Вы находитесь на странице: 1из 6

18.

7 DETAILS OF ELECTRICAL TESTING (During the month):


Any abnormality observed

Sl.No

Test

Unit / Equipment

Corrective Actions Taken / to be taken

Responsibility

GT#1,2,3,4,5 DG Analysis of UAT# 1A/B, UAT#2A/B, UAT#3A/B, UAT#4A/B, Power Transformers UAT#5A/B, ST#1,2,3,4 Thermo Vision Scanning. GEN#1,2,3,4,5 GT#1,2,3,4,5, 220 KV Switchyard, 15.75 Kv bus duct-1,2,3,4,5

Nil.

Nil

Nil

Nil

Others

18.10. ERS COMPLIANCE


COMPLIANCE SCORE FOR THE MONTH : Non compliance since (Date)

Sl.No

Unit

Description

Reason

1&2

1) Keep thyristor panel room cool and dry by Air conditioning Since inception and humidity control in existing stations and new projects Low frequency injection based relays to be installed (wherever Since inception not provided) Low frequency injection based rotor earth fault protection to be Since inception hooked up in class A trip

for better reliability

1&2

for better reliability

1&2

for better reliability

1&5

LBB scheme modification to provide primary breaker re-trip to be implemented at all stations for EHV CBs (other than lines) : All sites to ensure that in case of pick up of LBB relay a trip Since inception command is to be given to the primary breaker as per operation memorandum. Component replacement to increase reliability of Transformers Since inception

for better reliability

for better reliability

6 7 8

1&2 5 1&2

Guide lines for RLA of oil filled Transformers Minimum availability of critical spares as per the list issued by COS To be maitained at site.

Since inception Since inception

Health assessment to keep down time minimum Health assessment

Carry out RLA study on CTs after 15 years of ageing at all Since inception stations

6.10 FAILURE OF TRANSFORMERS:


ACTION PLAN FOR FAILURE OF TRANSFORMERS Description Details of any transformer Failure date & Duration Analysis of reason Action Plan Status of spare transformer Unit-1 Nil Unit-2 Nil Unit-3 Nil Unit-1 Nil

Target Date

Action plan

Respons ibility

Target Date
Unit 2 - at time of next OH / Unit 1 OH Unit 2 - at time of next OH / Unit 1 OH Unit 2 - at time of next OH / Unit 1 OH

Install Pkg AC, DGMPO No EMD 4000024402, 17/06/09 for unitInstall new DGMrelay, Relay on EMD site Install new relay DGMEMD

Unit 5 Numerical relay setting to be provided by PE/COS COPS conservator to be installed in GTs
RLA to be done

DGMEMD

Unit 1 OH 2010

DGMEMD DGMEMD

During next unit-2 O/H Proposal by 30/09/09 , IOM given PO Placed delivery by dec 10. Proposal by 30/09/09.

Spare motor for U5 DGMto be procurred EMD RLA to be done

DGMEMD

Unit-2 Nil

Unit-3 Nil

Unit-4
Nil

Unit-5
Nil

18.8 STATION BATTERY SYSTEM


Unit 1 Parameter No. of Batteries having s pecific gravity <1195 / >1220. No. of Batteries having voltage out of <2.1 V / >2.19 V Specific Gravity & voltage checked by ORT Coordinator * Single Earth Fault in DC System (Y/N) Result of capacity test of batteries in % age with date Unit 2 Unit 3 BANK1 Unit 3 BANK2 Unit 4 BANK1 Unit 4 BANK2 Unit 5 BANK1 Unit 5 BANK2 UPS 25 KVA UNIT 1 UPS 40 KVA UNIT1 UPS 25 KVA UNIT 2 UPS 40 KVA UNIT2 UPS UNIT3 UPS UNIT4 UPS UNIT5

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

NIL

N 100%
Aug'08

N 100%
Jun'07

N 100%
May'08

N 100%
May'08

N 100%
May'09

N 100%
May'09

N 100%
Nov'08

N 100%
Nov'08

N 100%
Aug'08

N 100%
Aug'08

N 100%
May'07

N 100%
May'07

N 100%
April'08

N 100%
May'09

N 100%
Nov'08

Voltage across total Battery Bank 237 238 237 238 *Note: ORT Cordinator to check the above aspects personally (at random)

238

237

237

237

419

421

419

421

421

420

419

18.9 ACTION PLAN FOR ANY ABNORMALITY IN THE BATTERY SYSTEM:


Unit / Battery system Target Date

Problem

Action plan

Responsibility

Present Status in last O/H in May'09 these banks shown 100% capacity due to washing of plates of the cells which shown less capacity in last test. ( PO placed. Material awaited.)

Unit4 SG1/TG1

Battery bank indicated capacity of 95 & 85%

PR Raised. PR No.100019576,Dt.21/04/09, PO No. 4000027146 placed to M/S Exide

DGM(EMD

Next unit 4 O/H

Unit2 G1(-)

Battery Bank capacity 80%

PO No. 4000005984,Dt.08/08/08

DGM(EMD)

Next unit 2 O/H

Material Received.

SWYD 1

SWYD 2

NIL

NIL

NIL

NIL

N 100%
April'09

N 100%
April'09

236

237

Вам также может понравиться