Академический Документы
Профессиональный Документы
Культура Документы
sulphide (H2S) can be produced necessitates special equipment and enhanced safety precautions. The main elements of a test separator are; The vessel including essential internal components to separate the phases and ease the separation process. The dixon plates or coalescent plates prevent droplets larger than 15 microns from being carried into the outlet gas stream, and the mist extractor, which is the last obstacle the gas encounters before leaving the separator vessel, blocks fine liquid droplets still in the gas stream. The blocked droplets coalesce and fall back into the oil phase.
Instrumentation for level regulation and retention time setting. A pneumatic liquid level
controller with a long vertical float provides a vast range of oil levels.
Metering manifold Oil metering is done via positive displacement meters for low rates and a
turbine meter for higher rates. Gas metering uses a calibrated orifice plate. 3.6.1 General On the surface, the fluids produced during a test are normally handled using temporary equipment or a surface testing package. This equipment needs to be assembled and designed to safely and reliably fulfil a wide range of operations;
Provide a means of quickly controlling the pressure and shutting in the well. Separate produced fluids into gas, oil and water phases, allowing the constituents to be metered, and record key data such as temperature and pressure. Allow representative samples of the produced fluids to be taken. Dispose of produced fluids in an environmentally acceptable manner. The traditional safety philosophy seeks to maintain a minimum of two independent pressure retaining barriers between the surface equipment and the formation. These may be located at three levels; downhole, subsurface and surface. Downhole barriers include the DST test valve itself or a special safety valve used only in emergencies. Subsurface barriers are not universally employed on fixed rigs or onshore. In some cases, particularly high pressure gas wells or in hostile environments, an additional means of shutting in the well is required. A typical offshore well testing set-up, including all standard equipment, is shown in Figure 3-26. Although the surge tank is recommended and compulsory in the presence of H2S, both surge and gauge tanks are shown in this set-up. The surge tank is used as a second stage separator, and the connection of both tanks is shown. The grey area shows the permanent piping, which is now being used frequently on drilling rigs. For safety reasons, compressed air to supply the burners must be totally independent from the rig air supply. 3.6.2 Equipment A brief description of the main components now follows, but it must be emphasised that each well test set-up requires detailed planning and design related to expected operating conditions and
customer objectives. 3.6.2.1 Flowhead Surface shut-in is usually provided by a flow control head or flowhead, which functions as a temporary christmas tree. The flowhead comprises four valves, the master valve, the swab valve, the flow valve and the kill valve. The master valve is usually isolated from the other three valves by a swivel which allows rotation of the landing string without disconnecting the kill lines. The master valve allows isolation of the surface equipment from the downhole string and as such connects directly to the top of the string. The swab valve allows introduction and retrieval of slickline, wireline or coiled tubing. The flowline valve is equipped with an automatic hydraulic actuator which is linked into the emergency shut down system, thus automatically closing the valve in the event of a pre-programmed event (such as too high pressure etc.). An actuated valve can also be installed on the kill valve if required. In certain applications an additional valve called a stand alone valve will be placed immediately downstream of the flowhead to provide anotherThis article was
developed with the intention to be a guide for the correspondence course TCC210, which forms part of the T-CAP training plan in BJ Services Company. It presents an overview of the coiled tubing equipment, necessary to perform a coiled tubing intervention either on land or offshore. Over the past decade the number of applications for coiled tubing services within the petroleum industry has been increasing exponentially and coiled tubing services continues to be one of the fastest growing sectors in the industry. BJ Services currently owns and operates about one hundred fifty five (155) Coiled Tubing Units worldwide - Second largest World CTU Fleet, of which more than half are operated on land. Coiled tubing growth has been driven by economics, continual technological advances and the successful utilization of CT to perform an ever-growing list of field operations. Gas Lifting Stimulation Fracturing & Acid treatments Fill Cleanouts Cementing Scale Removal Workover Drilling / Milling Electrical Applications Logging & perforating Fishing Force Application Ultra-high Pressure
Pipeline Servicing Permanent Installations Completions & Gravel Packs Vertical / Horizontal Under Balanced Drilling DUCT
The advantages associated with coiled tubing are: The ability to operate on live wells does not require well to be killed, thus reducing risk of formation damage. Quick mobilization and rig up. Ability to work Rigless no associated rig costs. Reduced surface footprint and crew configuration. Efficient offshore mobilization skid mounted units. Ability to perform operations while well is producing minimizing production downtime. No connections and thus ability for continuous circulation during live well intervention.
In 1944 the first coiled tubing pipeline treatment was executed; Project PLUTO (PipeLines Under The Ocean). The job consisted of laying 23 three-inch (76.2 mm) diameter pipelines across the English Channel to supply allied forces with fuel to sustain the liberation of occupied Europe during World War II. Each pipeline consisted of pre fabricated 4,000 ft (1219 m) sections of pipe, butt-welded together and spooled onto 40 foot (12.2 m) hub diameter reels. Of the 23 pipelines, 17 were about 30 mi. (48.3 km) long and the remaining six were 70 mi. (112.6 km) long. Injector head designs were first developed for use with submarines. In the early 1960s Bowen Tools was contracted to deploy a radio antennae from submarines. The concept was very similar to that of a coiled tubing injector. In 1962 the California Oil Company and Bowen Tools developed the first coiled tubing unit. The unit was called a continuous-string light workover unit. The size of pipe used was 1.315 OD.
The coiled tubing was fabricated from 50ft segments. The steel used was low alloy Colombian tubing. The 50ft segments were butt-welded and spooled onto a 9ftdiameter work reel with a total length of 15,000 ft. Through 1963 and 1964 this unit performed numerous jobs in the Louisiana area. The continued development of coiled tubing may be described as follows: 1964: Brown Oil Tools and Esso introduce a new coiled tubing injection system. The unit was built to run coiled tubing.
BJ Services Tomball EDC- Training Department
EDC Tomball, Version 1.01 Revised: April 2005 6 1967: Bowen introduces a downsized version of the original injector design. The injector is the 5M capable of handling 5,000 lb. of coiled tubing. NOWSCO contracted Bowen Oil Tools to build 12 5M coiled tubing units. 1968: Bowen developed the 8M coiled tubing injector head capable of running 8,000 lb. of coiled tubing. Late 1960s to mid 1970s: Modifications and new designs for coiled tubing units. The common size of coiled tubing in use increased to 1 OD More than 200 coiled tubing units were built in this time frame. Late 1970s: New coiled tubing equipment manufacturers emerged; Uni -Flex Inc., Hydra Rig Inc., Otis Engineering. The new injectors built were similar to that of Bowen Tools. 1975: Uni-Flex introduces a new injector head design. Many of the new features influenced future injector designs of other manufacturers. 1976: Formulation of Quality Tubing Inc., with financial assistance from NOWSCO. 1978: All construction of Uni-Flex and Brown Oil Tools coiled tubing equipment was stopped. Late 1970s to early 1980s: Many design changes and revisions made to improve coiled tubing equipment. The main suppliers of coiled tubing units were Bowen Tools, Hydra Rig Inc. and Otis engineering. 1985: New coiled tubing injector developed by Fleet Cementers, capable of supporting 8,500 ft of 1 coiled tubing. 1989: Quality Tubing Inc. awarded patent for bias weld procedure. This dramatically improved the fatigue life of the coiled tubing. 1993: Quality Tubing received a product patent for continuous coiled tubing. Dec. 1999 Coiled Line Pipe now established as an API Product
BJ Services Tomball EDC- Training Department