Measurement Sheet
NAME OF THE PROJECT NAME OF THE CONTRACTOR BILL NO : : : Road Project From Jorabat (Km.0) to Shillong (Barapani) (Km.61.800) Anjani Construction 3 PROJECT CODE: W.O./P.O. NO. DATE :
TP-ME-10-003
RIL/PRW/WO/TP-ME-10003/01 & 04
30/4/2012
Sl No
Item Description
Nos
Length
Width
Depth
Quantity
Remarks
a)
scalping
scalping
Page 1 of 5
#NA#
#NA#
#NA#
#NA#
Mining of Rock boulders (0-5520mm) by drilling,blasting,breaking,loading and transportation to crusher hopper with a lead a 1km. Mining of Rock boulders (0-5520mm) by drilling,blasting,breaking,loading and transportation to crusher hopper with a lead a 1km.for Headman Quary
tonne
600000
23749.2
8150.580
31899.780
130
3,087,396
1,059,575
4,146,971
tonne
7000
6952.610
6952.610
195
1,355,759
1,355,759
3,087,396
2,415,334
5,502,730
Accepted by
Quantity Surveyor
Manager-Planning & QS
AGM (F &A)
Project Head
Contractor
TDS RIL/PRW/WO/TP-ME-10-003/01 & 04 2.000% Work Contract Tax Retention RIL/PRW/WO/TP-ME-10-003/01 & 04 5% labour access RIL/PRW/WO/TP-ME-10-003/01 & 04 1% Material Recovery 5 a) Cement b) Steel c) Aggregate d) Pipe Stores Recovery 6 a) Diesel 7 Machinery Hire Charges ] 8 Cash Advances 9 Royalty Paid on behalf of S/Cont TOTAL RECOVERIES RECOVERIES IN THIS BILL IN WORDS: #NAME? Prepared by Checked by
216118 Approved by
193,227
409,344 Accepted
Quantity Surveyor
Manager-Planning & QS
Manager ( F & A)
Project Head
Contractor
SD 120767 2,222,108
TDS 48307
1 2 3 4
Gross value of this bill Total Recoveries in this bill Net value in this bill Recommended for payment Prepared by Checked by
: : : :
Quantity Surveyor
Manager-Planning
Manager (F & A)
Project Head
Contractor
Project Head
PC Accounts :
Approved by RH
CONTRACTOR
Issue No.: 1
Rev No: 0