Version 1.0
Observation / Remark Ok
Procedure: There 2 power supplies for 2 PEM cards, But the OLT can work with one power supply. Switch off one PEM card power and check for redundancy
02. Verification of Insertion Loss check of different types of Splitters . Refer Annexure-1
Procedure: Here we have to check the insertion loss for 1490 nm and 1310 nm. Checking insertion loss for 1490 nm: Connect the splitter input from the any of the EPM card ports. Make the port up by below configuration.
# no shut Check the output of the all the splitter ports with 1490nm power meter.
Checking insertion loss for 1310 nm: Connect the splitter input from 1310nm source, and check all the splitter outputs with 1310 nm
03. Verification of Insertion Loss check at WDM
This is not applicable to you, as the related equipment(Configuration-B) is not supplied to the Kerala SSA
04. Verification of Optical Power Measurement & Rx sensitivity of Uplink(Back haul) & PON Port of OLT Verification of Optical Power Measurement & RX Sensitivity of ONT
Refer Annexure-1
Ok
Ok
05.
Ok
06.
Optical Power Budget Management with 1 No. of Refer 1x32 Splitter Annexure-1 Verification of power supply check at ONT Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1
Ok
07.
Ok
08.
Ok
09.
Verification of VoIP
Ok
10.
Verification of IPTV
Ok
11.
Verification of RFOverlay
Ok
12.
Procedure: Redundancy towards uplink is called Link Aggregation. The below is the configuration for making redundancy between GE8/1 and GE8/2.
telnet@BBS4000>enable telnet@BBS4000# configure terminal telnet@BBS4000(Config-t) interface link-aggregation 1 #load-balance src-mac #description "GEM_LAG" # member ge8/1 # member ge8/2 #no shutdown
13.
Refer Annexure-1
Ok
Procedure: The PON Redundancy is called PON Protection. Here we can perform the redundancy test for the same card for PORT 1 & PORT 2, PORT 3 & PORT 4, not for any other combinations. Connect the 2 redundant ports to the 2x4 splitter, Take the O/P of the splitter to the ONU. Please do the below configuration in OLT.
telnet@BBS4000>enable telnet@BBS4000# configure terminal
telnet@BBS4000(Config-t)#slot epon 1 telnet@BBS4000(Config-t-slot-epon-1)#ponprotection 1 After doing the above configuration . Make triple services active. During the triple services are running , plug out one I/P of splitter cable . The services should not get disturbed.
15.
Refer Annexure-1
Ok
17.
Ok
18.
Ok
19.
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1 Refer Annexure-1
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Ok
Hardware conformity for all equipments including EMS, tools, As per P. O. & Spares, Testers and valid licensed software for operating B.O.M. systems Software conformity check Software release is to be verified with the referred document As per P. O. & B.O.M.
1X4 (Rack Mountable)------------------------------------------------Or any other type Details of Fibers used Vendor Technology Total Capacity that OLT can support e.g M/s ICOMM Tele ltd. GEPON from UTStarcom ( 11EPM card x 4port per card=44 ports x 64 ONT per port & 10KM Distance) 2816 ONTs =5 EPM cards x 4 ports per card x32 ONTs per port & 20KM distance: 640 ONTs
Total Capacity that OLT can support which is offered for A/T
This can be Observed from LCT, when the ONU is registered with OLT in ONU Round Trip tab
Distance from Splitter to ONT Avg 60 70 mtrs.
OLT
GEM Card 2 Nos EPM Card 5 Nos CSM Card 2 Nos XGM Card 2 Nos . Fan Tray 1 No.
Not Applicable
ACU 1 No.
Other Accessories like fiber patch panel, Ethernet Switch, terminal monitor/KVM switch, Alarm panel etc as per PO
VoIP connectivity detail (V- 5.2 SIP gate way etc)
Sl. No. 2
Item
Model
EMS Server
EMS client
Configuration detail- H/W and S/W equipped Configuration detail- H/W and S/W equipped Model No. And User Interface detail Model No. And User Interface detail
Dell PC.
Same
LCT
Not Applicable
10 EDFA Make/Model
Not Applicable
11 Optical Transmitter Make/Model
Not Applicable
PART E
Description
Procedure
1550nm
Not Applicable
1550nm
1550nm
PART F Connectivity Details Note the Connectivity details of Switch card of OLT to Tier II. and IP allotment detail
Management IP address Your OLT IP Address given by NOC Bangalore. 109
Management VLAN Management Gateway Set Top Box IP Pool Multicast Server IP HSI VLAN
VLAN:
1805
ANNEXURE 1
Sl. No.
01.
Procedure 1. Connect Power supply Fee d A and Feed B to external power source (From exchange -48V D.C Power)
3. Measure the DC voltage (i/p should be given between -40v to- 60v) : Reading Noted : -52.6 Volts 4. Capacity of the inverter installed for Equipments working on 230V
6. Check for Redundancy of -48 Volts DC in the BBS-4000 : Redundancy Checked & found OK. 7. Alarm extensions to the EMS when one of the DC power source is down
4) Insertion loss on forward path (1410nm) Refer Annexure-II 1 x 32 - Refer attached annexure 1 x 4 - Refer attached Annexure 1x 8 - Deployed in field 1 x 16 - Deployed in field 2x4 Refer Attached annexure.
5) Insertion loss on return path (Feeding 1310nm from Optical source) ) Refer Annexure-II 1 x 32 - Refer attached annexure 1 x 4 - Refer attached Annexure 1x 8 - Deployed in field 1 x 16 - Deployed in field 2x4 Refer Attached annexure
03.
1) Connect the OLT EPM port & RF-overlay to WDM Equipment
Not Applicable to Config-A 2) Measure the power at the Input of the WDM Equipment (Wavelength = 1490nm) at OLT Port Not Applicable to Config-A
3) Measure the power at the output of the WDM Equipment (wavelength = 1490nm) at ONT Port - 2.48 dBM
Spec: 0.65dbm
5) Measure the power at the Input of the WDM Equipment (Wavelength = 1550nm) at RF Port 19.64 dBM
Result: 0dBM
Spec: 0.65dbm
04.
1) Measure the Tx power at the OLT PON Ports( 1490nm)
Make the Ports up for EPON cards and check with 1490 nm . The sample reading are given below
Port 1. 4.52 dBM
Specification: Nominal +2.5dbm (+2 to +7dbm) Results as per specification 2) Measure the Tx power at the Uplink Port (Backhaul) of the Switch card 1Gb( A Port)
Make the Gigal-Ethernet Port Administratively Up and check the Power readings with 1550nm power meter. The sample readings are given below
Port 1. -1.16 dBM
3) Measure the RX Power at the Uplink port(Backhaul) of the switch card (B Port) 1Gb
Connect the Attenuator between RPR Switch and GEM Card and vary the attenuation as per below power levels
Checked at -23 dBM All services OK.
4) Measure the Tx power at the Uplink(Backhaul) Port of the Switch card ( A Port) 10Gb if equipped
1) Power on ONT
4) Introduce variable optical attenuator for ONT Verify the lower threshold point and Check all the services at lower threshold point
Introduce a variable optical attenuator between EPM card and ONU and pls do the above configuration for adding and activating ONU, and check the ONU registration for below specification of Power Levels. Result : working up to -33.3 dbm
Specification : -25.5dbm
06.
1. Downstream for 1490. Power budget for Physical length of 20KM between OLT &ONT OLT Tx power X dBm-(-ONT Lower threshold Y dBm )-Splitter loss Z in dB = M dB Cable length in Kms=M/0.33
2. Upstream for 1310 ONT Tx power X dBm-(- OLT lower threshold Y dBm )-Splitter loss Z in dB = N dB Cable length in Kms=N/0.43
2) Measure the output voltage Type A -4AH for ONT 404i Reading - AC On : 13.5 V, AC off : 12.8 V
08.
1. Add and activate the ONT
2. Activate all the services viz VOIP, IPTV, RF Overlay and HSI service
09.
1. Add and activate 2 ONTs
10.
1. Add and activate ONTs
5. Note the Zapping time with adjacent channels and with distant channel
12.
1. Add and activate ONTs
13.
1. Configure protection for EPM card1 and EPM card 2 2. Add and activate the ONTs
14.
1. Configure protection for EPM card1/port1 and EPM card 1/port2
15.
1. Configure protection pack 2. Add and activate the ONTs
5. Remove the PON Fiber from the splitter common port (2X4) which is active and restore it on another input port of 2x32 splitter
16.
1. Add and activate the ONTs
17. 18.
Check the LED indications of ONT and functionality OK Check the LEDs in the CSM card Power Run Hotswap Active Alarm Critical Major Minor Verified & OK 2 Check the LEDs in the EPM Card Power Run Hotswap Alarm Verified & OK 3 Check the LEDs in the GEM card Power Run Hotswap Alarm Verified & OK 1
19 a.
EM S NO T Inst alle d
2. Add an OLT into the EMS Topology and double click the OLT icon to Open Device Manager.
3. Add an ONT (Search and Register) 4. Installation and configuration of EPM card/GPON ports/ONTs created per port should be available in graphical view in EMS
5. Access the ONT by clicking on the ONT from CPE Management Menu of OLT Device Manager.
19 b.
1. Login into EMS Server thru EMS client. 2. Double click the OLT icon to Open Device Manager.
5. Activate and deactivate any one of the services namely VoIP, IPTV,HSI and RF-Overlay to any selected ONT
1. From EMS Topology, Double click the OLT icon to Open Device Manager 2. Select ONU Configuration tab from ONU ONU Configuration, now select the ONT and click Modify.
Verified with time stamp & date . Checked Alarm History also. Completed the Test as per above procedure & found OK.
19 e.
1. Add and activate ONT 2. Pull out the fiber at the EPMs PON port
3. Check in the EMS the green color link (in ONU Topology view.) for the ONT since it is up
4. Power off the ONT 5. Power Switch off alarm will be reported from ONT and PON ONT Link turns yellow in ONU Topology view.
6. Power ON the ONT and same alarm will clear after ONT is UP; Link again turns green in (in ONU Topology view).
1. From EMS Topology, Double click the OLT icon to Open Device Manager 2. Select ONU OpticalTX Diagnosis tab from ONU ONU Management and see the TX and RX Optical Powers.
Completed the Test as per above procedure & found OK. Following is the remark: When the power cross threshold values it would be appreciable if it is shown in different color for easy identification of the failure, even without going to alarm management.
19 h.
1. System Configuration for NTP Server and SNMP Trap Destination. IP Configuration and OLT & various boards reset.
4. PON Configuration for EPM PON port settings. Change PON PORT Admin State as Up/Down (or lock/unlock)
5. ONU Configuration for ONT registration and activation (& deactivation) VLAN Configuration for Services and ONT FEC Configuration
9. Radius Configuration
19 i. 1. From Tools menu Select GEPON Service Management ONU Management and OPEN ONU Device Manager
2. Select the ONT and click Device Manager to open ONT Device Manager.
5. Check the system status from EMS 6. Reboot ONT from EMS Card Level, Port Level, ONT Level support may be checked
k. 2. Click Refresh button to see the updations in various performance counters for OLT and ONT.
3. Logout and login with the old password. Should not be able to login
19 m.
1. Create various Roles with low, middle and high level privileges
2. Create a user and assign this role(with low privileges) to the user
4. Check only those actions are possible that were assigned to the low level user. Similarly verify for middle and High level users
19 n.
6. Email to be seen at the configured email account (For testing EMAIL server configured & integrated internally witin EMS server mail is received by an user on generation of Alarm.
7. Calendar management : 7.1 NE File management: OLT configuration save/backup & restore and node reset can be scheduled for once or periodically automatically. 7.2: Batch Discovery: EMS can be scheduled to search and add OLT available in the network. 7.3: Archive Management: To purge the old and excess data from database table
1. Open Alarm view and create customized view to see/export/print current alarms.
2. Open History Alarm view and create customized view to see/export/print history alarms.
3. Open Log management view, choose the search criteria and see/export/print Operations/Inventory/Session logs.
Completed the Test as per above procedure & found OK. Typical Customized report is attached.
19 p.
3. Backup/restoration
4. User creation/deletion
3. Re login and Restore the configuration from the EMS to the OLT and reboot the system
5. Check the configuration back up to and restoration from external storage like CD drive
19 r.
3. Perform various OLT and ONT configurations and see the results.
Annexure II
The Insertion Loss measurement for various splitter types in the upstream and downstream directions.
0.6 db connector loss to be reduced from the attenuation values. Upstream: Path loss Sending level at 0.11 dbm for wavelength at 1310nm at Individual ports COM PORT 1 Feeding at Port RX LEVEL(dbm) Attenuation(db) COM PORT 2 RX Level(dbm) Attenuation(db)
1 2 3 4 Specification
Upstream: Path loss Sending level at 0.37dbm for wavelength at 1310nm at individual ports COM PORT 1 Feeding at Port 1 RX LEVEL(dbm) -6.64 Attenuation(db) 7.01
2 3 4 Specification
Upstream: Path loss Sending level at ..... dbm for wavelength at 1310nm at individual port COM PORT 1 Feeding at Port 1 2 4 6 RX LEVEL(dbm) Attenuation(db)
Upstream: Path loss Sending level at .......dbm for wavelength at 1310nm at Individual port
COM PORT 1 Feeding at Port 1 2 4 8 10 12 14 15 16 Specification 14.1 dB (including connector loss) RX LEVEL(dbm) Attenuation(db)
25 30 32 Specification
Upstream Path loss: Sending level at ...0.11.dbm for wavelength at 1310nm at individual port COM PORT 1 Measured at Port 1 2 5 10 15 20 25 30 32 Specification RX LEVEL(dbm) 16.82 16.6 17.15 16.45 16.15 17.10 16.32 16.83 16.11 Attenuation(db) 16.93 16.71 17.26 16.56 16.26 17.21 16.43 16.94 16.22