Preliminary Data : El
Design Dischrage
83.500 m3/sec
10.730 m
90.425 m2
At
V
500.000 m
0.923 m/sec
Length of Tunnel
Ho
Net Head
hf
15303.0 m
20.00 m
13.373
V = Loss in Tunnel
L
B
Ath
A
t
2
Ho
V
2
*V2=
13.373
15.683
2
1
L * At * V^2
V2 * H * 2g
224.85 m2
2.0 m
449.71 m2
A
s
7000.00 m2
*
Zmax =Vo*sqrt(L*At/g*As)
Po
a)
Zmax + Po / 8,
4.55
c)
3.226
Down Surge as per Calame & Gaden :- Ref. Eq. 56a/85, Page 184
Z Dn
b)
hf / Zmax
4.15 m
7.13
4.76
Say
e)
8.22
500.000 m
Design Dischrage
267.500 m3/sec
10.730 m
90.425 m2
At
V
2.958 m/sec
Length of Tunnel
Ho
Net Head
hf
15303.0 m
20.00 m
13.373
V2 = Losses in Tunnel
L
B
Ath =
A
t
2
1
Ho
V
2
13.373
Therefore, =
1.528
2
1
L * At * V^2
V2 * H * 2g
2307.69 m2
a)
2.0 m
4615.37 m2
7000.00 m2
Zm
f
77.41
Let Zm
6.2
0.49
Zm / ()*Vo^2)
-0.46
-0.03
LHS
0.00
RHS
0.00
6.20 m
ok
A
t
b)
A
s
Discharge
At
90.43 m2
Velocity
2.958 m/sec
Length of Tunnel
15303 m
As
7000.0 m2
Z up
267.50 cumecs
= Zmax(1-2/3Po+1/9 Po^2)
Vo
2.96 m/sec
15303 m
At
90.43 m2
As
hf1
7000.00 m2
Head Losses in the Tunnel
Zmax =Vo*sqrt(L*At/g*As)
Po
13.28 m
hf / Zmax
1.007
Thefore Maximum Up Surge =
c)
d)
13.373 m
5.86 m
4.71 m
0.15
L * At
Ao =
hf * m
2.03
0.93
6.13 m
e)
4.87 m
t ( sec)
0
10
20
30
40
50
60
70
80
90
100
120
140
160
180
200
220
240
240.2
g *( yi+1 + *V^2 ) * t
l
Vi ( m/sec)
2.958
2.958
2.956
2.951
2.944
2.935
2.924
2.912
2.897
2.881
2.864
2.845
2.800
2.751
2.698
2.642
2.582
2.521
2.457
y (m)
0.000
-0.382
-0.382
-0.381
-0.380
-0.379
-0.378
-0.376
-0.374
-0.372
-0.370
-0.735
-0.723
-0.711
-0.697
-0.682
-0.667
-0.651
-0.006
yi (m)
13.373
13.373
12.991
12.609
12.228
11.848
11.468
11.091
10.714
10.340
9.968
9.598
8.863
8.140
7.429
6.732
6.049
5.382
4.731
yi+1 (m)
13.373
12.991
12.609
12.228
11.848
11.468
11.091
10.714
10.340
9.968
9.598
8.863
8.140
7.429
6.732
6.049
5.382
4.731
4.725
*Vi2
13.373
13.373
13.351
13.308
13.246
13.165
13.068
12.955
12.827
12.686
12.533
12.369
11.981
11.564
11.122
10.663
10.191
9.710
9.224
2.50
0.30
fck
Grade of Concrete
25.0
N/mm2
Ec
2.50.E+10
N/m2
2.00.E+10
N/m2
2.19E+09
N/m2
Density of Water
999
kg/m3
1.09
a = [ k / ( ( 1 + ( k/E) * ) ]
1415
m/sec
4640.5
ft/sec
4626.7
ft/sec
Diameter Tunnel
5.55
0.022
Es
2.07.E+11
N/m2
2.07.E+10
N/m2
2.19E+09
N/m2
Density of Water
999
kg/m3
9.62
a = [ k / ( ( 1 + ( k/E) * ) ]
1411
m/sec