FUNDAO FLORESTAL
Planilha Oramentria
data base: Outubro/2012
ITEM SUB-ITEM
1
1.1
1.2
1.3
2
2.1
2.2
2.3
2.4
3
3.1
4
4.1
4.2
4.3
DESCRIO
CHURRASQUEIRAS
Mdulo 1 ( 5 quiosques)
Mdulo 2 ( 2 quiosques)
Mdulo 3 ( 3 quiosques)
ESTACIONAMENTO
Adequao bolso 1 principal (com novo porto)
Adequao bolso 2 - Terreno das duas casas
Adequao bolso 3 - rea do lago
Adequao estacionamentos internos (4 bolses)
APARELHOS DE GINASTICA/BRINQUEDOS
Aparelhos (4 conjuntos) incluso montagem + fundao tipo radier
3,568.55
3,110.42
6,028.28
21,589.60
25,701.26
12,034.28
2,331.08
21,934.98
x QDADE
17,842.75
6,220.84
18,084.84
9,324.32
87,739.92
30% BDI
5,352.83
1,866.25
5,425.45
23,195.58
8,087.09
23,510.29
Sub Total 01
54,792.96
6,476.88
7,710.38
3,610.28
2,797.30
28,066.48
33,411.64
15,644.56
12,121.62
Sub Total 02
89,244.30
26,321.98
114,061.90
Sub Total 03
114,061.90
37,000.00
11,100.00
48,100.00
7,500.00
2,250.00
9,750.00
20,000.00
6,000.00
26,000.00
Sub Total 04
83,850.00
Planilha Oramentria
data base: Outubro/2012
ITEM SUB-ITEM
5
5.1
5.2
6
6.1
7
7.1
7.2
DESCRIO
ESTRUTURA TENSIONADA PARA PALCO
Colocao de estrutura em lona tensionada para cobertrura do palco da
concha acstica
Pintura geral da estrutura do palco e arquibancada da concha acstica
CANCELA AUTOMTICA
Cancela automatizada com 6 metros
PLACAS DE OBRA
Instalao de Placas de Obra (1 unidades)
Instalao de Placas de Obra (4 unidades)
x QDADE
30% BDI
56,500.00
16,950.00
73,450.00
4,700.00
1,410.00
6,110.00
Sub Total 05
79,560.00
1,050.00
4,550.00
Sub Total 06
4,550.00
541.21
1,082.42
2,345.24
4,690.48
Sub Total 07
7,035.72
3,500.00
1,804.03
902.02
1,804.03
3,608.06
433,094.87
ITEM
SUBITEM
1
1.1
1.2
1.3
2
2.1
2.2
2.3
2.4
DISCRIMINAO
COBERTURA
Limpeza com hidrojateamento das telhas
Substituio de telhas quebradas
Pintura com Hidrorrepelente incolor fosco a base de gua, para
superficie de telhas cermicas aplicao sob imerso total
REVESTIMENTO
Massa com bianco
Alvenaria de elevao tijolo macio aparente 1/2tijolo
Alvenaria de elevao de 1 tijolo macio aparente
Alvenaria de tijolos refratrio prprio para churrasqueiras
UN
QUANT
TOTAL
m
m
17.97
5.39
1.39
23.84
3.02
15.93
4.41
39.77
79.25
214.40
17.97
6.37
7.20
13.57
243.85
m
m
m
m
4.22
3.30
0.92
1.00
3.30
57.57
117.10
137.81
2.43
49.69
74.28
49.69
5.73
107.26
191.38
187.50
24.18
353.96
176.07
187.50
2.5
4.22
6.37
7.20
13.57
57.27
2.6
6.44
5.40
13.80
19.20
123.65
27.30
3.49
7.20
10.69
291.84
3
3.1
PINTURA
Pintura p/ estruturas de madeira aparente, ripas, caibros, teras,
vigas, pilares, etc. em "Stain" (polistein) impregnante tingido, cor
castanheira, trs demos a pincel.
4.1
4.2
PAISAGISMO
Terra
Grama
m
m
6.40
32.33
79.04
6.10
26.03
2.53
105.07
8.63
672.45
279.01
5.1
LIMPEZA
Limpeza do piso
10.10
0.26
2.08
2.34
23.63
6.1
6.2
BANCO
Mesa de concreto pr-moldado
Banco de concreto pr-moldado
un
un
1.00
2.00
384.85
211.60
11.15
11.15
396.00
222.75
396.00
445.50
3,568.55
17,842.75
5,352.82
23,195.57
ITEM
SUBITEM
1
1.1
1.2
1.3
2
2.1
2.2
2.3
DISCRIMINAO
COBERTURA
Limpeza com hidrojateamento das telhas
Substituio de telhas quebradas
Pintura com Hidrorrepelente incolor fosco a base de gua, para
superficie de telhas cermicas aplicao sob imerso total
REVESTIMENTO
Massa com bianco
Alvenaria de elevao tijolo macio aparente 1/2tijolo
Alvenaria de tijolos refratrio prprio para churrasqueiras
UN
QUANT
TOTAL
24.32
1.39
3.02
4.41
107.25
7.30
23.84
15.93
39.77
290.16
24.32
6.37
7.20
13.57
330.02
m
m
m
4.62
4.62
2.62
3.30
57.57
137.81
2.43
49.69
49.69
5.73
107.26
187.50
26.47
495.54
491.25
2.4
4.62
6.37
7.20
13.57
62.69
2.5
14.45
5.40
13.80
19.20
277.44
3.1
18.41
3.49
7.20
10.69
196.80
3.2
PINTURA
Pintura p/ estruturas de madeira aparente, ripas, caibros, teras,
vigas, pilares, etc. em "Stain" (polistein) impregnante tingido, cor
castanheira, trs demos a pincel.
Pintura do piso
13.62
4.71
9.84
14.55
198.17
4.1
4.2
PAISAGISMO
Terra
Grama
m
m
2.53
34.95
79.04
6.10
26.03
2.53
105.07
8.63
265.83
301.62
5.1
LIMPEZA
Limpeza Final
15.37
4.37
4.37
67.17
3,110.42
6,220.84
1,866.25
8,087.09
ITEM
SUBITEM
1
1.1
1.2
1.3
2
2.1
2.2
2.3
DISCRIMINAO
COBERTURA
Limpeza com hidrojateamento das telhas
Substituio de telhas quebradas
Pintura com Hidrorrepelente incolor fosco a base de gua, para
superficie de telhas cermicas aplicao sob imerso total
REVESTIMENTO
Massa com bianco
Alvenaria de elevao tijolo macio aparente 1/2tijolo
Alvenaria de tijolos refratrio prprio para churrasqueiras
UN
QUANT
TOTAL
40.16
1.39
3.02
4.41
177.11
12.05
23.84
15.93
39.77
479.15
40.16
6.37
7.20
13.57
544.97
m
m
m
7.28
7.28
4.80
3.30
57.57
137.81
2.43
49.69
49.69
5.73
107.26
187.50
41.71
780.85
900.00
2.4
7.28
6.37
7.20
13.57
98.79
2.5
71.04
5.40
13.80
19.20
1,363.97
3.1
22.00
3.49
7.20
10.69
235.18
3.2
PINTURA
Pintura p/ estruturas de madeira aparente, ripas, caibros, teras,
vigas, pilares, etc. em "Stain" (polistein) impregnante tingido, cor
castanheira, trs demos a pincel.
Pintura do piso
25.52
4.71
9.84
14.55
371.32
4.1
4.2
PAISAGISMO
Terra
Grama
m
m
3.06
41.70
79.04
6.10
26.03
2.53
105.07
8.63
321.51
359.87
5.1
LIMPEZA
Limpeza Final
30.00
4.37
4.37
131.10
6.1
BANCO
Banco de concreto pr-moldado
un
1.00
211.60
11.15
222.75
222.75
6,028.28
18,084.85
5,425.45
23,510.30
ITEM SUB-ITEM
1
1.1
DESCRIO
UN.
QUANT.
PSERV
P.TOTAL
120.00
72.08
8,649.60
2.1
Limpeza
Limpeza de superfcie com hidrojateamento
1,150.00
3.06
3,519.00
3.1
3.2
3.3
Pintura
Pintura de sinalizao, para faixas demarcatrias
Vaga de deficiente
Sinalizao com pictograma em tinta acrlica - letras
m
m
un
285.00
25.00
15.00
1.96
35.87
30.92
558.60
896.75
463.80
un
3.00
524.15
1,572.45
20.00
296.47
5,929.40
4
4.1
5
5.1
Placas
Sinalizao vertical em placa de ao galvanizada com pintura em esmalte
sinttico
Porto
Instalao de novo porto metlico nos moldes do porto existente
TOTAL
BDI = 30%
TOTAL + BDI
21,589.60
6,476.88
28,066.48
ITEM SUB-ITEM
1
1.1
DESCRIO
UN.
QUANT.
PSERV
P.TOTAL
151.00
72.08
10,884.08
2.1
Limpeza
Limpeza de superfcie com hidrojateamento
1,452.00
3.06
4,443.12
3.1
3.2
3.3
Pintura
Pintura de sinalizao, para faixas demarcatrias
Vaga de deficiente
Sinalizao com pictograma em tinta acrlica - letras
m
m
un
365.00
30.00
18.00
1.96
35.87
30.92
715.40
1,076.10
556.56
un
4.00
524.15
2,096.60
20.00
296.47
5,929.40
4
4.1
5
5.1
Placas
Sinalizao vertical em placa de ao galvanizada com pintura em esmalte
sinttico
Porto
Instalao de novo porto metlico nos moldes do porto existente
TOTAL
BDI = 30%
TOTAL + BDI
25,701.26
7,710.38
33,411.64
ITEM SUB-ITEM
1
1.1
DESCRIO
UN.
QUANT.
PSERV
P.TOTAL
22.00
72.08
1,585.76
2.1
Limpeza
Limpeza de superfcie com hidrojateamento
780.00
3.06
2,386.80
3.1
3.2
3.3
Pintura
Pintura de sinalizao, para faixas demarcatrias
Vaga de deficiente
Sinalizao com pictograma em tinta acrlica - letras
m
m
un
135.00
12.50
12.00
1.96
35.87
30.92
264.60
448.38
371.04
un
2.00
524.15
1,048.30
20.00
296.47
5,929.40
4
4.1
5
5.1
Placas
Sinalizao vertical em placa de ao galvanizada com pintura em esmalte
sinttico
Porto
Instalao de novo porto metlico nos moldes do porto existente
TOTAL
BDI = 30%
TOTAL + BDI
12,034.28
3,610.28
15,644.56
ITEM SUB-ITEM
DESCRIO
UN.
QUANT.
PSERV
P.TOTAL
1.1
1.2
Limpeza
Limpeza de superfcie com hidrojateamento
Limpeza de meio fio com hidrojateamento
m
m
375.00
42.00
3.06
3.06
1,147.50
128.52
2.1
2.2
2.3
Pintura
Pintura de sinalizao, para faixas demarcatrias
Vaga de deficiente
Sinalizao com pictograma em tinta acrlica - letras
m
m
un
95.00
5.30
5.00
1.96
35.87
30.92
186.20
190.11
154.60
un
1.00
524.15
524.15
3
3.1
Placas
Sinalizao vertical em placa de ao galvanizada com pintura em esmalte
sinttico
TOTAL
TOTAL PARA 4 BOLSES
BDI = 30%
TOTAL + BDI
2,331.08
9,324.32
2,797.30
12,121.62
ITEM
SUBITEM
DISCRIMINAO
UN
QUANT
P.U.MAT
P.U.M.O
1.1
unid
1.00
3,480.00
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
1.10
1.11
1.12
1.13
unid
unid
unid
unid
unid
unid
unid
unid
unid
unid
unid
vb
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2,528.00
1,288.00
1,460.00
1,385.00
2,415.00
2,599.00
1,035.00
820.00
400.00
260.00
1,640.00
1,300.00
2.1
2.2
FUNDAO
Fundao do tipo radier em concreto armado FCK 20MPa
Ao CA-50 DN 10 mm
m
m
7.28
7.28
3.30
57.57
3.2
PINTURA
Pintura do piso da fundao na cor branca
25.52
5.1
LIMPEZA
Limpeza Final
30.00
P.U.SERV
TOTAL
3,480.00
3,480.00
2,528.00
1,288.00
1,460.00
1,385.00
2,415.00
2,599.00
1,035.00
820.00
400.00
260.00
1,640.00
1,300.00
2,528.00
1,288.00
1,460.00
1,385.00
2,415.00
2,599.00
1,035.00
820.00
400.00
260.00
1,640.00
1,300.00
2.43
49.69
5.73
107.26
41.71
780.85
4.71
9.84
14.55
371.32
4.37
4.37
131.10
21,934.98
87,739.93
26,321.98
114,061.91