Safety system parts Scaffold anchoring Measurements for scaffold anchoring points Application details for shaft platforms Tables for shaft platforms Loadings for climbing scaffolds Tables for KG 240 Tables for KG 180 Range of parts PERI international

Page

2-3 4-5 6-7 8-9 10-11 12-13 14-15 16-17 18 19 20 21-23 24-25 26-45 48-49

PERI Formwork Engineering

KGF 240 and KG 180 climbing scaffolds Safety at any height

KGF 240 and KG 180 provide safety and flexibility at any height and can be adjusted to any building shape. Crane time is saved when transporting the units because of the fixed connection to the formwork.

3,30

20

3,30

20

KGF 240 traveling fahrbar

The external unit with 3.60 m high formwork saves forming the slab edge, which reduces the hourly rate. Climbing and travelling formwork is no luxury but a necessity for fast and safe work on high buildings.

20

24 storey, 95 m high office building in Berlin. Formed with travelling KGF 240 and TRIO panel formwork.

PERI Formwork Engineering

Bayerische Vereinsbank Frankfurt. KGF 240 a working and safety scaffold.

Football stadium, USA TRIO 330 on KGF 240 Brackets, max h = 6.58 m.

PERI Formwork Engineering

6,58

KGF 240 and KG 180 Economical on all projects

Administration building in Berlin. Formed with TRIO and travelling KGF 240.

TRIO on KGF 240 transported as a unit in one crane lift.

45 m high lift shafts and staircase.

PERI Formwork Engineering

The external formwork is withdrawn 750 mm on the carriage of the KGF 240. Reinforcement and blockouts are safely fixed in the protection of the formwork.

2,98

24

2,65

24

2,20

24

44 m high staircase for an industrial plant. Carried out with a structured concrete surface. Formed with VARIO GT 24 and travelling KGF 240. Internal formwork on BR platform beams. PERI Formwork Engineering

KGF 240 and KG 180 Examples of executed projects

Up to 49 m high circular bridge pier. VARIO GT 24 with special SRZ waling on travelling KGF 240.

Television tower in Madrid, Spain with KGF 240 climbing formwork.

PERI Formwork Engineering

X Detail X Scaffold anchoring

WGS Wall scaffold hinge Item no. 026110

Special WGS Wall scaffold hinge right or left Platform beam

Detail foot

The outer KGF 240 brackets must be arranged parallel so that the formwork can travel.

Padding timber as plan Tower of 14 m diameter and 23 m high for a furnishing company. Formed with RUNDFLEX on KG 240 brackets.

Circular silos of 20 m diameter and 72 m in height. VARIO GT 24 formwork with timber wedges between the GT 24 girders and the steel waling. Travelling KGF 240 outside and KG 180 inside.

PERI Formwork Engineering

KGF 240 and KG 180 The offset climbing scaffold brackets with non-trip scaffolding platforms

s The KG 180 and KGF 240 offset climbing scaffold brackets bridge over obstructions, such as reinforcement connections or corbels in the wall. Ample work space for the finishing platform is provided - the post extensions of the bracket are set at distance of 1,00 m. To avoid obstructions the finishing platform can be adjusted in 100 mm stages.

0,75 m

The PERI KG climbing scaffold brackets are offset and avoid projections in the wall.

KGF 240: When the formwork is withdrawn 750 mm, a safe working environment to carry out cleaning, fixing blockouts, reinforcement etc. is provided. With a permissible working load of 500 kg/m2 even heavy loads, such as reinforcement, can be stored in this area.

ca. 1,00 m

PERI Formwork Engineering

The platform lies on top of the PERI KG climbing scaffold bracket giving two important advantages: s Non-trip scaffold platform which gives a high standard of working safety. The brackets and cantilevered beam lie below the main and finishing platforms.

When the units are withdrawn 750 mm, KGF 240 Formwork provides a protected and safe working environment.

s Pre-assembly of the platforms: which is cost effective, saves time and avoids tight spaces. The assembly work can be carried out easier and faster in the plant, yard or shop. Plan of a KGF 240 working platform
12 Space for carriage

Plan of a KG 180 working platform


4x24 12x16 8x16 12x16

2,34

1,79
8x16 1,60 3,20 max. 6,40 1,60

12x16

8x16 1,43 2,86 max. 5,72 1,43

Plan of KGF 240 finishing platform


8x16

Plan of KG 180 finishing platform


8x16

1,05

1,43

2,86 max. 5,72

1,43

1,60

3,20 max. 6,40

1,60

The drawings are taken from parts of the Type Tests for KGF 240 and KG 180. Platforms with 40 x 240 mm scaffold planks. PERI Formwork Engineering

0,92

Load calculations and climbing cycle sequences

Table for easily calculating the loads Climbing scaffold units (2 brackets) KG 180 KGF 240 Starting scaffold consisting of: 2 brackets incl. cantilevered beam, scaffold tubes, 2 travelling brackets (KGF 240), 2 articulated joints, 2 ZAH tension anchors and necessary accessories 360 kg 495 kg Extension post 150 consisting of: 2 Post extensions 150 and scaffold tubes Extra finishing platform (alternative 1) Consisting of: 2 cantilevered beams with stiffeners Platform of timber (per lm) Working platform consisting of: 40 mm scaffold boards, 3 timbers, 3 handrail boards, 1 stiffening plank according to the type test Finishing platform consisting of: 40 mm scaffold boards, 2 timbers 3 handrail boards, 1 stiffening plank according to the type test 120 kg 131 kg
Example: Traveling KGF 240, Formwork height 3.75 m, formwork width 3.50 m (alternative Ii with perm. b = 1.84 m, see also page 23) Finishing platform with 2 extension posts 150. Load calculation: Formwork 3.75 x 3.50 x 60 kg/m/m2 Starting scaffold unit Weight of extension post 2 x 131 kg Weight of working platform 3.50 x 95 kg/m Weight of finishing platform 3.50 x 52 kg/m Total load

= 788 kg = 495 kg = 262 kg = 333 kg = 182 kg

= 2060 kg

85 kg

95 kg

KG 180 KGF 240

Note: The weight of the formwork can be set at approx. 60 kg/m2. This includes the concreting scaffold, push-pull props and accessories. An exact calculation may be necessary in individual or special cases because there could be deviations from these assumptions. Load assumption for timber: bulk density 600 kg/m3.

86 kg/m 95 kg/m

49 kg/m 52 kg/m Warning: KGF 240 transporting units are only to be transported with withdrawn and fixed carriage.

Detail: ZAH/KG (Item no. 026160) connection with starting scaffold unit, 2nd cycle.

KGF 240 climbing cycle sequence

1st Cycle Position and install the leading anchor according to the chosen version and information (see Page 14) for the following scaffold.

min. 2,20 m

70

2nd Cycle Suspend the pre-assembled scaffolding unit on the anchor and, if necessary, secure against wind loads (see d etail above). Erect formwork unit on the scaffolding and adjust.

3rd Cycle Loosen formwork anchor, withdraw formwork and fix leading anchor.

10

PERI Formwork Engineering

TRIO crane hook

crane sling angle max. 15

crane sling angle max. 15

40 x 240 pressure plank Slip the crane sling through the TRIO 1.5 t crane hook (Item no. 023690) to secure against tipping Place crane sling behind the VARIO steel waling to secure against tipping.

KGF 240 starting unit transported with TRIO

KGF 240 starting unit transported with VARIO GT 24


Formula for calculating post extension of KG 180 and KG 240.
X = concreting height H 1.25 m

212

4th Cycle The pre-assembled finishing platform is fixed to the scaffolding unit before suspending on the next anchor.

5th Cycle After suspending the complete unit (formwork with scaffold unit) the lower wall scaffold hinge is taken off and the tension anchor fitted.

6th Cycle Clean the units. Fix reinforcement, close formwork and concrete. The normal cycle starts here.

PERI Formwork Engineering

11

Safety system parts for PERI climbing scaffolds

KGF 240 Alternative II

Concreting height h

Access opening panel

Height difference h1

Side protection

220/6 ladder Ladder hook 180/6 ladder Ladder foot

Parts list for necessary post extensions and ladder access


Concreting height h in m Up to 3.00 Up to 3.70 Up to 4.50 Up to 5.50 Up to Up to 6.00 7.00

The ladders are suspended on the upper end of the Access opening panel and set down on the finishing platform. The side protection is fixed to the ladder later.

Detail of upper finishing platform (alternative I)

Height difference h1 of the platforms 3.53 4.24** 5.04 5.94** 6.54 7.75** Item no. Description Necessary post extension150 per bracket 026075 Post extension for KG 180 1 2 2 3 051420 Post extension for KGF 240 1 2 2 3 3 4 Item no. Description Material required for a ladder access 1 1 1 1 1 1 051430 Access opening panel 051420 220/6 ladder 1 1 1 1 1 1 051410 180/6 ladder 1 1 2 2 3 3 051450 Side protection 1 1 2 2 3 3 103718 Ladder hook 2 2 2 051460 Ladder foot 1 1 1 1 1 1 Timber under ladder foot 40mm* 60mm* Total weight in kg 94.7 94.3 129.0 127.7 165.0 163.7

Stiffening plank

Side protection

Ladder

* The ladder foot is to be supported where necessary. ** The lower cantilever beam is to be arranged to fit on the post extension.

When using alternative I (with 2 cantilevered beams per bracket unit) a horizontal stiffening is to be fitted between the upper cantilevered beams. In this case a ladder is to be fixed through this stiffening.

12

PERI Formwork Engineering

Arrangement of the sliding hatch cover as for the KGF 240

Safety warning: The safety regulations of each country are to be observed. Suitable measures for protection against falling objects and personnel falling off the scaffold are to be taken by the contractor.

KG 240 bracket with carriage

12

min. 10 15

min. 10 15 After fitting the sliding hatch cover, refix the cut boards properly

Sliding hatch cover fitted

60

Access opening 75

Screws for fixing ladder

Forming the side protection

KG 125 handrail post Item no. 026120

End handrail post Item no. 051610 Side protection boards 40 x 120 mm

Side protection board 40 x 120 mm

Toeboard 40 x 120 mm

Wood screws 6x80 DIN 571

Toeboard min. 40 x 160 mm because of opening for pushpull prop on bracket

Hole for GT 24 girder as platform bearer

Platform bearer

KG 240 bracket

PERI Formwork Engineering

13

Scaffold anchoring, safety in the details

Warning: Bolts for the scaffold suspension are high tensile bolts to ISO 4014-10.9. No other bolts may be used. KG suspension WGS wall scaffold hinge 1. M24/DW 20 screw-on cone and threaded anchor plate 20 Hex bolts ISO 4014 M24 x 70-10.9
150

BR suspension Folding bearer plate 25


150

2. 2 M24/DW 15 climbing cone, DW 15 tie rod and threaded anchor plate 15


min. 185

min. 185

Hex bolts ISO 4014 M24 x 70-10.9

3. PERI M 24 bolt anchor sleeve Hex bolts ISO 4014 M24 x 70-10.9
152

152

Erection tip: If an M 24 anchor positioning is used (Page 15), the anchor parts must be additionally fixed with binding wire to the reinforcement to avoid any unintentional loosening during concreting. 14

Example: climbing cone 2 with threaded anchor plate 15 PERI Formwork Engineering

The fast working sequence for scaffold anchor points

With drilling of the fomwork lining when using the M 24 advancing bolt Shown with the VARIO GT 24 girder formwork
1. Advancing bolt when erecting Position the advancing bolt. Drill the formwork lining, 25 mm diam. Fix the anchor parts to the appropriate version selected (see Page 14)

Without drilling the formwork lining when using the M 24 advancing bolt Shown with the TRIO panel formwork
1. Advancing bolt when erecting Position the M 24 anchor positioning plate. Fix with 4 nails (31 x 70) on the plywood. Fix the anchor parts to the appropriate version selected (see Page 14).

2. Fix the scaffold hinge Remove the advancing bolt. Withdraw the formwork. Bolt on the wall scaffold hinge or folding bearer plate 25 with hex bolts (see Page 14).

2. Fix the scaffold hinge Loosen the formwork from the concrete and withdraw. The anchor positioning plate remains on the cone or bolt anchor sleeve. Screw off the anchor positioning plate with a 12mm Allen key. Screw on the wall scaffold hinge or folding bearer plate 25 with a hex bolt (see Page 14).

3. Suspend the scaffolding Lower the climbing bracket into the hinge and immediately fix with securing bolts.

Elevation x

Elevation x Securing bolts

4. Fix the ZAH anchor chain Loosen the hex bolt with an SW 36 socket wrench and remove the wall scaffold hinge. Bolt on the anchor chain with hex bolts.

5. Recovering the anchor parts Unscrew the hex bolt on the anchor chain and the climbing cone from the finishing platform with the SW 36 socket wrench. Close the anchor holes.

PERI Formwork Engineering

15

Measurements for the scaffold anchoring points

The PERI wall scaffold hinge (for KGF 240, KG 180 and KG 130) provides the advantage that there is sufficient play for fast erection. Because of this the crane is free again immediately after erection.

Warning: The timber sizes are for standard cases which have been proved by the testing authorities (Test Certificate no. P 31-162/96). Deviations from this require a special static proof.

If alternative sizes of planks or timbers are used, the anchoring sizes are to be adjusted appropriately .

Design sizes for KGF 240 with carriage Shown with VARIO GT 24

Design sizes for KG 180 with articulated shoe Shown with VARIO GT 24

Concrete joint

Concrete joint Articulated joint 24

Articulated joint 24

50

Design size A

Carriage

Design size A

50

KG articulated shoe

Timber h = 160 KGF 240 KG 180 Anchor axis (scaffold suspension)

Anchor axis (scaffold suspension)

WGS wall scaffold hinge

WGS wall scaffold hinge

Sizes in mm Design size A Min A Max A

VARIO GT 24 70 58 84

TRIO 70 63.5 89.5

Sizes in mm Design size A Min A Max A

VARIO GT 24 70 55.5 81.5

TRIO 70 61 87

KG 240 as working scaffold

KG 180 as working scaffold

50

50

Timber = 360

40

Timber = 340

GT 24 = 440

Timber GT 24 KG 240

=160 =240

GT 24 = 420

40
Timber=160 GT 24 =240 KG 180

160

28

Anchor axis (scaffold suspension)

140

Anchor axis (scaffold suspension)

16

PERI Formwork Engineering

120

28

160

Application of the KG articulated shoe (Item no. 027150)

With VARIO GT 24

With TRIO

Section

1 x articulated shoe 60 Item no. 027150 2 x hex bolts M16 x 280 Item no. 103740

201

KG articulated shoe

10 240

40

15

55

80 x 160 or 120 x 160 KG 180 Pressure plate Articulated joint 37 233 69 37 30 233

80 x 160 or 120 x 160 KG 180

1 x articulated joint pressure plate Item no. 102988 min. 350 2 x plate for articulated shoe Item no. 027160 Instead of morticing the front platform beam, the other platform beams can be padded 15 mm.

The KG 130 climbing scaffold can also be pre-assembled and transported as a unit. Scaffold planks to DIN 4420
50

Safety Warning: Erected formwork may not be supported against the KG 130 climbing scaffold. The max. live load is 300 kg/m2 (scaffold group 4 to DIN 4420).

220

KG 130 bracket
perm. Q = 11.0 kN

Scaffold tube 48.3 x 4.05 Item no. 026410 Standard coupling NK 1 48/48 Item no. 017020 Swivel coupling DK 1 48/48 Item no. 017010

10

15

PERI Formwork Engineering

17

Application details for PERI shaft platforms

Two efficient methods of supporting the PERI shaft platforms: 1. With PERI 25 folding bearer plates For example when there is heavy reinforcement or fair-face concrete in shafts. Depending on concrete strength permissible loading is up to 25 kN. 2. With PERI gravity pivot plates For example when the blockouts do not have to be made good. Permissible loading up to 38 kN depending on concrete strength. The advantage is all parts can be re-used.

25 Hole for crane slings

max. 120* Hole for crane slings

50

40

50

210

70

160

70

365

140

100

40

120

60

*Warning: The gravity pivot plate will not function properly if the size of 120 mm is exceeded.

Warning: If different sizes of planks or timbers are used, or Beams larger than U 100 are used, the design sizes must be appropriately adjusted.

Reusable BR blockout boxes, Item no. 020630, see Page 45.

Fixing the platform beams: When using GT 24 girders: HB 24-100/120 hook strap For U 100 / U 120 steel sections HB 24-140/160 hook strap For U 140 / U 160 steel sections When using timbers: HB hook strap for U 100 / U 120 steel sections

10

120

10

100
20 mm hole

160

40

max. 100 mm timber

18

PERI Formwork Engineering

80

Platform Beams BR U-profil sections

Design loads: Platform = 0.65 kN/m2 (boarding, timbers, platform beam) Formwork = 0.60 kN/m2 Live load = 1.00 kN/m2

Size of channel required Perm. Formwork Span LS [m] loaded height width [m] HS [m] 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 1.00 3.00 4.00 5.00 6.00 3.00 4.00 5.00 6.00 3.00 4.00 5.00 6.00 3.00 4.00 5.00 6.00 3.00 4.00 5.00 6.00 3.00 4.00 5.00 6.00 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 120 100 100 100 100 100 100 100 100 100 100 100 120 100 120 120 120 120 120 120 120 120 120 120 120 100 100 120 120 100 120 120 120 120 120 120 120 120 120 120 140 120 120 140 140 120 140 140 140 120 120 120 120 120 120 140 140 120 140 140 140 140 140 140 140 140 140 140 160 140 140 160 160 120 140 140 140 140 140 140 140 140 140 140 160 140 160 160 160 160 160 160 160 160 160 160 160 140 140 140 160 140 160 160 160 160 160 160 160 160 160 160 180 140 160 160 160 160 160 160 180 160 180 180 180 180 180 180 180

1.50

2.00

2.50 = Actual support load 25 kN (use folding bearing bracket 25 or gravity pivot plate) = Actual support load 25 kN Use of the PERI gravity pivot plate only. For required concrete strength see table below.

3.00

160 180 160 180 180 180 160 180 180 180 180 180

3.50

(calculations based on platform edge beam)

Permissible bearing load A [kN] when using the gravity pivot plates
Concrete strength perm. A

[N/mm2] 10,0 13,7

[kN]
Span Ls

27,7 38,0

Formwork height Hs

PERI Formwork Engineering

19

KGF 240 and KG 180 Load assumptions for construction sites and wind loads to DIN

The normal uses according to the valid standards are taken into account in the type tests of the PERI travelling KGF 240 and KG 180.

The maximum wind load is taken into account according to DIN 1055 for the following cases: Height above ground 0-20 m 20-100 m ber 100 m Wind pressure q 0.8 kN/m2 1.1 kN/m2 1.3 kN/m2
The wind loads result from w = cw x q where cw = 1.3 (aerodynamic force correction value). Reduced wind loads are used when moving the formwork according to DIN 4421, section 6.3.2.2.

KGF 240 working position

KGF 240 concreting position p4

KG 180 p4

p4

Wind load Formwork weight 0.6 kN/m2 p1 p2

Wind load Formwork weight 0.6 kN/m2 p2

Wind load Formwork weight 0.6 kN/m2 p2

p5

p5

p5

p3

p3

p3

Live loads (kN/m2) Working platform Concreting position Working position Lower finishing platform Concreting scaffold Upper finishing platform 20 KGF 240 p1 = p2 p1 p2 p3 p4 p5* 3.0 5.0 3.0 1.0 1.0 1.0 p3 p4 p5* 1.5 1.5 1.5
PERI Formwork Engineering

KG 180 p2 p2 1.5 1.5

* When the stiffening level is carried out as a complete upper finishing platform (see Page 22, alternative 1 for KGF 240, and Page 24 alternative 1 for KG 180).

KGF 240, KG 180 Permissible anchor loads


The charts are taken from the Type Inspection, Inspection Certificate P31 - 162/86. They may only be used in conformity with these.

Permissible anchor loads For wall scaffold bracket with climbing cone 2 M24/DW15 or bolt cone M24/DW20
Shear force QA [kN]
100

90

80
Climbing cone fc= 20 N/mm2

70
Bolt of the wall scaffold bracket

60
fc= 15 N/mm2

50

QA= 38,9 kN 40

fc= 10 N/mm2

30
Example: Existing tension force ZA = 55,4 kN Perm. shear force QA = 38,9 kN Necessary concrete = ca. 12 N/mm2 strength W (fc is the cube strength W according to DIN 1045)

20

fc= 5 N/mm2

10 DYWIDAG DW 15 0 10 20 30 40 50
ZA= 55,4 kN

60

70

80

90

100

Tension force ZA [kN]

Allowable combined shear QA and tension ZA forces Concrete strength: Cube strength W when the load is imposed by mounting the climbing bracket

ZA QA QA

The proof of the tension force ZA in the concrete must be provided separately according to local conditions.

PERI Formwork Engineering

21

KGF 240
The charts are taken from the Type Inspection, Inspection Certificate P31 - 162/86. They may only be used in conformity with these.

Option 1, System: cantilevered girder on the climbing scaffold and on the finishing platform
ZA DB

H < 20 m H < 100 m

0.99 m

1.17 m

50.0 kN

45.0 kN

43.0 kN

39.1 kN

34.7 kN

32.5 kN

hB [m]
7.0

60.0

52.7

40.2

1.67 m

46.6

37.5

6.0 2.18 2.40

2.64 5.75 5.30 5.05 4.75 m 4.95 4.24 3.75 2.56 m

{ {
64.2 48.2 46.4 5.0 45.5 62.6 47.2 4.0 64.0 63.0 kN 53.0 kN 48.2 kN 47.5 kN 40.7 kN 39.2 kN 32.5 kN 3.0 60 50 40 30 0 1.0 2.0

H > 100 m

2.87 m 3.0

ZA / DB [kN]

QA 2.54 + b x (0.6 hB + 13.3) [kN]

bperm. [m]

b= width of Tension anchorage at the level of the top finishing influence platform, with kicker only: ZB 25.8 kN per bracket at the level of the bottom finishing platform: ZB 9.4 kN

The charts are taken from the Type Inspection of the State Structural Inspectorate, Dsseldorf (Inspection Certificate P31 - 162/86). They may only be used in conformity with the provisions of this Type Inspection. Application example: Utilisation height: Pour height: Bracket width of infl.: H = 40 m < 100 m hB = 4.75 m b = 2.25 m

0.35 m

H=

utilisation height above ground

from chart: bperm. = 2.56 m > 2.25 m Reaction forces on the wall scaffolding hinge: Actual QA = 2.54 + 2.25 x (0.6 x 4.75 + 13.3) = 38.9 kN hB Actual ZA = 63.0 x 2.25 2.56 Contact force on the finishing platform Actual DB = 47.5 x Tension anchorage: 2.25 2.56 actual ZB 9.4 kN = 41.8 kN hB = 55.4 kN

= overlap

Complete upper finishing platform. (alternatively stiffening level with diagonal planks) ZA QA ~ ~ 2.0 m

hB hB

DB approx. 0.40 m ZB

Variable or standard post extension

22

PERI Formwork Engineering

KGF 240
The charts are taken from the Type Inspection, Inspection Certificate P31 - 162/86. They may only be used in conformity with these.

Option 2 System: cantilevered girder on the finishing platform


ZA
11,5 kN

H < 20 m H < 100 m

11,7 kN

10,7 kN

0,70 m

DB

hB [m]
7,0 6,0

5,0

4,0

31,5 kN

26,5 kN

22,0 kN

19,0 kN

13,0 kN

3,0 1,84 m 2,47 m 2,67 m 2,0 10 0 0.5 1.0 1.5 2,87 m

30

20

0,61 m

3,75 m

0,85 m

{
ZA / DB [kN]

H > 100 m

2.0

2.5
bperm. [m]

QA 2,54 + b x (0,6 hB + 11,8) [kN]

Tension anchorage: -ZB 9.4 kN

b= width of influence per bracket

The charts are taken from the Type Inspection of the State Structural Inspectorate, Dsseldorf (Inspection Certificate P31 - 162/86). They may only be used in conformity with the provisions of this Type Inspection. Application example: Utilisation height: H = 40 m < 100 m Pour height: hB = 3.75 m Bracket width of influence: b = 1.60 m from chart: bperm. = 1.84 m > 1.60 m Reaction forces on the wall scaffolding hinge: Actual QA = 2.54 + 1.60 x (0.6 x 3.75 + 11.8) = 25.0 kN Actual ZA = 22.0 x = 19.1 kN

0.35 m

H= utilisation height above ground

hB

hB = overlap

ZA 1.84 Contact force on the finishing platform 1.60 Actual DB = 13.0 x 1.84 Tension anchorage: actual ZB 9.4 kN hB hB 1.60 QA

approx. 0.40 m

= 11.3 kN

ZB DB

Variable or standard post extension

PERI Formwork Engineering

23

KG 180
The charts are taken from the Type Inspection, Inspection Certificate II B 3 - 543 - 641. They may only be used in conformity with these.

Option 1 Cantilevered beam on the bracket and the finishing platform Width of influence perm. b and horizontal bearing reactions

H < 20 m H < 100 m

ZA

DB

hB [m]
5.0 4.5

H > 100 m

4.0

3.5

3.50 m

3.0

39.5 kN

32.0 kN

2.0

60

50

40

30

20

10

0.5

1.0

1.5

2.0

2.5

2.55 m 3.0

2.5

3.5

ZA / DB [kN]

Vertical bearing reaction on the traverse: QA = 2.9 + b x (0.6 hB + 9.2) [m; kN]

Tension anchorage: - ZB 9.4 kN 0.35 m

b = width of influence per bracket

bperm. [m]

Application example: Utilisation height: Pour height: Bracket width of infl.: H < 20 m hB = 3.50 m b = 1.60 m hB

hB 2 H= utilisation height above ground

from chart: bperm. = 2.55 m > 1.60 m Reaction forces on the wall scaffolding hinge: Actual QA = 2.9 + 1.60 x (0.6 x 3.50 + 9.2) = 21.0 kN 1.60 Actual ZA = 39.5 x 2.55 Contact force on the finishing platform: 1.60 Actual DB = 32.0 x = 20.1 kN 2.55 Tension anchorage: actual ZB 9.4 kN hB = 25.3 kN

hB = overlap

ZA QA hB 2.0 m

DB approx. 0.40 m ZB Variable or standard post extension

24

PERI Formwork Engineering

KG 180
The charts are taken from the Type Inspection, Inspection Certificate II B 3 - 543 - 641. They may only be used in conformity with these.

Option 2 Cantilevered beam on the finishing platform Width of influence perm. b and horizontal bearing reactions
H < 20 m H < 100 m

ZA

DB hB [m]
5.0 4.5

H > 100 m

4.0

3.5

3.50 m

3.0 8.0 kN

15.0 kN

2.0

60

50

40

30

20

10

0.5

1.0

1.5

1.63 m

2.5 2.3

2.0

2.5

3.0

3.5

ZA / DB [kN]

Vertical bearing reaction on the traverse: QA = 2.8 + b x (0.6 hB + 7.3) [m; kN]

0.35 m

Tension anchorage: - ZB 9.9 kN

b = width of influence per bracket

bperm. [m]

Application example: Utilisation height: Pour height: Bracket width of infl.: H < 20 m hB = 3.50 m b = 1.60 m hB

hB 2 H= utilisation height above ground

from chart: bperm. = 1.63 m > 1.60 m Reaction forces on the wall scaffolding hinge: Actual QA = 2.8 + 1.60 x (0.6 x 3.50 + 7.3) = 17.8 kN 1.60 Actual ZA = 15.0 x 1.63 Contact force on the finishing platform: 1.60 Actual DB = 8.0 x = 7.9 kN 1.63 Tension anchorage: actual ZB 9.9 kN = 14.7 kN hB

hB = overlap

ZA QA hB

approx. 0.40 m

ZB

Variable or standard post extension

DB

PERI Formwork Engineering

25

KGF 240 climbing scaffold

Push-pull prop connection: VARIO GT 24 With girder headpiece 24 or wedge headpiece or TRIO With brace connector 2

Push-pull prop

KG handrail post 125

AV Kicker brace

Articulated joint 24 or TRIO articulated joint

FW carriage

WGS wall scaffold hinge

KG 240 bracket

Upper cantilever beam KG 240 (alternative I)

Post extension 150 for KG 240

ZAH anchor chain

Lower cantilever beam KG 240

26

PERI Formwork Engineering

KGF 180 climbing scaffold

Push-pull prop connection: VARIO GT 24 With girder headpiece 24 or wedge headpiece or TRIO With brace connector 2 KG handrail post 125 Push-pull prop AV 190 Kicker brace Articulated joint 24 or TRIO articulated joint

Locating shoe for KG articulated joint

WGS wall scaffold hinge

KG 180 bracket

Upper cantilever beam KG 180 (alternative I)

Post extension 150 for KG 180

ZAH anchor chain

Lower cantilever beam KG 180

PERI Formwork Engineering

27

KG Climbing Scaffold and Accessories


Weight kg Item no. Climbing Bracket KG 240 Complete with: KG 240 Bracket, KG 240 Cantilever Beam and KG 125 Handrail Post for Climbing Scaffold. 154,00 026055

40

Scaffold board length 2340

38

40

Scaffold board length 1050

1097

Carriage FW Complete with: Wedge for continuously variable locking (1x) Pin 16x42 and Cotter Pin 4/1 (1x), Pin 16x65/86 and Cotter Pin 4/1 (1x).

36,30

027010
1408 35 View x 17 100 22 168 251 168 17 120 335 223 374 x 100 34 100 16x65/86 FS 4/1 40 70 1024 35 261 160 16x42 FS 4/1 13 60 1292 117 81

Accessories: Ratchet Lever SW17 Ratchet Lever SW17 For moving the Carriage FW.

1,76 1,76

027100 027100

28

48

PERI Formwork Engineering

68 75

1250

Weight kg Item no. Bracket KG 240 Complete with: Screw-on Coupling 48mm (2x), Pin 16x42 and Cotter Pin 4/1 (1x). 129,00 026050

2400 20 1030 875 2320 912 16x42 FS 4/1 150 50 235 192 70 110 415 M 12x40 100 60

140

175

50

IPE 140 250

View x

70 40

720

85

57

25

200

View y

52 200

80 100 100

100100

321

200

25

128

190

Post Extension 150 for KG 240 Complete with: Screw-on Coupling 48mm (2x), Pin 25x160 and Cotter Pin 5/1 (2x).

49,60

026085
25x160 FS 5/1 190 150 41

13 x 100 = 1300

150

IPE 200

2120

2079

200

1720

IPE 200

1204

13

150

35

Post Extension KG 240 Special Length Without Pin, Cotter Pin and Screw-on Coupling. Cantilever Beam KG 240 Complete with: Hex. Bolt ISO 4017 M12x40-8.8, galv., MU (6x).

27,50/m

026170

52

17,70

026060

1097 977 192 120 150

41

1422

IPE 120

250

PERI Formwork Engineering

29

2530

180

Weight kg Item no. Articulated Joint 24 For use with PERI GT 24 Girder. Complete with: Plate for Articulated Joint (2x) with Hex. Bolt ISO 4014 M 12x110-8.8, galv., and Hex. Nut ISO 4032 M12-8, galv. (4x). Articulated Joint Connector (2x) with Hex. Bolt ISO 4016 M 12x120-4.6, galv., MU (4x). Lifting Eye (1x). Pin 16x42 with Cotter Pin 4/1 (1x) 33,00 027030
min. 175 200 min. 175 axis GT 24

90

700

16x42 FS 4/1 550 max. 200 550

Load-bearing point Load Capacity Lifting Eye: 1500kg Accessories: Geka-Spike Grid 50mm (8x) Articulated Joint TRIO For use with PERI TRIO Elements. Lifting Eye (1x), Pin 16x65/86 and Cotter Pin 4/1 (1x).
TR 48x10

0,05 25,10

070090 027040

210

900

16x65/86 FS 4/1

22

190

max. 290

Load-bearing point Load Capacity Lifting Eye: 1500kg Accessories: Alignment Coupler BFD, galv. (2x)
230

min. 22

25

TR 48x10 90

4,05

023500

240

30

80

PERI Formwork Engineering

min. 22

130

U 80

180

145

Weight kg Item no. Climbing Bracket KG 180 110,00 Complete with: KG 180 Bracket, KG 180 Cantilever Beam and KG 125 Handrail Post for Climbing Scaffold. 026035

40

Scaffold board length 1787

38

40

Scaffold board length 927

962

Bracket KG 180 Complete with: Screw-on Coupling 48mm (2x), Pin 16x42 and Cotter Pin 4/1 (1x).

90,70

026030

1850 20 600 1770 740 16x42 FS 4/1 175 150 235 50 50 IPE 120 250 207 70 110 395 2510 150 1720 60

View x

70 40

15

120

720

57

180

85

200

View y

48

200

80

y 128

200

321

200

200

190

IPE 180

2079

2120

200

1250

PERI Formwork Engineering

31

Weight kg Item no. Post Extension 150 for KG 180 Complete with: Screw-on Coupling 48mm (2x), Pin 25x160 and Cotter Pin 5/1 (2x). 44,20 026075
25x160 FS 5/1 190 150 41 13 x 100 = 1300 IPE 180 962 845 192 100 140 13 48

Post Extension KG 180 Special Length Without Pin, Cotter Pin and Screw-on Coupling 48mm. Cantilever Beam KG 180 Complete with: Hex. Bolt ISO 4017 M 12x40-8.8, verz., MU (4x)

12,50

026040

41 IPE 100 M 12 x 40 80 17 550 65 9 16x65/86 FS 4/1 120 50 65 190 120 185 1410 1110 150 995 460 35 max 420 min 20

24,00/m

026140

150

35

1204

1422 50 90 250

Handrail Post 125 KG Complete with: Pin 16x65/86 and Cotter Pin 4/1 (1x).

6,83

026120

Handrail Holder Can be clamped to concrete slabs or formwork substructure up to 42cm deep.

9,81

035700

32

70

PERI Formwork Engineering

Weight kg Item no. Wall Scaffold Hinge WGS For KG 130, KG 180 and KG 240. Complete with: Captive Safety Pin. 7,77 026110

! Important Safety Note: Only anchor the scaffold with components specified by PERI for the purpose!

185

260

172

25

22

90

45

145

10

65 115

35

Accessories: Hex. Bolt ISO 4014 M 24x70-10.9 For connecting to: Climbing Cone 2, M24/DW15, Item no. 031220 Screw-on Cone M24/DW20, Item no. 030960 Anchor Sleeve M 24, Item no. 026230 Anchor Chain ZAH For KG 180 and KG 240. Complete with: Pin 16x42 and Cotter Pin 4/1 (2x), Hex. Bolt M 12x40 MU DIN 601, galv. (4x)

0,33

026430
100

7,72

026100
View of head plate

26

100

49

14

100 17 50 1098 bei KG 240 968 bei KG 180 18

62 106 Centre-line of chain Position for KG 180 57 49 180 16x42 FS 4/1 16x42 FS 4/1 M 12x40 SW 36 70 M 24

Permiss. Tension Load: 25kN Accessories: Hex. Bolt ISO 4014 M 24x70-10.9 Hex. Bolt ISO 4014 M 24x70-10.9 For connecting to: Climbing Cone 2, M24/DW15, Item no. 031220 Screw-on Cone M24/DW20, Item no. 030960 Anchor Sleeve M 24, Item no. 026230

0,33 0,33

026430 026430

57 max 1200 min 935

PERI Formwork Engineering

33

Weight kg Item no. Connector ZAH/KG For connecting the Tension Anchor to the KG 240 or KG 180 Bracket. 0,47 026160

25

50

55 16,3 60 16 6

Accessories: Pin 25x160, galv. Cotter Pin 5/1, galv. Locating Shoe for Articulated Joint KG

0,61 0,03 3,62

026200 022230 027150


60 60

17

17 40 75

15

26,5 130 250 130 316 9 10 6 100 20 110 47 27 17 120 100

100

Accessoires: Pin 16x65/86 (1x) Cotter Pin 4/1 (1x) Pressure Plate Articulated Joint

0,20 0,03 4,22

018050 018060 102988


17

Hex. Bolt ISO 4016 M 16x280-4.6, verz. MU

0,48

103740

Counterplate for Locating Shoe

1,46

027160

34

PERI Formwork Engineering

120

60

Weight kg Item no. Pin 25x160, galv. For Post Extension KG 180 and KG 240, and Connector ZAH/KG. 0,61 026200
25 6,5 44 135 10 160 110 88 67 16 5,5 60 45 16 5 25 65 120 48 600 4/5 1300 1120 24

Accessories: Cotter Pin 5/1, galv. Pin 16x65/86, galv.

0,03 0,20

022230 018050

Accessories: Cotter Pin 4/1, galv. Pin 16x42, galv. Accessories: Cotter Pin 4/1, galv. Cotter Pin 5/1, galv. For Pins 25 to 40mm. Cotter Pin 4/1, galv. For Pins to 25mm.

0,03 0,09

018060 027170

0,03 0,03 0,03

018060 022230 018060

Bracket KG 130 With welded-on Handrail Post. Can also be moved as a complete platform unit, when two or more are combined using scaffold tube and Swivel Couplings.

37,50

026180

12 40

200

50

100

35

26

80

200 17

1260

5 48

50

17 118 230 250 240 240 80

100

Assembled formwork may not be braced against the bracket.

238

240

13

PERI Formwork Engineering

85 9

30

35

Weight kg Item no. Ladder 220/6 Complete with: Hex. Bolt ISO 4017 M 12x40-8.8, galv. with Spring Washer DIN 128 A 12, galv. and Hex. Nut ISO 4032 M12-8, galv.(4x). 14,50 051420
25 400

50

13

390

30

25

298

960
2170 3 x 298 = 894 220 238 20 405 M 12x40 20 130 40

80 40 355

Ladder 180/6 Complete with: Hex. Bolt ISO 4017 M 12x40-8.8, galv. with Spring Washer DIN 128 A 12, galv. and Hex. Nut ISO 4032 M12-8, galv.(4x).

7,15

051410

25

400

1180 50 130 20 20 130 20 405 M 12x40 50 25 325 450 50 79 294 80 710 13 25 1810

Ladder Safety Cage 75, galv. Ladder Safety Cage 150, galv. Complete with: Hex. Bolt ISO 4017 M12x25-8.8, galv. (4x), Clamping plate (4x)

15,50 25,20

104132 051450

36

1500 (750)

M 12x25

220 155

5 x 298 = 1490

1960

95

PERI Formwork Engineering

Weight kg Item no.

120

Ladder Base For preventing the ladders sliding.

2,36

051460
405 50

320

Ladder hook, galv. Only for the lower ladder (2x) Complete with: Hex. Bolt ISO 4017 M 12x25-8.8, galv and. Hex. Nut ISO 4032 M 12-8, galv. (2x).

0,68

103718

SW 19

210

25 100

53 13 M 12x25 9 40 130 550 1140 60 40 340 80 80 80 80 40 80 50 100 30 60 190 7 6 50 730

Sliding Hatch Cover Complete with: Hex. Bolt ISO 4017 M 12x25-8.8, galv. (4x) with Spring Washer DIN 128 A 12, galv. (2x) and Hex. Nut ISO 4032 M12-8, galv. (4x).

38,80

051430

830

53

Side Handrail Post To be screwed to the end of the main beam for supporting end handrails.

6,95

051610

Accessories: Lag Screw 6x80 DIN 571, galv. (5x)

0,01

051640

440

1270

440

50

PERI Formwork Engineering

37

Anchoring KG
Weight kg Item no. Screw-On Cone M 24/DW 20, galv. Thread at formface is M 24. Thread at concrete side is DW 20. Permissible load see Type Test KGF. 1,03 030960

! Important Safety Note: Only anchor the scaffold with components specified by PERI for the purpose!

25

60

65

SW 36

M 24

49

150

DW 20

28

70,4

KK Concrete Cone M24-67/52 scr. For closing anchor points constructed with M24/DW20 screw-on cones. In packs of 50

0,26

031658

67,4

23,5 52

Accessories: 5kg Pack of Sealing Compound Climbing Cone-2 M 24/DW 15, galv. Thread at formface is M 24. Thread at concrete side is DW 15. Permissible load see Type Test KGF.

6,13 1,03

031554 031220

36,2

25

100 4 DW 15

SW 36

M 24

49

50

Accessories: Tie Rod DW 15 Special Length Cutting Cost Tie Rod DW15 / B15 KK Concrete Cone M24-67/52 For closing anchor points constructed with M24/DW15 climbing cones 2. In packs of 50

125

28

70,4

1,44/m

030030 030050 031652


67,4 40,3 23,5 52

0,27

Accessories: 5kg Pack of Sealing Compound Threaded Anchor Plate DW 20

6,13 0,70

031554 030860

65

Permissible load to DIN 18216: 150kN Dep. on conc. strength, embedment depth. Threaded Anchor Plate DW 15 0,60 030840
60 6

Permissible load to DIN 18216: 90kN Dep. on conc. strength, embedment depth.

38

DW 15

27

80

DW 20

100

32

PERI Formwork Engineering

Weight kg Item no. Bolt Anchor Sleeve M 24 Permissible Load * 1,03 026230

! Important Safety Note: Only anchor the scaffold with components specified by PERI for the purpose!
* Since it is not possible to give a generally applicable figure for the load for this sleeve, the permissible load must be worked out taking into account the conditions under which it is to be used.

152 120 8

100 80 10

35

30

12 Cone for anchor bolt sleeve M 24 M24

Accessories: Cone for Bolt Anchor Sleeve M24 Plug 26mm Bolt Anchor Sleeve M24 Cone for Bolt Anchor Sleeve M24 Concrete cover 24 mm

0,01 0,005 0,01

026240 026250 026240


4 18 2

42

29 35 21 26 40 M 24 24 53 70 100 65 6 80 SW 19 M 24

Plug for Bolt Anchor Sleeve M24 For closing the cone for the M 24 bolt anchor sleeve.

0,005

026250

60

Anchor Positioning M 24, galv. For connecting the Bolt Anchor Sleeve M24 or Screw On Cone or Climbing Cone-2 to the plywood form face, when it cannot be drilled.

0,22

026420

26

2,8 4,8

Accessories: 14mm Allen key, long Advancing Bolt M 24, galv. For connecting the Bolt Anchor Sleeve M24 or Screw On Cone or Climbing Cone-2 to the plywood form face, when it can be drilled.

0,45 0,30

027212 029270
34

20

Anchor Positioning Plate 15, galv. When using Advancing Bolt, galv.

0,20

029280
60 45

25

Accessories: Coach Screw 6x20 DIN 571, galv. (4x)

0,005

029440

42

PERI Formwork Engineering

39

RS, RSS Push-Pull Props and Accessories


Weight kg Item no. Kicker Brace AV Adjustable Length L=1.08-1.40m Complete with: Pin 16x42 and Cotter Pin 4/1 (1x). 5,20 028110

RS I min 1800-max 3000 RS II min 2500-max 4100 134 40 16 16 16 10 83 48 41 16 15 4434 10 36 40 16 15 RSS I 1915 RSS II 2775

980

10

Permiss. tension and compr. force: 18kN Push-Pull Props RSS RSS I RSS II
Extended length [m] Permiss. tension and compr. force [kN]

L=2.05-2.94m L=2.91-3.80m

17,30 21,70

028010 028020

2.05 2.25 2.50 2.75 2.94 30 30 26 19 16

Extended length [m] Permiss. tension and compr. force [kN]

2.91 3.00 3.25 3.50 3.80 30 30 25 19 13

RSS I min 2050-max 2940 RSS II min 2910-max 3800

71

Push-Pull Prop RSS III L=4.60-6.00m


Extended length [m] Permiss. tension and compr. force [kN] 4.60 5.00 5.30 5.65 6.00 29 24 20 16 12

38,20

028030

min 4600-max 6000

40

71

PERI Formwork Engineering

70

38

Weight kg Item no. Girder Headpiece 24, galv. For fixing Push-Pull Props and Kicker Braces to the GT 24 Girder. Complete with: Pin 16x42 and Cotter Pin 4/1 (1x). 4,50 028050
136 40 145 14

16x42 FS 4/1

min 40 max 100

Girder Headpiece 24/A, galv. For fixing Push-Pull Props and Kicker Braces to GT 24 Girder, when extended with Extension Splice 24. Complete with: Pin 16x42 and Cotter Pin 4/1 (1x).

4,60

028070

100

145 30 15

16x42 FS 4/1

min 52 max 100

Wedge Headpiece For fixing Push-Pull Props and Kicker Braces to Steel Walers SRZ. Profile U100, U120 and U140. Complete with: Pin 16x42 and Cotter Pin 4/1 (1x).

2,10

028060
100 24 U140 48 U120 27 27 U100 160 222 41

80

14

16x42 FS 4/1

Accessories: Wedge K (1x) TRIO Prop Connector-2 For fixing Push-Pull Props and Kicker Braces to TRIO panels. Complete with: Pin 16x42 and Cotter Pin 4/1.

0,34 3,30

024250 023660

155

170

170

60

104

PERI Formwork Engineering

41

Erection Accessories
Weight kg Item no. Screw-On coupling 48, galv. With M 20x32 bolt welded on. 0,85 017040

SW 30 or 19 spanner. DK 48/48mm Swivel Coupling, galv. 1,22 017010

SW 19 spanner. 48.3x3.2 Scaffold Tube, galv. Cutting costs for Scaffold Tube HB 24 Hook strap, galv. For fixing the GT 24 to the SRZ. HB 24-100/120 For SRZ U100/U120 HB 24-140/160 For SRZ U140/U160 0,61 0,68 024070 024080
152 (U100) 82 20 162 (U120) 172 (U140) 182 (U160)

3,55/m

026415 026417
102

M 8x70 DIN 603

Spare Bolts: M 8x70 MU DIN 603, galv. HB Hook straps, galv. For fixing timbers to the platform beam (max. timber width 100 mm)

0,04

024140

45

98

20

152 (U100)

HB 100/120 For BR sections U100/U120

0,61

024110

162 (U120)

M 8x70 DIN 603

20

118

Hex timber bolts, DIN 571, galv. SW 13 spanner. M M M M 6x20, 6x80, 8x60, 8x80, galv. galv. galv. galv. 0,005 0,014 0,023 0,027 029440 051640 024270 024260

FH bolt, DIN 603 MU, galv. M M M M 6x180, 8x 70, 8x100, 8x125, galv. galv. galv. galv. 0,06 0,04 0,05 0,06 051650 024140 710240 024360

42

PERI Formwork Engineering

Power Tools, Tools


Weight kg Item no. Power-Screwdriver ASSE 636 Electric Power-Screwdriver with reverse action. Voltage: 220V Power: 230W Rev. per min.: 0-450/min Version with 110 voltage upon request. Accessories: Bit Holder for Screwdriver Magnetic Holder Depth Chuck for Screwdriver Bit Point TX 30 Magazin Screwdriver for TSS-Torx Screw. consists of: Power-Screwdriver DSSE 642 Magazine Adapter 3302 Adapter DSSE 642/3302 Bit Point TX 30 Bit for TSS-Torx Screw. Electric Power Wrench M 14, ASB 636 Electric Power-Wrench with reverse action. Voltage: 220V Power: 230W Rev. per min.: 850/rpm Socket 1/2 Version with 110 voltage upon request. Accessories: Extension 1/2 l= 250mm Socket SW 13-1/2 l= 80mm Ratchet Wrench 1/2 Length approx. 270mm 2,10 072080

0,40 0,03 0,11 0,005

072090 072120 072110 072140

2,70 5,50 0,25 0,005

024920 024930 024940 072140

2,90

072150

0,34 0,10 0,56

072160 072170 072180

Extension 1/2" l= 250mm

0,34

072160

Socket SW 13-1/2" L= 80mm

0,10

072170

Allen Key 14mm, long For unscrewing M24, M30 and M36 anchor positioning studs.

0,45

027212

90 Socket spanner SW 36 For tightening and loosening scaffold M24/DW15 climbing cones or M24/DW20 screw-on cones. Length approx. 500mm

2,50

031480

PERI Formwork Engineering

43

BR Shaft Platforms and Accessories


Weight kg Item no. Platform Beam BR As main beam for shaft platforms. Permissible spans see PERI Tables. Platform Platform Platform Platform Beam Beam Beam Beam BR BR BR BR U100 U120 U140 U160 Special Special Special Special Length Length Length Length 21,80/m 28,00/m 32,80/m 38,60/m 020320 020510 020310 020520 With gravity pivot plate With folding bearing plate 25

30

The listed Item No. is for the Platform Beams only. Gravity Pivot Plate, Spacer BR and Crane Eyes BR are to be ordered separately.
120

70 352 45

15

54 300 L 700

60 25

115

10

120

10

140

45

Accessories: BR Spacing (spacing 70mm) BR Crane eye 0,4t (2x) or BR Crane eye 2,5t (2x) High Strength Joint Platform Beam, complete Gravity Pivot Plate BR 2 per Platform Beam. Complete with: Hex. Bolt ISO 4014 M 20x90-8.8, galv. with Spring Washer DIN 128 A 20, galv. and Hex. Nut ISO 4032 M 20-8, galv. (1x).

0,59 2,44 2,00 15,17 10,00

020620 020610 105401 020640 020600

115 70

300 L

130 80 SW 30

237

100 160 700

100 160

65

75

125 437

120

48

M 20x90

45

70

Perm. load: 38kN (when using BR profile U100) See PERI tables.

44

80

PERI Formwork Engineering

52

Weight kg Item no. Folding Bearing Plate 25 For supporting Platform Beams BR. Eliminates the need of wall box-outs. 12,10 020330
234 25 axis of anchorage 140 291 163 258 200 60 52 M 20x90 SW 30 50 85 165 M 20x90 SW 30 30 54 100 10 52 100 62 210 M 20x90 SW 30 45 52 M 24 116 120 100 120 140 70 160 50

Perm. load: 25kN See PERI tables. Accessories: Hex. Bolt ISO 4014 M24x70-10.9 Spacer for Platform Beam BR Max. Spacing e =700mm. Number depends on length of Platform Beams. Complete with: Hex. Bolt ISO 4014 M 20x90-8.8, galv., with Spring Washer DIN 128 A 20, galv., and Hex. Nut ISO 4032 M 20-8, galv. (1x).

0,33 0,59

026430 020620

Crane Eye for Platform Beam BR 0,4t 2 per Platform Beam. Complete with: Hex. Bolt ISO 4014 M 20x90-8.8, galv., with Spring Washer DIN 128 A 20, galv., and Hex. Nut ISO 4032 M 20-8, galv. (2x).

2,44

020610

Load-bearing point Perm. Load: 400kg BR Crane eye 2,5t 2 per Platform Beam. 2,00 105401

Load-bearing point Perm. Load: 2,5t Accessories: Spacer for Platform Beam BR Block Out Box BR Gives the required box-out in the concrete when using Gravity Pivot Plates. 0,59 1,31 020620 020630

350

30

PERI Formwork Engineering

45

VAKATSEITE

VAKATSEITE

1 PERI GmbH Rudolf-Diesel-Strasse 89264 Weissenhorn Phone 07309/950-0 Telefax 07309/951-0 info@peri.de www.peri.de

44 21 23 19

34

36 18 40 46 11 11 6 48 17 22

PERI International
2

1 16 3 31 20 9

32 13 50 43

30

4 25 35 12

2 France PERI S.A.S. Rue Nicphore Nipce 77109 Meaux Tel.: ++ 33 / 1/ 64 35 24 40 Fax: ++ 33 / 1/ 64 35 24 50 peri.sas@peri.fr 3 Switzerland PERI AG Aspstrae 17 8472 Ohringen Tel.: ++ 41 / 52/ 3 20 03 03 Fax: ++ 41 / 52/ 3 35 37 61 info@peri.ch

7 USA PERI Formwork Systems, Inc. Suite 200 7272 Park Circle Drive Hanover, MD 21076 Tel.: ++1 /4 10/ 7 12-72 25 Fax: ++1 /4 10/ 7 12-70 80 www.peri-usa.com 8 Indonesia PT Beton Perkasa Wijaksana P.O. Box 3737 Jakarta 10210 Tel.: ++62 /21/ 5 71 26 44 Fax: ++62 /21/ 5 73 85 64 halims@dnet.net.id

4 Spain PERI S.A. Camino Malatones - km 0,5 9 Italy PERI S.p.A. 28110 Algete / Madrid Via G. Pascoli, 4 Tel.: ++ 34 / 91/ 6 20 48 00 20060 Basiano (MI) Fax: ++ 34 / 91/ 6 20 48 01 Tel.: ++39 /02/ 9 50 78-1> ofic_central@periencofrados.com Fax: ++39 /02/ 95 76 19 14 info@peri.it 5 Belgium / Luxemburg www.peri.it N.V. PERI S.A. Industriepark Nijverheidstraat 6 PB 54 10 Japan Hory Corporation 1840 Londerzeel 11-17 Fuyuki, Kohtoh-Ku Tel.: ++ 32 / 52/ 31 99 31 Ishima Bldg., 9F Fax: ++ 32 / 52/ 30 08 30 Tokyo 135-0041 Tel.: ++81 /3/ 38 20 88 71 6 Netherlands Fax: ++81 /3/ 56 21 70 24 PERI B.V. frbk6541@mb.infoweb.or.jp v. Leeuwenhoekweg 23 Postbus 304 5480 AH-Schijndel 11 United Kingdom PERI Ltd. Tel.: ++ 31 / 73/ 5 47 91 00 Market Harborough Road Fax: ++ 31 / 73/ 5 49 36 51 Clifton upon Dunsmore info@peri.nl Rugby, CV23 OAN Tel.: ++44 /17 88/ 86 16 00 Fax: ++44 /17 88/ 86 16 10 www.peri.ltd.uk

16 Austria 12 Turkey PERI Ges.mbH PERI Kalip ve Iskeleleri Industriegelnde 152 San. Tic. Ltd. Sti. Postfach 1 Cakmakli Ky Kars s Mevkii 3131 Getzersdorf Sanbir Bl. 4.Blge 9.Cadde No: 133 Tel.: ++43 / 27 83 / 41 19 Bykcekmece / Istanbul Fax: ++43 /27 83/ 41 19-20 Tel.: ++90 /2 12/ 8 86 74 01(02)-(09) peri_austria@aon.at Fax: ++90 / 2 12 / 8 86 74 15 www.peri.com.tr 17 Czech Republic PERI spol. s r.o. 13 Hungary P.O. Box 3 PERI Kft. 252 42 Jesenice / Prahy Zdor u. 4. Tel.: ++420 /2/ 41 09 03 11 1181 Budapest Fax: ++420 /2/ 41 09 03 15 Tel.: ++36 /1/ 2-960 920 info@peri.cz Fax: ++36 /1 / 2-960 950 info@peri.hu 18 Denmark www.peri.hu PERI DANMARK A/S Fabriksparken 52 14 Malaysia 2600 Glostrup PERI-HORY MALAYSIA Tel.: ++ 45 / 43 / 45 36 27 Formwork SDN. BHD. Fax: ++ 45 / 43 / 45 36 87 Unit19-07-4, Level 7 peri@peri.dk Damansara Heights Plaza Kelanamas, 19 Finland 19 Jalan Dungun PERI Suomi Ltd. Oy 50490 Kuala Lumpur Periistentie 61 Tel.: ++60 / 3 / 20 93 68 23 05200 Rajamki Fax: ++60 / 3 / 20 92 58 76 Tel.: ++358 /9/ 27 66 06-0 perihory@po.jaring.my Fax: ++358 /9/ 27 66 06-66 info@perisuomi.fi 15 Singapore PERI-HORY ASIA 20 Croatia Formwork Pte. Ltd. RADIUS Oplate No. 1 Sims Lane # 06-10 II Maksimirsko naselje 1/6 Singapore 387355 10000 Zagreb Tel.: ++65 / 67 44 29 89 Tel.: ++ 385 / 1 / 2 30 42 66 Fax: ++65 / 67 44 36 93 Fax: ++ 385 / 1 / 2 30 42 66 pha@periasia.com

21 Norway PERI NORGE AS Industriegata 11 3400 Lier Tel.: ++ 47 / 32/ 24 17 00 Fax: ++ 47 / 32/ 24 17 01 info@peri.no www.peri.no 22 Poland PERI Sp.z o.o. ul. Stoeczna 62 05-860 Pochocin Tel.: ++ 48 / 22 / 7 21 74 00 Fax: ++ 48 / 22 / 7 21 74 01 info@peri.pol.pl 23 Sweden PERIform SVERIGE AB Kllngsvgen 5 Box 5006 14105 Huddinge Tel.: ++ 46 / 8 / 4 49 46 60 Fax: ++ 46 / 8 / 97 21 01 peri@periform.se 24 Korea PERI (Korea) Ltd. Korea Road Safety Authority Bldg., 9. Fl. 300-11,Yomgok-dong, Seocho-ku, Seoul 137-170 Tel.: ++ 82 / 2 / 34 60 18 00 Fax: ++ 82 / 2 / 5 57 53 82 peri11@chollian.net 25 Portugal PERIcofragens Lda. Largo da Lagoa, 14-A 2795 Linda-a-Velha Tel.: ++ 351 / 21 / 4 14 62 30 Fax: ++ 351 / 21 / 4 14 32 75

48

46 38 45

7 41 49 39 42 37 29 14 15 8 27

24 10

47 28 26

33

26 Argentina 30 Romania PERI S.A PERI (Romania) SRL C.P. 68 Ruta Nacional No. 9, km 47,5 (Panamericana Ramal Escobar) Bucuresti DN (1625) Escobar / Prov. Bs. As. 1km 20 + 150m - ILFOV Tel.: ++54 /34 88/ 42 81 00 Balotesti / Bucuresti Fax: ++54 /34 88/ 42 30 21 Tel.: ++40 /1/ 2 66 24 19 info@peri.com.ar Fax: ++40 /1/ 2 66 24 20 27 Brazil PERI Formas e Escoramentos Ltda. Passagem Abar, 1.502 06300-000 Carapicuba So Paulo Tel.: ++55 /11/ 41 86 10 41 Fax: ++55 /11/ 41 86 10 41 peribr@zaz.com.br www.peribrasil.com.br

35 Greece PERI Hellas Ltd. Leof. Messogion 317 & Lokridos 152 31 Chalandri / Athen Tel.: ++30 / 10 / 6 72 91 21 Fax: ++30 / 10 / 6 72 91 42 info@perihellas.gr

31 Slovenia 36 Latvia VIA TEH Ltd. Goran Opali s. p. Matisa 49-3 technologije in storitve 1009 Riga Obrena 137 Tel.: ++371 / 7 61 60 32 2000 Maribor Fax: ++371 / 7 61 40 44 Tel.: ++386 /2/ 4 21 52 40 www.peri.lv Fax: ++386 /2/ 4 21 52 41

32 Slovakia 37 United Arab Emirates PERI (L.L.C.) PERI spol. s r.o. Brashy Plaza, Office No. 212 Vajnorsk 135 Shk. Zayed Road 28 Chile 831 04 Bratislava P.O. Box 27933 PERI Chile Ltda. Tel.: ++421 /2/ 4 92 09-1 11 Dubai C /Jos de San Martin 104 Fax: ++421 /2/ 4 92 09-1 10 Tel.: ++971 / 4 / 3 39 44 94 Parque Industrial Los Libertadores info@peri.sk Fax: ++971 / 4 / 3 39 44 34 Colina, Santiago de Chile perillc@perime.com 33 Australia Tel.: ++56 /2/ 4 44 60 00 Fax: ++56 /2/ 4 44 60 01 PERI Australia Pty. Ltd. perich@peri.cl 116 Glendenning Road 38 Canada www.peri.cl Glendenning NSW 2761 PERI Formwork System, Inc. Tel.: ++61 /2/ 88 05 23 00 63 B Progress Court 29 Philippines Fax: ++61 /2/ 96 75 72 77 Brampton, L6S 5X2 PERI GmbH www.periaus.com.au Ontario Regional Headquarter Tel.: ++1 / 9 05 / 7 92 80 00 4-B Sycamore Center, Fax: ++1 / 9 05 / 7 92 99 42 34 Estonia Alabang-Zapote Road www.peri.ca B-Erivorm AS Corner Buencamino Street, Kalmistu tee 22 Alabang Muntinlupa 11216 Tallinn Metro Manila Tel.: ++372 /6/ 77 11 00 Fax: ++372 /6/ 77 11 22 Tel.: ++63 /2/ 8 09 34-01 (02) (03) Fax: ++63 /2/ 8 09 17 68 helmut@skyinet.net

39 Lebanon 43 Bulgaria PERI GmbH PERI BULGARIA EOOD 9 -11; Gebedje Str. Lebanon Representative Office 1612 Sofia / Bulgaria AYA Center, 7th floor Tel.: ++3 59 / 2 / 9 15 19 55 P.O. Box 90416 Fax: ++3 59 / 2 / 9 15 19 66 Antelias / Beirut Tel.: ++ 961 / 1/ 24 33 65 44 Iceland Fax: ++ 961 / 1 / 24 33 67 Merkur HF fady.abdo@peri.de Skutuvogi 12a 104 Reykjavik 40 Lithuania Tel.: ++ 354 / 5 68 10 44 AB IMSAS Fax: ++ 354 / 5 68 99 58 Buivydiskiu Street 22 2010 Vilnius 45 Kazakhstan Tel.: ++ 370 / 2 / 42 81 00 PERI Kalip ve Iskeleleri Fax: ++ 370 / 2 / 42 81 02 Almaty Branch Office Furmanova Strae, 65 41 Morocco Bro 412 Corner Makataeva PERI S.A. 480004, Alma Ata Route de Rabat, km. 5 Tel.: ++ 7 / 32 72 / 33 00 72 Piste de Beni Touzine Fax: ++ 7 / 32 72 / 33 91 16 Tanger perialmaty@peri.com.tr Tel.: ++ 212 / 39 31 75 48 Fax: ++ 212 / 39 31 75 49 46 Russian Federation 42 Israel PERI GmbH Krasnopresnenskaja PERI Formwork Naberezhnaja 12 Engineering Ltd. Hotel Mezhdunarodnaja 2 16 Moshe Dayan st. Nr. 1312 P.O. Box 10202 123610 Moskau Kiriat Arie Tel.: ++7 / 0 95/ 2 58 23 49 Petach Tikva 49002 Fax: ++7/ 0 95/ 2 58 23 50 Tel.: ++ 972 / 3 / 9 24 93 32 peri_moskau@yandex.ru Fax: ++ 972 / 3 / 9 24 93 31 info@peri-il.com

47 South Africa PERI Wiehahn (Pty.) Ltd. P.O. Box 2668 Bellville 7535 Tel.: ++ 27 / 21 / 9 05 18 15 Fax: ++ 27 / 21 / 9 05 47 07 team@wiehahn.co.za www.periwiehahn.co.za 48 Ukraine TOW PERI Ukraina T 23, M. Raskowoj Str. 02002 Kiew Tel.: ++ 380 / 44 / 2 38 83 57 Fax: ++ 380 / 44 / 5 17 54 88 49 Egypt PERI GmbH Egypt Branch Office 24 A, Obour Gardens, 4th floor, apt. #1 Salah Salem Street 11361 Heliopolis / Kairo Tel.: ++ 20 / 2 / 4 04 85 24/26 Fax: ++ 20 / 2 / 4 04 57 84 peri@link.com.eg 50 Jugoslavia PERI GmbH Tina Ujevica 8 11060 Belgrad Tel.: ++ 381 / 11 / 12 24 20 vladacujic@yahoo.de

49

The PERI Delivery Program


Panel Formwork TRIO, TRIO-L, TRIO 330 Versatile panel system HOUSING REPLIABLE DOMINO Light weight panel system HANDSET The "one man" panel system Girder Wall Formwork VARIO GT 24 Wall, column formwork RUNDFLEX and GRV Circular formwork FTF Facade formwork Shoring Systems ST 100 Stacking tower HD 200 Heavy duty prop PERI MULTIPROP The Alu prop PERI PEP Prop PEP = PERI EURO-PROP Climbing Formwork KG and CB Climbing systems ACS Self climbing formwork SKS and SSC Single sided climbing formwork Scaffolding UP T 70 / T 100 Frame scaffolding UP Rosett Modular scaffolding UP Rosett Shoring Further Systems ELPOS, Software for formwork planning Plywood Site equipment Brace frames Formwork accessories Custom forms Column Formwork RAPID Alu column formwork TRIO Column formwork QUATTRO The fast column formwork PERI SRS Circular column formwork Girder Slab Formwork MULTIFLEX Girder slab formwork UNIPORTAL / Table Modules Table form PD 8 1 system for 3 applications Platform Systems Folding Platform FB 180 Universal working and protective scaffold to DIN 4420 ASG 160 The light platform system for building trades Alu-Slab Formwork PERI SKYDECK Alu slab formwork system

PERI GmbH P.O. Box 12 64 89259 Weissenhorn Tel.: 0 73 09 / 9 50-0 Fax: 0 73 09 / 9 51 -0 info@peri.de www.peri.de

pr 5.10 e 05/2002 5ma Art. Nr.: 791366

pr 5.10 e 04/2002 5ma Art. Nr.: 791366

Climbing scaffolds KGF 240 and KGF 180

Designed for safety on high structures.

product range 5.10

Edition 05/2002 PERI GmbH Postfach 12 64 89259 Weissenhorn Tel.: 0 73 09 / 9 50 -0 Fax: 0 73 09 / 9 51 -0 info@peri.de www.peri.de

Other PERI climbing formwork and platform systems: - CB 240 and CB 160 climbing scaffolds - SKSF 240 and SKS 180 Dam climbing formwork - FB 180 Folding platform - ASG 160 Working and protection scaffold - ACS Self-climbing formwork

Important notes: Our products are to be used in accordance with the relevant national and European safety regulations. The illustrations in this brochure are photographs of real site situations. Safety or formwork anchor details are therefore not to be taken as a definitive guide to the way the equipment is to be used. Safety precautions and allowable loads are to be strictly observed. Separate structural calculations are required for any deviations from the standard design data. The information contained herein is subject to technical change in the interests of progress.