Вы находитесь на странице: 1из 1

TDI Logistics Code Of Practice Title TDI tank truck specification LCOP nr.

Revision : 1 Page 1 of 1
Process owner: Supply Chain Signature: Pont de Claix -

TDI-SPE-99 Date:25/07/08

1 Tank Truck 2 3 4 5 6 7 8 9 10 11 12

Approvals Material Operation Working pressure Calculation pressure Vacuum pressure Working amb.temp. range Heating temp. range Insulation Document box

13 Liquid connection 14 15 16 17 18 19 20 21 23 24 25 26 27

Liquid valve Vapour connection 1 Vapour connection 2 Sample connection Manhole Cleaning nozzle Ladders platform

General operating requirements DEDICATED to TDI SERVICE with top loading and top discharge including 3 internal baffles and external heatcoils. ADR Approval Product : SS 316 Gaskets Europe 4 bar max. RV setting 10 bar 0.4 bar without baffle strength -30 to 50 C 80 C hot water .... with aluminum sheating. 1 with drain holes at bottom side Connections and access requirements DN-50 including diptube incl. tankbottom pit for max. drainage . liquid flange located at top rear side of tank. DN-50, flanged, including stud mounted flange. DN-50 with valve, including blind flange. DN-50 with valve, inluding blind flange for silica dry bed connection. none Min DN 450 flanged on top covered with insulation On each compartment, except the one with manhole. Min 1 at rear yes, on total top surface with hinged railings

UN-2078 teflon 4.5 bar

Temperature control Pressure indicator Relieve valve Rupture disk

28 Earthing 29 30 Markings: 31 32 Labeling: 33 34 Documents: 35 36 37 Min. capacity 38 Inlet

Instrumentation and safety devices 2 digital thermometer located at middle rear side of tank truck; range -20 to + 80 C. yes, 2x digital, flanged; range 0 to 6 bar, including inserted needle valve. 2 flanged safety pressure relieve valve set at 4.5 bar including flame arrestor. between each relief valve and flange with pressure detection, Teflon coated and set at 4.6 bar. 1x top and 1 x bottom earthing Identification and documents Engraved marking plate for CSC -, Custom- and Identity plate Engraved marking plate for: heating coils, earthing and all nozzles. Regulatory labeling UN and product labeling European agreements, certificates and approvals. General arrangement and detail drawings. Heating coils 5 square meters., fabricated from min. 2 mm. thick plate in half pipe shape.
.................. Outlet ...................

39 For Readiness for operation see sheet TDI - OPS - 71

Notes:
40 1) All nozzles ,instruments and safety devices to be installed inside insulated boxes with insulated and 41 sealed covers. All boxes to be equipped with insulated drain pipes from top to bottom .