CALCULO DE LA RED DE ALCANTARILLADO

Material :

PVC.

Nmero de Buzones :
Nmero de Tramos :

Coef. Manning :

COTAS
Cota

1550.94
155.86
153.32
154.86
154.93
154.10
153.38
153.34
153.33
153.40
153.54
155.56
156.33
157.26
158.21
158.88
160.23
162.60
166.10
166.44
166.34
167.29
169.81
172.77
175.30
174.94
176.00
176.82
177.75
165.65
164.29
164.73
165.03

0.0100

Buzn
Aguas
Arriba

Buzn
Aguas
Abajo

-29
28
27
26
25
24
23
22
21
20
19
18
17
16
15
14
13
12
11
10
9
19D
19C
19B
19A

Longitud Total :

Longitud
Horizontal
Parcial

28
60.49
27
68.85
26
53.42
25
29.00
24
33.85
23
70.00
22
70.00
21
70.00
20
29.20
19
70.00
18
70.00
17
70.00
16
70.00
15
70.00
14
70.00
13
54.37
12
38.21
11
70.00
10
70.00
9
70.00
TANQUE SEPTICO
30.00
19C
63.30
19B
79.41
19A
71.90
19
71.90

Lacum.

60.49
129.34
182.76
211.76
245.61
315.61
385.61
455.61
484.81
554.81
624.81
694.81
764.81
834.81
904.81
959.18
997.39
1067.39
1137.39
1207.39
1237.39
286.51
223.21
143.80
71.90

Und.
Tramos
mts.

33
21
1523.90

Cota de
Terreno
Arriba

10

177.75
176.82
176.00
174.94
175.30
172.77
169.81
167.29
166.34
166.44
166.10
162.60
160.23
158.88
158.21
157.26
156.33
155.56
153.54
153.40
153.33
165.03
164.73
164.29
165.65

Poblacin :
Descripcin :
Clima :

Profundidad
Buzn

Abajo

Arriba

Abajo

11

12

13

176.82
176.00
174.94
175.30
172.77
169.81
167.29
166.34
166.44
166.10
162.60
160.23
158.88
158.21
157.26
156.33
155.56
153.54
153.40
153.33
153.34
164.73
164.29
165.65
166.10

1.20
1.20
1.20
1.20
1.80
1.20
1.20
1.20
1.20
1.50
3.80
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.50
1.85
1.00
1.10
1.15
2.95

1.20
1.20
1.20
1.80
1.20
1.20
1.20
1.20
1.50
2.90
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.20
1.50
1.85
2.05
1.10
1.15
2.95
3.80

214.000
Rural
Verano

Dotacin:
K1 :
K2 :

Cota Fondo
de Buzn
Arriba

14

176.55
175.62
174.80
173.74
173.50
171.57
168.61
166.09
165.14
164.94
162.30
161.40
159.03
157.68
157.01
156.06
155.13
154.36
152.34
151.90
151.48
164.03
163.63
163.14
162.70

15

175.62
174.80
173.74
173.50
171.57
168.61
166.09
165.14
164.94
163.20
161.40
159.03
157.68
157.01
156.06
155.13
154.36
152.34
151.90
151.48
151.29
163.63
163.14
162.70
162.30

17.0000

0.0000
0.0696
0.1488
0.2102
0.2436
0.2825
0.3630
0.4435
0.5240
0.5576
0.9676
1.0481
1.1287
1.2092
1.2897
1.3702
1.4327
1.4767
1.5572
1.6377
1.7182
0.0000
0.0728
0.1641
0.2468

Tramo

18

0.0696
0.0792
0.0614
0.0334
0.0389
0.0805
0.0805
0.0805
0.0336
0.0805
0.0805
0.0805
0.0805
0.0805
0.0805
0.0625
0.0439
0.0805
0.0805
0.0805
0.0345
0.0728
0.0913
0.0827
0.0827

Q md :
Q mh :

(lts/seg)
Arriba

16

1.54%
1.19%
1.98%
0.83%
5.70%
4.23%
3.60%
1.36%
0.68%
2.49%
1.29%
3.39%
1.93%
0.96%
1.36%
1.71%
2.02%
2.89%
0.63%
0.60%
0.63%
0.63%
0.62%
0.61%
0.56%

lts/hab. x diaQ p

Gasto Aguas

(0/0)

Abajo

250.000
1.300
2.000

( pulg)
Abajo

19

0.0696
0.1488
0.2102
0.2436
0.2825
0.3630
0.4435
0.5240
0.5576
0.6381
1.0481
1.1287
1.2092
1.2897
1.3702
1.4327
1.4767
1.5572
1.6377
1.7182
1.7527
0.0728
0.1641
0.2468
0.3295

20

6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00
6.00

0.619
0.805
1.238

lts/seg.
lts/seg.
lts/seg.

Gasto

Velocidad

Tubo Lleno

Tubo Lleno

( Q0 )

( V0 )

21

22

25.6100
22.5406
29.0945
18.7896
49.3184
42.4724
39.1887
24.0615
17.0936
32.5638
23.4197
38.0045
28.6832
20.2068
24.0615
27.0129
29.3202
35.0862
16.3752
15.9987
16.4371
16.4187
16.2245
16.1574
15.4055

1.4039
1.2357
1.5950
1.0300
2.7036
2.3283
2.1483
1.3191
0.9371
1.7852
1.2839
2.0834
1.5724
1.1077
1.3191
1.4809
1.6073
1.9234
0.8977
0.8771
0.9011
0.9001
0.8894
0.8858
0.8445

qi :
0.0005
Qtc : 1.75269074
qu : 0.00115014

Q/Q0

Cuadro
Y

23.0000

0.0027
0.0066
0.0072
0.0130
0.0057
0.0085
0.0113
0.0218
0.0326
0.0196
0.0448
0.0297
0.0422
0.0638
0.0569
0.0530
0.0504
0.0444
0.1000
0.1074
0.1066
0.0044
0.0101
0.0153
0.0214

lts/seg/mt.
lts/seg.
lts/seg/mt.

V/V0

Velocidad
Real

26

27

d/D

Tirante
Real
(d)

28

29

25

24

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
2
2
1
1
1
1

3
7
8
14
6
9
12
22
33
20
45
30
43
64
57
54
51
45
91
8
7
5
11
16
22

0.0584
0.1752
0.2044
0.313
0.146
0.2336
0.299
0.3658
0.4054
0.355
0.4374
0.3962
0.4322
0.4787
0.465
0.459
0.453
0.4374
0.645
0.5491
0.5478
0.1168
0.292
0.327
0.3658

0.082
0.216
0.326
0.322
0.395
0.544
0.642
0.483
0.380
0.634
0.562
0.825
0.680
0.530
0.613
0.680
0.728
0.841
0.579
0.482
0.494
0.105
0.260
0.290
0.309

0.0184
0.0552
0.0644
0.1016
0.046
0.0736
0.0952
0.1264
0.1514
0.1208
0.1718
0.1456
0.1684
0.2002
0.1904
0.1862
0.182
0.1718
0.334
0.2515
0.251
0.0368
0.092
0.108
0.1264

0.1104
0.3312
0.3864
0.6096
0.276
0.4416
0.5712
0.7584
0.9084
0.7248
1.0308
0.8736
1.0104
1.2012
1.1424
1.1172
1.092
1.0308
2.004
1.509
1.506
0.2208
0.552
0.648
0.7584

RELACION DE CAUDALES
Esdecali_23@hotmail.com

Q/Q0

Relacin

0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0

V/V0

Q/Q0

Relacin

0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0

d/D

Q/Q0

Relacin

0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0

R/R0

1
2
3
4
5
6
7
8
9
10
11

0.000
1
0.0292
0.5400
0.6560
0.7290
0.7960
0.8500
0.9000
0.9450
0.9840
1.0180
1.0410

0.010
11
0.2920
0.5530
0.6640
0.7320
0.8020
0.8550
0.9030
0.9510
0.9870
1.0210
1.0420

0.020
21
0.3620
0.5700
0.6730
0.7400
0.8060
0.8600
0.9080
0.9950
0.9900
1.0240
1.0420

0.030
31
0.4000
0.5800
0.6800
0.7500
0.8100
0.8650
0.9130
0.9580
0.9930
1.0270
1.0420

0.040
41
0.4270
0.5900
0.6870
0.7550
0.8160
0.8700
0.9180
0.9610
0.9970
1.0300

0.050
51
0.4530
0.6000
0.6950
0.7600
0.3220
0.8750
0.9220
0.9650
1.0010
1.0330

0.060
61
0.4730
0.6130
0.7000
0.7680
0.8300
0.8800
0.9270
0.9690
1.0050
1.0360

0.070
71
0.4920
0.6240
0.7060
0.7760
0.8340
0.8950
0.9310
0.9720
1.0070
1.0380

0.080
81
0.5050
0.6340
0.7130
0.7810
0.8400
0.8900
0.9360
0.9750
1.0110
1.0390

0.090
91
0.5200
0.6450
0.7300
0.7870
0.8450
0.8950
0.9410
0.9800
1.0150
1.0400

1
2
3
4
5
6
7
8
9
10
11

0.000
1
0.0092
0.2480
0.3450
0.4200
0.4980
0.5630
0.6250
0.6920
0.7560
0.8250
0.9140

0.010
11
0.0920
0.2530
0.3530
0.4310
0.5040
0.5700
0.5320
0.6990
0.7630
0.8350
0.9200

0.020
21
0.1240
0.2700
0.3620
0.4390
0.5100
0.5760
0.6390
0.7050
0.7700
0.8430
0.9310

0.030
31
0.1480
0.2800
0.3700
0.4470
0.5160
0.5820
0.6450
0.7100
0.7780
0.8530
0.9420

0.040
41
0.1650
0.2890
0.3790
0.4520
0.5230
0.5880
0.6510
0.7190
0.7850
0.8600

0.050
51
0.1820
0.3980
0.3850
0.4600
0.5300
0.5940
0.6580
0.7240
0.7910
0.8680

0.060
61
0.1960
0.3080
0.3930
0.4680
0.5360
0.6010
0.6600
0.7320
0.7980
0.8760

0.070
71
0.2100
0.3150
0.4000
0.4760
0.5420
0.6090
0.6720
0.7380
0.8040
0.8840

0.080
81
0.2200
0.3230
0.4090
0.4820
0.5500
0.5150
0.6780
0.7430
0.8130
0.8930

0.090
91
0.2320
0.3340
0.4170
0.4880
0.5570
0.6200
0.6860
0.7500
0.8200
0.9000

1
2
3
4
5
6
7
8
9
10
11

0.000
1
0.0239
0.5860
0.7690
0.8950
1.0070
1.0790
0.1360
1.1750
1.3030
1.2120
1.1720

0.010
11
0.2390
0.6060
0.7800
0.9070
1.0140
1.0870
1.1390
1.1790
1.3050
1.2100
1.1540

0.020
21
0.3150
0.6300
0.7950
0.9190
1.0210
1.0940
1.1430
1.1820
1.3080
1.2070
1.1500

0.030
31
0.3700
0.6250
0.8090
0.9310
1.0390
1.1000
1.1470
1.1840
1.3110
1.2040
1.1360

0.040
41
0.4100
0.6680
0.8240
0.9380
1.0350
1.0700
1.1510
1.8800
1.3140
1.2020

0.050
51
0.4490
0.8680
0.8360
0.9500
1.0430
1.1130
1.1550
1.1900
1.3160
1.2000

0.060
61
0.4810
0.7040
0.8480
0.9520
1.0500
1.1210
1.1600
1.1930
1.3190
1.1970

0.070
71
0.5100
0.7160
0.8600
0.9740
1.0560
1.1250
1.1630
1.1950
1.3190
1.1950

0.080
81
0.5300
0.7290
0.8740
0.9830
1.0650
1.1290
1.1670
1.1970
1.3150
1.1920

0.090
91
0.5540
0.7480
0.8860
0.9920
1.0730
1.1320
1.1720
1.2000
1.3140
1.1900

DISEO DE TANQUE SPTICO


01 Periodo de retencion Hidraulica (PR)
PR= 1,5 - 0,3 log (Pf x Q)
Poblacion Servida
Tasa de Crecimiento (%)
Peridodo de Diseo
Poblacin Futura
Caudal de aporte unitario de aguas residuales, litros/(habitante x dia)
El periodo de retencion es de 6 horas

Pr:
Pa:
Tcr:
T:
Pf:
Q:

0.23
174
1.20
20
214
80

dias
hab.
%
aos
hab.
litros/(habitante x dia)

Pr:

0.25 dias

Vs:

4.28 m3

Vd:
N:
ta:

7.49 m3
1 aos
70 litros/(habitante x ao)

04 Volumen de natas (Ve, en m3)


Como valor se considerar un volumen minimo de 0.7 m3

Ve:

0.70 m3

05 Profundidad de digestion y almacenamiento de lodos (Hd, en m)


Hd= Vd / A

Hd:

0.62

06 Profundidad mxima de espuma sumergida (He, en m)


He= 0,7 / A

He:

0.23

02 Volumen requerido para la sedimentacin (Vs, en m3)


Vs= 10-3 x ( Pf x Q) x PR

03 Volumen de digestion y alamcenamiento de lodos (Vd, en m3)


Vd= ta x 10-3 x P x N
Intervalo deseado en aos, entre operaciones sucesivas de remocin de lodos
Tasa de acumulacin de lodos expresada en L/(hab x ao)

Intervalo entre
ta (L/hab x ao)
limpieza del tanque
T 10 C 10 < T 20 C T > 20 C
sptico (aos)
1
94
65
57
2
134
105
97
3
174
145
137
Normas legales, El Peruano domingo 11 de Junio del 2006

Largo
b
Ancho
a
A: rea superficial del tanque septico den m2

6.00
2.00

07 Profundidad libre de espuma sumergida


Distancia entre la superficie inferior de la capa de espuma y el nivel inferior de la TEE de salida o cortina deflectora del dispositivo de salida
del tanque sptico, debe tener un valor mnimo de 0,10 m.

08 Profundidad libre de lodo (Ho, en m)


Ho= 0,82 - 0,26 x A
Ho, esta sueto a un valor minimo de 0.30m.

Ho: -2.30
Ho:

0.30

09 Profundidad mnima requerida para la sedimentacin (Hs, en m)


Hs= Vs / A

0.36

10 Profundidad de espacio libre minimo total (Hl min, en m)


Hl min= 0,1 + Ho

0.40

11 Profundidad de espacio libre (Hl, en m)


Comprende la superficie libre de espuma sumergida y la profundidad de lodos.
Seleccionar el mayor valor, comparando la profundidad del espacio libre minimo total (Hl min) con la profundidad mnima requerida para
la sediemntacion (Hs)
Hl: 0.40

12 Profundidad neta del tanque sptico


La suma de las profundidades de natas, sedimentacion, almacenamiento de lodos y profundidad libre de natas sumergidas
Ht= Hd + Hl + Ho
Ht: 1.26

CAMPOS DE PERCOLACIN
01 Clasificain de terrenos
Pr:
CLASIFICACIN DE TERRENOS SEGN RESULTADOS DE PRUEBA DE PERCOLACIN
Pa:
Clase de Terreno
Rapidos
Medios
Lentos

#NUM!

dias
824 hab.

Tiempo de Infiltracin
para el descenso de 1 cm.
de 0 a 4 minutos
de 4 a 8 minutos
de 8 a 12 minutos

Cuando el terreno presenta resultados de prueba de percolacion con tiempos mayores a 12 minutos no se consideran aptos para la disposicion de efluentes de los tanques spticos.
02 Distancia de los tanques Spticos campos de percolacion, pozo de absorcion a las viviendas, tuberias de agua, pozos de abastecimiento y cursos de agua superficiales
Tipo de Sistemas

Distancia minima en metros


Pozo de agua Tuberia de aguaCurso superficial
Vivienda
Tanque Sptico
15
3 ----Campo de percolacin
25
15
10
6
Pozo de absorcin
25
10
165
6
03 El tanque sptico y el campo de percolacin estarn ubicados aguas debajo de la captacin de agua, cuando se trate de pozos cuyos niveles estaticos esten a menos de 15m de profundidad

04 Area util del campo de percolacin sera el mayor valor entre las areas del fondo y de las paredes laterales, contabilizandolas desde la tuberia hacia abajo.
El area de absorcin se estima por medio de la siguiente relacin
A= Q / R
A: Area de Absorcin (m29
Q: Caudal promedio, efluente del tanque sptico (L/dia)
R: Coeficiente de Infiltracion (Lt/m2/dia)
La profundidad de la zanja se determinara deacuerdo con la elevacion del nivel freatico y la tasa de percolacion.
La profundidad minima de la zanja se de 0.60m procurando mantener una separacion minima de 2.00m. Entre el fondo de la zanja y el nivel freatico.
El ancho de las zanjas estar en funcin de la capacidadd de percolacion de los terrenos y podr variar entre un minimo de 0.45m. y un maximo de 0.90m.
La longitud de la zanja se determinara de acuerdo con la tasa de percolacion y el ancho de las zanjas, el cual podra variar entre un minimo de 0.45m.
Y un maximo de 0.90m. La configuracion de las zanjas podra tener diferentes diseos dependiendo del tamao y la forma de la zona de eliminacion disponible, la capacidad requerida y la topografia del area.
La longitud maxima de cada linea de drenes; sera de 0.30m. Todas las lineas de drenaje seran de igual longitud, en lo posible.
Todo campo de absorcion tendra como minimo dos lineas de drenes. El espaciamineto entre los ejes de cada zanja tendra un valor minimo de 2.00m.
La pendiente minima de los drenes sera de 1.5 por mil y un valor maximo de 5 por mil.

POZOS DE ABOSORCIN
01 Cuando no se cuente con area suficiente para la instalacion del campo de perforcion, o cuando el suelo sea impermeable dentro del primer metro de profundidad, existiendo estratos favorables a la infiltarcion, se podra usar pozos de absorcin.
02 El area efectiva de absorcin del pozo lo constituye el area lateral del cilindro (excluyendo el fondo). Para el clculo se considerar el diametro exterior del muro y la altura quedara fijada por la distancia entre el punto de ingreso de los liquidos y al fondo del pozo
03 La capacidad del pozo de absorcion se calcular en base a las pruebas de infltracin que se hagan en cada estrato, usandose el promedio ponderado de los resultados para definir la superficie de diseo.
04 Todo pozo de absorcion debera introducirse por lo menos 2.00m. En la capa filtrante, siempre y cuando el fondo del pozo quede por lo menos a 2.00m. Sobre el nivel maximo de la capa fretica.
05 El diametro minimo del pozo de absorcin sera de 1.00m.