Вы находитесь на странице: 1из 26

FORMULIR APLIKASI

Lomba Gedung Hemat Energi Nasional Tahun 2011

KATEGORY: RETROFITTED BUILDING

Batas waktu penyampaian kepada DJEBTKE 31 Maret 2011

Direktorat Jenderal Energi Baru Terbarukan dan Konservasi Energi Kementerian Energi dan Sumber Daya Mineral

1 INFORMASI SINGKAT (NAMA GEDUNG, FOTO, PERUNTUKAN, DLL.)

2 PENGHEMATAN ENERGI KESELURUHAN (DITULIS MAKSIMUM 2 HALAMAN)


Disampaikan secara rinci bagaimana penghematan energi dapat dicapai.

3 PENGHEMATAN ENERGI KESELURUHAN (SAMBUNGAN)

4 DISAIN AKTIF (DITULIS MAKSIMUM 4 HALAMAN)


1. Tata udara (pemilihan, rancangan sistem dan tata letak): __ kW/ton __ W/m 2; 2. Sistem Pencahayaan: _ W/m2; 3. Sistem yang lain (transportasi vertikal, dll.) __W/m 2; 4. Indoor air quality (kenyamanan termal, ventilasi: _ m3/hour/orang, etc.); Konsumsi Energi secara keseluruhan per meter persegi dari lantai ber-ac: __ W/m 2; Konsep disain aktif lainnya (bila ada perlu disampaikan di lembar disain aktif) .

5 DISAIN AKTIF (SAMBUNGAN)

7 DISAIN AKTIF (SAMBUNGAN)

8 DISAIN AKTIF (SAMBUNGAN)

9 DISAIN PASIF (DITULIS MAKSIMUM 4 HALAMAN)


1. Orientasi dan Rancangan Gedung (orientasi gedung, bentuk gedung (surface area to gross floor area ratio), lokasi area servis, letak jalan masuk/pintu, lansekap gedung, ruang untuk aneka fungsi, dll.); 2. Disain Selubung Bangunan (bahan, peneduh, fenestrasi, dll.); 3. Bahan Bangunan (perlindungan terhadap perpindahan panas, perlindungan terhadap kelembaban, MRT effect, warna selubung bangunan, perlindungan dan pengendalian terhadap infiltrasi, dll.); 4. Peneduh (efisiensi peralatan peneduh, penggunaan peralatan efisien,penggunaan peneduh dari bangunan di sebelahnya, dll.); peneduh yang

5. Fenestrasi (Disain Fenestrasi: lokasi, besar bukaan yang alami, cahaya, solar heat gain ratio (LT/SC), etc.); 6. OTTV & RTTV: wall _ W/m2; Roof _ W/m2; 7. Pencahayaan Alami (penggunaan diffuse radiation di dalam gedung seperti di hall, atrium, koridor, tempat parkir, toilet, dll., zoning for integrated lighting and daylighting , contrast ratio of brightness); 8. Ventilasi Alami; 9. Konsep disain pasif lainnya.

10 DISAIN PASIF (SAMBUNGAN)

11 DISAIN PASIF (SAMBUNGAN)

12 DISAIN PASIF (SAMBUNGAN)

13 PERAWATAN DAN PENGELOLAAN


(DITULIS MAKSIMUM 4 HALAMAN) 1. energy management systems (building Energy Management System (BAS), energy consumption monitoring system, etc.); 2. maintenance and management measures (manpower: __ man-hour/year, maintenance contractor, availability of energy management engineer, training of maintenance workers: ___cumulative no. of hours); 3. training programmes (with description, etc.); 4. others (specify).

14 PERAWATAN DAN PENGELOLAAN


(SAMBUNGAN)

15 PERAWATAN DAN PENGELOLAAN


(SAMBUNGAN)

16 PERAWATAN DAN PENGELOLAAN


(SAMBUNGAN)

17 DAMPAK TERHADAP LINGKUNGAN


(1 HALAMAN) waste management; pollution management (air, noise, visual, exhaust, etc.); green/non-toxic materials; others (specify).

18 INFORMASI GEDUNG (DIISI RINCI MAKSIMUM 4 HALAMAN)


A. 1. 2. 3. 4. General Information Name of the building: Name of owner and management company: Address: Tel. No./Fax No./E-mail address:

B. Building Physical Information 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. C. Physical building background Brief history Single function usage or mix function usage (specify) Age of building Any retrofit done? When? What? Total number of storeys Total number of basement floor Number of car park storeys Total gross floor area Surface area of the envelope including the roof to gross floor area ratio Car park area Gross lettable area Air-conditioned area Non-air conditioned area Plot ratio (total GFA / ground area)

Building Design and Practice Information 18. Plants and landscape design/ wind and natural ventilation/ water features/ daylighting/ etc. 19. Facade and shading design: - Type of faade - Color of faade - Use of shading devices

19 INFORMASI GEDUNG (SAMBUNGAN)


20.Location of service core 21.Shape of building 22.Overall heat transfer through building envelope: Wall .. W/m2; Roof .. W/m2 23.Lighting fixtures 24.Lighting load* .. W/m2 (gross floor area) 25.Building air-conditioner system and equipment Fresh air exchange rate: .............. m3/hour/person .............. m3/hour/m2 .............. m3/hour Energy efficiency of aircon chiller: .. kW/ton 26.Cooling Load .. W/m2 (air-conditioned area) D. Operation Information 27. Occupancy rate (year 2001): Minimum .. % of total area 28. Total number of occupants 29. Ownership of building (occupied by owner(s), renter(s), etc.) 30. Building operating schedule - weekdays from _______________ to _______________ - Saturday from _______________ to _______________ - Sunday from _______________ to _______________ - Operating hours/ yr ________ 31. Building indoor environment: Indoor air quality setting: temperature and RH

E.

Energy Consumption Information 32. 33. 34. 35. Peak demand (monthly) Energy used (monthly) Typical Load curve (weekdays, weekends) Energy efficiency index*: air-conditioned area ______ kWh/m 2/yr (based on 2,000 operational hours/yr) 36. Energy consumption: Electricity ________ kWh/m2/yr (based on 2,000 operational hours/yr) - Fuel ________ Liters/yr (not for electricity generation)

20 INFORMASI GEDUNG (SAMBUNGAN)

F.

Energy Management Information 37. Building energy management system Connected physical points _______ (no) 38. Energy saving: Schedule programme ______ kWh/yr Duty cycle programme ______ kWh/yr Optimum start / stop programme ______ kWh/yr Power demand programme ______ kW (mean)

G.

Maintenance Information 39. Maintenance programme - Manpower: ________ man-hr/yr - Maintenance contractor - Availability of energy management engineer - Training of maintenance workers: _____________ cumulative hours/yr.

H. Environmental Impacts 40. Impacts of waste 41. Impacts of pollution (air, noise, visual, exhaust, etc.) I. Additional Information for Retrofitted Buildings 42. Energy savings in air-conditioned area* _______ kWh/m 2/yr (based on 2,000 operational hours/year 43. Energy savings in lighting systems* _________ kWh/m 2/yr (based on 2,000 operational hours/year) 44. Retrofitted area*: _________ % of total area * - mentioned in the pre-qualification criteria

21 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN)

22 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - MAKSIMUM 4 HALAMAN)

23 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)

24 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)

25 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)

26 GAMBAR (UKURAN A3/A4: TYPICAL FLOOR PLAN, SITE LAYOUT, ROOF PLAN, AND VERTICAL CROSS SECTION - SAMBUNGAN)

Вам также может понравиться