Академический Документы
Профессиональный Документы
Культура Документы
Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral
5. Fenestrasi (Disain Fenestrasi: lokasi, besar bukaan yang alami, cahaya, solar heat gain ratio (LT/SC), etc.); 6. OTTV & RTTV: wall _ W/m2; Roof _ W/m2; 7. Pencahayaan Alami (penggunaan diffuse radiation di dalam gedung seperti di hall, atrium, koridor, tempat parkir, toilet, dll., zoning for integrated lighting and daylighting , contrast ratio of brightness); 8. Ventilasi Alami; 9. Konsep disain pasif lainnya.
B. Building Physical Information 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. C. Physical building background Brief history Single function usage or mix function usage (specify) Age of building Any retrofit done? When? What? Total number of storeys Total number of basement floor Number of car park storeys Total gross floor area Surface area of the envelope including the roof to gross floor area ratio Car park area Gross lettable area Air-conditioned area Non-air conditioned area Plot ratio (total GFA / ground area)
Building Design and Practice Information 18. Plants and landscape design/ wind and natural ventilation/ water features/ daylighting/ etc. 19. Facade and shading design: - Type of faade - Color of faade - Use of shading devices
E.
Energy Consumption Information 32. 33. 34. 35. Peak demand (monthly) Energy used (monthly) Typical Load curve (weekdays, weekends) Energy efficiency index*: air-conditioned area ______ kWh/m 2/yr (based on 2,000 operational hours/yr) 36. Energy consumption: Electricity ________ kWh/m2/yr (based on 2,000 operational hours/yr) - Fuel ________ Liters/yr (not for electricity generation)
F.
Energy Management Information 37. Building energy management system Connected physical points _______ (no) 38. Energy saving: Schedule programme ______ kWh/yr Duty cycle programme ______ kWh/yr Optimum start / stop programme ______ kWh/yr Power demand programme ______ kW (mean)
G.
Maintenance Information 39. Maintenance programme - Manpower: ________ man-hr/yr - Maintenance contractor - Availability of energy management engineer - Training of maintenance workers: _____________ cumulative hours/yr.
H. Environmental Impacts 40. Impacts of waste 41. Impacts of pollution (air, noise, visual, exhaust, etc.) I. Additional Information for Retrofitted Buildings 42. Energy savings in air-conditioned area* _______ kWh/m 2/yr (based on 2,000 operational hours/year 43. Energy savings in lighting systems* _________ kWh/m 2/yr (based on 2,000 operational hours/year) 44. Retrofitted area*: _________ % of total area * - mentioned in the pre-qualification criteria
21 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN)
22 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN)
23 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)
24 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)
25 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)
26 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)