Ejemplo de diseo: Edificio Placas

EJEMPLO DISEO DE PLACAS


Prof.: Ing. Alejandro Muoz

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

PLANTA DE LA EDIFICACIN 2do piso.


27.00 m

15.00 m

13.00 m
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

10.00 m
ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

Modelo en ETABS

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

Caractersticas de la planta Piso 1 2 3 4 5 6 7 8 9 rea 487.27 374.29 362.82 362.82 362.82 362.82 362.82 362.82 362.82

Estimado del Peso 1er 2do 3er 4to 5to 6to 7mo 8vo 9no Total Peso 487.27 374.29 362.82 362.82 362.82 362.82 362.82 362.82 362.82 3401.30
ye

Anlisis ssmico Parmetros Z = U = S = Rxx = Ryy = 0.4 1 1 6 4.5 V esttico

V=
Cx: Cy:

ZUCS P R
2.5 1.1 566.9 755.8
ye

V x: V y:
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

P = 3401 Tn

Espectro de aceleraciones NTE-030 (funcin) x (factor) = (S C) x ( ZU/R g)

Factor =
Resultados:

ZU g R

Factor X: Factor Y:

0.654 0.872

XX YY

Period T 0.282 0.908

C V est V din 2.50 567 390 1.10 333 270

90% V.est. 510 300

f 1.31 1.11

( 0.654)
ye

Desplazamientos Desplazamientos Derivas mximas Mximos Azotea Relativos X(cm) Y(cm) X(cm) Y(cm) X(cm) Y(cm) 2.21 10.90 0.31 1.43 1.13 5.19
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

DISEO Placa PL1A

DISEO Placa PL1A


Flexo-compresin PM=319 ton PV=66 ton

P (ton) M33 (ton-m) Sismo x Sismo y


/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

2.5 33.3

2080 634

P1 = { 1.25 ( M + V ) + S ; M33 } = ( 483 ; +2080 ) P2 = { 0.9 M S ; - M33 } = ( 285 ; -2080 )


ye

13.00 m
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

Predimensionamiento por Cortante

Vu = 133ton

Predimensionamiento por flexin


As cabezas = 2080 / ( 4.2 x 13 ) vertical local

Vc = Acw.(c.fc) = 0.85 x (1320 x 0.85 x 25) x (0.17 x 3.19 x210) = 187Ton

= 38 20 = 18 cm / cabeza

Vu < Vc mnimo 3/8 @ .45 en dos capas As vertical mnimo = 0.0025 x 2500 = 6.25 cm/ml = 3/8 @ .225 en dos caras As horizontal mnimo = 3/8 @ .225 en dos caras
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

13.00 m

Probando con :

As cabezas = 65/8 Mn = 4500 ton-m

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

DIAGRAMAS DE INTERACCION M3-3


Mn (tn.m ) -7500 -5000 -2500 0 2500 5000 7500 3500.0 3000.0 2500.0 2000.0 1500.0 1000.0 500.0 0.0 -500.0 -1000.0
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

Diseo final por corte


Vu= 133 x (4500 / 0.9) / 2080 = 319 ton

3/8 @ .20 en dos caras

Pn (tn)

3/8 @ .20

65/8

3/8 @ .20

65/8

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

DISEO Placa PL-04

SISMO YY:

PM = 556 ton PV = 128 ton PS = 397 ton MS = 1888 ton

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

SISMO YY:
Vu = 256 ton

Pre diseo por cortante

3
- M22

Vc = Acw.(c.fc) = 0.85 x (350 x 2 x 25 x 0.85) x (0.17 x 3.19 x210) = 99 Ton


Vs = 185 ton en dos ramales
3.50 m

2
T
PM = 556 ton PV = 128 ton

C
5.30 m

s = 0.71 x 2 x 4.2 x 300/ (185/2)

PS = 397 ton

3/8 @ .20

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

Diseo por flexin


Solicitaciones ssmicas: M =1888 ton-m con T = 397 ton

1era combinacin: Pu = 1.25 ( 556 + 128 ) + 397 = 1252 ton

2da combinacin: Pu = 0.9 ( 556 ) 397 = 103 ton

M =1888 ton-m

con

C = 397 ton

Mu = 1888 ton-m

Mu = 1888 ton-m

Solicitaciones de gravedad: PM = 556 ton PV = 128 ton

Para hoja de clculo: ( Pu = 1252 ton ; Mu = +1888 ton-m) ( Pu = 103 ton ; Mu = -1888 ton-m)

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

PL 04

125/8

63/4

DIAGRAMAS DE INTERACCION M2-2


Mn (tn.m )

3/8@.20 3/8@.20

-4000 -3000 -2000 -1000

1000 2000 3000 4000 4000.0 3000.0 2000.0 1000.0 Pn (tn)

0.0 -1000.0 -2000.0

65/8

3/8@.20

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

85/8

63/4 ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

Revisin por corte


Vu = 256 ( 2500 / 0.9) / 1888 = 376 ton Colocamos:

SISMO XX:

@ 20 cm
PM = 556 ton PV = 128 ton PS = 33 ton
@.20

@ 20 cm

MS = 312 ton

@.20

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

SISMO XX:

Diseo por flexin 3 2


+M33
5.30 m

Solicitaciones ssmicas: M = 312 ton-m con T = 33 ton

M = -312 ton-m

con

C = 33 ton

Solicitaciones de gravedad: P PM = 556 ton PV = 128 ton

PM = 556 ton PV = 128 ton

PS = 33 ton MS = 312 ton

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

1era combinacin: Pu = 1.25 ( 556 + 128 ) + 33 = 888 ton

2da combinacin: Pu = 0.9 ( 556 ) 33 = 467 ton


-4000

DIAGRAMAS DE INTERACCION M3-3


Mn (tn.m ) -2000 0 2000 4000 4000.0 3000.0

Mu = 312 ton-m

Mu = -312 ton-m

2000.0 1000.0 0.0 Pn (tn)

Para hoja de clculo: ( Pu = 888 ton ; Mu = +312 ton-m) ( Pu = 467 ton ; Mu = -312 ton-m)
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

-1000.0 -2000.0
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

Verificacin por cortante: Vu = 16.6 x ( 3000 / 0.9 ) / 312 = 16.6 x 10.7 R=6 Vu= 16.6 x 6 = 100 ton Vc = Acw.(c.fc) = 0.85 x (530 x 25 x 0.85) x (0.17 x 3.19 x210) = 75 Ton Vs= 30 ton
s = 0.71 x 4.2 x 490 / 75

PL 04

125/8

63/4

3/8@.20 3/8@.20

@.20

@.20

3/8 @ .20 cm
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

65/8

3/8@.20 3/8@.20

63/4

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

85/8

ye

Diseo Columna C2

0.40

0.90

En el 1er piso: PM = 331 ton


/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

MM = 0.07 ton MV = 0.06 ton

PV = 105 ton

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

SISMO YY M22 = 9.6 ton-m Combinaciones 1.4 M + 1.7 V 1.25 (M + V) S 0.9 M S Pu = 645 ton Mu = 00 ton Pu = 548 ton Mu = 9.6 ton Pu = 298 ton Mu = 9.6 ton PS = 0

221
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

DIAGRAMAS DE INTERACCION M2-2


Mn (tn.m ) -100 -50 0 50 100 800,0 600,0 400,0 Pn (tn) 200,0 0,0 -200,0 -400,0 -600,0
/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012
ye

Cortante en columna
Para: P = 298 ton Mmax = 60 ton-m

V = { (60+60)/0.9 } / 2.75 = 48.5 ton u = 83 kg/cm Vs = 33.5 ton 1 3/8@ .06

Vc = 0.53210 .b.d = 20 ton

3 3/8@ .18 .15 en toda la altura


ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007

Usando: Vc = (0.53 fc .b.d) ( 1+0.0071 Nu/Ag) = 10.4 bd = 31.7 ton

Capacidad Columna - Viga


DIAGRAMAS DE INTERACCION M2-2

(Nu/Ag en kg/m)

1er piso :

P=548 ton

Mn (tn.m ) -100 -50 0 50 100 800,0

Vs = 20 ton
3 3/8@ .30

Mmin = 33 ton-m

600,0 400,0 Pn (tn)


ye

200,0

2do piso :

P=495 ton

0,0 -200,0

Mmin = 40 ton-m

-400,0 -600,0

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

ye

/ PUCP / DIPLOMATURA EN DISEO ESTRUCTURAL / Diseo SR / A.Muoz/ 2012

40
65 cm

12

30 cm

36

Mn col = 73 ton Mn vig = 48 ton

33

Mn Mn

col

= 1.92 1.4
ye

vig

/ UNI / Diseo Ssmico de Estructuras de Concreto Armado /A.Muoz/ 2007