Вы находитесь на странице: 1из 7

QCS

Q
2010

Ackn
nowledgem
ments

Page 1

CONTENTS

SECTION
S
2 ---------------- BUILDING DEMOLITIO
D
ON
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Building Dem
molition
Part
P 3 ------------------------- Hazardous Materials
M
SECTION
S
3 ---------------- GROUND IN
NVESTIGAT
TION
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Boreholes
Part
P 3 ------------------------- Pits and Tre
enches
Part
P 4 ------------------------- Soil Samplin
ng
Part
P 5 ------------------------- in-Situ Testing, Instrume
entation and Monitoring
Part
P 6 ------------------------- Laboratory Testing
T
SECTION
S
4 ---------------- PILING
Part
P 1 ------------------------- General Req
quirements ffor Piling Wo
ork
Part
P 2 ------------------------- General Req
quirements ffor Concrete Piles
Part
P 3 ------------------------- Precast Reinforced and Prestressed
d Concrete Piles
Part
P 4 ------------------------- Precast Reinforced Con crete Segme
ental Piles
Part
P 5 ------------------------- Bored Cast--In-Place Pile
es
Part
P 6 ------------------------- Bored Piles Constructed
d Using Conttinuous Flight Augers andd Concrete or
o Grout
Injection Through Hollow
w Auger Stem
ms

QCS
S 2010

Arab engineering bureau

SECTION
S
1 ---------------- GENERAL
Part
P 1 ------------------------- Introduction
Part
P 2 ------------------------- Use and Ma
aintenance off the Site
Part
P 3 ------------------------- Site Access and Entry o
onto the Site
Part
P 4 ------------------------- Protection
Part
P 5 ------------------------- Interference
e
Part
P 6 ------------------------- Project Mee
etings
Part
P 7 ------------------------- Submittals
Part
P 8 ------------------------ Quality Assu
urance
Part
P 9 ------------------------- Materials
Part
P 10 ----------------------- Health and Safety
S
Part
P 11 ----------------------- Engineers Site
S Facilitiess
Part
P 12 ----------------------- Contractors
s Site Facilitie
es
Part
P 13 ----------------------- Setting Out of the Workss
Part
P 14 ----------------------- Temporary Works
W
and E
Equipment
Part
P 15 ----------------------- Temporary Controls
C
Part
P 16 ----------------------- Traffic Diverrsions
Part
P 17 ----------------------- Project Co-o
ordination
Part
P 18 ----------------------- Other Contrractors
Part
P 19 ----------------------- Regulatory Requirementts
Part
P 20 ----------------------- Clearance of
o the Site
Part
P 21 ----------------------- Inspection and
a Handove
er Procedure
es
Part
P 22 ----------------------- New Techno
ologies and IInnovations

QCS
Q
2010

Ackn
nowledgem
ments

Page 2

Part
P 7 ------------------------- Driven Castt-In-Place Pil es
Part
P 8 ------------------------- Steel Piles
Part
P 9 ------------------------- Steel Sheet Piling
Part
P 10 ----------------------- Static Load Testing Of P
Piles
Testing Piles
Part
P 11 ----------------------- Alternative Methods
M
for T
s
Part
P 12 ----------------------- Reduction of
o Friction on Piles
Part
P 12 ----------------------- Reduction of
o Friction on Piles

SECTION
S
6 ---------------- ROADWOR
RKS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Site Clearan
nce
Part
P 3 ------------------------- Earthworks
Part
P 4 ------------------------- Unbound Pa
avement Matterials
Part
P 5 ------------------------- Asphalt Worrks
Part
P 6 ------------------------- Concrete Ro
oad Paveme
ents
Part
P 7 ------------------------- Vehicle Crash Barriers
Part
P 8 ------------------------- Kerbs, Footw
ways and Pa
aved Areas
Part
P 9 ------------------------- Fencing
Part
P 10 ----------------------- Traffic Signs
s, Markings a
and Studs
Part
P 11 ----------------------- Works in Re
elation To Se
ervices
Part
P 12 ----------------------- Road Lightin
ng
Part
P 13 ----------------------- Traffic Signa
als
Part
P 14 ----------------------- Road Draina
age
Part
P 15 ----------------------- Geosynthetiics
Part
P 16 ----------------------- Miscellaneo
ous
SECTION
S
7 ---------------- GREEN CO
ONSTRUCTIO
ON
Part
P 1 ------------------------- Introduction
Part
P 2 ------------------------- Qatar Susta
ainability Asssessment Sys
stem - QSAS
S

QCS
S 2010

Arab engineering bureau

SECTION
S
5 ---------------- CONCRETE
E
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Aggregates
Part
P 3 ------------------------- Cement
Part
P 4 ------------------------- Water
Part
P 5 ------------------------- Admixtures
Part
P 6 ------------------------- Property Re
equirements
Part
P 7 ------------------------- Batching and Mixing
Part
P 8 ------------------------- Transportatiion and Placcing Of Concrete
Part
P 9 ------------------------- Formwork
Part
P 10 ----------------------- Curing
Part
P 11 ----------------------- Reinforceme
ent
Part
P 12 ----------------------- Joints
Part
P 13 ----------------------- Inspection and
a Testing O
Of Hardened
d Concrete
Part
P 14 ----------------------- Protective Treatments
T
fo
or Concrete
Part
P 15 ----------------------- Hot Weathe
er Concreting
g
Part
P 16 ----------------------- Miscellaneo
ous
Part
P 17 ----------------------- Structural Precast Conc rete
Part
P 18 ----------------------- Prestressed
d Concrete
Part
P 19 ----------------------- Testing of Water
W
Retainiing Structure
es

QCS
Q
2010

Ackn
nowledgem
ments

Page 3

Part
P 3 ------------------------- Energy
Part
P 4 ------------------------- Water [W]
Part
P 5 ------------------------- Indoor Envirronment
Part
P 6 ------------------------- Cultural and
d Economic V
Value

SECTION
S
9 ---------------- MECHANIC
CAL AND EL
LECTRICAL EQUIPMENT
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Submersible
e Pumps
Part
P 3 ------------------------- Centrifugal Sewage
S
Pum
mps (Dry-We
et Well)
Part
P 4 ------------------------- Centrifugal Pumps
P
(Splitt Casing Typ
pe)
Part
P 5 ------------------------- Archimedian
n Screw Pum
mps
Part
P 6 ------------------------- Surge Contrrol System
Part
P 7 ------------------------- Lifting Equip
pment
Part
P 8 ------------------------- Electric and Pneumatic A
Actuators
nt-Carbon Ty
Part
P 9 ------------------------- Odour Control Equipmen
ype
Part
P 10 ----------------------- Odour Control Equipmen
nt-Scrubber Type
Part
P 11 ----------------------- Screening Equipment
E
Part
P 12 ----------------------- Grit Remova
al Equipmen t
Part
P 13 ----------------------- Aeration Equipment
Part
P 14 ----------------------- Air Blowers and Compre
essors
Part
P 15 ----------------------- Settlement Tank
T
Equipm
ment
Part
P 16 ----------------------- Tertiary Treatment Gran
nular Filters
Part
P 17 ----------------------- Sludge Thic
ckening and D
Dewatering Equipment
E
Part
P 18 ----------------------- Mixers and Stirrers
Part
P 19 ----------------------- Chlorination
n Plant Equip
pment
Part
P 20 ----------------------- Washwater Systems
Part
P 21 ----------------------- Miscellaneo
ous Equipme nt
Part
P 22 ----------------------- Ventilation Systems
S
SECTION
S
10
0 --------------- INSTRUMENTATION, C
CONTROL AND
A
AUTOM
MATION
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Telemetry/S
Scada
Part
P 3 ------------------------- Primary Elements
Part
P 4 ------------------------- Panel Moun
nted and Misccellaneous In
nstruments
Part
P 5 ------------------------- Control Panels and Con
ntrol Room Hardware

QCS
S 2010

Arab engineering bureau

SECTION
S
8 ---------------- SEWERAGE
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Earthworks
Part
P 3 ------------------------- Pipes and Fittings
F
Materrials
Part
P 4 ------------------------- Pipeline Insttallation
Part
P 5 ------------------------- Valves, Pen
nstocks and A
Appurtenanc
ces
Part
P 6 ------------------------- Miscellaneo
ous Metal Wo
orks
Part
P 7 ------------------------- Miscellaneo
ous GRP Wo rks
Part
P 8 ------------------------- Protective Coatings
C
and Painting
Part
P 9 ------------------------- Trenchless Pipeline Con
nstruction
Part
P 10 ----------------------- Pipelines Cleaning and Inspection Survey
S
Part
P 11 ----------------------- Sewer Reha
abilitation
Part
P 12 ----------------------- Vacuum Sew
werage Systtem

QCS
Q
2010

Ackn
nowledgem
ments

Page 4

SECTION
S
11 --------------- HEALTH & SAFETY
Part
P 1 ------------------------- Regulatory Document
D
Part
P 2 ------------------------- Safety and Accident
A
Pre
evention Man
nagement / Administration
A
System (S
SAMAS)
SECTION
S
12
2 --------------- EARTHWORKS RELAT
TED TO BUILDINGS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Excavations
s
Part
P 3 ------------------------- Filling
Part
P 4 ------------------------- Utility Trenc
ches
Part
P 5 ------------------------- Installation of
o Protective
e Membranes
s

SECTION
S
14
4 --------------- ROOFING
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Membrane Roofing
R
Part
P 3 ------------------------- Metal and Plastic
P
Roofin
ng
Part
P 4 ------------------------- Roof and De
eck Insulatio
on
Part
P 5 ------------------------- Roofing Tile
es
SECTION
S
15
5 --------------- THERMAL INSULATIO N OF BUILD
DINGS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Building Insulation
Part
P 3 ------------------------- Cold Stores
SECTION
S
16
6 --------------- STRUCTUR
RAL STEELW
WORKS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Materials
Part
P 3 ------------------------- Drawings
Part
P 4 ------------------------- Fabrication
Part
P 5 ------------------------- Welding
Part
P 6 ------------------------- Bolting
Part
P 7 ------------------------- Accuracy off Fabrication
Part
P 8 ------------------------- Erection
Part
P 9 ------------------------- Accuracy off Erected Ste
eelwork
Part
P 10 ----------------------- Protective Treatment
T
SECTION
S
17
7 --------------- METALWORK
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Materials Classification
Part
P 3 ------------------------- Metal Doors
s and Window
ws
Part
P 4 ------------------------- Architectura
al Metal Workk
Part
P 5 ------------------------- Light Metal Support and Cladding Su
upport
Part
P 6 ------------------------- Workmansh
hip

QCS
S 2010

Arab engineering bureau

SECTION
S
13
3 --------------- MASONRY
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Mortar and Grout
G
Part
P 3 ------------------------- Accessories
s
Part
P 4 ------------------------- Unit Masonrry
Part
P 5 ------------------------- Masonry Laying

QCS
Q
2010

Ackn
nowledgem
ments

Page 5

SECTION
S
18
8 --------------- CARPENTR
RY, JOINERY
Y AND IRON
NMONGERY
Y
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Wood Treattment
Part
P 3 ------------------------- Structural Timber (Roug
gh Carpentry)
Part
P 4 ------------------------- Architectura
al Timber (Fin
nished Carpe
entry, Millwork)
Part
P 5 ------------------------- Joinery
Part
P 6 ------------------------- Fasteners and
a Adhesive
es
Part
P 7 ------------------------- Ironmongery
y (Hardware )

SECTION
S
20
0 --------------- DRAINAGE
E WORKS FO
OR BUILDIN
NGS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Internal Drainage Workss
Part
P 3 ------------------------- External Dra
ainage Workks
Part
P 4 ------------------------- Drainage Pipes in Trencches
Part
P 5 ------------------------- Structures Related
R
To D
Drainage Worrk
Part
P 6 ------------------------- Surface Water Drainage
e
Part
P 7 ------------------------- Commission
ning Of Syste
ems
SECTION
S
21 --------------- ELECTRICA
AL WORKS
Part
P 1 ------------------------- General Pro
ovisions for E
Electrical Insttallation
Part
P 2 ------------------------- MV Factory Built Assem
mblies (FBAs
s)
Part
P 3 ------------------------- Protective Devices
D
Part
P 4 ------------------------- Motor Starte
ers
Part
P 5 ------------------------- Variable Speed Controll ers
Part
P 6 ------------------------- Cables and Small Wiring
g
Part
P 7 ------------------------- Conduits an
nd Conduit Bo
oxes
Part
P 8 ------------------------- Trunking
Part
P 9 ------------------------- Cable Trays
s
Part
P 10 ----------------------- Wiring Acce
essories and General Pow
wer
Part
P 11 ----------------------- Light Fittings
Part
P 12 ----------------------- Emergency Lighting
Part
P 13 ----------------------- Telephone Installations
Part
P 14 ----------------------- Structured Cabling
C
Syste
ems
Part
P 15 ----------------------- Electric Mottors
Part
P 16 ----------------------- Power Facto
ory Correctio
on Capacitors
Part
P 17 ----------------------- Standby Die
esel Generattor Set
Part
P 18 ----------------------- Uninterruptible Power S upply System
ms
Part
P 19 ----------------------- Sound and Call
C Systemss
Part
P 20 ----------------------- Elevators/Es
scalators
Part
P 21 ----------------------- Lightning Prrotection
Part
P 22 ----------------------- Earthing and
d Bonding

QCS
S 2010

Arab engineering bureau

SECTION
S
19
9 --------------- PLUMBING
G WORK
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Water Distribution
Part
P 3 ------------------------- Plumbing Piipework in Trrenches
Part
P 4 ------------------------- Cold Water Storage
Part
P 5 ------------------------- Hot Water Storage
S
Part
P 6 ------------------------- Commission
ning of Syste
ems
Part
P 7 ------------------------- Plumbing fo
or Gases

QCS
Q
2010

Ackn
nowledgem
ments

Page 6

Part
P 23 ----------------------- Inspection and
a Testing
Part
P 24 ----------------------- Documentattion Format
Part
P 25 ----------------------- Electrical Identification
Part
P 26 ----------------------- Electromagn
netic Compa
atibility
Part
P 27 ----------------------- Battery and Battery Cha
arger
Part
P 28 ----------------------- Small Enclo
osures
Part
P 29 ----------------------- Underfloor Ducts
D
Part
P 30 ---------------------- Duct Bank and
a Manhole
es
Part
P 31 ----------------------- Power Distribution Transsformers
Part
P 32 ----------------------- 11 kv Switch
hgear
Part
P 33 ----------------------- Actuators

SECTION
S
23
3 --------------- FIRE FIGHT
TING AND F
FIRE FIGHTING SYSTEM
MS
Part
P 1 ------------------------- General
n Systems
Part
P 2 ------------------------- Fire Alarm and
a Detection
Part
P 3 ------------------------- Analogue Addressable F
Fire Alarm Sy
ystems
Part
P 4 ------------------------- Fire Fighting
g System
Part
P 5 ------------------------- Testing and Commission
ning
SECTION
S
24
4 --------------- FINISHES TO
T BUILDIN GS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Lath and Pla
aster
Part
P 3 ------------------------- Dry Lining (W
Wall Board)
Part
P 4 ------------------------- Special Wall Surfaces
Part
P 5 ------------------------- Tiles
Part
P 6 ------------------------- Terrazzo
Part
P 7 ------------------------- Stone Flooring
Part
P 8 ------------------------- Unit Masonrry Flooring
Part
P 9 ------------------------- Floor Screeds and Treattments
Part
P 10 ----------------------- Joints, Caulking and Sea
alants
Part
P 11 ----------------------- Recessed Duct
D
Covers
Part
P 12 ----------------------- Carpeting
Part
P 13 ----------------------- Other Floor Coverings
Part
P 14 ---------------------- Ceilings
SECTION
S
25
5 --------------- GLASS AND GLAZING
G
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Glass
Part
P 3 ------------------------- Workmansh
hip

QCS
S 2010

Arab engineering bureau

SECTION
S
22
2 --------------- AIR CONDITIONING, R
REFRIGERAT
TION AND VENTILATIO
V
ON
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Central Refrrigeration an d Air Conditiioning Equipment
Part
P 3 ------------------------- Unitary Equipment
Part
P 4 ------------------------- Air Handling
g Equipment
Part
P 5 ------------------------- Chilled Wate
er Pipework
Part
P 6 ------------------------- Ductwork an
nd Air-Side E
Equipment
Part
P 7 ------------------------- Thermal Ins
sulation
Part
P 8 ------------------------- Exhaust Fan
ns
Part
P 9 ------------------------- Accessories
s

QCS
Q
2010

Ackn
nowledgem
ments

Page 7

Part
P 4 ------------------------- Glazed Curttain Wall and
d Other Items
s
SECTION
S
26
6 --------------- PAINTING AND
A
DECOR
RATING
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Surface Pre
eparation for Painting
Part
P 3 ------------------------- Primers, Paints and Coa
atings
Part
P 4 ------------------------- Wall Coverin
ngs of Decorrative Papers
s/Fabrics

SECTION
S
28
8 --------------- LANDSCAP
PING
Part
P 1 ------------------------- Landscape Planting
Part
P 2 ------------------------- Landscape Irrigation Sysstem
Part
P 3 ------------------------- Play Equipm
ment Genera
al Specificatio
on

QCS
S 2010

Arab engineering bureau

SECTION
S
27
7 --------------- EXTERNAL
L WORKS
Part
P 1 ------------------------- General
Part
P 2 ------------------------- Block Paved
d Areas
Part
P 3 ------------------------- Fences and Gates
Part
P 4 ------------------------- Fountains and Aquatic F
Features
Part
P 5 ------------------------- Site Furniturre
Part
P 6 ------------------------- Flag Poles
Part
P 7 ------------------------- Protective or
o Shade Covver Systems
Part
P 8 ------------------------- Play Field and Park Equ
uipment
Part
P 9 ------------------------- Miscellaneo
ous Other Ext
xternal Works
s

Вам также может понравиться