Prepared for
SunBorne Energy Gujarat One Private Ltd. 403, 4th Floor, Unitech Cyber Park, Sector-39, Gurgaon, Haryana, INDIA
Prepared by Arbutus Consultants Pvt. Ltd. J 507-11, West Wing, Mega Center, Magarpatta, Hadapsar, Pune 411 028, INDIA
May, 2012
TABLE OF CONTENTS
TERMINOLOGY .................................................................................................................................................... 7 1. INTRODUCTION .............................................................................................................................................. 9 2. MANAGEMENT RESPONSIBILITES & COMMITMENT: ................................................................................ 10 3. SSEHS POLICY ................................................................................................................................................ 11 4. SAFETY ORGANIZATION IN SEGOPL ........................................................................................................... 12 4.1 CORPORATE ORGANIZATION CHART .......................................................................................................................12 4.2 PLANT ORGANIZATION CHART ...............................................................................................................................12 4.3 ROLES AND RESPONSIBILITIES ...............................................................................................................................12 4.3.1 Safety Committee .......................................................................................................................................12 4.3.2 Plant Manager ............................................................................................................................................13 4.3.3 Supervisor/Foreman ..................................................................................................................................14 4.3.4 Responsibility of Individuals ......................................................................................................................15 5 SAFETY COMMUNICATION ............................................................................................................................ 15 5.1 NEED FOR COMMUNICATION ..................................................................................................................................15 5.2 SAFETY NOTICE BOARDS........................................................................................................................................16 5.3 SAFETY POSTERS ..................................................................................................................................................16 5.4 GENERAL DOS AND DONTS ...................................................................................................................................17 5.5 SAFETY CELEBRATIONS .........................................................................................................................................19 6. SAFETY INSTRUCTIONS AND PROCEDURES ............................................................................................... 19 6.1 STATUTORY REQUIREMENTS..................................................................................................................................19 6.2 AS PER THE FACTORIES ACT 1948, CHAPTER 1, CLAUSE 2 (5), (CB)...................................................................20 6.3 SAFETY ASPECTS AND REQUIREMENTS TO ACHIEVE SAFE WORKING ENVIRONMENT ...............................................20 6.4 QUALIFICATIONS FOR OPERATORS AND MAINTENANCE PERSONNEL ..........................................................................21 6.5 MANDATORY SAFETY REQUIREMENTS AS PER IE RULES 1956 AND IS .......................................................................22 6.5.1 General .......................................................................................................................................................22 6.5.2 Earthing......................................................................................................................................................23 6.5.3 Lightning Protection ..................................................................................................................................23 6.5.4 Safe Electrical wiring and Residual protection .........................................................................................24 6.5.5 Safety Protection Equipment .....................................................................................................................24 6.5.6 Good House keeping ...................................................................................................................................28 6.6 SAFETY PRECAUTIONS FOR OPERATING EQUIPMENT INSTALLED IN THE PLANT............................................................28 6.6.1 Log out/Tag out Procedures ......................................................................................................................28 6.6.2 Work on live apparatus and mains ...........................................................................................................31 6.6.3 Pre-arranged shut down ............................................................................................................................31 6.6.4 Issue of Permit to work ..............................................................................................................................31 6.6.5 Special Instructions to Permit Issuing Authority ......................................................................................32 6.6.6 Special Instructions to Supervisors............................................................................................................32 6.7 SAFE HANDLING OF EQUIPMENT .............................................................................................................................33 6.7.1 Equipment in a SPV Plant ..........................................................................................................................33 6.7.2 Safety precautions in Modules ............................................................................................................35 Detailed Project Report 2
Safety Precautions for String Connection Box/String Monitor .........................................................35 Safety Precautions for Inverter ..........................................................................................................36 Safety precautions for HT Switch gears/Transformers .....................................................................36
7. HAZARD IDENTIFICATION AND CONTROL................................................................................................. 37 7.1 HAZARD IDENTIFICATION ......................................................................................................................................37 7.2 ACCIDENT CONTROL .............................................................................................................................................37 7.2.1 Unsafe Acts .................................................................................................................................................38 7.2.2 Unsafe conditions .......................................................................................................................................38 7.3 ACCIDENTS ..........................................................................................................................................................38 7.3.1 Classifications .............................................................................................................................................39 7.3.2 Causes of accidents .....................................................................................................................................39 7.4 ACCIDENT REPORTING, RECORDING AND INVESTIGATIONS .......................................................................................39 7.4.1 Reporting of accidents other than electrical .............................................................................................40 7.4.2 Reporting of electrical Accidents ...............................................................................................................40 7.4.3 Accident Investigation ...............................................................................................................................41 7.4.4 Action Taken report (ATR) ........................................................................................................................41 7.5. FIRE CONTROL.....................................................................................................................................................41 7.5.1 Fire risk Analysis ........................................................................................................................................41 7.5.2 Fire extinguishers .......................................................................................................................................42 7.5.3 Open Area Fire Points ................................................................................................................................42 7.5.4 Periodic Inspection .....................................................................................................................................43 8. EMERGENCY MANAGEMENT AND MOCK DRILLS ...................................................................................... 44 8.1 EMERGENCY PLANS...............................................................................................................................................44 8.2 SEQUENCE OF ACTION IN EMERGENCIES..................................................................................................................44 8.2.1 Fire ..............................................................................................................................................................45 8.2.3 Electric Shock .............................................................................................................................................45 8.2.4 Other types of Accidents .............................................................................................................................45 8.2.5 Technical Emergencies ..............................................................................................................................45 8.3 MOCK DRILLS .......................................................................................................................................................45 9. SAFETY AUDIT ............................................................................................................................................... 46 9.1 OBJECTIVES OF SAFETY AUDIT .........................................................................................................................46 9.2 SCOPE OF SAFETY AUDIT .......................................................................................................................................46 9.3 TYPES OF AUDIT ...................................................................................................................................................47 9.3.1 Routine Inspection- Table below lays down the frequency of inspection/audit in the plant ..................47 9.3.2 Internal audit .............................................................................................................................................48 9.3.3 External Audit ............................................................................................................................................48 10. HEALTH AND HYGIENE PROVISIONS ........................................................................................................ 49 10.1 MANDATORY REQUIREMENTS ..............................................................................................................................49 10.2 MEDICAL FACILITIES ...........................................................................................................................................49 11. CONCLUSION ............................................................................................................................................... 49
LIST OF FIGURES
Figure 1: Safety Warning Symbol ............................................................................................................................................................ 22
LIST OF ANNEXURES
Annexure 1 Annexure 2 Annexure 3 Annexure 4 Annexure 5 Annexure 6 Annexure 7 Annexure 8 Annexure 9 Annexure 10 Annexure 11 Annexure 12 Annexure 13 Annexure 14 : Safety Policy issued by SEGOPL : Corporate Organization Chart : Plant Organization Chart : Permit to work : Application form for pre-arranged shut-downs : Telephone Message Standard Form : Accident Report Form : Fire extinguisher, water type gas cartridge (IS 940)- Maintenance schedule : Fire extinguisher, water type stored pressure (IS 6234)- Maintenance schedule : Fire extinguisher, foam type mechanical (IS 10204)- Maintenance schedule : Fire extinguisher, dry powder type gas cartridge (IS 2171, IS 10658, IS 11833)- Maintenance schedule : Fire extinguisher, carbon dioxide type (IS 2878)- Maintenance schedule : The normal recharge periodicity : CPR procedure
Abbreviations
ABBREVIATION
CPR SEHS GOS HT HV IE Rules IS LV LT PPE SEGOPL SPV
EXPANSION
Cardio Pulmonary Resuscitation Environment, Health and Safety Ground Operated Switch High Tension High Voltage Indian Electricity Rules Indian standards Low Voltage Low Tension Personal Protection Equipment SunBorne Energy Gujarat One Private Limited Solar PhotoVoltaic
TERMINOLOGY
A DANGER FORESEEN, AN ACCIDENT PREVENTED
The terms used in this manual shall be interpreted in the most commonly accepted sense consistent with the electrical industry. a) Authorized person: One who is properly authorized to perform specific duties under certain conditions or who is carrying out order from competent authority and as defined under rule 3 of I.E. Rules of 1956. b) Unauthorized person: One who is not permitted to work on electrical apparatus except under the personal supervision of an authorized person. c) Dead: 'Dead' means at or about earth potential and disconnected from any live system, provided that the apparatus separated from a live conductor by a spark gap shall not be deemed to be 'Dead'. Note: The term 'Dead' is used only with reference to current carrying parts, when these parts are not alive. d) Earth i) Earth: 'Earth' means a conducting mass of earth or of any conductor in direct electrical connection therewith. ii) 'Earthed' means connected to earth in such a manner as it will ensure immediate discharge of electrical energy without danger at all times. e) Emergency: 'Emergency' for the purpose of this code means an unusual condition which exists that endangers life and/or property. f) Foreman: 'Foreman or supervisor' shall mean Assistant Engineer/Junior Engineer/the authorized employee directly in charge of workmen doing the work regardless of title. g) Live: 'Live' means electrically charged. h) Permit issuing Officer: 'Permit issuing Officer' is a person who is authorised for ensuring that all controlling switches and circuits have been isolated, made dead and inoperative and that adjacent circuits have been made safe for the work to be carried out and who is authorized to issue the 'Permit to work'. i) Permit to work: 'Permit to work' means a form of declaration signed by and given by one authorized person to another authorized person in-charge of work to be carried out on or adjacent to any electrical apparatus, mains or service lines, for the purpose of making known to such latter person exactly what apparatus, mains or service lines are made dead and earthed and safe for working.
Detailed Project Report 7
j) Protective Equipment: 'Protective Equipment' means devices such as rubber gloves, rubber gauntlets, line hose, rubber boots or other insulating devices, which are especially designed for the protection of workmen. k) Low Voltage: Where the normal voltage is not greater than 250 Volts and in no circumstances exceeds 263 Volts. l) Medium Voltage: Where the normal voltage exceeds 250 Volts but is not greater than 650 Volts and in no circumstances exceeds 683 Volts. m) High Voltage: Where the normal voltage exceeds 650 Volts but is not greater than 33,000 Volts and in no circumstances exceeds 37,125 Volts. n) Extra High Voltage: Where the voltage exceeds 33,000 Volts under normal conditions subject to 12.5% variation.
need proper attention. Especially in a plant generating electricity this safety assumes greater significance due to the possible damages that could be caused because of the basic nature of hazards from electrical equipment. Focus on Safety aspects has become essential in view of human, social, economic and other considerations. The complex technical equipment in a solar power plant spread over a large area pose peculiar challenges to the safety of the plant, the operators and the environment around the plant. The content in this manual aims is to explain the ways and means to create a safe and healthy work environment at the premises of 15 MW SPV Plant of SunBorne Energy Gujarat one Private Limited (SEGOPL) located at village Karmaria in Gujarat, for the protection of all equipment machinery and personnel involved in operation and maintenance of the SPV Plant. The SEHS plan is structured for effective implementation as of well SEHS as standards other according to State the Factories Act, 1948, Amendment act 1987 relevant
and central Acts of Govt. of India. The purpose of the SEHS Plan is to make all the employees, contractors, consultants, workmen and any visitor to the SPV Plant aware of minimum safety standards to be adhered to while working or within the premises of the solar power plant. The overall objective of the plan is to ensure effective implementation of Company standards and comply with all statutory provisions related to Environment, Health and Safety (SEHS) and also to meet specific SEHS requirements
It is the prime responsibility of parent company and plant Management to prevent / control all risks involved in the process of plant operation and maintenance. All Contractors and their sub-contractors and their staff and workmen must co-operate in implementation of SEHS rules and regulations mentioned in SEHS plan without any excuse in the interest of safe guarding Environment health and safety at plant site. It is of contractual responsibility of all concerned to maintain Plants reputation and to take care of workers safety & welfare as a social obligation. The basic requirement of plan is to achieve SEHS goals for successful operation of the SPV plant in the most efficient manner.
10
3. SSEHS POLICY
Management of SunBorne Energy Gujarat One Private Ltd is desirous of ensuring the Safety and Health of its employees and attaches utmost importance to safeguard the employees from injury, occupational disease and environment. Management shall make every effort to provide a safe, healthy working environment. The management shall initiate all endeavor to ensure that the plant, machinery, and electrical equipment are safe for use in compliance with established safe working procedures and practices. The company has made it a mandatory requirement that all employees temporary employees visitors and others must comply with the published SSEHS policy. It is in the best interest of practices to consider Social, Environment, Health and Safety in every activity. Commitment to Health and Safety forms an integral part of the organization from management to the workers. The plant shall be operated in such a way that the Safety and Health of all employees, contractors, visitors, local residents and Environment, are ensured and they will not be exposed to unacceptable risks. The Safety Policy issued by SEGOPL is attached as Annexure 1. SEGOPL shall take steps for wide publicity of the safety Policy issued in accordance with Gujarat Factory Rules No. 73-L. All concerned, employees and contracted skilled labour, technicians and visitors shall be made aware of the Safety Policy. Copies shall be displayed in Notice Boards at strategic places for everyone to see. The policy shall also be displayed in the local language to enable local workers to read and comprehend. SEGOPL shall take efforts to impart periodic training through video films on safety to workers for their better understanding visually.
11
12
The committee shall decide upon requirements or improvements from safety point of view and decide upon the budget planning.
The committee shall carry out health and safety surveys and identify any risks for accidents.
The safety committee shall deliberate on reports of safety, environment and occupational health surveys, emergency plans safety audits, risk assessment and implementation of the recommendations made in the reports.
Committee shall convene immediately after any accident, minor or major to find out the cause and to implement remedial action.
The Safety Officer shall record the minutes of the meeting and circulate to all. He shall also monitor the implementation of decisions taken to improve safety and reduce risks within the time frame laid down. He shall also be responsible for co ordination with all departments for arranging funds, procurement of PPE, or other equipment for improving safety.
organization in the SPV Plant. The Plant Manager is the team leader and should be the role model for all staff and employees to follow. Prepare and instigate safety policy and procedures, delegate responsibilities to other Competent persons, then check to ensure that they perform satisfactorily Fix the roles and responsibilities in writing and ensure they are fulfilled for each staff member Attend all safety meetings. Review safety plans and prepare work place risk assessments and initiate steps to remove such risks. Carry out informal and formal safety inspections routinely and report findings to the Management.
Detailed Project Report 13
Initiate necessary corrective action if required by obtaining funds from management for rectification. Educate new contractors to be fully conversant with all safety requirements and implementation of safe work practices in their operations. Set a personal example of implementing the Project Safety Policy
Plant Manager should issue detailed responsibilities for his supervisors along these lines.
4.3.3 Supervisor/Foreman
Supervisor/Foreman have the definite responsibility of ensuring the following: o o o o o o o o Safe working condition. Necessary equipment and its use Properly maintained tools and equipment. Properly planned work performed in a safe manner. Application of the general and special safety instructions by their workmen. Assignment of employees to jobs, which they are capable of doing safely. Immediate steps to correct any violation of safety rules observed or reported to them. Foreman/Supervisor will be held responsible for overseeing that work under them is done in a safe manner. o Each Foreman/Supervisor shall make certain that his men understand following: - Work to be done. Hazards that may be encountered. Proper procedure for doing the work safely.
Frequent periodic inspections of operation and maintenance equipment, work areas, conditions and methods should be made by Foreman / Supervisor as a part of their routine duty. Such inspections are essential to prevent fires and accidents.
14
4.3.4.2 Employee to read documents Every employee is expected to study the Safety Manual, familiarise himself with its contents and apply them to work. Ignorance of Rules and Regulations will result in accidents to himself and his co-workers. He should adhere to following: Consult his Foreman or Supervisor whenever in doubt regarding any rules and regulations. Before attempting any work under conditions that he considers to be unsafe, bring them to the attention of the person-in-charge of the work and seek his advice. To report promptly to his foreman or Supervisors any dangerous or improper condition of equipment he notices. 4.3.4.3 Personal Conduct Use of intoxicating liquor while on job is strictly prohibited. No employee shall report for work while he is under the influence of liquor and no foreman or supervisor shall knowingly permit a man to go to work while he is under the influence of liquor. Practical joking and horseplay while on the job is strictly prohibited.
5 SAFETY COMMUNICATION
5.1 Need for communication
Adequate and frequent communication among management and workers is the way to keep the plant safe and secure at all times. Following communication techniques must be implemented: In any factory, a tool box talk system is generally followed. However, this method is not directly applicable here, because, there is no manual intervention in production of electricity. The workers are mainly watch staff to watch over the functioning of equipment. A weekly interaction with the workers is suggested.
Detailed Project Report 15
After any accident an investigation shall be conducted and the findings of the investigation shall be shared and discussed with the workers. Examples of accidents in similar SPV Plants shall be discussed with workers so that they understand consequences of negligence.
IGNORANCE OF RULES AND REGULATIONS WILL RESULT IN ACCIDENTS TO YOURSELF AND CO-WORKERS.
STUDY THE USER MANUAL CAREFULLY BEFORE DOING ANYTHING. NO OPERATION OR ACTIVITY IS SO URGENT THAT IT HAS TO BE PERFORMED IN AN UNSAFE MANNER.
16
17
ELECTRICITY SAFETY RULES ! Don'ts 1. DO NOT renew a blown fuse until you are satisfied as to the cause and you have rectified the irregularity. 2. DO NOT disconnect a plug by pulling flexible cable when the switch is on. 3. DO NOT use wire with poor insulation. 4. DO NOT close any Switch/GOS/Breaker unless you are familiar with the circuit, which it controls and know the reason for its being kept open. 5. DO NOT work on energised circuits without taking extra precautions, such as use of rubber gloves and gauntlets. 6. DO NOT touch or tamper with any electrical equipment or conductor, unless you have made sure that it is DEAD AND EARTHED. 7. DO NOT work on the live circuit without the specific orders of the supervisor and make certain that all safety precautions have been taken. 8. DO NOT disconnect earthing connection or render ineffective the safety gadgets installed on mains and apparatus. 9. DO NOT open or close switch or fuse slowly or hesitatingly. 10. DO NOT touch an electric circuit when your hands are wet, or bleeding from a cut or an abrasion. 11. DO NOT use fire extinguisher on electrical equipment unless it is clearly marked for that purpose. 12. DO NOT throw water on live electrical equipment in case of fire. 13. DO NOT attempt to disengage a person in contact with a live apparatus, which you cannot switch-off immediately. 14. DO NOT touch his body, push him with a piece of dry wood. 15. DO NOT discontinue artificial respiration until recovery or death is confirmed by the Doctor. 16. DO NOT allow visitors and unauthorised persons to touch or handle electrical apparatus or come within the danger zone of HV apparatus. 17. DO NOT test circuit with bare fingers. 18. DO NOT trust luck, but trust safe practices. 19. DO NOT joke, joke begins in fun, and ends in death. 20. DO NOT shorten your life, life is short and precious
18
19
6.2 As per the Factories Act 1948, Chapter 1, Clause 2 (5), (cb)
"Hazardous process" means any process or activity in relation to an industry specified in the First Schedule where, unless special care is taken, raw materials used therein or the intermediate or finished products, bye products, wastes or effluents thereof would(i) Cause material impairment to the health of the persons engaged in or connected \ therewith, Or (ii) Result in the pollution of the general environment: Analyzing above clause it can be concluded that the end product being electricity at 66000 V, is a hazardous product and hence, the SPV Plant is categorized as an area of production for hazardous product. Thus, all relevant rules stipulations of a factory do apply. The safety rules and procedures thus must bring out these aspects.
6.3
This can be broadly categorised as under: Mandatory Qualifications and Certifications for Operators and Maintenance Personnel Mandatory Safety requirements in accordance with IE Rules 1956 and specific Electrical safety requirements as per IE Rules and Electricity Act 2003 Safety Precautions for operation/maintenance of equipment installed in the plant. Hazard Identification and preventive measures Prevention of accidents Containment of damage during accidents Fire prevention and protection Fire fighting
20
21
6.5 Mandatory safety requirements as per IE Rules 1956 and IS 6.5.1 General
IE Rule No. 29 stipulates that all electric supply lines and apparatus shall be of sufficient ratings for power, insulation and estimated fault current and of sufficient mechanical strength, for the duty which they may be required to perform under the environmental conditions of installation, and shall be constructed, installed, protected, worked and maintained in such a manner as to ensure safety of 2[human beings, animals and property]. SEGOPL shall ensure following to confirm the requirement as stated by following steps:
Detailed Project Report
22
The current carrying capacity of cables, short circuit currents etc of the cables already installed shall be confirmed to be within safe limits The fuse ratings, protective breakers etc installed shall also be similarly verified for their capacity. Confirmation that all materials cables, switches and electrical equipment apparatus used confirm to relevant specifications of Bureau of Indian standards wherever laid down (Rule 29(3)). In case any IS standards are not available, equivalent international standards shall be verified and confirmed.
6.5.2 Earthing
The complete SPV Plant is required to be provided with adequate earthing to minimise earth resistance, as laid down in IS-3043. Earthing has been provided in the plant. In order to ensure that the earthing remains effective at all times, following steps shall be taken by SEGOPL: All earth pits shall be numbered suitably with distinct identification number. Periodic measurement of earth resistance and confirmation within limits(once a quarter at each pit) Watering of earth pits once a month or as required based on season (Only for switchyard) Replenishment and improvement to earth pits as necessary when earth resistance increases. Physical verification of condition of GI earth strips once in six months and replace where necessary. Record of measured earth resistance shall be kept for review by higher officials and electrical inspectors. The meggar used for measurement must be with valid calibration certificate while taking measurements.
23
Periodic measurement of earth resistance of Down rod and earth pit to be done and record kept. In case of high earth resistance, the matter shall be investigated and measures taken to bring the resistance within limits. The performance check of the lightning arrestor shall be carried out by simulation as recommended by the manufacturer. The lightning arrestors shall be replaced just before expiry of their guarantee period.
1. Rubber Gloves, Gauntlets and Rubber Mats 2. Safety Belts 3. Leather Protective Gloves 4. Hand lines 5. Ladders 6. Ropes 7. Hand Tools
24
6.5.6 Proper Use of PPE Rubber gauntlets, gloves, mats, boots and galoshes, insulated platforms and stools, safety belts, hand lines, tower wagons and other special insulated devices shall be used as required by employees working on electrical apparatus, underground mains and overhead lines in Switch yard as precaution against accidental electric shock. Pliers and other tools insulated with brittle materials or otherwise liable to have the insulation damaged when in use, shall not be used. The Supervisor in charge of the work will be responsible to test and ensure proper use of the safety equipment, supplied to the gang of workmen under him and see that it is maintained at all times in efficient condition and must immediately bring to the notice of Plant Manger any equipment which is liable to be broken in use, when arrangements will be made immediately for their replacement. 6.5.7 Inspection of PPE All safety equipment shall be thoroughly inspected: (i) Monthly, by the T&P holder/Store keeper (ii) Quarterly, by the Supervisor (iii) Once in six months, by the Plant Manager to confirm they are in good condition. 6.5.8 Proper Use of PPE It is the responsibility of the employee to make use of safety devices properly. Different items required of is described below: Rubber gloves and gauntlets- Rubber gloves should not be rough handled as to be damaged. After the work they should be cleaned, and powdered with French chalk and stored in a safe place. Testing rubber gloves and gauntlets- Before using, the gloves should be checked for cuts, weak spots, pin holes, by an Air Test. This is done by rolling the gloves tightly from the gauntlet end, and noticing if any air escapes. If air leaks the gloves should be discarded. If the right hand glove is found to be unserviceable the pair itself should be discarded. A left hand glove should not be used on right hand.
25
6.5.9 Care of Rubber Equipment Rubber equipment should be kept clean and free from oil. They should not be stored near a source of heat, or exposed unnecessarily to sun's heat. They are best stored in protective containers, and should not be tied by cords or threads which may cut it. 6.5.10 Use of Rubber Gloves Rubber gloves should be insisted upon: When inspecting the Transformer or its H.T. & L.T. leads When connecting wire near a live conductor or equipment. A combination of gloves and hickory rod or fuse pole rods should be used where the voltage exceeds 5,000 volts. While opening and closing isolators.
6.5.11 Care of safety belts Safety belt should be properly handled, and periodically treated with oil to prevent its becoming hard. Care should be taken to see that sharp tools or edges do not cut dents and holes in it. Extra holes should not be punched as it weakens the belt. It is best preserved in a separate case. 6.5.12 Leather Protecting Gloves Protective leather gloves may be worn over rubber gauntlets when wires are being spliced or when solder or hot compound are being handled when it is necessary for the person to move about a lot during working, or when line wires are being tied on to insulators or when any other work is being done which might render the gauntlet liable to tear and consequent danger to the wearer. 6.5.13 Ladders Ladders must be of strength to carry double the strain of the heaviest load that would be placed upon them. Defective ladders must never be used. A clearance space of not less than 12 must be provided between ladder rungs. A minimum clearance space of 36/90 cms must be provided in front of ladders where space permits.
26
When straight, portable ladders are used on hard surfaces, they must be held or firmly locked in addition, anti-slip shoes must be used where provided. Ladders must be kept free from dirt, grease, and paint-spots. Ladders must be stored upon brackets and in sheltered locations. Ladders must not be placed in front of doors opening towards the ladder, or against window sashes. Step-ladders must be fully opened before being used. Two ladders must not be spliced together. Employees must face ladders when ascending or descending over them, and must have both hands free. Employees must not slide down or try stunts on ladders. Ladders must be periodically inspected; when found defective, they must be repaired or disposed off. Straight, portable ladders must be placed at safe angle about 75 degrees with the horizontal. In other words, place the foot of a 12'/4 Mts ladder 3'/1 Mts. from the object it leans against.
6.5.14 Hand Tools Using hand tools improperly, neglecting to keep them in safe working condition and carelessly leaving them around where they may endanger persons are frequent causes of accidents. Proper tools should always be used for the work. All tools shall be maintained in good working condition. Burred heads shall be promptly redressed. Broken, cracked or otherwise damaged handles shall be replaced. All tools with sharp edges should be kept in sheaths, shields, tool chests or other containers, when not in actual use. A screw driver should never be used as a chisel. Screw drivers with full length metal tong or shank through handle must not be used for electrical work. Other tools such as pliers, wrenches, etc., whether insulated or not insulated shall not be used without rubber gloves while working near live parts of any voltage. All files shall be fitted with substantial handle; workmen should keep files cleaned as this reduces the slipping hazard and prevents skinned hands. Never use metal tapes, rulers, or cloth tapes with metal strands or wood rulers with metal ferrules or joints near energized equipment. Avoid use of long saws among wires as a short circuit may be caused.
27
Belt-tools must be well secured to the belt. Only pliers, hammers, wrench and connectors should be carried. All other tools should remain below until needed and then hoisted in bag.
28
Lockout/tag out procedures are implemented to prevent injuries to humans caused by unexpected start-up or release of stored energy in electrical switchgears and equipment during repair and maintenance. This LOTO procedure will insure that the switchgear or electrical equipment are isolated and locked/tagged out from all potentially hazardous release of electrical energy so that the employees perform any servicing or maintenance activities are protected from unexpected energization, start up, or release of stored energy that could be injurious to them. 6.6.1.1 Intent of LOTO policy The policy aims to ensure that:
Every employee is sufficiently trained to comprehend that the Electrical switchgear equipment is to be attended to only after following the LOTO procedure Only qualified technicians are allowed to perform any work or operation, in compliance with OEMs requirements. No defective, shutdown or maintenance activity is attempted by unqualified personnel.
To lay down minimum safety requirements for the lockout/tag out of isolating electrical sources/devices by using display tags and ensuring that the lockout and Tag out activity remains in place as long as the work on the electrical equipment is being performed.
To ensure that all employees are protected from potentially hazardous electrical energy source when performing service or maintenance activities.
There is every possibility of serious injury or fatalities to all employees working with or around DC or AC Electrical switchgear or equipment. If proper lockout/tag out procedures are followed, it eliminates the risk of accidental contact with direct or stored electrical energy when operating or maintaining these equipment. The employee shall obtain specific instructions from their Plant In-charge/supervisor before proceeding with the work.
The procedure ensures that the technician who fixes the tag on any electrical equipment is the only one who is empowered to remove it. No lockout/tag out tags may be removed or cut by a person other than the one who originally installed the Tag, unless removal is authorized by the appropriate supervisor. The appropriate supervisor shall be the immediate supervisor of the employee who placed the Tag and performed, or is performing, the designated work.
29
Before the switchgear or equipment is restarted, a thorough safety check is to be performed and ensure that the equipment is functioning properly. 6.6.1.3 Lockout Sequence It shall be ensured that all employees are aware and religiously follow the procedure as below: Notify all the Operators/employees that servicing or maintenance is required or under way on a the switchgear or equipment and it has been shut down and locked out to perform the servicing or maintenance. The attending operator should intimate the Plant In-charge before carrying out the Lockout of the switchgear or the equipment for the purpose of maintenance or repair. Use the appropriate locks or tags to lock the equipment or display the complete details on the type of repair or maintenance being performed with start time and complete time along with the signature of the technician/shift in-charge. Ensure that all the switches are in switch OFF mode and all the fuses are removed during the lockout.
6.6.1.4 Restoration The restoration procedure to be adopted is as described below: After all servicing or maintenance operations are complete, verify that no one is exposed or likely to be affected when the equipment is started. Check to see that all tools have been removed, and the guards if any have been reinstalled. Notify all affected technicians/employees about the ending of the lockout, and the impending start-up of the affected electrical switchgear or equipment. Remove locks or tags. Start the equipment and check that it is working smoothly and satisfactorily and is safe for the operations. Notify affected technicians/employees that the servicing or maintenance is completed and the electrical switchgear or equipment is ready for use.
6.6.1.5 Switchgears and equipments requiring mandatory LOTO Procedure The following equipment and switch gears shall be covered by the LOTO procedure: 66 KV Isolators in switchyard SF6 Breaker in 66 KV switchyard 11 KV VCB Panels 11/66 KV Control and Relay Panel 11 KV Ring Main Unit (RMU) 0.33 KV LT Panel SMA & Bonfiglioli Inverters SSM of SMA Bonfiglioli String Combiner Boxes.
30
31
If, for any reasons, the pre- arranged shutdown work cannot be completed within the period applied for, intimation will be given to the Permit Issuing Officer and duration of permit, extended suitably on the permit Form.
The Supervisor, before allowing any Workmen to commence work on the lines, mains or apparatus shall: - Explain to the workmen the nature of work and the precautions taken by the Permit Issuing Officer, to ensure the safety of the workmen and also the precautions to be taken by them during the whole time, when the work is in progress. - Satisfy himself that the switch or switches Isolators controlling the mains and apparatus have been isolated, discharged, properly earthed where possible and tested for pressure with a discharge rod and that caution or Danger Notice have been placed at conspicuous places. - Warn the workmen and the public of the danger that exist in the vicinity of the area covered by the 'Permit-to-work'. - Create a safety zone by short circuiting together all the conductors and adequately earthing on either sides of the place of work.
The safety requirements would vary with each type of equipment. These shall be brought out in succeeding sections in detail. Photo Voltaic Modules produce DC voltage which can be lethal even in small quantities. This small quantity is progressively enhanced to very high voltages and MW of power. The operators must be made aware of the danger of DC electricity through warning sign boards and symbols as below which he should be able to recognise and understand.
Warning Sign
Electric Shock
33
The workers are fully trained on Usage and Operation of PV module installed. They are educated and made aware of on the system components to be operated in the installed system.
Have been trained and educated for basic preventive maintenance of the system. Have been educated with Cautions, Precautions and Informative symbols for Safe operation and usage of system.
Have been handed over the user manual and informed on the preservation of the same.
34
35
36
Damage to equipment in the open due to vehicle accident- The plant is spread over large area and vehicle movements cannot be avoided. Module cleaning needs water to be carried in large quantities in a tanker. Possibility of vehicle accident does exist.
Breakage of modules due to tools falling/stones and injury to personnelModules could be damaged due to falling tools and splinters may injure workers Negligence of workers causing injury to themselves and others- Carelessness, ill trained or ignorant workers may cause serious damage to themselves and equipment.
37
7.3 Accidents
One can easily say ACCIDENTS BEGIN, WHERE SAFETY ENDS. An accident may be defined as a sudden mishap that interrupts the operation of an activity.
38
7.3.1 Classifications
Accidents can be classified as below: Electrical: Resulting generally from any person or animal coming in contact with live electrical cable or overhead line Mechanical: Mechanical injury resulting from an electrical shock, such as person being thrown off due to electrical shock sustained. Non-electrical: Non Electrical injury due to reasons such as fall from a pole, structure, tower or roof trusses, etc., hurt caused while handling heavy machinery, while driving vehicles, etc., Miscellaneous: Other causes such as fires, explosions, etc.,
All accidents, which result in injury or not, shall promptly be reported to the Foreman or Supervisor. Many injury free accidents, which are not reported reoccur with serious consequences.
Every Accident should be investigated to determine the cause and what steps are needed to prevent recurrence. It shall be the responsibility of the person in charge of the job to get a complete detailed cause of the accident as soon as possible after its occurrence.
Immediately on occurrence of accident, a telephonic message/e mail shall be sent to Corporate HQ. The format for message/E mail is attached as Annexure 6.
centralised hydrant based fire fighting system which is basically recommended for multi storied buildings only. Hence, the fire fighting system shall be based on following concept: Adequate Number of fire extinguishers placed at strategic points inside buildings Fire Stands in the open areas, with buckets filled with sand, water, and beater rods Fire and smoke detectors at all control rooms and main control room.
Fire extinguisher, water type gas cartridge (IS 940)- Maintenance schedule is given at Annexure - 8 Fire extinguisher, water type stored pressure (IS 6234)- Maintenance schedule is given at Annexure - 9 Fire extinguisher, foam type mechanical (IS 10204)- Maintenance schedule is given at Annexure - 10 Fire extinguisher, dry powder type gas cartridge (IS 2171, IS 10658, IS 11833)Maintenance schedule is given at Annexure - 11 Fire extinguisher, carbon dioxide type (IS 2878)- Maintenance schedule is given at Annexure - 12
7.5.2.1 Periodic Maintenance/Replacement Fire extinguishers shall need periodic replacement of their charge as per the manufacturers recommendations. The normal recharge periodicity is as given at Annexure 13.
The fire point shall be painted in red with the words FIRE written in big letters prominently both in English and local language.
43
44
8.2.1 Fire
Shout fire! Fire! Loudly and rush for fire fighting equipment and try and contain the fire. Immediately switch off the electricity in the adjacent areas as precautionary measure. One person to call fire station, inform plant manager as soon as possible In case fire is major everyone to collect at the designated area and be ready to evacuate. Evacuate any injured person and give first aid. Call for ambulance or evacuate to hospital if the injury is serious or patient is unconscious Immediately inform police in case of any death. Do not remove the body unless the body is likely to be burnt. Make a detailed report subsequently for the record and investigation.
45
a safe place within the plant. The lessons learnt from the practice shall be conveyed to workers for their improvement. Electric shock- Practice on CPR will be provided to workers as well as saving a person who is in contact with live wire. Other demonstrations- Workers will be demonstrated the bad effects of negligence, littering and dirtying the place, reckless vehicle driving, unsafe working on equipment, not using protective gear etc.
9. SAFETY AUDIT
9.1 Objectives of Safety Audit
To carry out a systematic, critical appraisal of all potential hazards involving personnel, plant, services and operation method and To ensure that Occupational Safety and Health system fully satisfy the legal requirements and those of the companys written safety policies, objectives and progress.
46
9.3.1 Routine Inspection- Table below lays down the frequency of inspection/audit in the plant
Safety Walk Frequency Daily Safety Inspection 1 month Safety Audit 3 to 4 years ( based on organizational modifications , process changes and accidents, near misses history ) Duration Aim 2 hrs ( during site round randomly) -Housekeeping -Unsafe acts/ Unsafe Conditions 1 day -Housekeeping Unsafe Acts / Unsafe Conditions 3 to 4 days Housekeeping Unsafe Acts/ Unsafe conditions Questionnaires Equipments Procedures General
47
X By Management/Safety committee
Monitoring Follow up
48
11. Conclusion
Safety is a responsibility of one and all. Fundamental requirement of safety is to learn ABC, ALWAYS BE CAREFUL In an environment of electrical high voltages, safety assumes greater significance because of the danger to life constantly. The company and its employees must take pride in becoming an accident free safe organization for years to come.
49
Annexure 1
50
51
52
53
1. PERMIT APPLICATION (PERFORMING AUTHORITY) Associated cold work permit No.______________________ Location of Electrical work; Equipment to work on (Tag. No)_____________________________ Circuit voltage: ___________________ Type of Electrical Work : Electrical Hot Work /Electrical Proximity work /Electrical Hazardous Work(tick any one) Brief Description of work :
Exact period work : (Date) ________________ From ____________ (hrs) To ___________(hrs) Associated Permit(s): Cold work permit (S/No. ____________________ ) *Excavation permit *Other _____________________________________*Hot work permit GENERAL SAFETY CHECKS *The equipment to be worked on has been damaged *Equipment to be *Qualified and /or authorized Electrical Workers *All necessary personal protective equipment has 1 __________________________________________ been provided 2 __________________________________________ *Standby persons is provided 3 ___________________________________________ *Other ______________________________________ *Number of contract employees working _____________________________________________________
Detailed Project Report
54
*Written procedure is available for the job I certify that the above have been checked and format satisfactory Name ____________________Sign ______________________ Date _____________________ Time________________
GENERAL SAFETY CHECK PERMIT ENDORSEMENT *The Equipment Tag No. is correct *Potential hazards of the electrical work have been explained *All other necessary permits have been issued *The proposed electrical work and safety precautions *Special PPE required :________________________ been agreed upon __________________________________________ Affected Plan Name/Title Signed Date/Time ______________________________________________________ _________________________________________ *Other Safety requirements ________________________________ _________________________________________ _____________________________________________________
55
Annexure 4 Contd HOT WORK PERMIT(THIS COPY TO BE DISPLAYED AT WORK SITE) 1. PERMIT APPLICATION (PERFORMING AUTHORITY) Associated Cold Work Permit No.----------------------------------Type of Hot Work Permit No: *Heavy Hot Work ------------------------------ *Light Hot Work-------------------------------------Location of Hot Work :-------------------------------------------------------------------Equipment to Work on (Tag No.) ----------------------------------------------------------------------Brief Description of Work: -------------------------------------------------------------------------------
Except Period of Hot Work: (Date) ____________ From ____________ (hrs) To ____________(hrs) Associated Permit(s):*Vessel Entry Permit (S/No-------------------- ) *Excavation Permit (S/No.---------------) *Electrical Permit (S/No. -----------------------) *Other ---------------------------------------GENERAL SAFETY CHECKS Cutting/Welding equipment in good condition *Combustibles within 15Lits, that cant be removed are protected with Fire Extinguishers at work site. Covers. Guards or metal hoods Container Purged of Flammable Vapour*Contractors concerned have been thoroughly explained on all Equipment Cleaned of Combustibles, Relevant safety requirements and work procedure Work Area to be Wet down *Flame curtains necessary Barricades required *Others. Performer Name :__________________ Sign :_________________Date :__________ Time:________________
56
2. PERMIT APPROVAL(APPROVING AUTHORITY ONLY AUTHORISED PERSONS TO BE APPROVED ) *The Equipment tag no. is correct *Standby person is assigned for the duration of hot work *All other necessary permits have been issued*Others Name :___________________________ Sign :__________________ Date :______________ Time:_______________
3. PERMIT APPROVAL (Approving authority-ONLY AUTHORISED PERSONS TO BE APPROVED) *Potential hazards of the work have been explained *Standby person is assigned for the duration of hot work Name :__________________________ Sign :__________________ Date :______________ Time:________________
4. WORK COMPLETED (PERFORMING AUTHORITY) PERMIT EXTENSION *Hot work completed/suspended on ______ at _______ hrs. *The work site The work site has been resurveyed and permit Hot work will resume on ______________ at ______ hrs. conditions have not changed *Work site has been cleared and sources of ignition *The extension of permit granted from__________________ extinguished and removed. to _________________________________________ Name :____________________________________ Sign:______________________________ Name :____________________________________ Sign:______________________________ Date :______________________Time:___________________Date:__________________ Time :_________________
57
5. PERMIT CANCELLATION *permit cancellation of permit conditions & safety. 1. THE PERMIT IS AUTOMATICALLY SUSPENDED IN THE EVENT OF PLANT WIDE EMERGENCY OR *Permit cancelled on plant emergency THERE ARE CHANGES IN WORK SITE CONDITIONS MAKING IT UNSAFE TO CONTINUE HOT WORK
2. ALL HOT WORK MUST BE STOPPED AND IGNITION SOURCE EXTINGUISHED IMMEDIATELY.
Date :_________________________Time :_______________ *Heavy Hot Work : Involving spark / Flame (ex. Welding gas cutting etc) *Light Hot Work : Work generating heat (ex. Drilling, Grinding etc.) *Approving authority for Hot work permit Safety functional loaders Mechanical functional loaders Electrical functional loaders
58
Annexure 5 APPLICATION FOR PRE-ARRANGED SHUTDOWNS 1. Name of the applicant 2. Designation and address 3. Area/equipment on which shutdown is required 4. Time, date and duration of shutdown 5. Purpose of shutdown 6. Area affected by shutdown 7. Whether concurrence of competent authority obtained or not 8. Nearest contact No. : : : : : : : :
Signature of applicant
Signature of applicant
59
: ..
: ..
: ..
5. Departmental or non-departmental (If own employee, details of Employee. No. and designation etc., to be furnished) : ..
: ..
: ..
60
1. Date and time of accident 2. Place of accident (Village/Town/Taluk/District and State). 3. System and voltage of supply 4. Designation of the Officer in charge of the supplier in whose jurisdiction the accident occurred. 5. Name of the owner/user of energy in whose premises the accident occurred. 6. Details of Victim(s) (a) Human Sl. No Name of the victim(s) Father's Name Sex of the victim
: :
Approx age.
Fatal/Nonfatal
(b) Animal Sl. No Description Of animal(s) Numbers Name(s) of the owner(s) Address(es) of the owner(s) Fatal / Non-fatal
61
In case the victim(s) is/are employee(s) of Plant a) Designation of such person(s) b) Brief description of the job undertaken, if any
: : :
1. In case the victim(s) is / are employee(s) of a licensed contractor: a) Did the victim(s) possess any electrical workmen's permit(s) supervisor's certificate of competency issued under rule 45? If yes give number and date of issue and the name of issuing authority. b) Name and designation of the person who assigned the duties of the victim(s). (1) In case of accident in the supplier's system, was the permit to work (PTW) taken? 2. (a) Describe fully the nature and extent of injuries, eg., Fatal/ disablement (permanent or temporary) of any portion of the body or burns or other injuries. (b) In case of fatal accident, was the post mortem performed? (3) Detailed causes leading to the accident (to be given in a separate sheet annexed to this form). (4) Action taken regarding first-aid, medical attendance etc, immediately after the occurrence of the accident (give details) (5) Whether District Magistrate and police station concerned have been notified of the accident (if so, give details) (6) Steps taken to preserve the evidence in connection with the accident to the extent possible. (7) Name and designation(s) of the person(s) assisting, supervising the person(s) killed or injured. (8) What safety equipment were given to and used by the person(s) who met with this accident (eg. Rubber gloves, rubber mats, safety belts and ladders etc.,)?
Detailed Project Report 62
(9) Whether isolating switches and other sectionalising devices were employed to deaden the sections for working on the same? Whether working section was earthed at the site of work? (10) Whether the work on the live portion was undertaken by authorised person(s)?, If so, the name and the designation of such person(s) may be given. (11) Whether artificial resuscitation treatment was given to the person(s) who met with the electrical accident?, if yes, how long was it continued before its abandonment? (12) Name and designation of the persons present at and witnessed the accident. (13) Any other information/Remarks
63
Annexure 8 MAINTENANCE CHECKLIST FOR FIRE EXTINGUISHER (FOR ROUTINE CHECK AND MONTHLY MAINTENANCE) (EXTRACTS FROM IS 2190)
a)
Open the extinguisher, see the water level, throw away the water charge. Examine the extinguisher body internally and externally for corrosion and damaged conditions with illuminating probe. Damaged and corroded Extinguishers should be removed from service. Corroded gas cartridge should also be replaced.
b)
Examine the gas cartridge for mass. If there is loss of more than 10 percent of original mass, the cartridge should be sent for re-charging after being replaced by a charged one.
c)
Examine nozzle, strainer, vent holes, internal discharge tube, sealing washer, replace them if not in good condition. Otherwise clean them thoroughly.
d)
Check the operating mechanism for free movement and piercing mechanism if working properly.
e)
64
a)
Examine and verify that the pressure gauge or any other pressure indicating device fitted in is indicating the internal pressure correctly, if the extinguisher shows a loss of pressure of more than 10 percent, refer to the manufacturers instructions for appropriate action.
b) c)
Examine the extinguisher body externally for corrosion or damage. Weigh the extinguisher (with or without the operating mechanism according to the manufacturers instructions) or use suitable alternate means to check that it contains the correct mass of liquid. Check the mass against the mass recorded when it was first put into service.
d) e) f)
Examine the nozzle and hose and clean if necessary. Examine the hose for wear and replace if not in good condition. Where the extinguishers are designed to have the operating mechanism removed, check the operating mechanism and discharge control (where fitted) for free movement, clean, rectify or replace, if necessary.
g) h)
Replace safety clip/wire seal or equivalent device as originally fitted. Refill the fire extinguisher with clean water. NOTE: As this type of extinguisher is pressurized, it can be opened for inspection only after discharge of the extinguisher. It should be subjected to discharge / performance test every two years. Discharge of the extinguisher. It should be subjected to discharge / performance test every two years.
65
a)
Open the extinguisher, check the liquid level. Pour liquid in separate clean receptacle to see if there is any sediment at the bottom of the cylinder. Reject the charge if there is sufficient sludge formation.
b)
Examine the extinguisher externally and internally for any corrosion or damage. Damaged and corroded extinguisher should be removed from service. Corroded gas cartridge should also be replaced.
c)
Examine the gas cartridge of mass. If there is loss of more than 10 percent of original mass, replace it with fully charged one.
d)
Examine the foam generating nozzle, strainer, vent holes, internal discharge tube ceiling washer, etc. Replace them, if not in good condition. Otherwise clean them thoroughly.
e)
Check the operating mechanism for free movement and piercing mechanism for proper working.
f)
Clean the hose assembly and check it for any dust/sediment at either shank ends.
66
Annexure 11
FIRE EXTINGUISHER, DRY POWDER TYPE GAS CARTRIDGE (IS 2171, IS 10658, IS 11833)
All dry powder extinguishers should be inspected and maintained in accordance with the following. The dry powder extinguishers should be opened in a dry room and for a minimum possible time to avoid effect to atmospheric moisture on powder. a) Dry powder extinguisher, where discharge control is fitted on the nozzle, should be operated before opening the extinguisher to ensure that there is no pressure in the extinguisher. b) Weigh the extinguisher to check the correct mass of powder filled in it which should be marked on the body of extinguisher and record book when it was first put into service. c) Open the extinguisher and remove gas cartridge and see that sealing disc is intact. Weigh and compare its mass with full mass of cartridge marked on it. In case, loss of mass is more than 10 percent, it should be replaced by new cartridge. d) Check the operating mechanism, discharge control for free movement and closing. Examine nozzle, hose, vent holes, piercing mechanism of cap cartridge holder, grease and wipe clean. e) f) Remove the inner shell (if any) and clean port holes. Empty the dry powder in a dry container and examine for caking, lumps and foreign matter, in which case replace it with new dry powder charge. g) Examine the extinguisher body internally for any damage or corrosion and replace corroded or damaged extinguisher. h) i) Clean the extinguisher using dry air. Return the original charge to the extinguisher and fit the cartridge and other fittings.
Detailed Project Report 67
j)
In case of higher capacity dry powder fire extinguisher as per IS 10658, remove the carbon dioxide cylinder and check the weight marked on the cylinder to ensure that the size conforms to that stipulated in the specification. On weighing, if the loss of mass is more than 10 percent it should be sent for recharging. Also examine the wheel carriage and discharge hose assembly with control nozzle for free flow and test it with dry air.
k)
In case of dry powder extinguisher for metal fires as per IS 11833, in addition to item 10 above, examine the applicator pipe and the discharge shower head for freedom from clogging and clean it with dry air. Sample of the dry powder for metal fire may be tested on a small fire of magnesium turning or chips to ensure that the powder is suitable for metallic fire risks.
l)
The safety valves and pressure gauges fitted on higher capacity extinguishers should be calibrated once in 3 years and recorded in the register.
68
Annexure 12
a)
b)
Weigh the extinguisher, compare mass against the mass marked on it for fully, charged extinguisher. It should be sent for refilling if the loss is more than 10 percent of mass. Clean and polish externally.
c)
Examine hose, horn and assembly and clean. In case of trolley mounted extinguisher, examine the wheel carriage for free movement.
69
Annexure13 REFILLING SCHEDULE FOR FIRE EXTINGUISHERS AND SCHEDULE FOR OPERATIONAL TEST ON FIRE EXTINGUISHERS
Once in Two Years a) Portable fire extinguisher, water type stored pressure. b) Portable fire extinguisher, mechanical foam type.
Once in Five Years a) Portable fire extinguisher, water type (gas cartridge) b) Fire extinguisher, carbon dioxide type (portable and trolley mounted) c) Dry powder fire extinguishers for metal fires.
NOTES: 1. In corrosive environments, it is desirable to have the discharge test carried out at half the frequency mentioned. 2. As for the restriction on release of Halon in atmosphere, it need not be necessary to refill / operate Halon 1211 type portable fire extinguisher within any stipulated period. However as regards the pressure of injections gas, i.e., dry N2 it should be checked up for the adequate pressure on the pressure gauge / indicating gauge and the contents by weighing the fire extinguisher.
Once in Three years BC and ABC dry powder conforming to IS 4308 and IS 14609.
Detailed Project Report 70
SCHEDULE FOR HYDRAULIC PRESSURE TESTING OF FIRE EXTINGUISHERS 1. Every extinguisher installed in premises shall be hydraulically pressure tested as per the schedule given below. There shall not be any leakage or visible distortion. Extinguisher which falls in this requirement shall be replaced.
2. The carbon dioxide type and Halon 1211 type fire extinguishers shall be pressure tested every time the cylinders are sent for recharging (after periodic discharge test or otherwise) to the pressure specified in the relevant Indian standard specifications.
Sr. No.
Type of Extinguisher Water type (gas cartridge) (IS 940) Water type stored pressure) (IS 6234) Mechanical (IS 10204) Dry powder type foam
Test interval
Test Pressure
3 yr
1.75 MPa
2.5 min
2 yr
2.5 MPa
2.5 min
3 yr
1.75 MPa
2.5 min
3 yr
2.5 MPa
2.5 min
71
Annexure 14 CARDIO PULMONARY RESUSCITATION PROCEDURE(CPR) Place victim on flat surface Tilt the head slightly Take a breath not a deep breath Place your mouth on the victims and blow, pinching nose if necessary Give 4-5 puffs in 5 seconds Check for pulse. If pulse is present continue giving one breath every 5 seconds If there is no pulse felt, begin CPR, i.e. chest compressions Press the middle of the chest bone with two palms Press about an inch 5 compressions in 3 seconds After victim resumes breathing, treat for other injuries like burns or wounds If not.. Well, do the needful