Вы находитесь на странице: 1из 244

Discipline

Electrical Engineering Specification


Category

Fault Protection
Title

Protection System Requirements for the High Voltage Network


Reference Number

EP 19 00 00 02 SP
Version

3.4
Date of Issue

JUNE 2007
Status

Approved

Copy No.

A coloured number in this space indicates that this document is controlled

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

DISCLAIMER RailCorp has used its best endeavours to ensure that the content, layout and text of this document are accurate, complete and suitable for its stated purpose. It makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. RailCorp will not be liable to pay compensation in respect of the content or subsequent use of this document for any other purpose than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been wilful default. DOCUMENT APPROVAL The technical content of this document has been approved by the relevant RailCorp engineering authority and has also been endorsed by the RailCorp Configuration Management Committee directly or as delegated through the conditions of the Configuration Management Policy. DOCUMENT SUPPLY and CONTROL The Primary Version of this document is the electronic version that is available and accessible on the RailCorp Internet and Intranet website. It is the document users sole responsibility to ensure that copies are checked for currency against the Primary Version prior to its use. The approving section does not make controlled copies of this document available by any means other than on the aforementioned website. Controlled hardcopy versions of this document may be made if they are registered using a local document management and distribution system. When controlled hardcopy versions are issued using a local document management system each copy is to be uniquely identified in the Control Box provided on the front of the document. The identifier used must identify the local distribution centre and the copy number. The identifier is to be marked using a colour other than black or grey. COPYRIGHT The information in this document is Copyright protected. Apart from the reproduction without alteration of this document for personal use, non-profit purposes or for any fair dealing as permitted under the Copyright Act 1968, no part of this document may be reproduced, altered, stored or transmitted by any person without the prior written consent of RailCorp.

JUNE 2007

Version 3.4

RailCorp

Page 2 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

About This Standard


This document covers the Protection System requirements for the RailCorp High Voltage AC Network for 11kV, 33kV, 66kV and 132kV system voltages. The scope of this publication does not currently include specific requirements for the high voltage AC network at 2kV. This will be incorporated in a future revision of this specification. This document does not include protection requirements for the 1500V DC system. The Specific Protection Equipment Requirements (Section 5 and associated Appendix) are common requirements for the entire high voltage network. These protection requirements cover general design principles for protection schemes, as well as requirements relating specifically to the protection equipment. They do not include equipment used for detection and measurement of non-electrical protection parameters (such as oil and gas sudden pressure change, fibre optic temperature measurement), other than to specify necessary interface details. The correct design, implementation and management of the overall protection system are critical to the safe and reliable operation of the RailCorp power system. As such, all design processes for the protection system must follow the RailCorp Engineering Design Management Procedures. All new installations, modified and refurbished existing installations must comply with the requirements in this document. High voltage protection systems existing at the date of release of this document are not affected by the requirements of this document.

JUNE 2007

Version 3.4

RailCorp

Page 3 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Version History
Version 2.0 The changes in this document are: Reformatting of the document Changes to organisational names and position titles to reflect the formation of Rail Infrastructure Corporation

Version 3.0 Major expansion of information in the previous version.

Version 3.1 Correction to pilot wire relay model. Transformer differential relay types modified. Alternative busbar fault detection system added. Details of equipment connected to ACCB trip coils added. 33kV bus-zone CT ratio changed.

Version 3.2 Organisation change from Rail Infrastructure Corporation to RailCorp. Clarifications to breaker fail operation implementation with pilot wire schemes. Auto reclose policy for high voltage feeders added. Details of earth fault operation added for rectifier transformer protection and clarification to associated trip coil operation. Details of requirements when there are two battery systems and typical auxiliary supply to HV ACCBs added. MTM relay requirements added. Siemens 7D6S10 pilot wire relay added as an approved relay. Details of MBCI02 relay added. Detailed listing of SCADA alarms added. Additional protection relay identifications added. Standard test block configuration amended and standard relay input and output configuration added.

JUNE 2007

Version 3.4

RailCorp

Page 4 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Version 3.3

Requirement for TCS to be fitted to existing equipment added when new protection schemes are interfacing with existing switchgear. 11kV feeder protection requirements added. Requirements for breaker fail implementation added when installing electronic protection relays in an existing substation. Details of requirements for the VT supply to protection relays added. Requirements for CLOSE INHIBIT amended. Protection and auxiliary relay labelling guidelines added. Details of protection requirements for use on 11kV distribution transformers (up to 800kVA) added. Correction made to P127 output relays for system transformers and rectifier transformers. P632 output relay functions amended. Details of test block and relay configuration added for Siemens 7SD610 relay. Details of test block and configuration added for VIP35 relay. Details of SCADA alarms and control that are required to be hard wired added to Appendix K.

Version 3.4 Requirement for position of EARTH SWITCH, DISCONNECTOR & ACCB to be supplied as an input to P127relays removed. Breaker fail implementation added when a dedicated ACCB is not available. Standard current transformer configuration diagrams added as an appendix. Transducer model numbers detailed for 1A and 5A current transformers and voltage transducer model number expanded. Details of test block and configuration added for VIP300LL relay Protection requirement for 11kV equipment modified. Specific protection documentation requirements added. ECRL protection no-compliances added as an appendix. Current transformers for 11kV switchboards added.

JUNE 2007

Version 3.4

RailCorp

Page 5 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Contents
1 2
2.1 2.2 2.3 2.4

Scope and Application .................................................................... 10 Normative References..................................................................... 11


International Standards.............................................................................. 11 Australian Standards.................................................................................. 11 RailCorp Documents .................................................................................. 11 Industry Publications ................................................................................. 12

3 4
4.1 4.2 4.3

Definitions and Abbreviations ........................................................ 13 General Protection Philosophy ...................................................... 15


General ........................................................................................................ 15 Protection Settings..................................................................................... 15 Grading ........................................................................................................ 15

5
5.1 5.2 5.2.1 5.2.2 5.2.3 5.2.4 5.3 5.3.1 5.3.2 5.3.3 5.3.4 5.3.5 5.3.6 5.4 5.4.1 5.4.2 5.4.3 5.4.4 5.5 5.5.1 5.5.2 5.6

Specific Protection Equipment Requirements .............................. 17


Protection Equipment Design Principles - All New HV Switchgear ....... 17 Interfacing New Protection Schemes With Existing Equipment ............ 18 Multiple Use of Current Transformers Trip Circuit Supervision Breaker Fail Inter-trip General Requirements Multiple Ratio Current Transformers Protection Current Transformers Measurement Current Transformers Current Transformer Secondary Wiring General Requirements Voltage Transformer Secondary Wiring Voltage Transformer Alarms Voltage Transformer Supply to Protection Relays General Requirements Requirement for Two battery Systems 18 18 18 18 18 20 20 20 20 21 22 22 22 22 23

Current Transformers (CT) ........................................................................ 18 Additional Requirements for CTs with a Rated Secondary Current of 1 Amp.19

Voltage Transformers................................................................................. 21

Auxiliary Supply (DC) ................................................................................. 22

Protection Relays ....................................................................................... 24

JUNE 2007

Version 3.4

RailCorp

Page 6 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

5.7 5.8 5.9 5.9.1 5.9.2 5.9.3 5.10

Close Inhibit ................................................................................................ 24 Protection Alarms....................................................................................... 24 Inter-Trip Arrangements............................................................................. 25 Preferred Technology Fibre Optic Pilots Copper Pilots 25 25 25

Integrated Support System........................................................................ 25

6
6.1 6.1.1 6.1.2 6.1.3 6.1.4 6.1.5 6.1.6 6.2 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.3 6.3.1 6.3.2 6.3.3 6.3.4 6.4 6.4.1 6.4.2 6.4.3 6.4.4 6.5 6.5.1 6.5.2 6.5.3 6.5.4 6.5.5
JUNE 2007

Specific Equipment Applications ................................................... 26


33kV & 66kV Feeders.................................................................................. 26 Standard Protection Schemes Primary Protection Backup protection Circuit Breaker Fail Scheme Location of Current Transformers Metering Requirements Standard Protection Schemes Primary Protection Backup protection Circuit Breaker Fail Scheme Location of Current Transformers Metering Requirements Primary Protection for Busbars Primary Protection for Bus-tie Cables Backup Protection Location of Current Transformers Primary Protection Backup Protection Circuit Breaker Fail Scheme Protection Interface Requirements Standard Protection Schemes Primary Protection Backup Protection Circuit Breaker Fail Scheme Neutral Leakage
Version 3.4 RailCorp

26 26 26 27 27 27 28 28 28 29 29 29 29 30 30 30 31 31 31 32 32 32 32 32 32
Page 7 of 85

11kV feeders................................................................................................ 28

High Voltage Busbars & Bus-Tie Cables.................................................. 29

Rectifier Transformer and Power Cubicle ................................................ 31

System Transformers................................................................................. 32

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

6.5.6 6.5.7 6.6 6.6.1 6.6.2 6.6.3 6.6.4 6.6.5 6.6.6 6.7 6.7.1 6.7.2 6.7.3

Buchholz Relay Location of Current Transformers Transformers Supplied from Ring Main Units Transformers Supplied from SCADA Controlled ACCBs Standard Protection Schemes Primary Protection Backup Protection Circuit Breaker Fail Scheme Concept Design Documentation Detail Design Documentation Commissioning Documentation

33 33 33 33 33 34 34 34 34 35 35

11kV/415V Transformers............................................................................ 33

DOCUMENTATION REQUIREMENTS........................................................ 34

Appendix A

Protection Relays ............................................................................ 37

Appendix A.1 Approved Protection Relays...................................................................... 37 Appendix A.2 Location of Protection Relays ................................................................... 38

Appendix B Appendix C Appendix D Appendix E

ACCB Trip Coils - Standard Equipment Connection .................... 39 Two Battery Systems (125V DC) - Standard Protection Equipment Connection ....................................................................................... 41 Interfacing With Existing Pilot Wire Schemes............................... 42 Current Transformers (33kV & 66kV) ............................................. 43

Appendix E.1 Rectifier Instantaneous Overcurrent & Earth Fault ................................. 44 Appendix E.2 Overcurrent and Earth Fault ...................................................................... 45 Appendix E.3 Pilot Wire Schemes .................................................................................... 46 Appendix E.4 Bus-Zone Schemes & Transformer Differential....................................... 47

Appendix F Appendix G Appendix H Appendix I Appendix J Appendix K Appendix L Appendix M

Current Transformers for 11kV Switchgear................................... 48 Protection Relay Identification ....................................................... 49 Standard Test Block Wiring & Input/Output Relay Configuration50 Voltage and Current Transducers .................................................. 67 Pilot Wire Schemes ......................................................................... 68 Auto Re-close on High Voltage Feeders........................................ 69 Protection SCADA Alarms .............................................................. 70 Implementation Of SCADA Alarms & Control ............................... 74

JUNE 2007

Version 3.4

RailCorp

Page 8 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix N Appendix O Appendix P Appendix Q

Typical ACCB Auxiliary Supply Arrangement............................... 75 Protection Relay Labelling Guidelines .......................................... 77 Standard Current Transformer Configurations............................. 81 Protection Non-Compliances Particular to the ECRL Project...... 85

Appendix Q.1 11kV Protection........................................................................................... 85 Appendix Q.2 33kV Protection........................................................................................... 85

JUNE 2007

Version 3.4

RailCorp

Page 9 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Scope and Application


This document covers the Protection System requirements for the RailCorp High Voltage AC Network for 33kV, 66kV and 132kV system voltages. The scope of this publication does not currently include specific protection scheme requirements for the high voltage AC network at 2kV system voltage. This will be incorporated in a future revision of this specification. This document does not include protection requirements for the 1500V DC system. The Specific Protection Equipment Requirements (Section 5 and associated Appendix) are common requirements for the entire high voltage network. These protection requirements cover general design principles for protection schemes, as well as requirements relating specifically to the protection equipment. They do not include equipment used for detection and measurement of non-electrical protection parameters (such as oil and gas sudden pressure change, fibre optic temperature measurement), other than to specify necessary interface details. The correct design, implementation and management of the overall protection system are critical to the safe and reliable operation of the RailCorp power system. As such, all design processes for the protection system must follow the RailCorp Engineering Design Management Procedures. All new installations, modified and refurbished existing installations must comply with the requirements in this document. High voltage protection systems existing at the date of release of this document are not affected by the requirements of this document.

JUNE 2007

Version 3.4

RailCorp

Page 10 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Normative References
The following documents are either referenced in this standard or can provide further information. The edition is current at the time of publication of this document.

2.1

International Standards
Standard IEEE C.37.2 - 1996 Title Standard electrical power system device function numbers and contact designations.

2.2

Australian Standards
Standard AS1102-1996 AS 1675 - 1986 AS 2067 - 1984 AS 1243 - 1982 Title Graphical symbols for diagrams. Switchgear, control gear and protective devices. Current Transformers Measurement and Protection Switchgear assemblies and ancillary equipment for alternating voltages above 1 kV Voltage Transformers for Measurement and Protection

2.3

RailCorp Documents
Document EP 00 00 00 01 TI EP 00 00 00 12 SP EP 00 00 00 13 SP EP 00 00 00 15 SP EP 00 00 00 00 MP EP 03 02 00 01 SP EP 99 00 00 02 SP EP 01 00 00 01 SP Title RAC Electrical system General Description Electrical Power Equipment Integrated Support Requirements Electrical Power Equipment Design Ranges of Ambient Conditions Common requirements for Electrical Power Equipment Electric Power Technical Maintenance Plan Controls and Protection for Rectification Equipment System Commissioning tests 33kV AC Indoor Switchgear Non-Withdrawable

JUNE 2007

Version 3.4

RailCorp

Page 11 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Document TS 34 10 03 01 SP ED0001 P ED0021 P inclusive

Title Design & Installation Tunnel Fire safety New Passenger Railway Tunnels Engineering Design Management Procedures

2.4

Industry Publications
Network Protection & Automation Guide (AREVA) (previously titled: Protective Relays Application Guide) Alstom/Areva Protection Relay Application Guides

JUNE 2007

Version 3.4

RailCorp

Page 12 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Definitions and Abbreviations

Abbreviation ACCB DC Auxiliary Supply

Definition Alternating current circuit breaker Supply for the operation of electronic protection relays, energisation of multi-trip relay coils, energisation of HV ACCB trip and close coils and general control circuit operations. Nominally 125V DC or 48V DC. Current Transformer(s) Direct Current A communication cable that is used only for the control, indication and pilot wire functions between two substations. The cable is continuous between substations. Factory acceptance test Inter-trip The compartment on the high voltage switchgear where the protection relays, control equipment and wiring is installed. The compartment is usually accessed by a hinged door and does not require any isolation or operation of the switchgear for safe access. Protection relay used for the multi-tripping of ACCBs. This is a automatically reset relay with a hand reset flag. Protection relay used for the multi-tripping of ACCBs. This is a manually reset relay with a hand reset flag. The following are locations within the RailCorp electrical network which are classified as system substations for the purpose of this document. Any location that includes a high voltage circuit breaker. Traction substation High voltage switching station High voltage switchroom (except 2kV) 2kV locations, pole top and other distribution

CT(s) DC Dedicated Pilot Cable

FAT IT Low Voltage Compartment

MTA

MTM

Substation

JUNE 2007

Version 3.4

RailCorp

Page 13 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

substations that use HV fuses for protection are not classed as system substations. RTU SCADA Supervisory Remote Terminal Unit (Interface to SCADA system) Supervisory Control and Data Acquisition system. A connection to the Electrical Operating Centre to allow the remote operation of equipment and provision for remote monitoring of status and alarms using a SCADA system.

JUNE 2007

Version 3.4

RailCorp

Page 14 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

4 4.1

General Protection Philosophy General


In designing the protection schemes for RailCorps high voltage network, the following general principles shall be applied: All high voltage faults shall be detected and able to be cleared by two independent sets of protection (primary and backup). Either may be circuit breakers or fuses. The primary and backup protection schemes shall be independent. All HV circuit breakers shall be equipped with dual trip coils. Where primary and backup protection is installed in the same substation, that substation shall have two battery systems. Some substations are exempt from this requirement. This exemption is based on risk exposure considering safety, operational impact, economic and environmental considerations. The thermal limit current of the CTs shall not constrain the rating of associated power system elements. Primary protection shall be implemented using unit schemes wherever practical. The protection schemes shall be designed to eliminate or manage blind spots.

4.2

Protection Settings
The protection shall be set to operate at not more than 2/3 of the minimum phase to phase fault and not more than 2/3 of the minimum earth fault. The overcurrent protection settings shall, as far as practicable, be at least 1.5 times the maximum load current. Fault clearing times shall be minimised.

4.3

Grading
The protection shall be graded to ensure that the fault is cleared by the protection closest to the fault, and the area of interruption is minimised. A 0.3 second grading margin shall be provided for protection in series except that breaker fail timers shall be 0.2 second.

JUNE 2007

Version 3.4

RailCorp

Page 15 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Relay settings shall be, as far as practicable, at least 1.5 times the highest downstream setting.

JUNE 2007

Version 3.4

RailCorp

Page 16 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

5 5.1

Specific Protection Equipment Requirements Protection Equipment Design Principles - All New HV Switchgear
To ensure the independence and integrity of protection schemes the following principles shall apply: Protection current transformers shall be connected to protection equipment only. Approved transducers used for interfacing with the SCADA are to be regarded as protection equipment. Appendix I lists approved transducers. Primary and backup protection schemes shall be implemented using separate relays. Where the primary and backup scheme trip the same HV circuit breaker, the following shall apply: The primary and backup schemes shall use separate trip coils, one trip coil for the primary scheme the second trip coil for the backup scheme. Refer to Appendix B for standard trip coil arrangements and Appendix N for typical HV switchboard arrangements. The backup scheme (protection relay, trip coil control and supply) shall have a separate auxiliary supply.

Where two DC auxiliary supplies are required (see clause 5.5) the primary protection scheme is to be supplied by battery A and the backup protection scheme supplied by battery B. SCADA monitored trip circuit supply supervision with local indication shall be provided for all tripping circuits. The auxiliary supply for each bus-zone protection scheme (protection and multi-trip relays) shall have its auxiliary supply from a dedicated circuit originating at the distribution board. Fuse protection and monitoring shall be provided with the monitoring relay connected to the SCADA system. Individual protection schemes to be connected to dedicated current transformers.

JUNE 2007

Version 3.4

RailCorp

Page 17 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

5.2
5.2.1

Interfacing New Protection Schemes With Existing Equipment


Multiple Use of Current Transformers It is acceptable to have more than one protection scheme (maximum two schemes) connected to the same set of CTs as long as the following applies: It is not economically feasible to install additional CTs (eg. Circuit breaker would have to be replaced; additional post type CTs would be required.) The protection schemes are not the primary and backup protection for the same equipment. A failure of the CTs will not result in a piece of equipment having no protection due to an existing compromise in the protection system. The output of the current transformers shall be sufficient for the burden of all the connected protection schemes and associated equipment to ensure each scheme operates as required up to the available fault level.

5.2.2

Trip Circuit Supervision Where a new protection scheme is interfacing with existing switchgear that does not have trip circuit supervision (TCS), TCS shall be implemented either as a function of the protection relay (if available) or installation of a dedicated TCS relay (refer Appendix A).

5.2.3

Breaker Fail When new protection relays that have breaker fail functionality are installed in an existing substation, the breaker fail detection shall result in the energising of a multi trip relay. The multi-trip relay shall trip all the associated ACCBs on the busbar.

5.2.4

Inter-trip If the breaker fail function is associated with a feeder that does not have a dedicated ACCB, then it is acceptable to implement an inter-trip by destabilising the pilot wire schemes of feeders that are a possible source of fault current. When destabilising the pilot wire schemes this must be implemented at the pilot wire relay.

5.3
5.3.1

Current Transformers (CT)


General Requirements All protection and metering CTs shall comply with AS 1675.

JUNE 2007

Version 3.4

RailCorp

Page 18 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

The CT shall be easily replaceable and shall be installed with polarity markings assuming supply from the bus in all cases. All secondary leads shall be terminated in individual links in the appropriate compartment where the CT is installed and the earth point formed by using a proprietary cross connection for the links being used. The CTs shall be earthed at one point. This single point earth is to be within the applicable LV compartment. CTs shall be rigidly clamped to prevent movement under short circuit conditions. They shall be provided with rating plates and terminal markings as specified in AS 1675. The rating plates shall be mounted in such a manner that they are visible, and the secondary terminals shall be readily accessible. Duplicate rating plates shall be mounted in the instrument compartment with connection diagram. The majority of existing CTs installed in the RailCorps system have a rated secondary current of 5A. With the installation of GIS switchgear, the reduced space available for CTs has resulted in the necessity to install CTs with a rated secondary current of 1A. CTs shall safely withstand the mechanical and thermal stresses set up by a short circuit equal to the full short circuit rating of the switchgear. CTs shall have a minimum thermal limit current at least 1.5 times rated current unless modified by the RFT for the specific location. See 6.1.5 for CT location requirements for 33 & 66kV Feeders. See 6.2.5 for CT location requirements for 11kV Feeders. See 6.3.4 for CT location requirements for HV Busbars and Bus-Ties. See 6.5.7 for CT location requirements for System Transformers. 5.3.2 Additional Requirements for CTs with a Rated Secondary Current of 1 Amp. If it is proposed to use CTs with a rated secondary current of 1A, then the following issues shall be complied with. Provision of a detailed design solution for the secondary wiring under system fault conditions. This design solution must address the voltage withstand ratings of all connected equipment as the secondary voltages developed are five times larger than if the CTs have the preferred value of 5A. A complete integrated system support analysis of using the non-standard protection equipment must be economically justified. See 5.10 Integrated Support System for details.

JUNE 2007

Version 3.4

RailCorp

Page 19 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

5.3.3

Multiple Ratio Current Transformers Where multiple ratio CTs are used, the links associated with changing the CT ratio shall be fit for purpose. The CT terminals shall be clearly marked to enable correct changing of the ratio. The associated rating plate shall also be marked with the information to enable correct changing of the ratio.

5.3.4

Protection Current Transformers Protection CT shall be of a class entirely suitable for the connected equipment so as to give correct operation under all service and fault conditions. The following composite error shall apply: Differential schemes 2.5% Overcurrent & earth fault 10%

The rated short-time is 3 seconds. The rated short time current shall have a minimum rating equal to the short time withstand current of the associated switchboard or circuit breaker. Appendix B has a table listing the typical ratio and designation of current transformers, which are preferred for use in the RailCorp electrical network. 5.3.5 Measurement Current Transformers Measurement CTs shall be of a class entirely suitable for the application as specified in AS 1675. As a general guide the following are typical class of accuracy used in the RailCorp network: 0.5M for general tariff metering such as supplies to shops, workshops etc. 2M for general measurement such as transducers and ammeters.

The measurement current transformers shall have the same ratio and thermal current limit as the associated protection CTs on the circuit. 5.3.6 Current Transformer Secondary Wiring All CT secondary wiring shall be provided with test links at the marshalling strip within the respective low voltage compartment. The test links shall be Weidmuller SAKC10. The wiring shall be connected to the associated protection relay (or meter) via a test block that allows isolation of the relay / metering and short-circuiting of the

JUNE 2007

Version 3.4

RailCorp

Page 20 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

current transformer secondary. If the relay test blocks are not integral with the relay enclosure, test blocks of the type Areva MMLG01 shall be provided. The test blocks shall be located adjacent to the respective protection relay. The current transformer secondary wiring shall be coloured as detailed below: A : red B : white C : blue Neutral : black

The wiring shall be a minimum size of 2.5mm2 and have an insulation rating of 0.6/1 kV. Where 2.5mm2 wiring is used it shall have a stranding of 50/0.25mm. All wiring connections to CTs and to protection relays shall be made using double grip ring type pre-insulated crimp lugs. Wiring identification shall be in accordance with AS2067. Refer to EP 00 00 00 15 SP Common Requirements for Electrical Power Equipment, for details of cable identification requirements.

5.4
5.4.1

Voltage Transformers
General Requirements Voltage transformers shall be provided for all three phases and can either be a 3 phase voltage transformer or 3 single phase voltage transformers. Voltage transformers shall be manufactured and tested in accordance with AS 1243. They shall have a rated primary voltage as specified by the switchgear and have two secondary windings with a voltage factor of 1.9 for 30 seconds as follows:

PERFORMANCE CATEGORY A B (residual)

RATED VOLTAGE 110 V 110/3 V

ACCURACY CLASS 5P 3R

RATED BURDEN 8 mS 8 mS

TABLE 2: Voltage Transformer Specifications The neutral point of the star connected primary shall be earthed. The neutral point of the star connected secondary winding shall be brought out and

JUNE 2007

Version 3.4

RailCorp

Page 21 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

connected to suitably insulated terminals located in the LV compartment and earthed. The voltage transformers shall be protected by suitably rated circuit breakers connected in the low voltage circuit as close as possible to the transformer terminals. High voltage fuse protection of VTs is not mandatory and is only required where necessitated by equipment design. The requirement for a residual winding is dependent on the type of protection relays to be used. For maintenance, and for the commissioning of protection relays, it shall be possible to simulate the voltage conditions that would occur during earth faults and the supplier shall explain how this is achieved. A typical way to achieve this is to remove the high-voltage fuse in any one phase and earth that phase of the voltage transformer. 5.4.2 Voltage Transformer Secondary Wiring The voltage transformer secondary wiring shall be coloured as per the current transformer wiring with the exception of any open delta wiring, which shall be purple. Terminal blocks for VT secondary wiring shall provide 4mm sockets for the connection of test equipment. 5.4.3 Voltage Transformer Alarms A three phase, phase failure relay shall be connected to the star connected secondary winding of the voltage transformer. The phase failure relay shall provide a normally closed 'VOLTAGE TRANSFORMER FAIL' alarm contact as well as visual indication. The relay shall detect both under-voltage and negative phase sequence voltage unbalance on the load side of the main circuit breaker. 5.4.4 Voltage Transformer Supply to Protection Relays The VT supply to protection relays shall be via a dedicated circuit breaker for each protection relay. The circuit breaker shall have a voltage free auxiliary contact which is connected to the SCADA system to give an FEEDER XXX DIRECTIONAL VOLTAGE FAIL' alarm.

5.5
5.5.1

Auxiliary Supply (DC)


General Requirements The following are general requirements for the arrangement of auxiliary supplies to protection circuits and ACCB control.

JUNE 2007

Version 3.4

RailCorp

Page 22 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

All ACCBs shall be individually supplied from the 125V DC or 48V DC distribution board(s). The majority of RailCorp locations have an auxiliary supply of 125V DC, other locations have a supply of 48V DC. In each ACCB, distinct control circuits and equipment shall be individually fused. The fuses shall be sized to ensure there is discrimination. The following is a list of typical ACCB circuits and equipment that would be individually protected by fuses. 5.5.2 electronic protection relays trip coil circuits close control circuit motor/spring charge circuits alarm & indication circuits DC/DC power supplies (eg. ILIS power supply, transducer supplies)

Requirement for Two battery Systems To ensure integrity of the RailCorp electrical network is maintained when an auxiliary supply fails, strategic substations are required to have two independent substation battery systems. The criteria determining this requirement are: Connectivity of the substation (4 or more high voltage feeders) within the RailCorp electrical network. Maximum high voltage fault level and the margin to the rated short-time withstand current capacity of the switchgear installed at the substation. Criticality of the substation within the rail system. (eg. Main supply substation for city circle, rail tunnel, rail junction, last traction substation on a radial rail line). Where primary and backup protection is installed in the same substation, that substation shall have two battery systems. Some substations are exempt from this requirement. This exemption is based on risk exposure considering safety, operational impact, economic and environmental considerations. Complexity of the protection schemes and any resulting compromises in the protection coordination.

JUNE 2007

Version 3.4

RailCorp

Page 23 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

The associated main distribution boards of the battery systems are to be capable of being paralleled. Refer to Section 5.1 and Appendix C for specific requirements relating to protection schemes when there are two auxiliary supplies at a substation.

5.6

Protection Relays
All protection relays shall be flush mount and withdrawable. The auxiliary supply to the protection relays shall be 125V DC or 48V DC as determined by the existing substation battery or specified in the Substation design. Appendix A has a table listing the protection relays which are currently approved for use in the RailCorp electrical network. When specifying the type of protection relay to be used consideration must be given to ensure adequate integrated system support including availability of system spares. See 5.3.2 Additional Requirements for CTs with a Rated Secondary Current of 1 Amp. Alternatives to relays specified in Appendix A must be approved by the Chief Engineer, Electrical Systems.

5.7

Close Inhibit
Where a protection operation results in an MTM relay being energised, the MTM relay shall have normally closed contacts in the closing circuit of all the HV ACCBs that were tripped by the MTM. This is to prevent the ACCBs from being closed. This is applicable for all protection schemes. System transformers and 11kV/415V transformers shall have a close inhibit contact in both the primary and secondary ACCB closing circuits where fitted.

5.8

Protection Alarms
Every operation of a protection relay shall result in an individual alarm being sent to the SCADA system and provide a local indication. The alarm shall enable the Electrical System Operators to accurately identify the protection scheme that has operated. If a protection relay has more than one function (eg A and C overcurrent elements), then where practical each function shall have a separate alarm output. Refer to Appendix L for a detailed listing of SCADA alarms.

JUNE 2007

Version 3.4

RailCorp

Page 24 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

5.9
5.9.1

Inter-Trip Arrangements
Preferred Technology Optical fibre pilots are preferred for inter-tripping. Refer to Appendix A for protection relays currently preferred for use in the RailCorp Electrical Network for type of inter-trip relay.

5.9.2

Fibre Optic Pilots Where fibre optic pilots are available, the inter-tripping may be achieved utilising pilot wire relays that have inter-tripping as a function of the relay.

5.9.3

Copper Pilots Where inter-trip arrangements are required for a feeder, it is preferred the intertrip scheme is implemented using a dedicated pair of pilots for the scheme. If there are no spare pilots in the existing pilot cable, the inter-trip may be achieved by manipulating the feeder pilot wire scheme. A minimum of 15kV isolation shall be provided to avoid transfer of voltages across the pilots. This may be achieved by using an inter-trip relay that provides isolation at either end of the scheme.

5.10

Integrated Support System


An Integrated Support System exists for protection equipment. This current system is based on 5 Amp CTs and protection relays nominated in Appendix A. An economically justified integrated support analysis is required for any proposal to use non preferred schemes, relays or CTs. The analysis shall include relevant requirements of EP 00 00 00 12 SP and take account of the following: Test and support equipment Relay programming software Staff training Spares analysis and procurement Maintenance requirements analysis Operation and maintenance manuals

JUNE 2007

Version 3.4

RailCorp

Page 25 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

6 6.1
6.1.1

Specific Equipment Applications 33kV & 66kV Feeders


Standard Protection Schemes The following schemes shall be provided for the protection of 33kV and 66kV feeders:

RailCorp network feeder Primary Protection Pilot wire

Bulk Supply Feeder Directional over-current and earth fault (looking towards supply point) and Pilot wire or Distance protection (zone 1, last 20% Zone 2) at the supply end

Backup Protection

over-current and earth fault (may be directional if required by system configuration to achieve discrimination) and circuit breaker fail

In accordance with the other Network Operators policy

TABLE 2: 33kV & 66kV Feeder Protection Schemes 6.1.2 Primary Protection If the pilot circuit is not run via a dedicated pilot cable, an instantaneous overcurrent and earth fault check relay shall be provided in series with the trip from the pilot wire relay to prevent nuisance tripping of the feeder. All pilot wire schemes shall include pilot circuit supervision. This may be implemented either as a function of the pilot wire relay or using dedicated pilot circuit supervision equipment. 6.1.3 Backup protection The unit protection on the feeder shall be backed up by an over-current and earth fault scheme. This scheme shall operate via a circuit breaker and current transformers that are not part of the primary scheme.

JUNE 2007

Version 3.4

RailCorp

Page 26 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

6.1.4

Circuit Breaker Fail Scheme The failure of a circuit breaker to open in response to a protection trip command shall be detected and the appropriate upstream circuit breaker(s) tripped. A time delay shall be provided to avoid nuisance tripping. It is preferred that the feeder pilot wire relay provides this function. Where the pilot wire relay does not have this function an overcurrent and earth fault relay (with directional capabilities) shall be provided to implement the breaker fail scheme. A contact from the pilot wire relay shall be connected to the overcurrent and earth fault relay, which will initiate an internal timer (nominally set to 0.2s). If the fault has not been cleared within this time all possible sources of supply shall their ACCBs tripped. All ACCBs on the same busbar section as the failed ACCB shall be tripped via a multi-trip relay. Where the operation of a breaker fail scheme shall cause a Supply Point feeder to be not available, the associated protection relay(s) shall attempt to trip the ACCB via all available trip coils. The trip coils shall be connected to separate output contact/relays of the protection relay.

6.1.5

Location of Current Transformers It is preferred that the CTs are located on the busbar side of the feeder circuit breakers. However where this is not practicable, the current transformers for feeder protection may be located on the line side of the feeder circuit breaker. In this arrangement an inter-trip shall be provided to trip the feeder circuit breaker at the far end of the feeder whenever the local feeder circuit breaker is tripped. The far end circuit breaker is only required to trip if fault current is flowing through that circuit breaker. Refer to Section 5.9 Inter-Trip Arrangements for further details on inter-tripping. See Appendix J for typical Pilot Wire arrangements.

6.1.6

Metering Requirements Every feeder shall be provided with an ammeter and all bulk supply feeders shall be provided with kWh metering. Details of the ammeter, metering and their connection are specified in the appropriate switchgear standard. The requirements for 33kV indoor switchgear are detailed in EP 01 00 00 01 SP 33kV AC Indoor Switchgear Non-Withdrawable.

JUNE 2007

Version 3.4

RailCorp

Page 27 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

6.2 11kV feeders


6.2.1 Standard Protection Schemes The 11kV network supplies a large variety of installations with varying degrees of operational criticality. These installations range from underground stations, major signal boxes to minor maintenance locations supplied from pole mounted transformers. The criticality of the installation, accessibility of the 11kV feeder and the fault level determines the type of protection to be provided. 6.2.2 Primary Protection The following list details the requirement for the primary protection to be a pilot wire scheme. 11kV feeders supplying underground railway stations. 11kV feeders supplying major signal boxes 11kV feeders installed in tunnels 11kV feeders supplying installations deemed to be operationally critical 11kV feeders where it is time critical to clear the fault due to high fault levels or bushfire hazards. All pilot wire schemes shall include pilot circuit supervision. This can be implemented either as a function of the pilot wire relay or using dedicated pilot circuit supervision equipment. Where the primary protection scheme is not required to be a pilot wire scheme, the feeder shall be protected with an over-current and earth fault scheme. 6.2.3 Backup protection The primary protection on the feeder shall be backed up by an over-current and earth fault scheme. Where the primary protection is a pilot wire scheme, the backup over-current and earth fault scheme can be located on the same circuit breaker panel, however the scheme must operate via a separate protection relay and ACCB trip coil. Where the primary protection is not a pilot wire scheme, the backup overcurrent and earth fault scheme shall operate via a circuit breaker and current transformers that are not part of the primary scheme.

JUNE 2007

Version 3.4

RailCorp

Page 28 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Where the primary protection is an overcurrent and earth fault scheme and is located on a 11kV switchboard supplied directly from a transformer, a neutral leakage relay shall be used as backup protection for earth faults. The transformer primary overcurrent protection may be used to backup feeder overcurrent protection. This is subject to the transformer overcurrent settings being suitable. 6.2.4 Circuit Breaker Fail Scheme The failure of a circuit breaker to open in response to a protection trip command shall be detected and all ACCBs on the same busbar section as the failed ACCB shall be tripped via a multi-trip relay. The multi-trip relay used to implement this may be the bus-zone multi-trip relay. If the feeders are protected by a pilot wire scheme then the appropriate upstream circuit breaker(s) shall be tripped. A time delay (0.2s) shall be provided to avoid nuisance tripping. It is preferred that the protection relays provide this function. 6.2.5 Location of Current Transformers It is preferred that the CTs are located on the busbar side of the feeder circuit breakers. However where this is not practicable, the current transformers for feeder protection can be located on the line side of the feeder circuit breaker. This is subject to RailCorp approval. 6.2.6 Metering Requirements Every feeder shall be provided with an ammeter and all feeders that are a dedicated supply to commercial premises (eg, train maintenance centres) shall be provided with kWh metering. Details of the ammeter, metering and their connection are specified in the appropriate switchgear standard.

6.3
6.3.1

High Voltage Busbars & Bus-Tie Cables


Primary Protection for Busbars All 33kV and 66kV indoor switchgear shall have bus zone protection as the primary protection for the busbar. The requirement for 11kV indoor switchgear to have bus zone protection depends whether the location is a:

JUNE 2007

Version 3.4

RailCorp

Page 29 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

strategic location location with high fault levels location where there is more than one busbar section

The traditional high impedance bus-zone protection scheme using CTs is an approved RailCorp scheme. A fault detection scheme that has been type tested and is an integral system within the switchgear may be offered for consideration by RailCorp and if approved will be the preferred scheme. Strategically important outdoor 33kV and 66kV busbars shall also have high impedance bus zone protection as the primary protection. The criteria for this decision will be provided in a later version of this document. Separate schemes shall be provided for each section of the busbar. All ACCBs on the associated bus-section shall be tripped. Close inhibit shall also be implemented, refer to Section 5.7 The tripping of circuit breakers on an indoor switchboard shall be via a MTM relay. The tripping of circuit breakers on an outdoor busbar shall be via an MTA relay. 6.3.2 Primary Protection for Bus-tie Cables All bus-tie cables interconnecting 11kV, 33kV and 66kV indoor switchboards shall have high impedance bus zone protection as the primary protection. The scheme shall be arranged to trip the circuit breakers at both ends of the tie cable via a manually reset multi-trip relay. Close inhibit shall also be implemented, refer to Section 5.7 6.3.3 Backup Protection The backup protection for a busbar shall be upstream over-current and earth fault protection. The backup protection for a bus-tie shall be upstream over-current and earth fault protection except where the switchboard directly interfaces with a Supply Authority. Where the switchboard interfaces with a Supply Authority the bus-tie cables shall have a duplicate high impedance protection scheme as the backup protection. Refer to Appendix A for the type of relay to be used.

6.3.4

Location of Current Transformers The current transformers for protection of the busbar shall be located on the line side of all circuit breakers.

JUNE 2007

Version 3.4

RailCorp

Page 30 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

The current transformers for protection of the bus-tie cables shall be located on the busbar side of the tie circuit breaker. Where the current transformers for the feeder, bus-tie, or transformer circuits are not located on the busbar side of the circuit breaker and the bus zone scheme is used to cover the blind spots between the circuit breakers and the CTs, then the bus-zone scheme shall also initiate tripping of the circuit breakers at the far end of the feeder or tie cable, or on the other winding of the transformer.

6.4
6.4.1

Rectifier Transformer and Power Cubicle


Primary Protection The primary protection for the rectifier transformer and power cubicle shall be provided by an A and C instantaneous overcurrent and instantaneous earth fault relay. If the transformer is cable connected (terminals/bushings are not exposed), the circuit breaker shall be tripped via a MTM relay for earth faults. The overcurrent elements are required to operate when a fault on the +1500V DC busbar (when there is a 400V arc) is detected. A current transducer shall be provided in the B protection circuit. The transducer output shall be connected to the panel ammeter and analogue input to SCADA. See EP 03 02 00 01 SP Controls and Protection for Rectification Equipment, for further detailed information on these requirements.

6.4.2

Backup Protection The backup protection scheme for the rectifier transformer and power cubicle shall be provided by a separate protection scheme, which is located in the same substation. The protection relay shall be an A, B and C instantaneous overcurrent and instantaneous earth fault relay. If the transformer is cable connected, the circuit breaker shall be tripped via a MTM relay for earth faults.

6.4.3

Circuit Breaker Fail Scheme The failure of the circuit breaker to open in response to a protection trip command shall be detected and the associated bus-zone MTM relay shall be energised. A time delay of 0.2 seconds shall be provided to avoid nuisance tripping. It is preferred that the protection relays provide this function

JUNE 2007

Version 3.4

RailCorp

Page 31 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

6.4.4

Protection Interface Requirements Refer to EP 03 02 00 01 SP Controls and Protection for Rectification Equipment, for further detailed information on the protection interface requirements.

6.5
6.5.1

System Transformers
Standard Protection Schemes All 33kV and 66kV transformers 750MVA or greater in size shall have transformer differential as the primary protection and overcurrent and earth leakage as the backup protection. Oil filled transformers shall be fitted with a buchholz oil & gas relay.

6.5.2

Primary Protection The transformer differential scheme shall be arranged to trip both the primary and secondary circuit breakers. The tripping of the circuit breakers shall be via a multi-trip relay. If the transformer is cable connected (terminals/bushings not exposed) the multi-trip relay shall be a manually reset relay.

6.5.3

Backup Protection Overcurrent and earth fault shall be provided as the backup transformer protection. The tripping of the circuit breakers shall be via a multi-trip relay. If the transformer is cable connected (terminals/bushings not exposed) the multi-trip relay shall be a manually reset relay for earth faults and an automatically reset relay for overcurrent faults. Three phase over current protection shall be provided on the high or low voltage side of the transformer as backup protection to the outgoing feeder overcurrent protection.

6.5.4

Circuit Breaker Fail Scheme The failure of a circuit breaker to open in response to a backup protection trip command shall be detected and the associated bus-zone MTM relay energised. A time delay of 0.2 seconds shall be provided to avoid nuisance tripping. The three phase overcurrent protection relay on the same side of the transformer as the scheme being backed up shall provide this function.

6.5.5

Neutral Leakage

JUNE 2007

Version 3.4

RailCorp

Page 32 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Neutral leakage shall be provided as backup protection to feeder earth fault. The scheme shall trip both the primary and secondary circuit breaker of the transformer via an MTA relay. 6.5.6 Buchholz Relay A buchholz relay shall be provided in the oil line between the conservator and the main tank. Operation of either the oil or gas element of the buchholz relay shall trip both the primary and secondary circuit breakers via a manually reset multi-trip relay. Each element of the buchholz relay shall have voltage free alarm contacts, which are connected to the SCADA system. 6.5.7 Location of Current Transformers It is preferred that the current transformers for the differential protection are located on the busbar side of both the primary and secondary circuit breakers. Where this is not practicable, it is acceptable that the current transformers for transformer protection be located on the transformer side of the transformer circuit breaker. The current transformer for the neutral leakage protection shall be located on the neutral to earth connection of the transformer.

6.6
6.6.1

11kV/415V Transformers
Transformers Supplied from Ring Main Units All 11kV distribution transformers (200kVA and above up to 800kVA), that are supplied via an ACCB from a RMU shall be protected by a Merlin Gerin VIP300LL protection relay. An MMLG01 test block shall be fitted adjacent to the relay. Transformers less then 200kVA shall be protected by fuses. The VIP300LL relay can not be used for transformers less then 200kVA as there may be insufficient magnetising current to meet the self powering requirements of the relay.

6.6.2 6.6.3

Transformers Supplied from SCADA Controlled ACCBs Standard Protection Schemes All 11kV transformers 750kVA or greater in size shall have transformer differential as the primary protection and overcurrent and earth leakage as the backup protection. Oil filled transformers shall be fitted with a buchholz oil & gas relay.

JUNE 2007

Version 3.4

RailCorp

Page 33 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

For transformers < 750kVA primary protection shall be overcurrent and earth leakage. Transformer differential schemes may be used on smaller transformers where required to ensure that the transformer protection grades over the LV protection. 6.6.4 Primary Protection The transformer differential scheme shall be arranged to trip both the primary and secondary circuit breakers. The tripping of the circuit breakers shall be via a multi-trip relay. If the transformer is cable connected (terminals/bushings not exposed) the multi-trip relay shall be a MTM relay. 6.6.5 Backup Protection Overcurrent and earth fault shall be provided as the backup transformer protection. The backup protection scheme is not required to detect faults on the LV winding of a distribution transformer or the LV cables. The tripping of the circuit breakers shall be via a multi-trip relay. If the transformer is cable connected (terminals/bushings not exposed) the multi-trip relay shall be a MTM relay for earth faults and an MTA relay for overcurrent faults. 6.6.6 Circuit Breaker Fail Scheme The failure of a circuit breaker to open in response to a backup protection trip command shall be detected and the associated bus-zone MTM relay energised. A time delay of 0.2 seconds shall be provided to avoid nuisance tripping. It is preferred that the protection relays provide this function.

6.7

DOCUMENTATION REQUIREMENTS
There are three distinct stages for the submission of documentation related to the protection design and implementation for RailCorp to review. 1) 2) 3) The first stage is the concept design documentation. The second stage is the submission of the detailed design documentation. The third stage is the submission of all testing, commissioning and as-built documentation.

6.7.1

Concept Design Documentation

JUNE 2007

Version 3.4

RailCorp

Page 34 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

The following documentation is to be submitted to RailCorp prior to the procurement of any equipment that is required to meet comply with this standard: Approved operating diagrams Fault levels Protection concept design. This document shall include: Diagrams detailing the functionality of the protection schemes Text document outlining in detail the protection schemes. This document shall include such details as: functional description of protection schemes, current transformer details, protection relay types, trip coil, SCADA alarms, analogue details, auxiliary battery details.

Calculations (eg. CT knee-point voltage, VT burdens, fault levels) High voltage equipment specifications

6.7.2

Detail Design Documentation The following documentation is required to be submitted to RailCorp prior to the approval of equipment manufacture. Schematic diagrams Equipment arrangement / layout drawings Equipment label schedule

6.7.3

Commissioning Documentation The following commissioning documentation is required to be submitted to RailCorp prior to the energisation of equipment. Equipment FAT test results Primary injection test results Secondary injection test results Protection relay/scheme functionality checklists

JUNE 2007

Version 3.4

RailCorp

Page 35 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Protection relay software setting files Protection grading studies Protection instructions Equipment operating and maintenance manuals As-built documentation (drawings, schedules etc) Related test documentation to ensure the safe operation of the equipment (eg. earthing test results)

JUNE 2007

Version 3.4

RailCorp

Page 36 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix A
Appendix A.1

Protection Relays
Approved Protection Relays

The following tables detail the requirements for protection relays when new switchboards are installed in the RailCorp electrical Network. The tables detail the protection relays which are currently preferred for use in the RailCorp electrical network and when installing a new switchboard in an existing system whether the existing pilot wire relays are required to be replaced.

SCHEME

EQUIPMENT Supply point feeder

RELAY TYPE MHOB04, MiCOM P521/P540, SIEMENS 7SD610 (mandatory if fibre optic available)

Pilot Wire RailCorp feeder

MBCI02* or MiCOM P521/P541 (mandatory if fibre optic available)

Feeder Rectifier - primary Rectifier - backup OC, EF, DOC, DEF Current check System Transformer 11kV Distribution Transformer (refer Section 6.6) Busbar Bus-zone Transformer differential Neutral leakage MTA Bus-tie cable SystemTransformer (2 winding) Transformer

KCEG142, MiCOM P127 MCAG33 or MiCOM P124 KCEG142 or MiCOM P127 MCAG39 or MiCOM P122 MiCOM P127 VIP35

MCAG34 MCAG34, P127 (when duplicate protection required) KBCH120, MiCOM P632 KCEG142 or MiCOM P127 MVAJ11 (with flag)

JUNE 2007

Version 3.4

RailCorp

Page 37 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

SCHEME MTM Intertrip TCS Bus Supply

EQUIPMENT

RELAY TYPE MVAJ13 (hand reset with flag) GCM05 (15kV isolation) RMS 1TM10

48V DC supply 125V DC supply

RMS 1X10CAA RMS 1X10EAA

TABLE A1: Protection Relays The MBCI02 pilot wire relay is a specific model for use on the RailCorp system. The relay has been modified to produce a lower voltage suitable for the insulation level of communication pilots and is Austel approved.

Appendix A.2

Location of Protection Relays

The physical location of protection relays will depend on the type of switchgear installed. In general the protection relays and associated test blocks for specific equipment shall be located together on the same panel. This is usually on the low voltage compartment of the switchgear panels themselves (indoor switchgear) or on dedicated protection panels (for outdoor ACCBs or indoor switchgear that does not have the physical space for installing the relays). The particular requirements for specific relays and equipment are detailed below: Transformer protection - MTA and MTM relays located on the primary protection panel. 33/11kV transformer neutral leakage relay shall be located on the 11kV switchgear panel. Bus-zone protection relay and associated MTM relay located on the appropriate end panel. Bus cable tie protection relay and associated MTM relay located on either of the associated bus tie ACCB panels. Pilot wire isolation transformers shall be located as close as possible to the termination enclosure of the pilot cable.

JUNE 2007

Version 3.4

RailCorp

Page 38 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix B

ACCB Trip Coils - Standard Equipment Connection

The following table details the ACCB trip coils and associated relays that are connected to each trip coil. This table is based on typical protection schemes used in RailCorp. Protection designs for specific locations must be verified by RailCorp. Refer to 6.1.1 for additional requirements relating to breaker fail schemes and Supply Points.

EQUIPMENT Feeder Protection

PROTECTION SCHEME Pilot wire Overcurrent & Earth Fault Inter-trip Busbar protection trips via MTM Cable Bus-tie protection trips via MTM

TRIP COIL NUMBER 1 2 1 2 1 1 1,2 2 1 1,2 1 1 via MTM 2 2 & 1 via MTM 1

NOTES

Bus-zone & Bus-Tie

1 4

System Transformers

Differential trips via MTM or MTA Overcurrent trips via MTA Neutral Leakage trips via MTA

11kV/415V Transformers

Differential trips via MTM or MTA Overcurrent trips via MTA

2, 5 3

Rectifier Instantaneous Overcurrent Transformers Earth Fault (primary protn) Rectifier Transformers (backup protn) Rectifier Transformer Instantaneous Overcurrent Earth Fault MTM TABLE B1: Trip Coils Notes:

JUNE 2007

Version 3.4

RailCorp

Page 39 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

1)

The operation of the bus-zone protection energises an MTM relay, which trips all ACCBs on the section of the busbar. The trip coil number applies to all ACCBs that are tripped. If the differential protection operates via an MTM then the overcurrent protection shall trip via trip coil 2. Refer to 6.4 for requirements of when earth faults are required to energise MTM. When there is duplicate protection on the bus-tie cable the duplicate scheme shall trip the ACCBs via trip coil 2 (via an MTM). If there is no differential protection, then the overcurrent protection shall trip via trip coil 1.

2) 3) 4) 5)

JUNE 2007

Version 3.4

RailCorp

Page 40 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix C

Two Battery Systems (125V DC) - Standard Protection Equipment Connection

The following table details the battery system that the ACCB trip coils and protection relays should be connected to. This table is based on typical protection schemes used by RailCorp. When there are two battery systems the equipment should be connected across the two battery systems to obtain balanced loads as close as possible. Protection designs for specific locations must be verified by RailCorp. Refer to 5.5.2 for details of the requirement for two battery systems.

PRIMARY PROTECTION PRIMARY & BACKUP ONLY PROTECTION LOCATED IN SAME SUBSTATION ONE TRIP COIL TWO BATTERY SYSTEMS TWO TRIP COILS
Protection relay supply from one battery Trip coil supply from same battery as relay supply Protection relay supply from one battery Trip coil 1 supply from battery 1 Trip coil 2 supply from battery 2 Primary protection relay supply from battery 1 Backup protection relay supply from battery 2 Trip coil supply from battery 1 Primary protection relay supply from battery 1 Backup protection relay supply from battery 2 Trip coil 1 supply from battery 1 Trip coil 2 supply from battery 2

TABLE C1: Two Battery Systems Connection of Equipment Notes:


1) 2) When there is only one battery system, the two trip coils must be supplied from separate submains originating from the 125V DC distribution board. Refer to Appendix N for typical arrangement of auxiliary supplies to HV switchboards. This diagram illustrates the principle; however detailed design is required to ensure security of the protection scheme.

JUNE 2007

Version 3.4

RailCorp

Page 41 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix D

Interfacing With Existing Pilot Wire Schemes

The following table details whether the existing pilot wire scheme needs to be upgraded when a new switchboard is to be installed, and is interfacing with an existing pilot wire protection scheme.

SCHEME

EXISTING EQUIPMENT

SCHEME TO BE REPLACED YES NO NO NO NO NO

NOTES

Pilot wire

HO2 HO4 HMB4 MHOB04 MBCI02 MiCOM P521/P541

2 1,2 1 1

TABLE D1: Interfacing With Existing Pilot Wire Schemes Notes:


1) If there are fibre optic pilots available between substations or fibre is to be installed, then pilot wire relays that use fibre optic for their communication (MiCOM P521/P541) shall be used. If system spares are to be used to create/interface with an H04 or HMB4 scheme then the RailCorp Protection Engineer shall be consulted to ensure there are adequate spares available. If the number of spares available is at the minimum required number, then the pilot wire scheme shall be replaced.

2)

JUNE 2007

Version 3.4

RailCorp

Page 42 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix E

Current Transformers (33kV & 66kV)

The following tables detail the ratio and designation of current transformers, which are to be used in the RailCorp electrical network for typical schemes on the 66kV & 33kV high voltage system. The current transformer designation details are calculated based on the following parameters: Maximum CT secondary lead (loop) length of 20m with 2.5mm2 size cable for indoor equipment and a lead (loop) length of 150m with 16mm2 size cable for outdoor equipment. CT core knee point flux density of 1.45T System X/R = 5 MICOM P521 relay, refer to general equations for X/R<40 and tIdiff = 0.1s. MBCI relay, refer to general equations, X=1, large X/R, Kt = 20. Overcurrent and earth fault relays, Vk = In*If*(Rrelay+Rct+Rleads), with relay burdens as specified by the manufacturer.

Where the equipment to be protected is not in the following tables or the standard parameters above are not applicable then the protection CT requirements must be determined on an individual basis. Typical examples of these scenarios are: Lead lengths > 20m. System transformers with a size or voltage not specified below. Transformers with a different configuration. Feeders with a higher capacity than 500A.

JUNE 2007

Version 3.4

RailCorp

Page 43 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix E.1
EQUIPMENT

Rectifier Instantaneous Overcurrent & Earth Fault


VOLTAGE /SIZE 5.3, 4.28 & 2.5MVA CT RATIO RELAY TYPE MCAG33 CT DESIGNATION 10 P100F20 (specified on 200 tap) 10 P50F20 (specified on 200 tap) 10 P100F20 (specified on 100 tap) 10 P50F20 (specified on 100 tap)

Rectifier Tx 33kV

300/200/5 MiCOM P127 MCAG33

Rectifier Tx 66kV

5.3, 4.28, 2.5MVA

150/100/5 MiCOM P127

TABLE E1: Rectifier Protection Relays & CTs

JUNE 2007

Version 3.4

RailCorp

Page 44 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix E.2

Overcurrent and Earth Fault

CTs for use on overcurrent and earth leakage on feeders have been sized on a fault level of 31.5kA at 33kV and 15.75kA at 66kV.

EQUIPMENT

VOLTAGE /SIZE

SCHEME

CT RATIO 250/5

RELAY TYPE KCEG142 MiCOM P127 KCEG142

CT DESIGNATION 10P150 10P150 10P300 (specified on 300 tap) 10P300 (specified on 300 tap) 10P50F20

66kV Feeder

OC & EF

33kV Feeder

OC & EF

500/400 /300/5 MiCOM P127

33/11KV Tx (5MVA )

33KV

OC & EF

150/5

MiCOM P127

TABLE E2: Overcurrent and Earth Fault Protection Relays & CTs

JUNE 2007

Version 3.4

RailCorp

Page 45 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix E.3

Pilot Wire Schemes

CTs for use on pilot wire schemes have been sized on a fault level of 31.5kA at 33kV and 15.75kA at 66kV

EQUIPMENT

CT RATIO

RELAY TYPE MBCI02 or MiCOM P521/P541 MBCI02 or MiCOM P521/P541 MBCI02 or MiCOM P521/P541 MBCI02 or MiCOM P521/P541

CT DESIGNATION 0.3PL115R0.3

250/5 66kV Feeder 250/1

0.05PL50R0.8

500/400/300/5 33kV Feeder 500/400/300/1

0.3 PL200R0.3 (specified on 300 tap) 0.05 PL80R0.8 (specified on 300 tap)

TABLE E3: Pilot Wire Protection Relays & CTs

JUNE 2007

Version 3.4

RailCorp

Page 46 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix E.4

Bus-Zone Schemes & Transformer Differential

The overall design of a bus-zone scheme is critical to ensure stability for through faults. The requirement for stabilising resistors to ensure stability and for metrosils to limit CT output voltage shall be determined for each individual scheme. Please refer to the AREVA MCAG34 application brochure for methods of calculation and requirements. CTs for use on bus-zone schemes have been sized on a fault level of 31.5kA.

EQUIPMENT 33kV Buszone 33/11kV Tx 5MVA, Dyn1 (differential)

RELAY TYPE MCAG34 KBCH120 (two winding), MiCOM P632

CT RATIO 1250/5 33kV 150/5

CT DESIGNATION 0.1 PL200R0.4 2.5P50F20

TABLE E4: Bus-Zone & Transformer Differential Protection Relays & CTs Notes:
1) The P632 relay should be ordered with an extra I/O module. This is required to allow for the transformer and tapchanger alarms.

JUNE 2007

Version 3.4

RailCorp

Page 47 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix F

Current Transformers for 11kV Switchgear

The following current transformer details are typical values only. The CT specification shall be determined for specific individual applications and is subject to RailCorp approval.

EQUIPMENT

SCHEME

CT RATIO

RELAY TYPE MiCOM P521 MiCOM P127 MiCOM P632 MiCOM P127 MiCOM P127 MiCOM P632 MCAG34 MCAG34

CT DESIGNATION 0.05PL50R1.0 10P50F20 0.02PL100R3.0 10P50F20 10P50F20 0.15L50R0.3 0.03PL120R2.0 0.03PL120R2.0

Notes

11kV Feeder 11kV Feeder

Pilot Wire OC & EF Differential

300/1 300/150/1 450/0.577 450/1 150/1 100/1 600/1 600/1

33/11kV Tx (6.25 MVA )

OC & EF Neutral leakage

11KV/415V Tx (1MVA ) Busbar Bus-tie Cables

Differential Buszone Buszone

1 2 2

Notes: 1) 2) The rated primary current value will depend on the size of the transformer. The rated primary current value will depend on the rating of the busbar.

JUNE 2007

Version 3.4

RailCorp

Page 48 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix G

Protection Relay Identification

Device numbers and functions shall generally be in accordance with IEEE C.37.2. The detailed implementation shall be as set out below.

Relay Identifier Description 50A 50C 50/L 50/T 50/T1 51A 51C 63 64 67 67/L 87/B 87/BT 87/L 87/T MTA MTM SRR TBK1, 2 TCS Instantaneous Overcurrent Relay (A phase) Instantaneous Overcurrent Relay (C phase) Instantaneous Overcurrent Relay (A,C & E; feeder) Instantaneous Overcurrent Relay (A,C & E; transformer) Instantaneous Overcurrent Relay Backup (A,C & E; transformer) Inverse Time Overcurrent Relay (A phase) Inverse Time Overcurrent Relay (C phase) Buchholz Relay Instantaneous Earth Fault Relay Directional Overcurrent Relay Directional Overcurrent Relay (feeder) Differential Protective Relay (busbar high impedance) Differential Protective Relay (bus-tie cable high impedance) Differential Protective Relay (feeder - pilot wire scheme) Differential Protective Relay (transformer) Multi Trip Automatic Reset Relay Multi Trip Manual Reset Relay Send Receive Relay Test Block Trip Circuit Supervisory Relay TABLE F1: Protection Relay Identification

JUNE 2007

Version 3.4

RailCorp

Page 49 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix H

Standard Test Block Wiring & Input/Output Relay Configuration

The following test block, protection relay input and output configurations are based on the majority of existing configurations in the RailCorp network. The configurations do not determine the requirement for a particular protection function, but detail the test block connections and output or input relay if that function is to be implemented. It is not general practice to connect alarms via the test block or connect spare output relays to the test block. The test block shall be located adjacent to the protection relay it is associated with. It is important that new installations comply with these diagrams as they affect the programming of electronic relays, the testing procedures for periodic maintenance and the production of standard designs. Any deviations from the standard configuration must be approved by the Protection Engineer.

JUNE 2007

Version 3.4

RailCorp

Page 50 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

PILOT WIRE PROTECTION MBCI+MCRI Check RELAYS

Relay MMLG01 MBCI RELAY 1-1 contact MBCI RELAY 1-1 contact MCRI check contact MCRI check contact Pilot 1 MBCI (17) Pilot 2 MBCI (18) MBCI&MCRI Aux MBCI&MCRI Aux

Incoming Supplies

Ia (MBCI&MCRI) Ib (MBCI&MCRI) Ic (MBCI&MCRI) Io (MBCI&MCRI)

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Pilot Wire Trip MBCI inhibit(11) Pilot 1 Pilot 2 + 125V dc Aux Supply - 125V dc Aux Supply

Ia Ib Ic Io

MBCI RELAY OUTPUT RELAYS RELAY 1-1 RELAY 1-2 RELAY 2-1 RELAY 2-2 PILOT WIRE TRIP PILOT WIRE TRIP ALARM INTERTRIP SEND SPARE

JUNE 2007

Version 3.4

RailCorp

Page 51 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

MBOH04 RELAY

Relay MMLG01 MB0H04 contact (1) MB0H04 contact (3)

Incoming Supplies

Pilot 1 MB0H04 Pilot 2 MBOH04

Ia (MBCI&MCRI) Ib (MBCI&MCRI) Ic (MBCI&MCRI) Io (MBCI&MCRI)

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Pilot Wire Trip Spare Spare Pilot 1 Pilot 2 Spare Spare

Ia Ib Ic Io

JUNE 2007

Version 3.4

RailCorp

Page 52 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

P521 RELAY

Relay MMLG01 RELAY 1 contact RELAY 1 contact

Incoming Supplies

TERMINAL 33 TERMINAL 34 RELAY 8 contact RELAY 8 contact Ia Ib Ic Io

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Pilot Wire Trip Spare Spare Spare Spare + 125V dc Aux Supply - 125V dc Aux Supply Trip +ve Breaker Fail Trip Ia Ib Ic Io

OUTPUT RELAYS: RELAY 1 PILOT WIRE TRIP RELAY 2 TCS ALARM RELAY 3 PILOT WIRE TRIP ALARM RELAY 4 COMMS FAIL ALARM RELAY 5 SPARE RELAY 6 BREAKER FAIL ALARM RELAY 7 SPARE RELAY 8 BREAKER FAIL TRIP INPUT RELAYS: L1 L2 L3 L4 L5

INTERTRIP INITIATE TCS INPUT SPARE SPARE SPARE

JUNE 2007

Version 3.4

RailCorp

Page 53 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

SIEMENS 7SD610 RELAY

Relay MMLG01 RELAY BO4 contact RELAY BO4 contact

Incoming Supplies

RELAY BO5 contact RELAY BO5 contact TERMINAL F1 TERMINAL F2 RELAY BO3 contact RELAY BO3 contact Ia Ib Ic Io

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Pilot Wire Trip Spare Spare Trip +ve Intertrip Trip + 125V dc Aux Supply - 125V dc Aux Supply Trip +ve Breaker Fail Trip Ia Ib Ic Io

OUTPUT RELAYS: BO1 EA ACCB STATUS BO2 COMMS FAIL ALARM BO3 BREAKER FAIL TRIP BO4 PILOT WIRE TRIP BO5 INTERTRIP RECEIVE Note: Output relays BO1, BO2 & BO3 are not voltage free contacts. The +125V DC for the breaker fail trip is also connected to B01 & B02 contacts by internal relay wiring.

JUNE 2007

Version 3.4

RailCorp

Page 54 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

RECTIFIER OC & EF PROTECTION P127 RELAY

Relay MMLG01 RELAY 1 contact RELAY 1 contact RELAY 3 contact RELAY 3 contact

Incoming Supplies

TERMINAL 33 TERMINAL 34 RELAY 8 contact RELAY 8 contact Ia Ib Ic Io

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Overcurrent Trip Trip +ve Earth Fault Trip Spare Spare + 125V dc Aux Supply - 125V dc Aux Supply Trip +ve Breaker Fail Trip Ia Ib Ic Io

OUTPUT RELAYS: RELAY 1 OVERCURRENT & EARTH FAULT TRIP RELAY 2 TCS ALARM RELAY 3 EARTH FAULT TRIP RELAY 4 OVERCURRENT ALARM RELAY 5 EARTH FAULT ALARM RELAY 6 BREAKER FAIL ALARM RELAY 7 SPARE RELAY 8 BREAKER FAIL TRIP INPUT RELAYS: INPUT L1 INPUT L2 INPUT L3 INPUT L4 INPUT L5 INPUT L6 INPUT L7

SPARE SPARE SPARE TCS TIMER INITIATE SPARE SPARE

JUNE 2007

Version 3.4

RailCorp

Page 55 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

RECTIFIER OC & EF PROTECTION MCAG33 RELAY Relay MMLG01 MCAG trip contact MCAG trip contact Spare trip contact Spare trip contact Spare Spare Spare Spare Spare Spare Ia Ib Ic Io ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____ MVAJ13 Trip +ve MVAJ13 Trip Spare trip contact Spare trip contact Spare Spare Spare Spare Spare Spare Ia Ib Ic Io Incoming Supplies

RELAY CONTACTS: A contacts: terminals 1 & 3 : trip 2 & 4 SCADA alarm terminals 5 & 7 : trip 6 & 8 SCADA alarm terminals 9 & 11 : trip 10 & 12 SCADA alarm

E/F contacts: C contacts:

Notes: 1. A & C phase trip contacts are connected in parallel at the relay terminals.

JUNE 2007

Version 3.4

RailCorp

Page 56 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

33/11kV TRANSFORMER OC & EF PROTECTION

P127 RELAY
Relay MMLG01 RELAY 7 contact RELAY 7 contact RELAY 3 contact RELAY 3 contact ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____ Trip +ve Overcurrent Trip Trip +ve Earth Fault Trip Spare Spare + 125V dc Aux Supply - 125V dc Aux Supply Trip +ve Breaker Fail Trip Ia Ib Ic Io Incoming Supplies

TERMINAL 33 TERMINAL 34 RELAY 8 contact RELAY 8 contact Ia Ib Ic Io

OUTPUT RELAYS: RELAY 1 NOT AVAILABLE * RELAY 2 TCS ALARM RELAY 3 EARTH FAULT TRIP RELAY 4 OVERCURRENT ALARM RELAY 5 EARTH FAULT ALARM RELAY 6 BREAKER FAIL ALARM RELAY 7 OVERCURRENT TRIP RELAY 8 BREAKER FAIL TRIP

INPUT RELAYS: INPUT L1 INPUT L2 INPUT L3 INPUT L4 INPUT L5 INPUT L6 INPUT L7

SPARE SPARE SPARE TCS SPARE SPARE SPARE

* THE BREAKER FAIL FUNCTION OF THE RELAY IS INITIATED INTERNALLY BY RELAY 1. HENCE RELAY 1 IS PROGRAMMED TO BE ENERGISED FOR EITHER AN OVERCURRENT OR EARTH FAULT TRIP. HOWEVER, IT IS NOT CONNECTED EXTERNALLY AS AN OVERCURRENT TRIP IS REQUIRED TO ENERGISE AN MTA RELAY AND THE EARTH FAULT TRIP IS REQUIRED TO ENERGISE AN MTM RELAY.

JUNE 2007

Version 3.4

RailCorp

Page 57 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

11kV DISTRIBUTION TRANSFORMER OC & EF PROTECTION VIP35 RELAY

Relay MMLG01 TERMINAL 2 TERMINAL 3 ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

TERMINAL 12 TERMINAL 13

TERMINAL 9 TERMINAL 10 TERMINAL 7 TERMINAL 8 TERMINAL 5 TERMINAL 6

Trip -ve Trip +ve Spare Spare Io Io Spare Spare Ia Ia Ib Ib Ic Ic

JUNE 2007

Version 3.4

RailCorp

Page 58 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

11kV DISTRIBUTION TRANSFORMER OC & EF PROTECTION VIP300LL RELAY

Relay (x1 range 4-50A) MMLG01 TERMINAL 15 TERMINAL 16 ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

TERMINAL 12 TERMINAL 8 TERMINAL 11 TERMINAL 6 TERMINAL 10 TERMINAL 4

Trip -ve Trip +ve Spare Spare Spare Spare Spare Spare Ia Ia Ib Ib Ic Ic

VIP300LL RELAY

Relay (x4 range 50-200A) MMLG01 TERMINAL 15 TERMINAL 16 ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

TERMINAL 12 TERMINAL 7 TERMINAL 11 TERMINAL 5 TERMINAL 10 TERMINAL 3

Trip -ve Trip +ve Spare Spare Spare Spare Spare Spare Ia Ia Ib Ib Ic Ic

JUNE 2007

Version 3.4

RailCorp

Page 59 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

FEEDER DOC & DEF PROTECTION P127 RELAY

Relay MMLG01 RELAY 1 contact RELAY 1 contact Va Vb Vc Vn TERMINAL 33 TERMINAL 34 RELAY 8 contact RELAY 8 contact Ia Ib Ic Io

Incoming Supplies

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Trip Va Vb Vc Vn + 125V dc Aux Supply - 125V dc Aux Supply Trip +ve Breaker Fail Trip Ia Ib Ic Io

OUTPUT RELAYS: RELAY 1 OVERCURRENT & EARTH FAULT TRIP RELAY 2 TCS ALARM RELAY 3 SPARE RELAY 4 OVERCURRENT ALARM RELAY 5 EARTH FAULT ALARM RELAY 6 BREAKER FAIL ALARM RELAY 7 INTERTRIP SEND (IF REQUIRED) RELAY 8 BREAKER FAIL TRIP

INPUT RELAYS: INPUT L1 INPUT L2 INPUT L3 INPUT L4 INPUT L5 INPUT L6 INPUT L7

SPARE SPARE SPARE TCS SPARE SPARE SPARE

JUNE 2007

Version 3.4

RailCorp

Page 60 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

FEEDER DOC & DEF PROTECTION KCEG142 RELAY

Relay MMLG01 KCEG142 trip contact KCEG142 trip contact Va Vb Vc Vn KCEG142 Aux KCEG142 Aux KCEG142 ACCB fail trip contact KCEG142 ACCB fail trip contact Ia Ib Ic Io

Incoming Supplies

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

52 Trip +ve 52 Trip Va Vb Vc Vn + 125V dc Aux - 125V dc Aux ACCB/fail trip +ve ACCB/fail multitrip Ia Ib Ic Io

OUTPUT RELAYS: RELAY 0 SPARE RELAY 1 BREAKER FAIL ALARM RELAY 2 SPARE RELAY 3 OVERCURRENT & EARTH FAULT TRIP RELAY 4 OVERCURRENT ALARM RELAY 5 EARTH FAULT ALARM RELAY 6 SPARE RELAY 7 BREAKER FAIL TRIP

JUNE 2007

Version 3.4

RailCorp

Page 61 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

TRANSFORMER DIFFERENTIAL PROTECTION P632/MBCH RELAY

Relay MMLG01 P632/MBCH trip contact P632/MBCH trip contact Spare Ia (delta connected C.Ts) Ib (delta connected C.Ts) Ic (delta connected C.Ts) P632/MBCH Aux P632/MBCH Aux Spare Spare Ia Ib Ic Io ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

MVAJ Trip +ve MVAJ Trip Spare Ia Ib Ic + 125V dc Aux - 125V dc Aux Spare Spare Ia Ib Ic Io

OUTPUT RELAYS (P632): K901 TX DIFFERENTIAL TRIP K902 K903 K904 K905 K906 K907 K908 RELAY HEALTHY BREAKER FAIL TRIP TX DIFFERENTIAL TRIP ALARM TX BUCHHOLZ GAS ALARM TX BUCHHOLZ OIL ALARM TAP CHANGER ALARM TCS ALARM

K701 K702 K703 K704 K705 K706 K707 K708

TAP CHANGER PRESSURE SWITCH ALARM BREAKER FAIL ALARM TAP CHANGER OIL SURGE ALARM SPARE SPARE SPARE SPARE SPARE

INPUT RELAYS (P632): U901 TAP CHANGER OIL SURGE OPERATION U902 TX BUCHHOLZ OIL SURGE OPERATION U903 TX BUCHHOLZ GAS OPERATION U904 TAP CHANGER ALARM U701 U702 U703 U704 U705 U706 TAPCHANGER PRESSURE SWITCH TCS SPARE SPARE SPARE SPARE

JUNE 2007

Version 3.4

RailCorp

Page 62 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

DIRECTIONAL OC/E FEEDER PROTECTION: RELAY: MCGG52 + METI

Relay MMLG01 MCGG trip contact MCGG trip contact Va Vb Vc METI Aux MCGG &METI Aux MCGG Aux Vo1 (open delta voltage) Vo2 (open delta voltage) Ia Ib Ic Io ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

52 Trip +ve 52 Trip Va Vb Vc + 125 V dc Aux - 125 V dc Aux Vo1 Vo2 Ia Ib Ic Io

JUNE 2007

Version 3.4

RailCorp

Page 63 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

FEEDER PROTECTION, OVERCURRENT & EARTH FAULT RELAY: MCGG52/82

Relay MMLG01 MCGG trip contact MCGG trip contact Spare Spare Spare Spare MCGG Aux MCGG Aux Spare Spare Ia Ib Ic Io ______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Incoming Supplies

52 Trip +ve 52 Trip Spare Spare Spare Spare + 125 V dc Aux - 125 V dc Aux Spare Spare Ia Ib Ic Io

JUNE 2007

Version 3.4

RailCorp

Page 64 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

BUS TIE / BUS ZONE PROTECTION MCAG34 RELAY

Relay MMLG01 MCAG trip contact MCAG trip contact Spare trip contact Spare trip contact Spare Spare Spare Spare Spare Spare Ia Ib Ic Io

Incoming Supplies

______2____x____1_____ ______4____x____3_____ ______6____x____5_____ ______8____x____7_____ ______10___x____9_____ ______12___x___11_____ ______14______13_____ ______16___x___15_____ ______18___x___17_____ ______20___x___19_____ ______22___x___21_____ ______24___x___23_____ ______26___x___25_____ ______28___x___27_____

Trip +ve Trip Spare trip contact Spare trip contact Spare Spare Spare Spare Spare Spare Ia Ib Ic Io

RELAY CONTACTS: A contacts: B contacts: C contacts: terminals 1 & 3 : trip 2 & 4 SCADA alarm terminals 5 & 7 : trip 6 & 8 SCADA alarm terminals 9 & 11 : trip 10 & 12 SCADA alarm

Notes: 1. A, B &, C phase trip contacts are connected in parallel at the relay terminals.

JUNE 2007

Version 3.4

RailCorp

Page 65 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

RECTIFIER LOCAL BACKUP PROTECTION MVTT14 + MCTI39 RELAYS

Relay MMLG01

Incoming Supplies/Contacts

MCTI trip contact ______2____x____1_____ MCTI trip contact ______4____x____3_____ MCTI current check ______6____x____5_____ MCTI current check ______8____x____7_____ lLocal bu +ve ______10___x____9_____ MVTT start ______12___x___11_____ Local bu +ve ______14______13_____ Local bu -ve ______16___x___15_____ MVTT Breaker fail trip contact ______18___x___17_____ MVTT Breaker fail trip contact ______20___x___19_____ MCTI Ia ______22___x___21_____ MCTI Ib ______24___x___23_____ MCTI Ic ______26___x___25_____ MCTI Io ______28___x___27_____

52 Trip +ve 52 Trip CB/fail trip +ve CAG33 contact CAG33 contact + 125V dc local bu Aux - 125V dc local bu Aux CB/fail multitrip Ia Ib Ic Io

JUNE 2007

Version 3.4

RailCorp

Page 66 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix I

Voltage and Current Transducers

Transducers that are to be used to provide the SCADA system with current and voltage information relating to the high voltage network shall have the following general characteristics: Output of 020mA Mean sensing Self powered

The following transducer is approved for connection in the protection current transformer circuit. Areva Istat 300; Type 3CAEA513AA (for CTs with 1A secondaries) Areva Istat 300; Type 3CAEA55GKA (for CTs with 5A secondaries)

The following transducer is approved for connection in the voltage transformer circuit. Areva Istat 300; Type 3VAEA5450A, (nominal input range of 0-125V ac to measure a 110V ac voltage transformer output, usually measuring the voltage between A & C).

JUNE 2007

Version 3.4

RailCorp

Page 67 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix J

Pilot Wire Schemes

JUNE 2007

Version 3.4

RailCorp

Page 68 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix K

Auto Re-close on High Voltage Feeders

The RailCorp re-closure policy is as follows: In general, one auto re-close in 5 seconds by SCADA (ie the master station initiates the auto re-close if all the requirements are met). This policy applies to the following: 2kV, 11kV, 33kV 66kV aerial lines 11kV, 33kV 66kV cables, no auto re-close 2kV signalling cables do have auto re-close because of the criticality of maintaining the supply and often the fault blows clear. A feeder that is partially cable and partially aerial line is treated as aerial line.

The auto re-close is taken off 33kV and 66kV feeders that traverse areas considered to be a bush fire risk when fire bans are imposed. This is a master station function initiated by the ESO's. Auto re-close is also automatically inhibited for 10 minutes after a close control.

JUNE 2007

Version 3.4

RailCorp

Page 69 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix L

Protection SCADA Alarms

PROTECTION SCADA ALARMS ORIGIN OF ALARM SCADA ALARM NAME ACCB SpringCharged LowGas LowGasLockOut MotorSupply MotorTrouble The number of alarm stages will depend on the ACCB being installed. COMMENTS

PROTECTION RELAY

DirectionProtectionA DirectionProtectionB DirectionProtectionC DirectionRelayFail DirectionalDCSupply PilotWireTripA PilotWireTripB PilotWireTripC BrokenConductorA BrokenConductorB BrokenConductorC PilotWireComms PilotWireRelayFail OverCurrentA OverCurrentB

JUNE 2007

Version 3.4

RailCorp

Page 70 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

PROTECTION SCADA ALARMS ORIGIN OF ALARM SCADA ALARM NAME OverCurrentC EarthLeakage InstOverCurrentA InstOverCurrentB InstOverCurrentC Inst_OC/ELtrip OverCurrentRelayFail BreakerFail NeutralLeakageProtection IntertripReceive IntertripSend BusZone1 BusZone2 BusZone3 BusZoneRelayFail DifferentialProtectionA DifferentialProtectionB DifferentialProtectionC DifferentialRelayFail TripCircuitSupervision TRANSFORMER BuchholzGas BuchholzOil TCBuchholzGas These alarms originate from the COMMENTS

JUNE 2007

Version 3.4

RailCorp

Page 71 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

PROTECTION SCADA ALARMS ORIGIN OF ALARM SCADA ALARM NAME TCBuchholzOil TCFail TCLowLimit TCHighLimit TCControlSupply TCInProgress TCIncomplete TCRefSupplyAlarm TemperatureAlarm This alarm originates from the temperature indicators on the transformer. There could possibly be several stages. COMMENTS transformer tap changer.

VOLTAGE TRANSFORMER

PhaseFailure

This alarm originates from a dedicated phase failure relay connected to the output of the VT. This alarm originates from a LV circuit breaker that supplies the voltage to the specific directional protection relay.

DirectionalAlarm

DCCB Frame Leakage BATTERY CHARGER

DCFrameLeakage BattChargerAC BattUnderVolts BattOverVolts BattConnected These alarms originate from the battery charger and the exact alarms available will depend on the battery charger.

JUNE 2007

Version 3.4

RailCorp

Page 72 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Not all the alarms in the above list will be applicable. When determining the proposed alarms the following factors must be considered: Type of relay Capacity of RTU Function of relay Value adding of the alarm information to the EOC operator and RailCorp Protection Engineer.

In many existing locations some of the protection alarms (eg. TCS) are connected in parallel for each piece of equipment to give one general alarm. This was due to the limitations on the quantity of alarms that could be connected to the RTU at the time of installation.

JUNE 2007

Version 3.4

RailCorp

Page 73 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix M

Implementation Of SCADA Alarms & Control

The SCADA alarms and control to and from equipment can be implemented by hard wiring or using a high level interface such as a serial link. Electronic protection relays can be used to convey the information by using discrete output relays or via serial links. However certain information is critical for system operation and must be independent on the protection relay or communication link to the RTU. The following list details the SCADA alarms and control that are required to be hard wired to the RTU.

ACCB control ACCB indication (both open and closed) ACCB DISCONNECTOR/ISOLATOR indication (all positions)* EARTH SWITCH indication (both open and closed)* Tapchanger control Battery Charger alarm Protection relay watchdog alarms Trip Circuit Supervision (TCS), where provided by a dedicated TCS relay. Analogues (current and voltage) Phase failure relay * If all circuit breakers on a switchboard are not fitted with electronic relays having adequate RS485 communications to the RTU

JUNE 2007

Version 3.4

RailCorp

Page 74 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix N

Typical ACCB Auxiliary Supply Arrangement

JUNE 2007

Version 3.4

RailCorp

Page 75 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

JUNE 2007

Version 3.4

RailCorp

Page 76 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix O

Protection Relay Labelling Guidelines

The following rules apply to the labelling of protection relays and associated auxiliary relays: LOCATION OF LABELS: Labels should be located above the relay. If this is not possible, then they should be located directly below the relay.

COLOUR OF LABELS: All protection relays labels shall have black writing on a yellow background. All auxiliary relays (such as multi-trip relays) shall have black writing on a white background.

FORMAT To keep the length of labels to a minimum, abbreviations shall be used for the protection functions. The valid abbreviations are detailed in Table N1. All labels are to be in CAPITALS (except for abbreviations such as Tx & kV). The description of equipment shall be consistent with terminology as used in the AC operating diagrams. This is summarised below: FEEDERS: Feeder ID ;

Where Feeder ID is the unique 3 digit identification assigned to each high voltage feeder. TRANSFORMERS: Unit ID + voltage ratio + Tx ;

Where Unit ID is the identification given where there are multiple transformers (eg. No.1, No.2 etc). voltage ratio is the voltage ratio of the transformer usually expressed in kV (eg. 33/11kV, 66/33kV). RECTIFERS: Unit ID + RECTIFIER

Where Unit ID is the identification given where there are multiple rectifiers (eg. No.1, No.2 etc).

JUNE 2007

Version 3.4

RailCorp

Page 77 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

CONTENT:

FIRST LINE OF LABEL: The following sequence should be used to construct a label: 1) Equipment being Protected/Monitored
eg. No.1 RECTIFIER BUS ZONE 792 No.2 33/11kV Tx

2)

Type of Protection
eg. DOC & DE RELAY PW RELAY A DOC RELAY A OC RELAY FL RELAY Tx OC RELAY Tx DIFF RELAY

3)

Make of Relay in Brackets.


eg. (HMB4), (P521), (HO4) (CDD31), (P127), (CRP7), (CR LE) (P632), (KBCH), (DDT)

4)

Pointer to Relay (if needed)


eg.

EXAMPLES OF LABELS:
798 DOC & DE RELAY (P127) 798 PW RELAY (P521) No.1 RECT IOC & IE RELAY (MCAG33) No.1 RECT IOC & IE BACKUP RELAY (P127) TRIP CCT 1 TCS RELAY (1TM10) No.1 33/11kV TxDIFF RELAY (P632) No.1 33/11kV Tx OC & E RELAY (P127) 1-2 BZT RELAY (MCAG34) 1-2 BZT MTM RELAY (MVAJ13) No.1 33/11kV Tx MTA RELAY (MVAJ11)

JUNE 2007

Version 3.4

RailCorp

Page 78 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

No.1 SECTION BZ MTM RELAY (MVAJ13)

PROTECTION FUNCTION ARC DETECTION BUCHHOLZ BREAKER FAIL BLOCKING RELAY BACKUP BUS ZONE BUS ZONE TIE DIRECTIONAL EARTH FAULT DIRECTIONAL INSTANTANEOUS OVERCURRENT DIRECTIONAL OVERCURRENT EARTH FAULT DCCB FRAME LEAKAGE AC FRAME LEAKAGE RECTIFIER FRAME LEAKAGE INSTANTANEOUS EARTH LEAKAGE INTELLIGENT GAS INFORMATION SYSTEM INTELLIGENT LIGHT INFORMATION SYSTEM INSTANTANEOUS OVERCURRENT INTERTRIP INSTANTANEOUS & TIME DELAY OVERCURRENT MUTI TRIP RELAY AUTOMATIC RESET MULTI TRIP RELAY MANUAL RESET (HAND) NEUTRAL LEAKAGE OVERCURRENT LOW OIL OVERCURRENT & RESIDUAL EARTH FAULT INVERSE TIME PRESSURE SWITCH

ABBREVIATION AD B BF BRly BU BZ BZT DE DIOC DOC E FLDC FL FLR IE IGIS ILIS IOC IT ITOC MTA MTM NL OC LO ORET PS

JUNE 2007

Version 3.4

RailCorp

Page 79 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

PROTECTION FUNCTION PILOT WIRE DC REVERSE CURRENT TRANSFORMER DIFFERENTIAL TRANSFORMER WINDING TEMPERATURE TRIP CIRCUIT SUPERVISION TRIP SUPPLY SUPERVISION

ABBREVIATION PW RC TxDIFF WT TCS TSS

TABLE N1: Protection Function Abbreviations

JUNE 2007

Version 3.4

RailCorp

Page 80 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix P

Standard Current Transformer Configurations

JUNE 2007

Version 3.4

RailCorp

Page 81 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

JUNE 2007

Version 3.4

RailCorp

Page 82 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

JUNE 2007

Version 3.4

RailCorp

Page 83 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

JUNE 2007

Version 3.4

RailCorp

Page 84 of 85

Electrical Engineering Standard Fault Protection Protection System Requirements for the High Voltage Network

EP 19 00 00 02 SP

Appendix Q

Protection Non-Compliances Particular to the ECRL Project

This appendix details known design issues relating to the protection schemes and equipment installed in the ECRL project that do not comply with the general requirements of this standard. These arrangements have been accepted for the ECRL project only.

Appendix Q.1

11kV Protection
Bus-zone protection not installed on the 11kV switchboards, (blocking scheme installed in lieu). Pilot wire protection not installed on the 11kV feeders. Multi-trip relays not used. Dual trip coils not installed. Test blocks not wired in accordance with standard configuration. Protection relays not programmed with standard configuration.

Appendix Q.2

33kV Protection
Multi-trip relays not used on the 33/11kV transformer protection (pushbutton installed to reset latched P632 output relays). Dual trip coils not installed. Test blocks not wired in accordance with standard configuration. Protection relays not programmed with standard configuration.

JUNE 2007

Version 3.4

RailCorp

Page 85 of 85

Discipline

Electrical Engineering Standard


Category

General
Title

Electrical Power Equipment - Integrated Support Requirements


Reference Number

EP 00 00 00 12 SP
Version

2.0
Date of Issue

JUNE 2007
Status

Approved

Copy No.

A coloured number in this space indicates that this document is controlled

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Prepared by Reviewed by Approved by

Neal Hook, Principal Engineer, Power Systems Engineering Standards & Services Division Neal Hook, Principal Engineer, Power Systems Engineering Standards & Services Division David Stuart-Smith, Chief Engineer, Electrical Systems Engineering Standards & Services Division

Revision Summary

Version

Revision Date

Authorised Details Name/Position


NEAL HOOK Principal Engineer, Power Systems Engineering Standards & Services

Signature

2.0

21/06/2007

First Issue

See Revision History on page 11 for a full listing of the document changes.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 2 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

DISCLAIMER
Rail Corporation of New South Wales has used its best endeavours to ensure that the content, layout and text of this document is accurate, complete and suitable for its stated purpose. It makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. RailCorp will not be liable to pay compensation in respect of the content or subsequent use of this document for any other purpose than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been wilful default.

DOCUMENT APPROVAL
The technical content of this document has been approved by the relevant RailCorp engineering authority and has also been endorsed by the RailCorp Configuration Management Committee directly or as delegated through the conditions of the Configuration Management Policy.

DOCUMENT SUPPLY and CONTROL


The Primary Version of this document is the electronic version that is available and accessible on the RailCorp Internet and Intranet website. It is the users sole responsibility to ensure that they are only using the latest version of the document prior to its use. The approving section does not make controlled copies of this document available by any means other than on the aforementioned website. Controlled hardcopy versions of this document may be produced if they are registered using a local document management and distribution system. When controlled hardcopy versions are issued using a local document management system each copy is to be uniquely identified in the Control Box provided on the front of the document. The identifier used must identify the local distribution centre and the copy number. The identifier is to be marked using a colour other than black or grey.

COPYRIGHT
The information in this document is Copyright protected. Apart from the reproduction without alteration of this document for personal use, non-profit purposes or for any fair dealing as permitted under the Copyright Act 1968, no part of this document may be reproduced, altered, stored or transmitted by any person without the prior written consent of RailCorp.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 3 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

About This Standard


This document details the integrated support requirements common to most major electrical equipment in the RailCorp high voltage and traction networks. It is designed to be used in conjunction with RailCorp technical standards for individual electrical equipment and contains information to facilitate the support of the RailCorp asset management systems including maintenance management, configuration management, quality management, risk management and financial processes. To achieve best practice RailCorp is continually developing its asset support requirements related to its business objectives. This document will aid in the provision of information required to determine the full life cycle cost of electrical equipment through their acquisition, operational and disposal phases. The release of this document may affect the operation or maintenance of existing electrical equipment in the RailCorp high voltage or traction network. Where integrated support requirement work is undertaken on existing equipment it shall comply with this document.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 4 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Table of Contents
1 2
2.1 2.2 2.3 2.4 2.5

Scope and Application............................................................................. 7 References................................................................................................ 8


Code of Practice ................................................................................................................8 Australian Standards.........................................................................................................8 Ex-RIC Standards ..............................................................................................................8 RailCorp Documents .........................................................................................................8 RailCorp Templates ...........................................................................................................9

3 4
4.1 4.2 4.2.1 4.2.2 4.2.3 4.2.4 4.3 4.3.1 4.3.2 4.3.3 4.4 4.4.1 4.4.2 4.4.3 4.4.4 4.5 4.5.1 4.5.2 4.5.3 4.6

Definitions and Abbreviations .............................................................. 10 Integrated Support Requirements ........................................................ 11


Integrated Support Objectives .......................................................................................11 Maintenance Requirements ............................................................................................11 Scheduled Maintenance Maintenance Requirements Analysis (MRA) Failure Modes, Effects and Criticality Analysis (FMECA) Technical Maintenance Plan (TMP) 11 12 12 15

Spares Support ................................................................................................................17 Spares Assessment Methodology Recommended Spares List Packaging, Storage and Handling 17 17 18

Operation and Maintenance Manual ..............................................................................18 General Submission of Documentation Scope of Manual Validation of Content 18 23 25 29

Training.............................................................................................................................29 Training Requirements Operator Training Maintenance Training 29 30 30

Facilities, Equipment and Special Tools .......................................................................31

5
5.1 5.2

Revision History ..................................................................................... 32


Version 1.1........................................................................................................................32 Version 2.0........................................................................................................................32

Appendix A Appendix B
Version: 2.0 Issue Date: JUNE 2007

Technical Schedule................................................................................ 33 Request for Tender (RFT) Checklist ..................................................... 35


Rail Corporation Page 5 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Appendix B.1

General .............................................................................................................................35

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 6 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Scope and Application


This document details the integrated support requirements common to most major electrical equipment in the RailCorp high voltage and traction networks. It is designed to be used in conjunction with RailCorp technical standards for individual electrical equipment and contains information to facilitate the support of the RailCorp asset management systems including maintenance management, configuration management, quality management, risk management and financial processes. To achieve best practice RailCorp is continually developing its asset support requirements related to its business objectives. This document will aid in the provision of information required to determine the full life cycle cost of electrical equipment through its acquisition, operational and disposal phases. The requirements of this document apply when a new piece of major electrical equipment is installed in the RailCorp high voltage or traction networks in conjunction with the relevant RailCorp standard for the equipment. The release of this document may affect the operation or maintenance of existing electrical equipment in the RailCorp high voltage or traction network. Where integrated support requirement work is undertaken on existing equipment it shall comply with this document.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 7 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

2 2.1

References Code of Practice


The following documents are either referenced in this standard or can provide further information.

2.2

Australian Standards
The following Australian Standards are either referenced in this document or can provide further information. Standard AS 1000 AS 1100 AS 1102 AS 1470 AS 9001 Title The International System (SI) units and their application Parts 101 & 201 Technical Drawing Graphical symbols for electrotechnical documentation Health and Safety at work Principles and Practices Quality Systems Model for Quality assurance in design/development, production, installation & servicing

2.3

Ex-RIC Standards
Standard AM 9995 PM EP 00 00 00 02 SP Title RIC Maintenance Requirements Analysis Manual Electrical Technical Maintenance Coding System

2.4

RailCorp Documents
The following RailCorp documents are either referenced in this document or can provide further information. Document Title

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 8 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

2.5

RailCorp Templates
The following drawings form part of this specification. Use FMECA Service schedule(s) TMP Filename Blank FMECA sheet.xls Blank service schedule sheet.xls Blank TMP sheet.xls

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 9 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Definitions and Abbreviations


For the purpose of this specification the definitions specified in the referenced Australian Standards apply. Item Rotable item Description A major item of equipment/item/component that may be removed from its operating position for scheduled maintenance and subsequently reinstalled or replaced with a serviceable equivalent. A non repairable component which is damaged or wears due to use and is replaced with new component when necessary or where predetermined wear limits are reached, ( items such as contacts, lubricants, etc). An equipment component which may be removed from its operating position for maintenance, restored to a predetermined serviceable condition and reinstalled for a further use, such as switchgear bushings, high speed circuit breaker. An equipment component purchased and stored as replacement component for use in repairing the systems to serviceable condition subsequent to the occurrence of a major incident that causes secondary damage, such as damage to OHW, train derailment and the like. Insurance spares are normally components that are susceptible to sustaining damage beyond economical repair if involved in an incident and/or, have excessive lead times for replacement, and are required to restore a system to service. Maintenance requirements analysis (MRA) The process of determining the range of tasks in the maintenance schedules that will preserve the inherent levels of reliability of the design and which provide an effective and efficient means of keeping the equipment in the condition required.

Consumable item

Repairable item

Insurance spare

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 10 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

4 4.1

Integrated Support Requirements Integrated Support Objectives


The information required to operate and maintain the equipment throughout the operational life, in a cost effective manner and to a level that is consistent with the planned operational performance and usage of the systems shall be developed and provided. This includes: Maintenance Requirements Spares Support Operations and Maintenance Manuals Training, and Support Equipment and Tooling

4.2
4.2.1

Maintenance Requirements
Scheduled Maintenance The planned maintenance requirements for the equipment shall be developed and provided. Planned maintenance requirements shall as a minimum include the following, to the extent applicable to the design: Pre-operating procedures. Preventive maintenance, including service/lubrication tasks, condition monitoring requirements, scheduled restore/discard tasks, failure finding testing and any other tasks considered appropriate for all installed systems and equipment. Recommended overhaul requirements, including the recommended overhaul interval and location (onsite/depot/service centre). Details of any items subject to finite replacement or inspection lives, including structural inspections where applicable.

Maintenance checklists and procedures necessary to carry out the proposed tasks shall be defined. Maintenance checklists and procedures shall include information on consumable items used as part of the task and reference to any special tools,
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 11 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

facilities or equipment needed to perform the task as well as any special skills and/or training necessary for the task. The recommended maintenance requirements established as a result of this activity shall be documented in the form of a Technical Maintenance Plan as defined in 4.2.4. 4.2.2 Maintenance Requirements Analysis (MRA) The MRA process shall be undertaken in accordance with the RailCorp Maintenance Requirements Analysis Manual AM 9995 PM, which is based upon a Failure Modes, Effects and Criticality Analysis (FMECA) and Reliability Centred Maintenance (RCM) methodology. (see below) The results of the MRA shall be documented and supplied. The Hazards and Occupational Health and Safety (OH&S) implications resulting from the MRA shall also be analysed and documented prior to completion of the respective sets of Service Schedules. The analysis and documentation shall be undertaken using either the OEMs inhouse software tools, or the templates provided. Where in-house tools are used, hard and electronic copy of the analysis shall be provided in an agreed format to allow transfer of the information into the maintainer's systems. 4.2.3 Failure Modes, Effects and Criticality Analysis (FMECA) A Failure Modes, Effects and Criticality Analysis (FMECA) shall be completed, documented and supplied as part of the MRA. The FMECA serves to identify potential failure modes that must be considered as part of the reliability estimation process for a specific item and to provide information on those that should receive highest priority for reliability improvement. The FMECA also provides the basis for development of programmed maintenance requirements and for identifying failure modes and effects for consideration as part of the Safety program. The FMECA will be conducted down to the Lowest Replaceable Unit level. The FMECA process shall be completed and documented to either: RailCorps requirements as specified in the Maintenance Requirements Analysis Manual AM9995PM, or the OEMs standard, provided that the approach meets the basic objectives set out within the potential Failure Mode and Effect Analysis Handbook, which forms part of the set of documentation for the QS 9000 supplement to QS 9000 Quality Systems. The FMECA shall be documented using the OEMs FMECA software tool.

The purpose of the FMECA is to review and analyse the equipments design to establish:
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 12 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Potential or demonstrated failure modes for each significant item within the design. This will be carried out at the replaceable subassembly level. The likelihood of failure for each identified failure mode, where possible expressed in terms of failure per million operating hours. The effect of failure in terms of the impact on safety, operating performance, environmental impact and economic consequences, including damage to other equipment. The criticality of failure in terms of operation of the system, that is, whether trains can continue to operate without delay or whether the rail systems/subsystem can continue to operate after the failure has occurred.

4.2.3.1 FMECA Worksheet documentation The following table provides definition of the information to be included in the FMECA.

Heading Item/Assemby, Part No and Drawing No. Analyst Functional description. MTBF (hrs) Function

Requirement Identify the asset, manufacturer's part identification, and drawing details Identify the analyst(s) who prepared the FMECA Provide an overview description of the asset's function Enter the asset/item's Mean Time Between Failure in hours Principal functions - which represent the business reason for an assets existence. Enter the item name and as concisely as possible the function(s) of the item to meet the design intent. Functions may also be identified in the form of a desired standard of performance with functional failure deemed to have occurred when this level of performance is not available. Include information regarding the environment in which the system operates. (eg, define temperature, voltage etc). Ancillary function - which provide additional useful functions either as enhanced capability, additional capability or opportunistic. Protective function - such as alarms and automatic shutdowns

Part

The component part within the Item/Assembly which

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 13 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Heading Failure mode

Requirement fails Failure modes are the effects by which failures are observed. It includes the manner by which the failure is observed & is generally described by the way in which the failure occurs and its impact, if any, on the equipment operation. Ie broken, seized, excessive vibration. Need to state the engineering mechanism of failure that leads to the particular functional or conditional failure. Failure causes are derived from the design. They are associated with the detailed design approach taken, the materials used, the operating environment including such information as physical loads and corrosive materials. Human factor information is also required, to support the allocation of warning notices in manuals or service schedules. Identify that impact a particular failure mode has on the operation, function or status of an item. The description of the failure effect must be adequately detailed to allow classification into one of the four categories of consequences: Hidden/safety/environment Evident/safety/environment Evident/economic Hidden/economic

Cause of Failure

Local effects

Failure Rate

Identify the rate (in failures per million hours) at which this failure mode/cause combination occurs. If data is not available to establish exact rates, enter the indicative percentage (with % symbol) that this failure mode / cause combination represents out of the total failures Identify maintenance task which addresses the failure mode/cause. Needs to be split maintenance tasks into and on or off system. The maintenance task must fall into one of the following categories: Service / lubrication task Condition monitoring task include examinations for indications of conditional failure before they lead to functional failure Scheduled restoration or rework at some hard time conducts a schedule of maintenance tasks Scheduled discard which at some time removes an item

Tasks

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 14 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Heading

Requirement from the system Failure finding task which is only applicable to hidden functional failures where a confidence check that the system is still operational is required at some interval to reduce the probability of multiple failures

Type Period

Identify type of Maintenance Task using the code letters on the worksheet. Frequency for the maintenance Task - time, operational count, operational event(s), etc Table 1 FMECA worksheet

4.2.4

Technical Maintenance Plan (TMP) The recommendations resulting from the maintenance analysis process shall be documented in the form of a Technical Maintenance Plan (TMP) for the system using the RailCorp Service Schedule and TMP Templates. The TMP shall include details of: The equipment. All scheduled maintenance activities for the equipment. The intervals (periodicity) at which each maintenance schedule should be performed. Skills and competencies for completion of each major task in the schedule. Note that for the purposes of the TMP a task may comprise a number of actions performed as part of a scheduled examination. Recommended location at which the schedule is to be completed eg onsite, depot, workshop, central facility, etc. Details of special facilities or equipment necessary for completion of the schedule. Reference to technical data or inspection schedules required for completion of the task. Checklists for recording the results of the maintenance processes.

The terminology used in the service schedule tasks shall be in accordance with 4.2.4.1. Refer to section 4.3.6 of AM 99 95 PM RailCorp Maintenance Requirements Analysis Manual for further details.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 15 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

4.2.4.1 Service Schedule standard terminology The words used to define maintenance actions shall be standardised to ensure consistency of approach and to assist the transfer of information across application boundaries. Consistency of task description enables the provision of a common interpretation of instructions and task directives by all support staff. Each task statement should have the standard structure shown at Figure 1
VERB NOUN CONDITIONAL STATEMENT for

Examine

attachment blocks

security

Figure 1 - Standard task statement structure The verbs are the key words which define the task action and have a standardised description. The remainder of the statement will depend on the particular item and failure mode and hence use conventional English meanings. These key verbs are listed in Figure 2:

Verb Examine

Detailed requirement Carry out a visual survey of the condition of an item without dismantling (unless directed to do so by the maintenance instruction). Apply a specified lubricant (e.g. oil type XYZ, grease type ABC) to a specified area of equipment (often specified in a separate lubrication chart). Make a comparison of a measurement of some quantity (e.g. time, pressure, temperature, resistance, dimension) to a known value (accept/reject criteria) for that measurement and if required rectify and/or replenish if necessary. Ensure that an item of equipment or system functions correctly as far as possible without the use of test equipment or reference to a measurement. Remove contaminating materials (e.g. dust, dirt, moisture, excessive lubricant) from an item of equipment. To alter as necessary to make an item compatible with system requirements.

Lubricate

Check

Check Operation or Operate Clean

Adjust

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 16 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Verb Test Replenish

Detailed requirement Determine by using appropriate test equipment that a component of equipment functions correctly. Refill a container to a predetermined level, pressure or quantity and undertake associated access and closure tasks. Correctly attach an item to another. Fit an item that has been previously been removed. Make a comparison of a measurement of time, pressure, temperature, resistance, dimension or other quantity to a known standard (usually a NATA laboratory function). Uncouple or detach cables, pipelines or controls. Reverse of disconnect. Securing of equipment which requires the breaking of a seal to manually operate (usually associated with emergency equipment). Correctly detach one item from another. To make firm or fast. Figure 2 - Task verbs - standard terminology

Fit Refit Calibrate

Disconnect Reconnect Safetyseal

Remove Secure

4.3
4.3.1

Spares Support
Spares Assessment Methodology The need for spare parts shall be assessed and the spare parts list developed using a clearly defined methodology. The methodology shall use established failure rates and the related maintenance policies, and identify the range and quantity of spares to be made available at any time to maintain the systems and ensure they meet the availability requirements. The need for insurance spares to meet unplanned needs shall be addressed, and a separate assessment process used to identify, quantify and list these insurance spares. The methodology to be used for the assessment of spares requirements must be included in the Maintenance Plan.

4.3.2

Recommended Spares List A recommended spares list shall be developed and provided. The recommended spares list must define the recommended range and quantity of

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 17 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

rotable and repairable items, consumables and insurance spares to support the planned operational usage with the recommended maintenance policies. The recommended spares list shall be developed and refined during the design and construction of the equipment. The recommended spares list shall include the following information: 4.3.3 item identification (name, manufacturers part or reference number and specification, as appropriate); recommended spares quantities; expected price; source; procurement lead time; failure rate; number of items installed in the equipment predicted usage rate and whether the item is consumable or is used in support of scheduled preventative maintenance; and probability of the required item being available based on the recommended spares quantity and procurement lead time.

Packaging, Storage and Handling The requirements for packaging, storage and handling shall be provided for all recommended spares.

4.4
4.4.1

Operation and Maintenance Manual


General An Operations and Maintenance Manual shall be provided for the equipment, and shall meet the requirements below. The manual shall be delivered in hard copy and in electronic format. (see below). Manuals may be produced to meet the specification below, or supplied as standard manuals in the OEMs proprietary format, provided that the information required in 4.4.3 below is clearly contained within the combination of manuals, and any attachment. Manuals shall only contain information about the equipment supplied. Where the OEMs proprietary manuals contain information and references to multiple models of equipment, information relating to unsupplied equipment shall be clearly crossed or blanked out.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 18 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Hard copies of the manual shall have the following features:

Binding
Bound; or Contained in white, durable, four ring hard cover binders, not greater than 50 mm thick, with the facility, equipment or plant identification permanently marked on the spine and outside cover with clear protection on the covers. Binders shall not be filled to more than 60% capacity.

Paper
Not less than 80 gsm in weight, surface sized and suitable for offset/laser printing, in double-sided form; Text on A4 pages Illustrations on A3 size paper folded to A4 size

Typeface and layout


Clear typeface; 35 mm margin for binding; Each section shall start on a right hand side page;

Organisation
Divide sections with indexed plastic divider sheets ; Protect vulnerable and much used pages with plastic covers; Index the contents Locate illustrations and at the rear of the text. Small illustrations, to highlight matters, may be located in the text; Commence each document with a title sheet detailing as a minimum: 1) 2) 3) 4) 5)
Version: 2.0 Issue Date: JUNE 2007

Name of System/Element/Item/Equipment; Supply Contract Details (if applicable); Name of Supplier (if applicable); Address for Service Calls (if applicable), and Document version # and date of issue
Rail Corporation Page 19 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

The electronic form of the document shall be delivered in two forms: Microsoft Word97 format (for custom produced manuals), PDF File(s), with all headings down to level 3 linked to the appropriate page/section in the pdf file(s). The PDF files shall also include pdf versions of OEM information, Works/Test certificates and other hardcopy documents to produce a pdf version of the entire manual. Clear scanned images with a resolution for legibility incorporated into pdf files are acceptable. When the individual pdf files are generated they shall not be password protected, and shall be enabled for editing to enable the pdf file size to be reduced where required for more efficient intranet access. Or Approved equivalent appropriate industry standard software as may be appropriate at the time of delivery of this documentation 4.4.1.1 Word Processor Configuration for Custom Produced Manuals 4.4.1.1.1 Text Styles and page settings The following settings and styles shall be used to produce the printed pages of the manual. Page Size Margins Top Bottom Left Right Header (from edge) Footer (from edge) Gutter Text Styles Heading 1 Arial, 14pt Bold, indent: hanging 2.06cm, paragraph spacing 12pt before, 6pt after, outline numbered, level 1 Arial, 12pt Bold, indent: left 1.25cm, hanging 1.73cm, paragraph spacing 6pt before, 6pt after, outline numbered, level 2 Arial, 12pt, indent: left 1.25cm, hanging 1.73cm,paragraph spacing 6pt before, 3pt after, outline numbered, level 3 A4 2 cm 2 cm 2 cm 2 cm 1.25 cm 1.25 cm 1.5 cm

Heading 2

Heading 3

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 20 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Heading 4

Arial, 12pt, italic, indent: left 1.25cm, hanging 1.73cm, paragraph spacing 6pt before, 3pt after, outline numbered, level 4 Arial, 11pt, indent left 2.0cm, paragraph spacing 6pt before and after, line spacing (at least) 12 point. Arial, 11pt, left indent 0.1cm, right indent 0.1cm paragraph spacing 1pt before and after, line spacing (at least) 12 point. Arial, 8pt, bold, centred, paragraph spacing 3pt before and after. Normal + indent left 3.0cm, indent right 2.5cm Arial, 10pt italic, Tabs:9cm centred, 15.5cm right flush Arial, 10pt italic, Tabs:9cm centred, 15.5cm right flush

Normal

Table text

Caption Warning Header Footer

4.4.1.1.2 Table of Contents The table of contents for the manual shall commence on page iii of the document and the table shall be created from style heading levels 1 to 4 inclusive. It shall be followed by a list of Figures and a list of Tables. 4.4.1.1.3 Page Numbering The introductory pages of the manual shall be numbered consecutively in roman numerals (i, ii, iii, iv etc). Each section of the manual shall be consecutively numbered in Arabic numerals, and be presented as page x of y, where y is the number of pages in the section of the manual. The introductory pages shall include the title page, Revision Control Table (see 6.1) and table of contents. 4.4.1.1.4 Numbering methodology The sections and subsections of the manual shall be outline numbered. Sections shall be numbered sequentially from 1.0 and shall be style Heading 1 Subsections shall be numbered sequentially within the section from n.1 and shall be style Heading 2 The section and subsection titles are listed in 4.4.3.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 21 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Tables may be used to where applicable to simplify the presentation of information and data interpretation. Tables shall be numbered sequentially within each section using Arabic numerals in the order they appear in the text. Table numbering shall be of the form Table n-1 where n is the section number and it shall prefix the title of the Table. The figure text shall be style caption. The text within the tables shall be of style table text. Figures shall be numbered sequentially within each section using Arabic numerals in the order they appear in the text. Figure numbering shall be of the form Fig. n-1 where n is the section number and it shall prefix the title of the figure. The figure text shall be style caption. 4.4.1.1.5 Page header The header shall be formatted as style header and shall have a 1 pt border line below the header paragraph. The content of the header lines of each section shall be:Line 1 Manual Title Section Name Manual Number Line 2 Section Revision Date Section Revision Number 4.4.1.1.6 Page Footer The footer shall be formatted as style footer and shall have a 1 pt border line above the footer paragraph. The content of the footer lines of each section shall be: Rail Infrastructure Corporation Section n - page x of y 4.4.1.1.7 Warnings and Cautions Where it is essential for the protection of the staff and / or equipment the manuals shall include the appropriate Warnings, Cautions and notes. The format of the text shall be style Warning. The content of a warning box shall not be split over two pages. Warnings and cautions shall not contain procedural steps, nor be numbered. Where the warning or caution contains more than one critical element, those elements should be separated by the use of bullet points for each separate element. Left Flush at Tab 15.5 cm, right Flush Left flush at Tab 15.5 cm, right Flush Left flush at Tab 9 cm, centred at Tab 15.5 cm, right Flush

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 22 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Warning shall be used for the protection of staff, Caution used for the protection of the equipment, and Note used to draw attention special requirements. Where a combination of warning, caution or note appear together they shall appear in the order of Warning, Caution then Note as applicable. 4.4.2 Submission of Documentation Operation and Maintenance Manuals shall be provided and be written in clear, concise English, produced in the format outlined above, and covering the following scope and content. 4.4.2.1 Document Numbering The number format shall be AA aabbcc ZZ, where: AA is the relevant discipline code from the RailCorp TMP, aabbcc represent the next three layers of the RailCorp Technical Maintenance Code (TMC), and ZZ is MP for a manual covering a system or subsystem, or EQ where the manual covers only one equipment group.

Refer to EP 00 00 00 02 SP Electrical Technical Maintenance Coding System. Revision numbers for draft versions of the Manuals shall be A, B, C etc. Revision numbers for approved versions of the Manuals shall be 1, 2, 3 etc. The document number shall be unique and shall be registered in the RailCorp master list of document numbers prior to document development commencing. 4.4.2.2 Inclusion of Drawings and Photographs Figures and/or pictures should be included where appropriate to complement the manual text. They shall be used to: Present information difficult to describe by text alone; Provide identification of tools, parts etc; Halftone figures (photographs) where used, shall be suitable for electronic scanning and photocopying without loss of detail.

4.4.2.3 Folders Where required the contents of the manual may be spread over multiple folders. Each folder shall be called a Volume. Where volumes are utilised, a complete table of contents for the entire manual shall be included in each volume, clearly indicating which sections are located in each volume.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 23 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

4.4.2.3.1 Covers and Spines The cover page for each volume shall be inserted as the first page within each volume, and a copy inserted into the front cover of the volume. The spine shall contain the Manual Identification Number, the volume number, and the numbers of the sections in the respective volume where the manual is split over more than one volume. The text shall be sized to suit the thickness of the folder. The spine identification box shall be positioned 5 cm from the top edge of the folder 4.4.2.3.2 Revision History The revision history of the manual shall be included in a Revision Control Table on page ii of the Operations and Maintenance Manual. See following sample page for layout of revision control tables. Sample Revision Control Table Page.

Revision Control Table Revision 1 2 Date of Approval Sept 2002 Dec 2002 Summary of change Original Issue Section 4.3 revised

Current Subsection Revision Subsection Title page Revision Control Table of Contents 1.0 2.0 3.0 4.0 4.2 Current Revision 1 2 2 1 2 1 1 Original Issue Updated description of HV circuit breakers Original Issue Original Issue Summary of change Original Issue

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 24 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Subsection 4.3 4.4-4.5 5.0 6.0 7.0 8.0

Current Revision 2 1 1 1 1 1

Summary of change Updated alarm test procedure Original Issue Original Issue Original Issue Original Issue Original Issue

4.4.3

Scope of Manual The following information shall be included (where applicable) in the general order detailed below, in separate Operation and Maintenance Manuals for separate operable systems, types of items, geographic areas and the like.

Section 1

Purpose of the Manual 1.1 Brief description of the Manuals purpose, structure and content. 1.2 References and associated publications and standards. 1.3 Definitions.

Section 2

Equipment Description 2.1 Physical Description of equipment and major components. 2.2 Principles and theory of operation. This section should explain enough so that fault finding can be sensibly carried out. Line type illustrations are appropriate. Summary of the key Design Parameters of the various elements of the equipment that need to be known in its operation, maintenance and management. A basic working description, including features and any automatic control, operational purposes and functions of the components, systems and items. For software oriented systems, functional specifications (hardware and software), systems programs, individual program modules, including flow charts and source codes, and the like. 2.3 Detailed component description. Each major component illustrated and described. 2.4 Operating Instructions and Procedures. Comprehensive details of technical information relevant to modes of operation with

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 25 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

a step by step procedure arranged into sections, such as: Safety Procedures and inherent hazards to be documented including applicable material safety data sheets. This information will be used as input for Job Safety Analysis and pre work briefing. The JSA and pre work briefing to be undertaken by RailCorp; Operating ratings and limitations due to temperature, pressure and flow, or other relevant factors; Checks before, and procedures for, Equipment Startup, Operations and Shutdown; Emergency Shutdown and Abnormal Operation; Full information on alarm and trip settings; Full details on condition monitoring capability including accept/reject criteria Links to inspection, servicing and maintenance schedules as defined in the Maintenance Plan; Any other information needed by operating staff to ensure the safe and efficient operation of the equipment. Section 3 Operational and functional checks Describe the tests required to confirm operation and whether the equipment and its components are functioning within acceptable limits. Specify accept and reject limits and tolerances. Section 4 On system maintenance Refers to maintenance carried out on the installed site. 4.1 List of tasks; 4.2 Tools and materials; 4.3 Maintenance tasks. Comprehensive step by step instructions in preventative and corrective maintenance procedures, nominating the work to be carried out by qualified tradespersons and others Safety procedures Maintenance standards Maintenance instructions for each of the service periods. Location of maintenance action (on-system, workshop etc). Consumables and special tools required. List of recommended greases and oils, stating quantities, methods and frequency for application. Section 5 Fault diagnosis

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 26 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Describe a series of sequential actions to diagnose equipment faults. It is important that the operational requirements are included in these sequences. Troubleshooting instructions in tabular form listing fault, possible cause and remedial action, with testing regimes and instructions. Section 6 Removal and Installation Describes procedure for transport, installation, commissioning or removal of the equipment or components. It shall include information on support equipment, packaging, handling, transport and storage requirements. Section 7 Overhauling Step by step instructions and procedures for complete overhauls, indicating those procedures to be carried out by qualified tradespersons, described under at least the following subheadings: Material safety data Sheets Handling precautions Dismantling Cleaning, Inspection, Repair and Adjustment Reassembly Final Checks and Unit Running

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 27 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Section 8

Spare Parts Data on spare parts supplied under the following headings:List of Suppliers, stating: Manufacturer Manufacturers nearest representative Company address Telephone and Facsimile numbers Illustrated Parts List, including: A list (or lists) of parts with part numbers referenced to an illustration, preferably an exploded view of sectional drawing and a specification Recommended Spare Parts, including: The list of recommended spare parts with part numbers and quantities and a separate list of spare parts supplied under this Contract to the Principals Representative Availability of Spare Parts, including: A short statement quoting the worst case procurement lead time/availability to suit the quantities of parts from suppliers Ordering Information, including: Specific details that would be required when ordering replacement parts, such as serial number, model number, name, reference number and the like Special Tools, including: A list of any special tools required when for periodic maintenance or overhauls

Section 9

References Summary tabulation and details of all applicable Certificates, Warranties and Guarantees related to the asset with cross reference to the location of the originals. (Originals of all Certificates, Warranties and Guarantees must be provided as handover documentation, in a logical grouping for particular assets, labelled in such a manner as to provide traceability.) Tabulation of Consultants, Sub-Consultants, Service providers, Suppliers and other Subcontractors and utilities/service providers,

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 28 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

together with contact details for each significant element of the assets. Reference to all commissioning records/results and reports. Section 10 Quality Records This section shall provide details and the respective forms (where required) of all records that are required for maintenance and breakdown actions. These shall be presented in tabular form, and sample forms produced one form per page in the manual. Each form shall be delivered in a separate file of native format (eg. MS Word or MS Excel) Section 11 Test Certificates All works and site test/commissioning certificates for the system/ subsystem and equipment shall be included in this section. Section 12 Hard copy of Work-as-Executed Drawings This section shall include a complete list of the drawings associated with the manual. The PDF version of the manual shall link to a PDF or TIFF copy of the each corresponding drawing. 4.4.4 Validation of Content The operations and maintenance documentation provided must be validated prior to commissioning and used as part of the training provided by the OEM.

4.5
4.5.1

Training
Training Requirements A training program shall be developed, provided and implemented. This shall cover each part of the equipment as specified by the RFT and address the following issues for each training course: specific training objectives; training methods for the operation and maintenance personnel; training documentation, aids and material necessary to support the training; training syllabus, course outlines, training notes, content plans, in the form of a training manual, meeting the defined training course objectives; cover both operations and maintenance requirements including testing and operational evaluations.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 29 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

The training shall be designed for appropriately qualified personnel requiring only specialised training required on the relevant systems. The training shall be conducted only by persons who are appropriately skilled, qualified, experienced and competent in the field involved, and who have completed formal training in instruction techniques. All training aids and material must be up to a good commercial standard and appropriate for the training to be conducted. Training may be conducted on a site where the equipment is installed or off-site. The required location for training will be stated in the RFT. Where training is to be conducted off-site and access to particular equipment is required, training must be undertaken on equivalent duplicate equipment to that installed on RailCorps network. Off site training must be supplemented with visits to the applicable installed system on the Site. If no location for off-site training is specified in the RFT, off-site training shall be provided in Sydney. 4.5.2 Operator Training The training program shall cover and address operations and site familiarisation training for electrical operators who will be required to operate, isolate and earth electrical equipment: The operator training shall be designed for persons qualified under the RailCorp Electrical Safety Instructions and experienced in the operation of existing electrical High and Low voltage infrastructure that is part of the Sydney railway network. The training shall include the: 4.5.3 theory and practice of the operation of the equipment and its constituent parts and systems; controls and instruments; safety and emergency operations; and techniques for checking, testing and adjusting systems.

Maintenance Training Specific maintenance training shall be included for personnel responsible for: routine examination and servicing; repair systems, including the temporary and permanent repair of damage caused through vandalism, collision or other unscheduled event; and

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 30 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

specialist processes such as on site fault finding, removal and replacement, functional or operational testing to a level necessary to support the systems involved.

Maintenance training shall include familiarisation with the equipment, and the specific maintenance requirements for all system, subsystem and ancillary equipment arrangements. Maintenance training shall also cover the engineering management of the systems for engineering staff.

4.6

Facilities, Equipment and Special Tools


A list of special tools, facilities and equipment necessary for the operation and maintenance of the systems shall be developed and provided. The list shall: include the recommended number of special tools, facilities and equipment required for the operation and maintenance of the equipment; identify the items required to perform specific maintenance, repair and recovery tasks on the equipment, including scheduled preventative maintenance of the equipment, the removal, installation and testing of rotable and repairable items, and other procedures, such as temporary repairs during normal operating periods for unscheduled failures with follow-up maintenance and emergency recovery; and include any special purpose test equipment and facilities needed in support of the maintenance tasks, including specialist hand-tools. This list of special tools, facilities and equipment must include: details of, and a specification for, each item; purpose of the item; maintenance requirements for each item, supplier; the quantity required; price and validity period expected; packaging, storage and handling requirements; and delivery times.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 31 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

5 5.1

Revision History Version 1.1


Added to Appendix A 4.2.1Scheduled Maintenance the requirement at tender stage to provide a preliminary list of scheduled maintenance and methodology to facilitate life cycle costing assessment.

5.2

Version 2.0
Updated to RailCorp Standards formatting. Changed hyperlink from 3.3.3 to 3.4.2

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 32 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Appendix A

Technical Schedule

The Tenderer shall supply the information listed in this Technical Schedule at tender stage. This information will be used as an aid to assess the life cycle cost of each tender and to confirm that tenderers understand the importance of the integrated support requirements in the procurement process. 4.2.1 Scheduled Maintenance Provide details of a preliminary scheduled maintenance list including methodology for this list.. 4.2.2 Maintenance Requirements Analysis (MRA) What analysis and documentation tools are to be used? RailCorp templates or OEMs in house software If OEMs in house software is used please provide details of documentation and past usage.

Provide details of experience with MRA/RCM analysis and documentation. 4.2.3 Failure Modes, Effects and Criticality Analysis (FMECA) What method of FMECA will be used? RailCorp templates or OEMs in house software If OEMs in house software is used please provide details of documentation and past usage. What is the source and extent of the data used in the FMECA provide detail. Is the FMECA based on operational experience provide detail. 4.3.1 Spares Assessment Methodology What methodology for spares assessment will be used? Please provide details of documentation and past usage.

Provide details of a preliminary spares list including methodology for this list. 4.3.3 Packaging, Storage and Handling Any special requirements for packaging, storage and handling for the equipment or recommended spares to be provided. 4.4 Operation and Maintenance Manual What format are the manuals to be supplied? Microsoft Word97 format or OEM proprietary format modified to meet all requirements of section 4.4.3 of this standard. If OEMs format is used please provide

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 33 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

details of documentation and past usage. 4.5 Training Please provide details of anticipated delivery method, location, qualifications (technical and training) of personnel and list of resources.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 34 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Appendix B

Request for Tender (RFT) Checklist


General

Appendix B.1

Where this standard is used as a supporting document for the integrated support requirements for the procurement of a major item of electrical equipment, the following information must be considered for the particular situation, and provided to the tenderers if required. All the items listed in this document may not be required. The Request for Tender must be specific in highlighting which clauses are mandatory, which clauses are optional and which clauses can be deleted. The following issues must be considered in making these determinations for each RFT: Previous usage of identical or similar equipment in the RailCorp network; The number of items of equipment; and The planned geographical spread of the equipment in RailCorp network; The complexity of equipment; The cost of equipment; The cost of the total order.

Maintenance Requirements The RFT must indicate that the equipment supplier must provide all of the information set out in clause 4.2 Maintenance Requirements. The tenderer should also be made aware that if they are successful they must submit the FMECA at least 28 days prior to the delivery of the equipment; Spares Support The RFT must indicate that having completed the spares assessment methodology of clause 4.3 Spares Support the equipment supplier must provide the Recommended Spares List as set out in clause 4.3.2. The tenderer shall provide a preliminary spares list, refer to Appendix A Technical Schedule both in the equipment standard for the particular item of electrical equipment and this document. The decision for the procurement of spares is an iterative process and should be addressed as such by the RFT. Once the successful tenderer has provided the detailed spares list (which should be consistent with the original proposed spares list provided as part of the tender) and methodology, a RailCorp representative must then review the life cycle cost analysis in conjunction with the existing RailCorp spares. Note that it is a RailCorp responsibility to determine the system spares policy.
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 35 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

Packaging, Storage and Handling The RFT must indicate that the equipment supplier must provide all of the requested information in clause 4.3.3 Operation and Maintenance Manual The document number, as described in clause 4.4.2.1 Document Numbering, must be supplied to the successful tenderer. The successful tenderer must: submit two unbound draft hard copies of the Operations and Maintenance Manual at least 28 days prior to the delivery of the equipment; ensure the draft manuals must meet all the formatting requirements of clause 4.4 act on comments made on, and correct deficiencies in, the draft copies and supply the final bound hard copy sets and electronic sets incorporating all the changes needed by the equipment delivery date;

The number of hard copies of the manual shall be a minimum of five (5) (or 1 each location if required, 1 each field engineering office, 1 for Design) and the number electronic versions on CD shall be two (2) (or 1 each field engineering office, 1 for Design). The RFT must specify total hardcopy required. Training For the tenderer to determine the training requirements of clause 4.5 Training, the tenderer must be informed of the number of staff nominated for each type of training. The RFT must indicate that the equipment supplier must provide the training program and training manual for review at least 28 days before any training takes place. The RFT must nominate location for on-site, and off-site training to be delivered. Refer to clause 4.5.1. Facilities, Equipment and Special Tools The RFT must indicate that the equipment supplier must provide the list of special tools, facilities and equipment as set out in clause.4.6 A final list of special tools, facilities and equipment shall be submitted not later than 28 days prior to delivery of the first installation or in sufficient time for essential items to be available for use with training, whichever is the earlier. The RFT must specify details of the process to procure the range of special tools, facilities and equipment required following the submission and review of the recommended list. Refer to clause 4.6.
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 36 of 37

Electrical Engineering Standard: General

Electrical Power Equipment - Integrated Support Requirements EP 00 00 00 12 SP

The RFT must indicate that the tenderer must provide a preliminary list of special tools, facilities and equipment with the tender. Quantity and Costing of Integrated Support Deliverables The RFT shall state the quantity of each deliverable required and request a breakdown of the cost for the various items to facilitate the full life cycle cost analysis. The list of deliverables to be costed shall include: Provision of Operations and Maintenance manuals in accordance with clause 4.4; Provision of training aids and material for the Principals use in undertaking future training.

Provision of training in accordance with clause 4.5. The training costs are to be broken down into separate costs for Operator Training and Maintenance Training.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 37 of 37

Discipline

Electrical Engineering Standard


Category

General
Title

Common Requirements for Electric Power Equipment


Reference Number

EP 00 00 00 15 SP
Version

2.0
Date of Issue

JUNE 2007
Status

Approved

Copy No.

A coloured number in this space indicates that this document is controlled

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Prepared by Reviewed by Approved by

Neal Hook, Principal Engineer, Power Systems Engineering Standards & Services Division Neal Hook, Principal Engineer, Power Systems Engineering Standards & Services Division David Stuart-Smith, Chief Engineer, Electrical Systems Engineering Standards & Services Division

Revision Summary Authorised Details Name/Position


NEAL HOOK Principal Engineer, Power Systems Engineering Standards & Services

Version

Revision Date

Signature

2.0

01/06/2007

First Issue

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 2 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

DISCLAIMER
Rail Corporation of New South Wales has used its best endeavours to ensure that the content, layout and text of this document is accurate, complete and suitable for its stated purpose. It makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. RailCorp will not be liable to pay compensation in respect of the content or subsequent use of this document for any other purpose than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been wilful default.

DOCUMENT APPROVAL
The technical content of this document has been approved by the relevant RailCorp engineering authority and has also been endorsed by the RailCorp Configuration Management Committee directly or as delegated through the conditions of the Configuration Management Policy.

DOCUMENT SUPPLY and CONTROL


The Primary Version of this document is the electronic version that is available and accessible on the RailCorp Internet and Intranet website. It is the users sole responsibility to ensure that they are only using the latest version of the document prior to its use. The approving section does not make controlled copies of this document available by any means other than on the aforementioned website. Controlled hardcopy versions of this document may be produced if they are registered using a local document management and distribution system. When controlled hardcopy versions are issued using a local document management system each copy is to be uniquely identified in the Control Box provided on the front of the document. The identifier used must identify the local distribution centre and the copy number. The identifier is to be marked using a colour other than black or grey.

COPYRIGHT
The information in this document is Copyright protected. Apart from the reproduction without alteration of this document for personal use, non-profit purposes or for any fair dealing as permitted under the Copyright Act 1968, no part of this document may be reproduced, altered, stored or transmitted by any person without the prior written consent of RailCorp.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 3 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

About This Specification


This document details the common requirements for electric power and control cubicles or assemblies forming part of switchgear, rectification equipment, transformers and similar equipment deployed in the Electric Power sub-system of RailCorp. It includes requirements relating to the equipment as a whole and components used in the equipment, to both hardware and software aspects and also the data set associated with the equipment. The requirements of this document apply to new power and control cubicles or assemblies as well as existing equipment that is modified or refurbished. It is intended that this document be called up in other documents and these requirements only apply when this document is referred to in the primary specification for the equipment.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 4 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Table of Contents
1 2
2.1 2.2 2.3 2.4 2.5

Scope and Application............................................................................. 7 Normative References ............................................................................. 8


Code of Practice ................................................................................................................8 International Standards.....................................................................................................8 Australian Standards.........................................................................................................8 RailCorp Documents .........................................................................................................9 RailCorp Templates ...........................................................................................................9

3
3.1 3.2 3.2.1 3.2.2 3.3 3.4 3.5 3.6 3.7 3.7.1 3.7.2 3.8 3.9 3.9.1 3.9.2 3.9.3 3.9.4 3.9.5 3.10 3.10.1 3.10.2 3.10.3 3.10.4 3.11 3.11.1 3.11.2 3.11.3

Technical Requirements........................................................................ 10
Panels and Doors ............................................................................................................10 Painting.............................................................................................................................10 Indoor Equipment Outdoor Equipment 10 10

Cable Entry.......................................................................................................................11 Access ..............................................................................................................................11 Lifting Points....................................................................................................................11 Fixing Points ....................................................................................................................11 Colour Convention for Controls and Indications .........................................................11 1500V and High Voltage Devices Low Voltage Devices 11 12

Equipment Mounting .......................................................................................................12 Labelling ...........................................................................................................................12 Language Equipment Labels Terminal Strip Labels Wire Identification & Numbering Cable identification codes for schematics, cable schedule and drawings 12 12 13 13 13

Auxiliary Supply Voltage.................................................................................................14 Traction Substation DC auxiliary supply Traction Substation AC auxiliary supply DC auxiliary supply other than traction substations AC auxiliary supply other than traction substations 14 15 15 15

Wiring................................................................................................................................15 General Termination Minimum Wire Size and Wire Type 15 16 16

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 5 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3.11.4 3.12 3.13 3.14 3.15 3.15.1 3.15.2 3.15.3 3.15.4 3.15.5 3.16 3.17 3.18 3.19 3.20

Wire Colours

16

Terminal Blocks ...............................................................................................................16 Earth terminal...................................................................................................................17 Light ..................................................................................................................................17 Auxiliary Relays, Push Buttons, and Selector Switches .............................................17 Contacts Relays Suppression Diodes Trip Circuit Supervision Indicator Lights 17 17 17 17 18

Programmable Equipment ..............................................................................................18 Current Transformers......................................................................................................18 Metering ............................................................................................................................18 Selection of Components and Equipment ....................................................................19 Environmental..................................................................................................................19

4 5
5.1 5.2

Maintenance Concept ............................................................................ 20 Testing .................................................................................................... 21


Type Tests ........................................................................................................................21 Routine Tests ...................................................................................................................21

6
6.1 6.1.1 6.1.2 6.1.3 6.2

Data Set Associated With The Equipment ........................................... 22


Drawings...........................................................................................................................22 Drawings Required Manufacturers Standard Drawings Project Drawings 22 23 23

Test Results .....................................................................................................................25

7 Appendix A Appendix B
Appendix B.1 Appendix B.2 Appendix B.3

Appendices............................................................................................. 26 Schematic Diagram Identifiers.............................................................. 27 Request for Tender Checklist ............................................................... 31


Application .......................................................................................................................31 Information to be supplied to the Tenderer ..................................................................31 Information to be provided by equipment suppliers ...................................................33 33 33 33

Appendix B.3.1 Label Schedule Appendix B.3.2 Inspection and Test Plan Appendix B.3.3 Drawings

Appendix C

AutoCAD to Microstation Specifications ............................................. 35

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 6 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Scope and Application


This document details the common requirements for electric power and control cubicles or assemblies forming part of switchgear, rectification equipment, transformers and similar equipment deployed in the Electric Power sub-system of RailCorps infrastructure. It includes requirements relating to the equipment as a whole and components used in the equipment, to both hardware and software aspects and also the data set associated with the equipment. The requirements of this document apply to new power and control cubicles or assemblies as well as existing equipment that is modified or refurbished. The standard RailCorp relay and circuit naming conventions are included at Appendix A. The release of this document will not affect the operation or maintenance of existing power and control cubicles or assemblies in the RailCorp network.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 7 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

2 2.1

Normative References Code of Practice


The following documents contain provisions that, through reference in this text, constitute provisions of this specification. At the time of publication, the editions indicated were valid.

2.2

International Standards
Standard IEEE C.37.2 -1996 Title Standard electrical power system device function numbers and contact designations.

2.3

Australian Standards
The following Australian Standards are either referenced in this document or can provide further information. Standard AS 1042 1973 AS 1102 1997 AS 1675 - 1986 AS 60044.1 2007 AS 1939 Supp 1 1990 AS 1939 Supp 2 1990 AS 2067 1984 AS 2700 1996 AS/NZS 3000 2000 AS/NZS 3439.1 2002 AS/NZS 5000.1 Title Direct-acting Indicating Electrical Measuring Instruments and their Accessories. (Withdrawn) Graphical symbols for Electrotechnical Documentation Currrent Transformers - Measurement and Protection Instrument Transformers Current Transformers. Degrees of protection provided by enclosures for electrical equipment (IP Code) Wallchart 1 Degrees of protection provided by enclosures for electrical equipment (IP Code) Wallchart 2 Switchgear assemblies and ancillary equipment for alternating voltages above 1 kV Colour Standards for General Purposes. Electrical Installations (known as the Australian/New Zealand Wiring Rules) Low-voltage switchgear and controlgear assemblies Type-tested and partially type-tested assemblies. Electric cables Polymeric insulated For working

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 8 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Standard 2005 AS/NZS 5000.2 2006 AS/NZS 5000.3 2003 AS 60038 2000 AS 60529 2004

Title voltages up to and including 0.6 / 1 (1.2) kV Electric cables Polymeric insulated For working voltages up to and including 450/750 V Electric cables Polymeric insulated Multicore control cables Standard voltages Degrees of protection provided by enclosures (IP Code)

2.4

RailCorp Documents
The following RailCorp documents are either referenced in this document or can provide further information. Document EP 00 00 00 12 SP EP 00 00 00 13 SP EP 19 00 00 02 SP ED 0022P ED 0024P Title Electrical Power Equipment Integrated Support Requirements Electrical Power Equipment Design Ranges of Ambient Conditions Protection System Requirements for the High Voltage Network CAD and Drafting Manual All Design Areas CAD and Drafting Manual Electrical

2.5

RailCorp Templates
The following templates are provided for documentation: Use Cable schedule Filename Blank Cable schedule.xls

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 9 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3 3.1

Technical Requirements Panels and Doors


All panels, including doors, shall generally be constructed of mild steel sheet with robust steel framework sufficiently braced to prevent warping and twisting. The minimum sheet thickness shall be 1.2 mm for panels and 1.6 mm for doors. Other materials such as aluminium and stainless steel may be used subject to RailCorp approval. The doors shall be fitted with removable-pin hinges and locking handles. Opening doors shall have stops to prevent damage to doors or hinges from overswing.

3.2
3.2.1

Painting
Indoor Equipment Where the supplier is able to provide a customised paint finish, outside surfaces of the cubicle shall be painted storm grey, colour No. N42 in accordance with AS 2700, in textured powder coat. The inside surfaces shall be painted white, colour No. N14 in accordance with AS 2700, in smooth powder coat. Cubicles that will be installed in corrosive environments shall be painted with a fit-forpurpose system rather than powder coat. Where customised painting is not available, the suppliers standard paint system and colour may be accepted subject to approval. However, the preferred colour for inside surfaces is white, colour No. N14.

3.2.2

Outdoor Equipment Where external surfaces of outdoor equipment are to be painted, an approved paint system suitable for extended outdoor service shall be used. The paint system shall address: Surface preparation, including protection of threads and other vulnerable features, and treatment of difficult access parts. Masking of items that must be kept paint free. Timing, including time between surface preparation and the application of the first coat of paint, and the time between coats. Details of each coat to be applied including the type of coating, the method of application and the required dry film thickness.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 10 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

The repair scheme for minor damage. The applicable QA provisions.

3.3

Cable Entry
Floor mounted equipment shall be configured to accommodate cabling from both above and below. Cable entries shall be designed for glanding of all control cables. Sufficient space in gland plates etc. shall be provided for the installation of at least two additional control cables in the future, and to accommodate cables with at least 15% spare cores.

3.4

Access
All controls, alarms, and indications shall be mounted for ready Operator access at the front of the cubicle. Access to equipment, terminal strips and wiring for maintenance shall be unimpeded.

3.5

Lifting Points
Where appropriate, equipment shall be provided with lifting points suitable for slinging the equipment complete with all components installed.

3.6

Fixing Points
Fixing and mounting holes shall be welded or drilled and painted in the suppliers works at locations to be shown on the general arrangement drawings. All fixing and mounting holes shall be positioned to allow comfortable use of the appropriate tool during installation at site.

3.7
3.7.1

Colour Convention for Controls and Indications


1500V and High Voltage Devices A red indication shall indicate that the switch is closed. A green indication shall indicate that the switch is open. A red control shall cause the switch to close.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 11 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

A green control shall cause the switch to open. Note: This colour requirement is the opposite of the convention as defined in Table 7.1 of AS 2067.

Push Buttons Action:

CLOSE OPEN

Mechanical Indicator

O
CLOSEDD

= Circuit Breaker Open = Circuit Breaker Closed

Figure 1 3.7.2 Low Voltage Devices A red indication shall indicate that the switch is closed. A green indication shall indicate that the switch is open. A green control shall cause the switch to close. A red control shall cause the switch to open.

3.8

Equipment Mounting
All control equipment and circuitry shall be mounted so that it is easily removable for maintenance. This may be achieved by the use of plug-in modules or an equivalent method.

3.9
3.9.1

Labelling
Language All labelling shall be in the English language only.

3.9.2

Equipment Labels All individual components and items of equipment shall be labelled by Traffolyte or similar material which shall remain legible over the life of the equipment when subjected to all reasonable mechanical wear and abrasion conditions. Lettering shall be black letters on white background.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 12 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Labels shall be mounted on a fixed portion of the cubicle or compartment and not on the actual components, equipment or duct covers. Labels shall be positioned to remain visible after wiring and cabling are completed and so that components and equipment are not blocked from view. Components and equipment mounted inside the cubicle or compartment shall be labelled with the schematic designation (eg 52OP) in lettering of not less than 3 mm in height. Operator controls and equipment on the front panel shall be labelled with the device function (eg Open ACCB, DCCB Closed) in lettering not less than 4 mm in height. Stand-alone cubicles shall also be fitted with a main label inscribed with the name (eg No. 1 Rectifier Control Cubicle) in lettering of not less than 15 mm in height. Specific labelling requirements for protection equipment are detailed in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network. 3.9.3 Terminal Strip Labels All terminals shall be clearly and indelibly labelled with the terminal number shown on the schematic diagram using proprietary labels from the terminal supplier. 3.9.4 Wire Identification & Numbering All control and protection wires shall have a unique number and shall be identified at each end by white number ferrules inscribed in black characters with the wire number shown on the schematic diagram. Ferrules shall be a proprietary, interlocking type of size to match the wire diameter. 3.9.5 Cable identification codes for schematics, cable schedule and drawings The identification codes for cables are to be used on all drawings, schedules and labeling are detailed in the table below:

ID

Category

Example application OPTICAL FIBRE, COPPER SERIAL LINKS, PILOT CABLES, TELEPHONE, DATA CONTROL CABLES BETWEEN PANELS. DCCB FRAME TO FRAME LEAKAGE RELAY BAR, RECTIFIER TO RECTIFIER FRAME LEAKAGE RELAY. EQUIPMENT EARTHS, EARTH GRID CONNECTIONS, HV CABLE SCREEN EARTHS

CM COMMUNICATION C FL CONTROL FRAME LEAKAGE (RECT & DCCB) EARTHING

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 13 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

IA S AC

INSTRUMENTATION (ANALOGUE 0-20MA) SUPERVISORY <= 600V

VOLTAGE & CURRENT TRANSDUCER OUTPUT CABLES, AMMETER & VOLTMETER CABLES SUPERVISORY INDICATION & CONTROL RECTIFIER TRANSFORMER 600V CABLES, AUXILIARY TRANSFORMER 600V CABLES, 415/240V POWER, 240V LIGHT BATTERY SUBMAINS 2KV, 11KV, 33KV & 66KV RECTIFIER 1500V POSITIVES, OHW FEEDER POSITIVES, RECTIFIER 1500V NEGATIVES, REACTOR TO TRACKSIDE BAR NEGATIVES, 1500V LINK RAIL CONNECTIONS, 1500V NEGATIVE LINK

DC HV TP TN

<= 120V > 600V AC 1500V POSITIVE 1500V NEGATIVE

TC CT

TRACTION CONTROL REC, DCCB NEGATIVES, 1500V SURGE DIVERTERS , HARMONIC FILTER CURRENT CT CABLES FROM OUTDOOR SWITCHGEAR TO TRANSFORMER PROTECTION PANELS SECONDARY CABLES VOLTAGE VT CABLES FROM OUTDOOR VOLTAGE TRANSFORMER TRANSFORMER TO PROTECTION PANELS SECONDARY CABLES Pilot Wire

VT

PW Pilot Wire

3.10

Auxiliary Supply Voltage

3.10.1 Traction Substation DC auxiliary supply Traction substations have dc auxiliary supply. For new and upgraded traction substations the nominal voltage is 125Vdc. Equipment supplied at 125Vdc shall be designed to operate satisfactorily with the auxiliary voltage in the range 96 to 135V . All connected loads shall operate within this voltage range under ambient conditions as specified in section 3.20 Environmental and derating for enclosures as necessary. Strategic traction substations have two independent dc auxiliary supplies. Criteria determining which substations have two dc supplies is specified in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 14 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3.10.2 Traction Substation AC auxiliary supply Traction substations have an ac auxiliary supply. For new and upgraded traction substations the nominal voltage is 3-phase 415/240 Vac. Equipment supplied at 415/240 Vac shall be designed to operate satisfactorily with the auxiliary voltage in the range -20% to +20% of this nominal voltage. 3.10.3 DC auxiliary supply other than traction substations DC auxiliary supply for equipment in sectioning huts, HV AC switching substations and other locations can be 125 or 48 Vdc nominal. At locations with 48V dc, equipment must be designed to operate satisfactorily with the auxiliary voltage in the range 43 to 58 Vdc. 3.10.4 AC auxiliary supply other than traction substations Requirements for equipment operating in sectioning huts, HV AC switching substations and other locations requiring ac auxiliary supplies will be provided in future versions of this standard.

3.11

Wiring

3.11.1 General All wiring shall be installed to the requirements of AS 3000 and equipment supplier specifications. All 125 Vdc wiring (other than control wiring installed on 1500 Vdc equipment) shall be able to withstand a 1 minute test voltage of 1.5 kV rms to earth. Requirements for control wiring installed on 1500 Vdc equipment such as DCCBs and rectifiers are detailed in the respective RailCorp equipment specifications. DC control wiring and the AC auxiliary supply wiring shall be segregated. The requirements of this section need not apply to special purpose signal and electronic wires. On terminal blocks, intermeshing of cores of different field cables will not be accepted. Current and voltage transformer wiring shall be as specified in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network Wiring to swing-frames and doors shall be suitably formed to sustain the flexing imposed and properly protected from damage.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 15 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3.11.2 Termination All wires shall be terminated using proprietary crimp lugs (not bootlaces) of correct size for the conductor. Lugs shall be the insulated barrel type. Termination of protection wiring at the relay shall be by screwed connections using ring type crimp lugs as recommended by the relay manufacturer. Not more than two wires shall be terminated in any tunnel-type terminal. 3.11.3 Minimum Wire Size and Wire Type Small wiring shall generally be stranded copper 0.6/1 kV or 0.45/0.75 kV V-90HT PVC insulated. Unless noted otherwise on the schematic diagrams, DC control wiring shall be 1.5 mm2 cross-section, flexible, multi-strand copper (30/0.25). 3.11.4 Wire Colours Colours for dc control wiring shall be brown for positives, light blue for negatives and grey for all mid-wires. Mid-wires means all wires that are more than one device away from the positive and negative rails of the control circuit, where a device is a relay or switch contact, coil, indicating light etc. Colours for ac and dc power wiring shall be in accordance with AS 2067. CT and other protection wiring shall be as specified in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network.

3.12

Terminal Blocks
Small wiring field terminals shall generally be the rail-mounted, spring-loaded tunnel type. Terminals shall be grouped according to function and voltage and groups shall be segregated by proprietary barriers. Terminals energised at 415 and 240 Vac shall be shrouded and denoted as hazardous by warning labels. Terminal numbers shall be allocated on the schematic diagrams so that all the cores of each field cable can be terminated on consecutive terminals. The terminal block shall include 15% spare terminals, or a minimum of one (1), whichever is the larger, for each cable to be terminated. CT and VT secondary wiring terminals shall be as specified in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 16 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3.13

Earth terminal
Equipment intended to be located in substations shall be provided with an earth terminal suitable for connection of an earth cable of a minimum size of 70 mm2.

3.14

Light
An appropriate 240 Vac light fitting shall be installed in the cubicle or assembly to illuminate areas containing equipment and terminal strips where the design is such that this equipment will not be directly illuminated by external lighting. The light shall be activated by a switch on the front panel, or automatically when the door is opened.

3.15

Auxiliary Relays, Push Buttons, and Selector Switches

3.15.1 Contacts Contacts of auxiliary relays, push buttons, and selector switches used at ELV, low current shall be designed for such duty. Particular attention shall be given to ensuring contact wetting by means of gold plated contacts, wiping contacts or other suitable means. 3.15.2 Relays All relays shall have clear and ready visual indication of the state of the relay, either by direct observation of the mechanism (flag) or by means of a LED. Plug-in relays are preferred. All plug-in relays shall be positively retained in their bases. 3.15.3 Suppression Diodes Suppression diodes shall be provided across DC coils where appropriate to limit back EMF in order to protect contacts and/or reduce EMR. 3.15.4 Trip Circuit Supervision Where Trip Circuit Supervision is employed, continuity of the circuit shall be monitored as well as availability of the power supply. The Trip Circuit Supervision (TCS) relay shall be connected, physically, to the end point of the wires in the trip circuit. ie The tripping circuit is to be made by looping all wires right onto the terminals of each tripping contact, with the TCS relay furthest from the supply fuses or circuit breaker. In this way, a break in the wiring of this circuit will be detected.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 17 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

The TCS relay shall drop out (providing indication to SCADA) before the voltage measured at the end point of the circuit wiring falls to the minimum operating level of the control relays. (SCADA indication is required based on the control relays capabilities). It is acceptable that the indicating LEDs have stated minimum operating voltages different to this threshold. Refer to EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network for details of approved TCS relays. 3.15.5 Indicator Lights All indicator lights shall be LED types. The colour of indicating lights shall be identified on schematics by placing an appropriate letter adjacent to the LED: G green, R red, W white.

3.16

Programmable Equipment
Programmable controllers used in Electric Power Equipment shall be the product of a recognised supplier and be purpose-built to carry out the functions specified. Programming shall be carried out using non-proprietary, commonly available and inexpensive equipment and software and shall be possible by downloading from storage medium or entering via keypad and display unit mounted on the front of the cubicle or compartment. Operator control and interrogation shall be possible via the keypad and display unit. Access to keypad control functions and programming shall be restricted by password. Indications of status shall be continuous and immediately apparent without the need to use the keypad. The controller shall include means of retaining programming for one year in the event of loss of auxiliary power.

3.17

Current Transformers
Current transformers shall be as detailed in EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network.

3.18

Metering
Where required, analogue display meters for indication purposes shall be between 96 mm and 144 mm square and comply with AS 1042 with an accuracy class of 2.5. Meters shall be mounted with the bottom not lower than 500 mm above floor level and the top not higher than 2000 mm above floor level.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 18 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

3.19

Selection of Components and Equipment


The make and model of components and equipment used shall generally be as nominated on the schematic diagrams. However, approved equivalents may be used provided that these are readily available items from recognised suppliers.

3.20

Environmental
The ambient temperature rating and degree of protection to AS 60529 shall be as required by RailCorp Standard EP 00 00 00 13 SP, Electrical Power Equipment Design Ranges of Ambient Conditions. The equipment supplier shall make due allowance for the temperature rise that can occur within a panel or assembly when specifying the ambient rating of components used in that panel or equipment assembly.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 19 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Maintenance Concept
The equipment supplied must be suitable for operation with only limited periodic routine maintenance comprising tasks falling into the following categories as applicable: Testing of functionality Injection testing of any protection relays Cleaning Lubrication of locks and hinges. Replacement of circuit breaker contacts. Calibration Checking of gas pressure Oil sampling

These tasks shall be Level 1 (on system). Level 2 (off system) tasks are generally not acceptable for periodic routine maintenance. Where it is not practical to undertake major corrective tasks on system, a level 2 off system approach will be acceptable.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 20 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

5 5.1

Testing Type Tests


All protection relays, electronic modules and controllers shall be type tested in accordance with the relevant standards.

5.2

Routine Tests
Routine factory tests shall include the following as applicable to the equipment concerned: Inspection in accordance with AS 3439.1 Clause 8.3.1. Continuity (point-to-point) test of all wiring. Dielectric test at power frequency in accordance with AS 3439.1 Clause 8.3.2 or AS 2067 Clause 11.3.1 as appropriate. Function test of all logic and interlocks. Secondary injection testing of protection relays and metering. Polarity (flick) test of CTs and VTs. Group primary injections of CTs. Phasing of power circuits.

Copies of final inspection and equipment routine test reports shall be provided and comply with EP 00 00 00 12 SP, Electrical Power Equipment Integrated Support Requirements.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 21 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Data Set Associated With The Equipment


The following data shall be provided when relevant by the equipment supplier and maintained for the life of the equipment. This data shall remain the property of RailCorp.

6.1
6.1.1

Drawings
Drawings Required General arrangements, giving cubicle dimensions and showing the location of all relays, operator controls, terminal blocks and other devices along with the entry points of all cables. General arrangement views to include front, floor plan and end. Sheet metal fabrication details of cabinets showing material type and thickness, surface preparation and paint finish details shall be provided. Single line diagram. Functional block diagram. Schematic diagrams of all circuitry, including a legend sheet listing all device identifiers with their full description and giving their locations on the schematics. Component schedule listing the device schematic identifier, description, supplier, model number, ratings if relevant and the location on the schematic diagram. (This may be integrated with the schematic diagrams legend sheet). Cable / termination schedule giving cable number, core number, wire number, origin and destination, origin and destination terminal numbers, function of each core, number of cores in cable, conductor material and cross-section, insulation grade, screen type if applicable, insulation and sheath material and any relevant comments. RailCorp template in excel format is available and is the preferred method of documentation. See section 2.5 RailCorp Templates. Cabling block diagram. Terminal block layout. Where programmable controllers are included, provide full functional specification of the control logic, fully annotated logic diagrams, factory and site acceptance tests and, if available, source code for any custombuilt software.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 22 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

6.1.2

SCADA I/O list

Manufacturers Standard Drawings The manufacturers standard drawings for an item of equipment will be acceptable where they : Accurately represent the equipment supplied Provide all required information Are presented on sheets not larger than A1 Are provided in the English language Use symbols in accordance with AS 1102.

6.1.3

Project Drawings

6.1.3.1 CAD Drafting All drawings shall be produced in accordance with the RailCorp specification ED 0024P, CAD and Drafting Manual Electrical. The sheet size shall not be larger than A1. All drawings will be stored within the RailCorp drawing system in Microstation format, the preferred format for drawings being Microstation Version 8, however RailCorp will accept drawings produced in AutoCAD Version 2000. To minimise the complications arising from conversion from AutoCAD to micro station & vice versa the following shall be observed: Copy & rename suitable size RailCorp provided border sheet. Border sheets for sizes A1 to A3 with scales of 1:100, 1:50, 1:20 & 1:1 are available. use the renamed file to draw and annotate. For linework, draw in modelspace at 1:1 scale, units are in mm. For annotation, draw in modelspace at 100 times (eg. to get a printed text size of 2.5mm, draw at text size of 250mm). Do not attach xref's. If you do, merge them & detach xref's. Do not use paperspace. Do not use viewports.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 23 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Use one scale only in one drawing. Xrefs and viewports should not be used. Use isocp3.shx as font file with width factor of 1.05 Do not use shared cells.

The border sheet has elements on level 60. Do not draw anything on this level; do not delete anything from this level (if needed please consult RailCorp). Do not move the border area. The final printed size is determined by the master drawing sheet, which can be A1, A2, A3 or A4 dependent upon content. For additional information see Appendix C. 6.1.3.2 Schematic Diagrams Symbols used in drafting schematic diagrams shall be in accordance with AS 1102-1997 Components on the schematic and other drawings must be designated according to the RailCorp identifiers tabled in Appendix A. Where there is no RailCorp identifier for a particular device, it shall be designated according to IEEE standard C.37.2 1996. Schematics shall employ a column reference system for locating devices. The location of each relay contact and device auxiliary contact shall be shown near the relay or device on all schematics. Every connecting line or group of lines in a control or protection circuit shall be identified with a wire number on the schematic. The numbering system used shall conform to that given in Appendix D of AS 2067 1984 except that positive rails shall be designated BP# (for battery positive 1, 2, 3 etc) and negative rails shall be designated BN#. Connecting lines that pass between separate equipment cubicles shall be drawn dashed to highlight that they are field connections. Terminal symbols shall be in accordance with Figure 2 and shall be shown at the ends of each such line.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 24 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

RECTIFIER CONTROL CUBICLE TERMINAL ACCB TERMINAL DCCB PLUG PIN/SOCKET DCCB TERMINAL BOX CONNECTOR RECTIFIER TRANSFORMER TERMINAL RECTIFIER TERMINAL DC REACTOR TERMINAL FIELD CABLE CORE

Figure 2 Drawing Terminal Symbols All terminals shall be designated with a prefix letter consistent with the broad function of the circuit, followed by a two or three digit number. The prefixes to be used are C for DC control and protection, CT for current transformer secondaries and S for connections to SCADA.

6.2

Test Results
The results of all tests, including Routine, Type and corrective maintenance tests, shall be recorded and maintained. Routine test certificates showing the results of each test performed shall be supplied in duplicate and electronically, in English, and maintained for the life of the equipment. Type test certificates for each protection relay and electronic module shall be supplied in duplicate, in English, and maintained for the life of the equipment.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 25 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Appendices
Schematic Diagram Identifiers.............................................................. 27 Request for Tender Checklist ............................................................... 31
Application .......................................................................................................................31 Information to be supplied to the Tenderer ..................................................................31 Information to be provided by equipment suppliers ...................................................33 33 33 33

Appendix A Appendix B
Appendix B.1 Appendix B.2 Appendix B.3

Appendix B.3.1 Label Schedule Appendix B.3.2 Inspection and Test Plan Appendix B.3.3 Drawings

Appendix C

AutoCAD to Microstation Specifications ............................................. 35

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 26 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Appendix A

Schematic Diagram Identifiers

Device numbers and functions shall generally be in accordance with IEEE C.37.2. The detailed implementation shall be as set out below. Relay Identifier Description 8LX 33-1 43 43A 50A 50C 51A 51C 51A2 51B2 51C2 51AX 51CX 51X 52 52C 52CC 52H 52M 52M 52MC 52OP 52R 52SO 52T 52t 52 Close Auxiliary CB Trip Relay Negative Isolator Accessed Switch Local/Supervisory Changeover Switch (L - Local S - Supervisory) Local/Remote Changeover Switch ACCB Instantaneous Overcurrent Relay (A phase) Instantaneous Overcurrent Relay (C phase) Inverse Time Overcurrent Relay (A phase) Inverse Time Overcurrent Relay (C phase) Overcurrent Breaker Fail Relay (A phase) Overcurrent Breaker Fail Relay (B phase) Overcurrent Breaker Fail Relay (C phase) Auxiliary Overcurrent Relay (A phase) Auxiliary Overcurrent Relay (A phase) Auxiliary Relay for Rectifier Breaker Fail Protection ACCB ACCB Closing Contactor ACCB Closing Coil ACCB Heater Control Switch ACCB Closing Motor ACCB Closing Springs Charge Motor Spring Charging Limit Switch ACCB Open Auxiliary Relay ACCB Heater Coil Solid State Open Device ACCB Trip Coil ACCB Heater Thermostat ACCB Close Push Button ACCB ACCB Rectifier CC Rectifier CC ACCB ACCB ACCB ACCB ACCB ACCB ACCB Rectifier CC ACCB ACCB Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier Rectifier CC Typical Location

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 27 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Relay Identifier Description 52 Open 54 54A 54a 54C 54D 54ES 54H 54M 54R 54S 54T 54US 54UV 54X 54XX 54Y 54Z 54 Close 54 Open 63-1 63-2 63RX 63RY 63X 63Y 64 64-2 64E ACCB Open Push Button DCCB DCCB Auxiliary Relay DCCB Operating Auxiliary Switch DCCB Closing Coil Auxiliary Relay for Reverse Current Trip DCCB Closing Motor Limit Switch DCCB Holding Coil DCCB Closing Motor DCCB Reverse Current Trip Indication Relay DCCB Stabilising Coil DCCB Delayed Closing Relay Mechanically Interlocked Limit Switch DCCB Undervoltage Coil DCCB Closing Coil Contactor Auxiliary Relay for Closing Coil DCCB Auxiliary Relay for De-engergising Closing Coil DCCB Auxiliary Relay DCCB Close Push Button DCCB Open Push Button Buchholz Gas Contact Buchholz Oil Contact DC Reactor Overpressure Follower Relay DC Reactor Overpressure Auxiliary Relay Auxiliary Relay for Buchholz Oil Auxiliary Relay for Buchholz Gas Instantaneous Earth Fault Relay Earth Fault Breaker Fail Relay Rectifier Frame Leakage Relay

Typical Location Rectifier CC DCCB

DCCB DCCB DCCB DCCB DCCB DCCB DCCB DCCB

DCCB DCCB DCCB

DCCB

Rectifier CC Rectifier CC Rect. Transf. Rect. Transf. DC Reactor Overpress Pnl Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 28 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Relay Identifier Description 64EX 71 75 77CAP 77CD 77TI 77TO 77VD 84-1 84-2 84Y 86 86A 86AX 86PB 89 89G 89G-1, -2 89GR 94 94D 97 97X 305A 306A FS ILS LCS1 Auxiliary Relay for Rectifier Frame Leakage Rectifier Cell Fail Relay DCCB Door Switch Interlock Rectifier Transformer Primary Current Transducer Rectifier Output Current Transducer Rectifier Inlet Air Temperature Transducer Rectifier Outlet Air Temperature Transducer Rectifier Output Voltage Transducer Tap Change In Progress Signal Contact Tapchanger Fault Tap Change In Progress Auxiliary Relay Rectifier Lockout Relay DCCB Frame Leakage Relay. DCCB Frame Leakage Auxiliary Relay Rectifier Lockout Relay Reset Push Button Air Break Switch Negative Isolator Negative Isolator Limit Switch Negative Isolator Auxiliary Relay ACCB Anti-pumping Relay DCCB Anti pumping Relay Sequence Timing Relay Auxiliary Relay for Reverse Current Trip ACCB Supervisory Close Relay ACCB Supervisory Open Relay DCCB 1500 V 3 A Fuse Indicating Light Switch ACCB Local Control Switch (T Trip N Normal C Close)

Typical Location Rectifier CC Rectifier CC DCCB Rectifier CC Rectifier Rectifier Rectifier Rectifier Rect. Transf. Tapchanger Rect. Transf. Tapchanger Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier CC Rectifier Rectifier Rectifier CC ACCB

Rectifier CC ACCB ACCB DCCB Rectifier CC ACCB

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 29 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Relay Identifier Description MTA

Typical Location

Multi Trip Auto Reset Relay (Follows 51A2, 51B2, Rectifier CC 51C2 & 64-2 and trips all 33 kV ACCBs all sources of power) Test Block Trip Circuit Supervisory Relay DCCB Test Link Charge Motor Timer Link Terminal Rectifier CC Rectifier CC DCCB

TBK1, 2 TCS TL TM Xn

The colour of indicating lights shall be identified on schematics by placing an appropriate letter adjacent to the LED: G green, R red, W white.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 30 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Appendix B

Request for Tender Checklist


Application

Appendix B.1

The following material is for guidance in the preparation of a Request for Tender (RFT) for this type of equipment. This checklist itself is not intended to directly form part of any contract.

Appendix B.2

Information to be supplied to the Tenderer

Where this document is used as the basis for procurement of equipment for a particular location, in addition to the general requirements in this standard the following information related to the particular site will need to be supplied: A full list of deliverables required under the contract including: Number of sets of equipment required. Support Equipment and Tooling. Number of sets of Documentation required. Training Required.

DC auxiliary voltage. AC auxiliary voltage. Any site specific limitations on size or arrangement. Any site specific corrosion protection requirements such as suitability for coastal installation. Colour requirements for outdoor equipment as might be required to match existing equipment or meet requirements of a local authority. Limitations due to access or transport. Details of interfacing equipment supplied by RailCorp, including schematic diagrams, general arrangement drawings and manufacturers data. The pricing methodology to be applied for selection of equipment. This must be made on the basis of minimising the whole-of-life cost. The following factors must be considered in determining this: Cost of changes to the Technical Maintenance Plan & Service Schedules or the creation of new manuals & schedules.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 31 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Initial purchase price. Cost of installation. Cost of inventory spares. Cost of maintenance. Cost of manuals. Cost of modifications to other parts of the installation. Cost of replacement parts. Cost of special tools. Cost of staff training. Electrical losses. Environmental costs. Reliability and cost of consequential damage after failure. Cost of decommissioning and disposal. Discount rate. Lifetime of equipment.

Tenderers should be advised that the cable / termination schedule and cabling block diagram specified at section 6.1.1 Drawings Required are not required for contracts including only supply of equipment. The tenderers should be advised that at the time of publication of this document, the editions of reference standards indicated were valid. All standards and specifications are subject to revision, and parties to agreements based on this specification are encouraged to investigate the possibility of applying the most recent editions of the reference standards.

The RFT document shall have a section on preparation of equipment for shipment. The main points are: All equipment shall be suitably packed for protection against damage during loading, transport, storage and unloading. Equipment subject to damage due to vibration such as plug-in relays, printed circuit boards and the like shall be removed and separately packed in clearly marked containers.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 32 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Equipment packed separately or sectionalised for installation shall be provided with all assembly fittings, accessories and instructions.

Appendix B.3

Information to be provided by equipment suppliers

Type Test certificates for evaluation, QA management certificates, sample ITP and ITC, tentative manufacture and delivery programme, typical GA drawing, data sheets and pamphlets, information listed in B2 that is required for estimation of whole-of-life cost.

Appendix B.3.1

Label Schedule

Attention must be drawn to the requirement for the equipment supplier to provide a Label Schedule. The Label Schedule shall list all labels required and shall detail wording, letter size and label size.

Appendix B.3.2

Inspection and Test Plan

Attention must be drawn to the requirement for the equipment supplier to provide an Inspection and Test Plan (ITP) and associated Inspection and Test Checklist (ITC). This must include the time after the placement of the order by which the draft ITP and ITC must be submitted for approval. The ITP must nominate hold points for witness tests and inspections. The amount of notice required regarding the approach of each such hold point must be stated.

Appendix B.3.3

Drawings

Each revision of every drawing during design and manufacture shall be submitted for review by RailCorp. One print marked with any necessary comments will be returned to the equipment supplier within fifteen (15) working days of receipt by RailCorp. The comments shall be considered by the equipment supplier and incorporated in the next revision of the drawing. The required timing for the initial submissions of each drawing must be stated in the RFT. As-Built versions of each drawing shall be submitted no later than the time of delivery of the equipment. Each drawing revision forwarded to RailCorp shall be submitted in the following forms: Three (3) full-size paper prints Electronic copy in Microstation Version 8 or AutoCAD Version 2000 format.
Rail Corporation Page 33 of 36

Version: 2.0 Issue Date: JUNE 2007

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Electronic copy of each approved drawing in TIFF MSB, Monolithic CCIT Group IV file format, non colour drawings - resolution 300dpi in both X & Y directions.

All submissions shall be accompanied by a transmittal form listing all drawings being forwarded and stating the drawing revisions. The transmittal shall be signed and dated by a responsible representative of the Contractor. The Component Schedule (refer section 6.1.1 Drawings Required) shall be subject to approval by RailCorp.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 34 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

Appendix C

AutoCAD to Microstation Specifications


AutoCAD LAYER FONT MICROSTATION WEIGHT LINE CODE

COLOR WEIGHT LINESTYLE LEVEL FONT COLOR 60

BORDER TEXT & LINE TITLE TEXT GENERAL TEXT 2.5mm GENERAL TEXT 3.5mm GENERAL TEXT 5.0mm EQUIPMENT/HARDWARE EQUIPMENT/HARDWARE EQUIPMENT/HARDWARE MAJOR CABLES, CONDUITS AND BUILDING TEXT/LINEWORK FOR BILL EARTHWORK & OTHER

60 59 8 8 8 1 3 4 5 5 12 20 21 22 ROMANC ROMANS ROMANS WHITE WHITE RED CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS CONTINUOUS DASHED CENTRE CONTINUOUS DASHED SEE TABLES SEE TABLES CONTINUOUS SEE TABLES

59 8 8 8 1 3 4 5 5 12 20 21 22

137 138 138 137 138 -

0 0 3 2 0 5 5 3 3

1 1 2 3 1 0 0 2 2

0 0 0 0 0 2 4 0 2

ROMANC GREEN ROMANS WHITE MAGENTA MAGENTA RED RED SEE SEE WHITE SEE

VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS VARIOUS 0 1 0

VARIOUS VARIOUS VARIOUS

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 35 of 36

Electrical Engineering Standard: General

Common Requirements for Electric Power Equipment EP 00 00 00 15 SP

FONT MAPPING BETWEEN AutoCAD & MICROSTATION

AutoCAD
ROMANS ROMAND ROMANC

MICROSTATION
139 138 137

LINE STYLES MAPPING BETWEEN ACAD & MICROSTATION. LTSACLE TO SUIT AutoCAD. LTSCALE IS IRRELEVANT IN MICROSTATION

AutoCAD
CONTINUOUS DASHED2 DASHED DASHEDX2 CENTRE HIDDEN PHANTOM

MICROSTATION
0 1 2 3 4 5 6

COLOR MAPPING BETWEEN AutoCAD & MICROSTATION. PLEASE SEE THAT CHOOSING A COLOR IN AutoCAD AFFECTS BOTH COLOR & WEIGHT AT THE SAME TIME

AutoCAD
COLOUR
RED (1) YELLOW (2) GREEN (3) CYAN (4) DARK BLUE (5) MAGENTA (6) WHITE (7) 0.70 0.18 0.25 0.50

MICROSTATION
COLOUR
3 4 2 1 9 5 0

PEN THICKNESS
0.35

WEIGHT
2 3 4 0 1

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 36 of 36

Discipline

Electrical Engineering Specification


Category

High Voltage AC Switchgear


Title

11kV AC Indoor SCADA controlled switchgear fitted with stationary (non withdrawable) switching devices
Reference Number

EP 01 00 00 02 SP
Version

2.0
Date of Issue

JUNE 2007
Status

Approved

Copy No. A coloured number in this space indicates that this document is controlled

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Prepared by Reviewed by

Approved by

NEAL HOOK, Principal Engineer, Power Systems Engineering Standards & Services Division David Stuart-Smith, Chief Engineer, Electrical Systems Engineering Standards & Services Division Chris Lilly, Technical specialist, Electrical Systems Engineering Standards & Services Division David Stuart-Smith, Chief Engineer, Electrical Systems Engineering Standards & Services Division

Revision Summary Authorised Details Name/Position NEAL HOOK 1.0 21/06/2007 First Issue Principal Engineer, Power Systems Engineering Standards & Services Signature

Version

Revision Date

See Revision History on page 16 for a full listing of the document changes.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 2 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

DISCLAIMER
Rail Corporation of New South Wales has used its best endeavours to ensure that the content, layout and text of this document is accurate, complete and suitable for its stated purpose. It makes no warranties, express or implied, that compliance with the contents of this document shall be sufficient to ensure safe systems of work or operation. RailCorp will not be liable to pay compensation in respect of the content or subsequent use of this document for any other purpose than its stated purpose or for any purpose other than that for which it was prepared except where it can be shown to have acted in bad faith or there has been willful default.

DOCUMENT APPROVAL
The technical content of this document has been approved by the relevant RailCorp engineering authority and has also been endorsed by the RailCorp Configuration Management Committee directly or as delegated through the conditions of the Configuration Management Policy.

DOCUMENT SUPPLY and CONTROL


The Primary Version of this document is the electronic version that is available and accessible on the RailCorp Internet and Intranet website. It is the users sole responsibility to ensure that they are only using the latest version of the document prior to its use. The approving section does not make controlled copies of this document available by any means other than on the aforementioned website. Controlled hardcopy versions of this document may be produced if they are registered using a local document management and distribution system. When controlled hardcopy versions are issued using a local document management system each copy is to be uniquely identified in the Control Box provided on the front of the document. The identifier used must identify the local distribution centre and the copy number. The identifier is to be marked using a colour other than black or grey.

COPYRIGHT
The information in this document is Copyright protected. Apart from the reproduction without alteration of this document for personal use, non-profit purposes or for any fair dealing as permitted under the Copyright Act 1968, no part of this document may be reproduced, altered, stored or transmitted by any person without the prior written consent of RailCorp.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 3 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

About This Standard


This document details the whole of life performance requirements for indoor 11kV non-withdrawable switchgear for use in the RailCorp distribution system. All information required to ensure that the switchgear is electrically suitable for the RailCorp network is contained in this document or referenced by this document. Switchboard units of various configurations are fitted with SCADA controlled circuit breaker and load break fault make switch panels complete with interlocked make-proof earthing facilities combined and arranged in linear configurations. The normal arrangement whereby a busbar and associated switchgear is to be sectionalised into two or more sections is accomplished by each section comprising a separate switchboard unit, physically separated from the other unit(s) and connected by a tie cable through a bus tie circuit breaker at each end of the tie cable. Where space or building constraints (cable ducts etc) exist a bus coupling circuit breaker arrangement maybe required for the busbar sectionalising function this is not a preferred configuration. Specific circuit breaker panel configuration requirements are set out for the following applications: feeder, bus tie, transformers and capacitors. Some configurations will require switch disconnector functional units. The protection and control equipment is an integral part of the switchboard and located with the associated switchgear. Specific details of the required protection schemes and associated equipment are provided in a companion document, EP 19 00 00 02 SP Protection System requirements for the High Voltage network. The requirements of this protection document must be complied with in the supply and use of 11kV switchgear specified herein. Busbar voltage transformers shall be provided for each busbar in each switchboard. This standard does not apply to ring main units.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 4 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Table of Contents
1
1.1 1.2

Scope and Application ............................................................................ 8


General................................................................................................................................8 Application .........................................................................................................................9

2
2.1 2.2 2.3

References.............................................................................................. 10
International Standards...................................................................................................10 Australian Standards.......................................................................................................10 RailCorp Standards .........................................................................................................11

3
3.1 3.2

Definitions, Terms and Abbreviated Terms ......................................... 13


Definitions and Terms .....................................................................................................13 Abbreviated terms: ..........................................................................................................14

4
4.1 4.2

Revision History..................................................................................... 16
Version 1.0........................................................................................................................16 Version 2.0........................................................................................................................16

5 6 7
7.1 7.2 7.2.1 7.2.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 7.10

Background ............................................................................................ 17 Functional Characteristics .................................................................... 18 Performance Characteristics ................................................................ 19


General..............................................................................................................................19 Busbar...............................................................................................................................21 High impedance bus zone protection Internal arc fault detection scheme 22 22

Bus tie cable circuit breaker...........................................................................................22 Bus coupling circuit breaker ..........................................................................................24 Feeder Circuit Breaker ....................................................................................................25 System transformer (incomer) circuit breaker .............................................................26 Distribution transformer (outgoing) circuit breaker ....................................................28 Capacitor / harmonic filter circuit breaker ....................................................................29 Feeder circuit breaker (Non Auto) .................................................................................32 Feeder network switch (Supervisory Indication only) .................................................33

8
8.1 8.2 8.2.1 8.2.2 8.2.3 8.2.4
Version: 2.0 Issue Date: JUNE 2007

Technical Characteristics...................................................................... 34
General..............................................................................................................................34 Switchboard Configurations...........................................................................................34 Supply Point switchboard configurations Switching Station switchboard configurations System substation switchboard configurations Mid point switching switchboard configuration
Rail Corporation

34 35 35 36
Page 5 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.2.5 8.2.6 8.3 8.4 8.5 8.6 8.6.1 8.6.2 8.6.3 8.6.4 8.6.5 8.7 8.8 8.8.1 8.9 8.9.1 8.9.2 8.9.3 8.10 8.11 8.11.1 8.11.2 8.11.3 8.11.4 8.12 8.13 8.14 8.15 8.15.1 8.15.2 8.15.3 8.15.4 8.16 8.17 8.18 8.19 8.20 8.21 8.22 8.23

Bus coupled circuit breaker switchboard Example switchboard configurations

36 36

Rated Insulation Level.....................................................................................................50 Control Voltage DC auxiliary supply voltage.............................................................50 Busbar...............................................................................................................................51 Gas insulation (where applicable) .................................................................................51 Pressure relief for gas compartments On-site installation and possible extension Current transformers Voltage transformers End of life gas recovery 52 52 52 52 53

Earthing bar......................................................................................................................53 Current Transformers......................................................................................................54 CT rating plate General Directional Protection Supply Alarm Voltage Transformer Alarm 54 54 54 54

Voltage Transformers......................................................................................................54

Low voltage cabinet ........................................................................................................55 Circuit-Breakers...............................................................................................................55 General Circuit Breaker Type Circuit-breaker operating mechanisms Circuit-breaker Operation and Control 55 55 56 56

Indication ..........................................................................................................................57 Auxiliary Equipment ........................................................................................................57 Interlocks ..........................................................................................................................58 HV Cable Interface ...........................................................................................................60 General Fully insulated cable terminations Non fully insulated cable terminations Cable compartment size 60 60 60 61

Surge arresters ................................................................................................................61 Circuit Earthing Facilities ...............................................................................................61 Voltage detecting system ...............................................................................................62 Circuit Test Facilities.......................................................................................................62 Padlocking........................................................................................................................62 Floor fixing and penetration details...............................................................................63 Segregation of LV wiring in HV compartment ..............................................................63 Instruments, Transducers and Metering .......................................................................63

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 6 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.23.1 8.23.2 8.23.3 8.23.4 8.23.5 8.23.6 8.24 8.24.1 8.24.2 8.24.3 8.24.4 8.25 8.25.1 8.25.2 8.25.3

General Current transducers Voltage transducers Ammeters Voltmeters Watthour meter General Feeder Protection System Transformer Protection Distribution Transformer Protection Binary Indication & ACCB Control Analogue Indication Controls

63 64 64 64 64 64 65 65 65 65 66 66 67

Busbar and Circuit Protection........................................................................................65

SCADA Indications and Controls...................................................................................66

9
9.1 9.2

Integrated System Support Requirements .......................................... 68


Integrated Support Objectives .......................................................................................68 Equipment Supplier Deliverable ....................................................................................68

10
10.1 10.2

Tests........................................................................................................ 69
Routine tests ....................................................................................................................69 Type tests .........................................................................................................................69

11
11.1 11.2 11.3

Data Set associated with the Equipment ............................................. 70


Information .......................................................................................................................70 Technical Schedule at Appendix A................................................................................70 Life Cycle Costing ...........................................................................................................70

Appendix A Appendix B
Appendix B.1 Appendix B.2 Appendix B.3

Technical Schedule................................................................................ 71 RFT Checklist ......................................................................................... 84


Application .......................................................................................................................84 Information to be Sought From the Tenderer ...............................................................84 Information to be supplied at time of order ..................................................................85

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 7 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

1 1.1

Scope and Application General


This document specifies the characteristics of factory assembled, type tested, metal enclosed, single busbar, fixed (stationary) switching devices designed for indoor installation on railway distribution systems operating at nominal 11kV A.C., three-phase, 50 Hz. The requirement is for switchboards of up to nine SCADA controlled circuit breaker panels suitable for deployment in linear configurations. Where two or more busbar sections are required at a substation each section will comprise a separate Switchboard Unit, physically separated from the other unit(s) and connected by a tie cable through a tie circuit breaker at each end of the tie cable. Specific switchboard functional units may include: feeder ACCB, bus tie cable ACCB, bus coupling ACCB, system transformer (66kV/11kV and 33kV/11kV) ACCB, (incomer) distribution transformer (11kV/415) ACCB, harmonic filter or capacitor bank switching ACCB feeder network load switch

The switchgear panels will in general each include equipment that comprises a fixed functional unit, with an associated off-load disconnector and interlocked earthing facility, in combination with the associated SCADA control, measuring, indicating, alarm, and protective equipment, including interconnections, accessories, enclosures and supporting structure. The protection equipment is located in or immediately above the relevant circuit breaker panel. Details of the required protection schemes are specified in RailCorp standard EP 19 00 00 02 SP Protection System Requirements for the High Voltage Network. The switchboard shall incorporate the applicable requirements of EP 19 00 00 02 SP. Busbar voltage transformers are required for all switchboard units. The switchgear is for indoor use under ambient conditions as specified in RailCorp standard EP 00 00 00 13 SP.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 8 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

1.2

Application
The requirements of this document apply when a new 11kV indoor switchboard is purchased or installed in a RailCorp substation from the date of issue that this specification is approved. The requirements of this document are not applicable to existing 11kV indoor switchboards currently in service in the RailCorp network.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 9 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

References
The following documents contain provisions, which, through reference in this text, constitute provisions of this Standard. At the time of publication, the editions indicated were valid.

2.1

International Standards
Standard IEC 61243-5 Title Voltage detection systems Table 1 International Standards

2.2

Australian Standards
The following Australian Standards are either referenced in this document or can provide further information. Standard AS 1018 AS 1265-1990 AS 1852.441-1985 AS 1931.1 Title Recommendations for partial discharge measurements Bushings for Alternating Voltages above 1000V International Electro technical Vocabulary. Chapter 441: Switchgear, control gear and fuses High voltage test techniques, Part 1. General definitions and test requirements (Identical to IEC 60060-1) Switchgear assemblies and ancillary equipment for alternating voltages above 1 kV Separable insulated connectors for power distribution systems above 1kV Common specifications for high-voltage switchgear and control gear standards, (IEC 60694 Ed.2.2(2002) MOD) Colour Standards for General Purposes High voltage A.C. switchgear and controlgear Use and handling of SF6 in high voltage switchgear and controlgear (Identical to IEC 61634) In service Safety inspection & testing of electrical equipment

AS 2067-1984 AS 2629 1983 AS 2650-2005

AS 2700-1996 AS 2791-1996

AS 3760-2003 + Amd 1 - 2005

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 10 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Standard AS 1675 - 1986 AS 1243 - 1986 AS 60265-2001 AS 60417(all parts) AS 60529 - 2004 AS 62271.100 2005 AS 62271.102 2005 AS 62271.200 2005 AS 62271.301 2005 AS K126 AS ISO 9001

Title Instrument transformers - Current Transformers Instrument transformers - Voltage transformers High-voltage switches - Switches for rated voltages above 1 kV and less than 52 kV Graphical symbols for use on equipment (identical to IEC 60417) Degrees of Protection Provided by Enclosures (IP Code). High Voltage A.C. Switchgear and Controlgear - Part 100 High voltage alternating-current circuit Breakers breakers High voltage A.C. switchgear and controlgear - Part 102 Alternating Current Disconnectors (isolators) and earthing switches High voltage switchgear and control gear - Part 200 AC metal enclosed switchgear and controlgear for rated voltages above 1kV and up to and including 52kV High voltage switchgear and control gear - Part 301 Dimensional standard of terminals Full gloss enamel, oil and petrol resistant Quality systems requirements Table 2 Australian Standards

2.3

RailCorp Standards
Key RailCorp Standards: Several significant sets of requirements applicable to 11kV AC Indoor, supervisory controlled switchgear are common to other classes of equipment and are set out in the following RailCorp standards. The equipment shall comply with the relevant requirements set out therein.

Standard EP 00 00 00 12 SP EP 00 00 00 13 SP

Title Electrical Power Equipment - Integrated Support Requirements Electrical Power Equipment - Design Ranges of Ambient Conditions

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 11 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Standard EP 00 00 00 15 SP EP 19 00 00 02 SP EP 21 00 00 01 SP EP 90 10 00 02 SP

Title Common Requirements for Electric Power Equipment Protection System Requirements for the High Voltage network Insulation Coordination and Surge Arrester Selection Standard Voltage Tolerances

Table 3 Railcorp Standards

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 12 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

3 3.1

Definitions, Terms and Abbreviated Terms Definitions and Terms


For the purpose of this specification, the terms, definitions and abbreviated terms in AS 1852.441 and the following apply: Item Circuit-breaker Meaning A mechanical switching device that is capable of making, carrying and breaking currents under normal circuit conditions, and also of making, carrying for a specified time and breaking currents under specified abnormal conditions, such as those of a short-circuit. A switchgear panel complete with a fixed circuitbreaker, switch-disconnector, earthing switch and protection & control equipment. As defined in (AS 1852(441) 441-14-11). A circuit breaker which is not a withdrawable part of the panel assembly in which it is mounted.

Circuit-breaker panel

Earthing switch Fixed circuit breaker

Metal-clad switchgear Metal-enclosed switchgear in which certain components, for example, circuit breakers, are arranged in separate compartments that have metal partitions and that are intended to be earthed. Non-withdrawable switchgear Rated insulation level Switchgear such as circuit-breaker and switches, which are not a withdrawable part of the panel assembly in which they are mounted. The combinations of the rated lightning impulse withstand voltage and the rated short duration power frequency withstand voltage specified in AS 2650. For main circuits and switching devices, the r.m.s. value of the current that they are designed to carry continuously under the specified conditions of use and behaviour. For main and earthing circuits, the peak current associated with the first major loop of the short-time withstand current that a mechanical switching device is designed to carry in the closed position under prescribed conditions of use and behaviour. For main and earthing circuits, the r.m.s. value of current that the switching device is designed to carry in the closed position during a specified short time under prescribed conditions of use and behaviour.

Rated normal current

Rated peak withstand current

Rated short-time withstand current

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 13 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Rated voltage

The highest r.m.s. phase-to-phase voltage of the supply on which the switchgear is designed to operate. A mechanical switching device that is capable of making, carrying and breaking currents under normal circuit conditions, which can include specified operating overload conditions, and also capable of carrying for a specified time, currents under specified abnormal circuit conditions such as those of a shortcircuit. Two or more switchgear panels coupled together in various combinations. As defined in (AS 1852(441) 441-14-12). A general term that covers switching devices and their combination with associated control, measuring, indicating, alarm, protective and regulating equipment, also assemblies of such devices and equipment with associated interconnections, accessories, enclosures and supporting structures, intended, in principle, for use in connection with the generation, transmission, distribution and conversion of electric energy. As defined in (AS 1852(441) 441-13-09). Table 4 Definitions and Terms

Switch

Switchboard Switch-disconnector Switchgear

Withdrawable

3.2

Abbreviated terms:
Item ACCB Auxiliary Supply Meaning Alternating current circuit breaker Supply for the operation of electronic protection relays, energisation of multi-trip relay coils, energisation of HV ACCB trip and close coils, motor charge and general control circuit operations. Nominally 125V DC or 48V DC. Current Transformer(s) Direct Current Factory acceptance test Inter-trip

CT(s) DC FAT IT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 14 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Item Low Voltage Compartment

Meaning The compartment on the switcgboard where the protection relays, control equipment and wiring is installed. The compartment is usually accessed by a hinged door and does not require any isolation or operation of the switchgear for safe access. Protection relay used for the multi-tripping of ACCBs. This is a automatically reset relay with a hand reset flag. Protection relay used for the multi-tripping of ACCBs. This is a manually reset relay with a hand reset flag. Rail Corporation NSW Remote Terminal Unit (Interface to SCADA system) The following are locations within the RailCorp electrical network which are classified as system substations for the purpose of this document. Any location that includes a high voltage circuit breaker. Traction substation High voltage switching station High voltage switchroom Except distribution substations that use HV fuses for protection.

MTA

MTM Railcorp RTU System Substation

SCADA Supervisory

Supervisory Control and Data Acquisition system. A connection to the Electrical Operating Centre to allow the remote operation of equipment and provision for remote monitoring of status and alarms using a SCADA system. Voltage transformer Table 5 Abbreviated Terms

VT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 15 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

4 4.1

Revision History Version 1.0


Draft release for one off procurement

4.2

Version 2.0
First release

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 16 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Background
RailCorp operates a high voltage AC network in which the nominal voltages used are 11kV, 33kV, 66kV and 132kV. RailCorp also operates a 1500V DC network that supplies power for electric traction. The RailCorp high voltage distribution system operates at 11kV and supplies railway signalling, stations and other loads along the rail corridor. The RailCorp 11kV system comprises both overhead lines and underground cable. Some portions of the RailCorp 11kV system are solidly earthed while other portions are resistively earthed. System substations are either outdoor or indoor. Indoor arrangements are preferred for new construction. System substations by definition are locations that include a SCADA controlled HV circuit breaker. Distribution substations are either pole mounted, kiosks (pad mount), or indoor and are generally protected by a HV fuse. Some distribution substations have self-powered HV circuit breakers.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 17 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Functional Characteristics
The 11kV indoor switchgear covered by this standard shall: Provide an 11kV busbar and busbar voltage transformer. Provide for connection of 11kV feeders, bus tie cables, system transformer, and distribution transformer circuits to the 11kV busbar. Provide for isolation and earthing of feeders, bus tie cables, system transformer, and distribution transformer circuits. Provide protection and SCADA control for 11kV feeders, system transformer, and distribution transformer circuits and sections on the 11kV busbar. Provide for connection, protection and SCADA control of 11kV harmonic filter or capacitor banks. Provide the means to perform a DC cable test on the HV cables, without disturbing existing HV cable connections. Provide for a dc control voltage of either: 125 V dc or 48 V dc.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 18 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

7 7.1

Performance Characteristics General


The switchboard shall be designed and manufactured in accordance with following standards: Designation Switchgear (Common specification) Metal enclosed switchgear Internal arc classification (IAC) Earthing switch Disconnector Switch Circuit breaker (except capacitor) Capacitor switching Switchgear status indicators (definite indication of position) Current transformer Voltage transformer Degrees of protection provided by enclosure (IP code) General AS 1675 AS 1243 AS 60529 AS 2067 Table 6 Switchboard standards The service conditions are to be in accordance with the indoor standard requirements of AS 2650-2005 clause 2.1. Special ambient conditions -5C to 50C may apply. Due to possible high ambient temperature when the 11kV switchboard is installed inside a traction substation, derating of the switchboard may apply. RailCorp standard: EP 00 00 00 13 SP, Electrical Power Equipment - Design Ranges of Ambient Conditions provides this detail. Derating factors for high ambient temperature shall be provided in Appendix A, technical schedule tenderer supplied information. Similar components of all equipment shall fit properly and perform correctly if interchanged. The configuration and rating requirements are as follows: Standard AS 2650 AS 62271.200 AS 62271.200 AS 62271.102 AS 62271.102 AS 60265 - 1 AS 62271.100 AS 62271.100 PM AFLR E2 M2 M1, E3 M2, E2, C1 M2, E2, C2 Class

AS 62271.102 appendix A

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 19 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Parameter Number of Phases Rated System Voltage (Ur) Neutral earthing of the system Switchboard Main device type Class Busbar Possible extension to switchboard Insulation medium

Rating 3 Not less than 12kV Both: Resistive (NER) and solid earth Metal Clad non withdrawable (stationary) Indoor Single Both sides SF6 (preferred), cast resin or air All active HV parts are located in hermetically enclosed, gas filled compartments. The gas insulated busbar system is to be continuosly monitored, along with all other HV parts to ensure the integrity of the insulation.

SF6 insulated systems :

Gas filled compartments are to be designed as a sealed pressure system for a minimum 30 year life (clause 5.15.3) in accordance with AS 2650 2005. Gas compartments must be welded and all static bushings must be sealed by pressure gaskets for operational life. The operational leak rate for gas insulation must not exceed 0.1% per year.

Rated frequency (fr) Rated lightning impulse withstand voltage (Up) Common value Across the isolating distance Rated short-duration power-frequency withstand voltage (Ud) Common value Across the isolating distance

50hZ

95 kV (peak) 110 kV (peak)

28 kV (rms) 32 kV (rms)

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 20 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Parameter Rated short time withstand current (Ik) (for main and earthing circuits) Rated peak withstand current (Ip) (for main and earthing circuits) Rated duration of short circuit (tk) (for main and earthing circuits) Interruption medium Internal Arc Classification (IAC) Arc test current Arc test current duration Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Partition class (as defined in AS 62271 200, Annex A) Partial discharge level of complete switchboard including all componenets

Rating 16 kA (rms)

40 kA (peak) 3 sec Vacuum (preferred) or SF6. AFLR 16kA 1s 125 V dc (96 135 V) PM < 50 pC 48 V dc (43 58 V)

Table 7 Switchboard common ratings

7.2

Busbar
Most switchboards will require a 630 Amp busbar. The current rating will be specified on the approved for purchase operating diagram to be supplied at time of order. See Appendix B.3

Parameter

Rating Option 1 Option 2 1250 Amp

Rated normal current (Ir)

630 Amp

Table 8 Busbar characteristics Components to be fitted: Bus bar VT Voltmeter and selector switch

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 21 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

7.2.1

Continuous gas monitoring system (GIS) Bus protection equipment (if arc fault activated scheme) Other components as necessary

High impedance bus zone protection Where specified, a high impedance, unit protection scheme: protection relay, MTM, test block etc are to be located within one of the end panels that will be nominated at time of order.

7.2.2

Internal arc fault detection scheme An alternative to the traditional high impedance scheme is subject to RailCorp approval. If approved, this system is the preferred scheme. If offered as an alternative to the high impedance scheme complete system description is to be provided at tender for assessment.

7.3

Bus tie cable circuit breaker


Railcorp switchgear code = T Where required for 11kV network reasons more than one switchboard may be required in a substation. Such switchboards would normally be physically separated to reduce the risk of one event damaging both. Switchboards are interconnected by a tie cable through a bus tie circuit breaker at each end of the tie cable. This is the preferred bus sectioning arrangement at a substation location. The cable tie requires a high impedance unit protection scheme. All bus cable tie ACCBs shall be arranged for local and remote control as specified in this document. In conjunction with the switchboard common standards and ratings specified in clause 7.1, the following additional requirements are specific to bus tie cable ACCBs

Parameter

Rating Option 1 Option 2 1250 Amp 48 V dc

Rated normal current (Ir) Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Interrupter type

630 Amp 125 V dc

Vacuum preferred or SF6

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 22 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence Cables connected

2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO Bottom front and optional top

Table 9 Bus tie cable circuit breaker characteristics

Components to be fitted: Protection CT, resistors, supply fuses and relays: MCAG34, MTM (see note 1) Protection relay test blocks: AREVA MMLG01 (see note 1) Trip circuit supervision relays: RMS 1TM10 (1 for each trip coil) Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry ACCB control circuitry and supply fuses Motor operated drive mechanism and controls VT secondary protection circuit breakers CT test links, wiring terminals Cable test facility Voltage detection system Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

Note 1: Only one set of protection equipment is required per bus tie. The protection equipment shall be located together in the appropriate compartment of the circuit breaker at one end only of the tie cable. Normally this will be the lower numbered busbar end. See clause 8.2 for typical bus tie cable examples.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 23 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

7.4

Bus coupling circuit breaker


Railcorp switchgear code = B Where space or building constraints (cable ducts etc) exist a bus coupling circuit breaker arrangement maybe required for the busbar sectionalising function this is not a preferred configuration. The switchboard configuration is specified with a bus coupling circuit breaker sectioning the busbar within a switchboard.

Parameter

Rating Option 1 Option 2 1250 Amp 48 V dc

Rated normal current (Ir) Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Rated short time withstand current (Ik) Interrupter type Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence

630 Amp 125 V dc

16 kA (allows fault on outgoing part of the board) Vacuum preferred or SF6 2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO

Table 10 Bus coupling circuit breaker characteristics

Components to be fitted:
Version: 2.0 Issue Date: JUNE 2007

Protection CT, resistors, supply fuses and relays: MCAG34, MTM Protection relay test blocks: AREVA MMLG01 Trip circuit supervision relays: RMS 1TM10 (1 for each trip coil) Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry, ACCB control circuitry and supply fuses Motor operated drive mechanism and controls
Rail Corporation Page 24 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

VT secondary protection circuit breakers CT test links, wiring terminals Cable test facility Voltage detection system Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

7.5

Feeder Circuit Breaker


Railcorp switchgear code = F All feeder ACCBs are to be arranged for local and remote control as specified in this document. In conjunction with the switchboard common standards and ratings specified in clause 7.1, the following additional requirements are specific to feeder ACCBs

Parameter

Rating Option 1 Option 2 48 V dc

Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Rated normal current (Ir) Interrupter type Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence Cables connected

125 V dc 400 Amp

Vacuum preferred or SF6 2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO Bottom front and optional top

Table 11 Feeder circuit breaker specific requirements Components to be fitted:

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 25 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Protection CT, supply fuses and relays: MiCOM P127, MiCOM P521(if PW required) Protection relay test blocks: AREVA MMLG01(1 per protection relay) Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry, ACCB control circuitry and protection relay supply fuses VT secondary protection circuit breakers CT test links, wiring terminals Motor operated drive mechanism and controls Cable test facility Voltage detection system Moving coil ammeter in phase L2 Transducer, current in phase L2 Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

7.6

System transformer (incomer) circuit breaker


Railcorp switchgear code = ST All incomer ACCBs are to be arranged for local and remote control as specified in this document. In conjunction with the switchboard common standards and ratings specified in clause 7.1, the following additional requirements are specific to incomer ACCBs Parameter Rating Option 1 Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Rated normal current (Ir) Interrupter type 125 V dc 630 Amp Vacuum preferred or SF6
Rail Corporation Page 26 of 86

Option 2 48 V dc

Version: 2.0 Issue Date: JUNE 2007

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence Cables connected

2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO Bottom front and optional top

Table 12 System transformer circuit breaker specific requirements Components to be fitted: Protection CT, supply fuses and relays: MiCOM P127 Neutral leakage relay: MiCOM P127 (if required) Protection relay test blocks: AREVA MMLG01(1 per protection relay) Trip circuit supervision relays: RMS 1TM10 Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry, ACCB control circuitry and supply fuses VT on incomer side VT secondary protection circuit breakers CT for transformer differential scheme CT test links, wiring terminals Motor operated drive mechanism and controls Cable test facility Voltage detection system Moving coil ammeter in phase L2 Transducer, current in phase L2 Transducer, voltage B phase Facilities for padlocking Non-resettable mechanical operation counter

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 27 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Other components as necessary

7.7

Distribution transformer (outgoing) circuit breaker


Railcorp switchgear code = t All Distribution transformer ACCBs are to be arranged for local and remote control as specified in this document. In conjunction with the switchboard common standards and ratings specified in clause 7.1, the following additional requirements are specific to Distribution transformer ACCBs

Parameter

Rating Option 1 Option 2 48 V dc

Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Rated normal current (Ir) Interrupter type Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence Cables connected

125 V dc 200 Amp

Vacuum preferred or SF6 2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO Bottom front and optional top

Table 13 Distribution tx circuit breaker specific requirements Components to be fitted:


Version: 2.0 Issue Date: JUNE 2007

Protection CT, supply fuses and relays: MiCOM P127 or MiCOM P632, MTM, MTA Protection relay test blocks: AREVA MMLG01(1 per protection relay) Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry, ACCB control circuitry and supply fuses
Rail Corporation Page 28 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Motor operated drive mechanism and controls VT secondary protection circuit breakers CT test links, wiring terminals Cable test facility Voltage detection system Moving coil ammeter in phase L2 Transducer, current in phase L2 Transducer, voltage (if VT fitted to circuit side) Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

7.8

Capacitor / harmonic filter circuit breaker


Railcorp switchgear code = C A capacitor bank or harmonic filter circuit breaker will generally be similar to a feeder circuit breaker, however in each instance of use the circuit breaker opening and closing duty must be approved by the manufacturer. A capacitor circuit breaker shall have the ratings of a feeder circuit breaker, however it will be confirmed with the manufacturer as being capable of breaking capacitive load current and subsequently maintain a resulting voltage across its contacts as defined below: All capacitor ACCBs are to be arranged for local and remote control as specified in this document. In conjunction with the switchboard common standards and ratings specified in clause 7.1, the following additional requirements are specific to capacitor ACCBs

Parameter

Rating Option 1 Option 2 48 V dc

Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua)
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation

125 V dc

Page 29 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Rated normal current (Ir) Interrupter type Number of trip coils Number of close coils Rated short-duration withstand voltage (across the isolating distance) (Ud) Command response time both ON and OFF Cables connected

400 Amp Vacuum preferred or SF6 2 independently operated coils 1 12 kV AC rms with 13.5kV DC offset 25 msec (max) Bottom front and optional top

Table 14 Capacitor circuit breaker specific requirements Components to be fitted: Protection relay: MiCOM P127 Protection relay test block: AREVA MMLG01 Trip circuit supervision relay: RMS 1TM10 Remote control for the circuit breaker, with changeover switch for remote control L/R, anti pumping circuitry, ACCB control circuitry and protection relay supply fuses Motor operated drive mechanism and controls VT secondary protection circuit breakers CT test links, wiring terminals Cable test facility Voltage detection system Moving coil ammeter in phase L2 Transducer, current in phase L2 Additional components as required Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 30 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Prior Service Conditioning Circuit breaker contacts for capacitor or filter control shall be conditioned prior to use in switching a capacitor bank. This may be achieved by placing a low voltage welder across the circuit breaker contacts, ramping the current to the circuit breaker rating then successively opening and closing the breaker. Conditioning removes any manufacturing sharp edges that may have resulted which in first true service may ultimately lead to re-strike. An alternate method of achieving conditioned capacitor bank circuit breaker contacts is to swap the circuit breaker with one that is already in service and that has been switched on load. The circuit breaker to be swapped must be similar in all other respects to the new unconditioned circuit breaker. Confirmation of Opening Duty A circuit breaker intended to supply a capacitor bank shall be confirmed suitable for the duty by the manufacturer, such that no re-strike will occur after the arc is extinguished in each pole. It shall be noted that capacitor bank de-energisation will place a DC offset on the power frequency voltage across the circuit breaker contacts. In the worst case this DC offset may be taken to be 150% of the system peak phase to neutral voltage. If a circuit breaker is not able to be confirmed by the manufacturer as suitable for capacitor bank opening resulting in a 150% DC voltage on the load side, then the expected opening transients shall be simulated and supplied to the manufacturer for consideration and approval. Where a floating neutral capacitor bank is used, then opening transient voltage simulations shall take into account possible purely capacitive coupling of the capacitor bank neutral to earth and possible purely resistive coupling of the capacitor bank neutral to earth. Either case results in a differing trapped charge on the capacitor bank neutral following the last two poles of the circuit breaker to open. Time domain simulations shall account for saturable Voltage Transformers if they exist on the capacitor bank load side of the circuit breaker. Time domain simulations shall account for individual pole opening on current zero crossings when an open command is issued. Vacuum interrupting is preferred due to its natural dielectric recovery upon arc extinguishing. If SF6 interrupters are used then the SF6 arc quenching mechanism shall not rely on movement of the SF6 gas through the arc to quench the arc. This requirement allows for unexpected delayed re-strike to be interrupted with arc quenching and dielectric strength recovery with the circuit breaker contacts held still in the fully open position. Confirmation of Closing Duty

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 31 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

The designed capacitor bank inrush currents and contact voltages on Closing shall be time domain simulated. Three phase plots of the circuit breaker contact inrush current shall be forwarded to the circuit breaker manufacturer for approval. Time domain simulations shall account for any back to back capacitor bank switching where applicable. Circuit earthing Provision of suitable earthing switches, interlocks and components for circuit and capacitor discharge capability shall be included. Where required, supplementary earthing switch(s), interlocks and circuity for the neutral of a floating capacitor bank shall be provided.

7.9

Feeder circuit breaker (Non Auto)


Railcorp switchgear code = Fna Supervisory controlled circuit breaker configured as non-auto (no CTs or protection relay fitted).

Parameter

Rating Option 1 Option 2 48 V dc

Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Rated normal current (Ir) Interrupter type Number of trip coils Number of close coils Breaking time Command response time both ON and OFF Rated switch sequence Cables connected

125 V dc 400 Amp

Vacuum preferred or SF6 2 independently operated coils 1 40 msec (max) 25 msec (max) O - 0.3s-CO-3min-CO Bottom front and optional top

Table 15 Feeder non auto circuit breaker specific requirements

Components to be fitted:

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 32 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Remote control for the circuit breaker, with changeover switch for local/remote control L/R, anti pumping circuitry. ACCB control circuitry and supply fuses Motor operated drive mechanism and controls Auxiliary contacts Cable test facility Voltage detection system Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

7.10

Feeder network switch (Supervisory Indication only)


Railcorp switchgear code = D Fully rated load break, fault make feeder network switch complete with integral fully rated earth switch configured for supervisory indication only.

Parameter Feeder Fault make, load break switch to AS 60265.1 class E2/M1 Rated current

Rating

400 Amp

Table 16 Feeder switch specific requirements Components to be fitted: Auxiliary contacts Cable test facility Voltage detection system Facilities for padlocking Non-resettable mechanical operation counter Other components as necessary

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 33 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8 8.1

Technical Characteristics General


The switchboards and switchgear shall be provided in accordance with the performance requirements specified in chapter 7 and the technical requirements of this chapter.

8.2

Switchboard Configurations
Due to the variability of the requirements for SCADA controlled 11kV switchboards, it is not possible to identify all configurations. Each switchboard is to be designed and manufactured specifically for each site within the following constraints: The switchgear functional units shall be assembled into switchboard panels. Each switchboard shall include a bus bar voltage transformer (VT). Standard circuit breaker functions are: Feeder, System Transformer, Distribution Transformer, Tie (Bus) and Bus coupler. Switchboards with single bus tie panels should have the bus tie at one end of the switchboard. Switchboards with two bus tie panels should have the bus tie panels at opposite ends of the switchboard. The position of each functional unit will be specified at time of order in accordance with the approved for purchase operating diagram see Appendix B.3

8.2.1

Supply Point switchboard configurations

Application Supply Point Supply Point Supply Point Supply Point

Code ST1FT ST2F ST2FC

Build 1 incoming System Tx ACCB with VT + 1 Feeder ACCB +1 Tie ACCB + Busbar VT 1 incoming System Tx ACCB with VT + 2 Feeder ACCB + Busbar VT 1 incoming System Tx ACCB with VT + 2 Feeder ACCB + 1 Capacitor ACCB + Busbar VT

ST2FtT 1 incoming System Tx ACCB with VT + 2 Feeder ACCB + 1 Distribution tx ACCB + 1 Tie ACCB + Busbar VT ST3F 1 incoming System Tx ACCB with VT + 3 Feeder

Supply Point

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 34 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

ACCB + Busbar VT Supply Point ST4F 1 incoming System Tx ACCB with VT + 4 Feeder ACCB + Busbar VT

Table 17 Supply point switchboard configuration

8.2.2

Switching Station switchboard configurations

Application Switching Station Switching Station Switching Station Switching Station

Code 2FT 3F 3FT 4F

Build 2 Feeder ACCB + 1 Tie ACCB + Busbar VT 3 Feeder ACCB + Busbar VT 3 Feeder ACCB + 1 Tie ACCB + Busbar VT 4 Feeder ACCB + Busbar VT

Table 18 Switching Station switchboard configuration

8.2.3

System substation switchboard configurations

Application System Substation System Substation System Substation System Substation

Code 1Ft 1FtT 2FtT 3FtT

Build 1 Feeder ACCB + 1 Distribution tx ACCB + Busbar VT 1 Feeder ACCB + 1 Distribution tx ACCB + 1 Tie ACCB + Busbar VT 2 Feeder ACCB + 1 Distribution tx ACCB + 1 Tie ACCB + Busbar VT 3 Feeder ACCB + 1 Distribution tx ACCB + 1 Tie ACCB + Busbar VT

Table 19 System Substation switchboard configuration

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 35 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.2.4

Mid point switching switchboard configuration Application Mid point switching Mid point switching Code Build

1FnaD 1 Feeder ACCB (non auto) + 1 network Switch (D) (supy indication)+ Busbar VT 1FD 1 Feeder ACCB + 1 network Switch (D) (supy indication)+ Busbar VT

Table 20 Feeder mid point switchboard configuration

8.2.5

Bus coupled circuit breaker switchboard

Application Bus coupled by ACCB

Code

Build

ST2FB1Ft 1 incoming System Tx ACCB with VT + 2 Feeder ACCB +. Busbar VT +. Bus coupling ACCB + 1 Feeder ACCB + 1 Distribution tx ACCB + Busbar VT

Table 21 Bus coupled switchboard configuration

8.2.6

Example switchboard configurations

Figure 1 Example Switchboard type ST1FT and 3FT


Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 36 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Figure 2 Example Switchboard type 2FtT

33/11KV Tx ACCB C1 51/L


I mA

C4 C5 VT TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

TO 33KV PANEL

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
BREAKER FAIL

TC2 TC1

TC1

87/L VT 67/L
I mA

C3 C2 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
Current transducer TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51/L, 67/L: AREVA MiCOM P127 87/B, 87/BT: AREVA MCAG34

FEEDER ACCB

TIE ACCB

11KV SWITCHBOARD CONFIGURATION ST1FT 13/6/2007

Figure 3 Type ST1FT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 37 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

C1 51/L
I mA

C4 C5 VT TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER 1 ACCB FEEDER 2 ACCB

TO 33KV PANEL

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
INTERTRIP INITIATE

BREAKER FAIL

TC2 TC1

TC2 TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
Current transducer TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51/L, 67/L: 87/B: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34

FEEDER 1 ACCB

FEEDER 2 ACCB

11KV SWITCHBOARD CONFIGURATION ST2F 13/6/2007

Figure 4 Type ST2F

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 38 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

33/11KV Tx ACCB C1 51/L


I mA

C4 C5 VT TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER ACCB DISTRIBUTION Tx ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

TO 33KV PANEL

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
BREAKER FAIL

TC2 TC1

TC1

TC2

TC1

87/L VT 67/L
I mA

C3 C2 C1 MTM 51

87/T
I

C6 C7 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

mA O/C

MTA

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx) C6: 100/1 0.15PL50R0.3 C7: 100/1 10P50F20
I mA

E/F BUCHHOLZ

87/B

FEEDER ACCB

TO 415V ACCB

TIE ACCB DISTRIBUTION Tx ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51/L, 67/L: 87/B, 87/BT: 87/T: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34 AREVA MiCOM P632

11KV SWITCHBOARD CONFIGURATION ST1FtT 13/6/2007

Figure 5 Type ST1FtT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 39 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

33/11KV Tx ACCB C1 51/L


I mA

C4 C5 VT TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB

TO 33KV PANEL

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
INTERTRIP INITIATE

BREAKER FAIL

TC2 TC1

TC2 TC1

TC2 TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
Current transducer TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51/L, 67/L: 87/B: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34

FEEDER 1 ACCB

FEEDER 2 ACCB

FEEDER 3 ACCB

11KV SWITCHBOARD CONFIGURATION ST3F 13/6/2007

Figure 6 Type ST3F

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 40 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

33/11KV Tx ACCB C1 51/L


I mA

C4 C5 VT

TO 33KV PANEL

TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB FEEDER 4 ACCB

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
INTERTRIP INITIATE
BREAKER FAIL

TC2 TC1

TC2 TC1

TC2 TC1

TC2 TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
I mA

FEEDER 1 ACCB

FEEDER 2 ACCB

FEEDER 3 ACCB

FEEDER 4 ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51/L, 67/L: 87/B: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34

11KV SWITCHBOARD CONFIGURATION ST4F 13/6/2007

Figure 7 Type ST4F

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 41 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

TRIPS (all TC2): FEEDER 1 ACCB FEEDER 2 ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

MTM

11kV BUSBAR
BREAKER FAIL

TC2 TC1

TC2 TC1

TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

MTA

INTERTRIP INITIATE

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0
I mA

87/B

Current transducer

FEEDER 1 ACCB

FEEDER 2 ACCB

TIE ACCB

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51/L, 67/L: AREVA MiCOM P127 87/B,87/BT: AREVA MCAG34

Figure 8 Type 2FT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 42 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

TRIPS (all TC2): FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB

11kV BUSBAR
BREAKER FAIL

MTM
INTERTRIP INITIATE

TC2 TC1

TC2 TC1

TC2 TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/B

mA

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0
I mA

Current transducer

FEEDER 1 ACCB

FEEDER 2 ACCB

FEEDER 3 ACCB

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51/L, 67/L: 87/B: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34

Figure 9 Type 3F

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 43 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

FEEDER 2 ACCB C1 51/L


I mA

C2 C3

87/L

TRIPS (all TC2): FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

TC1 TC2 BREAKER FAIL INTERTRIP INITIATE

MTM

11kV BUSBAR
BREAKER FAIL
INTERTRIP INITIATE

TC2 TC1

TC2 TC1

TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0
I mA

Current transducer

FEEDER 1 ACCB

FEEDER 3 ACCB

TIE ACCB

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51/L, 67/L: AREVA MiCOM P127 87/B, 87/BT: AREVA MCAG34

11KV SWITCHBOARD CONFIGURATION 3FT

Figure 10 Type 3FT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 44 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

33/11KV Tx ACCB C1 51/L


I mA

C4 C5 VT

TO 33KV PANEL

TRIPS (all TC2): 33/11KV Tx ACCB FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB FEEDER 4 ACCB

FROM 33KV PANEL

TC2 TC1 BREAKER FAIL

MTM

11kV BUSBAR
INTERTRIP INITIATE

BREAKER FAIL

TC2 TC1

TC2 TC1

TC2 TC1

TC2 TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 FEEDER 1 C4: 450/ 1 10P50F20 ACCB C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
I mA

FEEDER 2 ACCB

FEEDER 3 ACCB

FEEDER 4 ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51/L, 67/L: AREVA MiCOM P127 87/B, 87/BT: AREVA MCAG34

11KV SWITCHBOARD CONFIGURATION 4F 13/6/2007

Figure 11 Type ST4F

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 45 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

TRIPS (all TC2): FEEDER ACCB DISTRIBUTION Tx ACCB

MTM

11kV BUSBAR
BREAKER FAIL
INTERTRIP INITIATE

TC2 TC1

TC1

TC2

87/L VT 67/L
I mA

C3 C2 C1 51

87/T
I mA O/C

C4 C5 C1

MTA 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 100/1 0.15PL50R0.3 C5: 100/1 10P50F20
I mA

E/F

MTM FEEDER ACCB


TO 415V ACCB

BUCHHOLZ

Current transducer DISTRIBUTION Tx ACCB

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51, 67/L: AREVA MiCOM P127 87/B: AREVA MCAG34 87/T: AREVA MiCOM P632

Figure 12 Type 1Ft

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 46 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

TRIPS (all TC2): FEEDER ACCB DISTRIBUTION Tx ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

MTM

11kV BUSBAR
BREAKER FAIL

TC2 TC1

TC1

TC2

TC1

87/L VT 67/L
I mA

C3 C2 C1 51

87/T
I mA O/C

C4 C5 C1 87/BT C1
FROM ADJACENT TIE ACCB

MTA

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 100/1 0.15PL50R0.3 C5: 100/1 10P50F20
I mA

E/F

C1 TIE ACCB

87/B

MTM FEEDER ACCB


TO 415V ACCB

BUCHHOLZ

Current transducer

DISTRIBUTION Tx ACCB

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51, 67/L: 87/B, 87/BT: 87/T: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34 AREVA MiCOM P632

11KV SWITCHBOARD CONFIGURATION 1FtT 13/6/2007

Figure 13 Type 1FtT


TRIPS (all TC2): FEEDER 1 ACCB FEEDER 2 ACCB DISTRIBUTION Tx ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

MTM

11kV BUSBAR
BREAKER FAIL

TC2 TC1

TC2 TC1

TC1

TC2

TC1

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 MTM 51

87/T
I mA O/C

C4 C5 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

MTA

87/B

CT & RELAY DETAILS C1: 600/1 0.04PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.08PL50R1.0 C4: 100/1 0.2PL50R0.3 C5: 100/1 10P50F20
I mA

E/F BUCHHOLZ

FEEDER 1 ACCB

FEEDER 2 ACCB

TO 415V ACCB

TIE ACCB DISTRIBUTION Tx ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51, 67/L: AREVA MiCOM P127 87/B, 87/BT: AREVA MCAG34 87/T: AREVA MiCOM P632

11KV SWITCHBOARD CONFIGURATION 2FtT

Figure 14 Type 2FtT

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 47 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

FEEDER 2 ACCB C1 51/L


I mA

C2 C3

87/L

TRIPS (all TC2): FEEDER 1 ACCB FEEDER 2 ACCB FEEDER 3 ACCB DISTRIBUTION Tx ACCB TIE ACCB TIE ACCB (ADJACENT SWITCHBOARD)

TC1 TC2 BREAKER FAIL INTERTRIP INITIATE

MTM

11kV BUSBAR
BREAKER FAIL
INTERTRIP INITIATE

TC2 TC1

TC1

TC2

TC2 TC1

TC1

87/L VT 67/L
I mA

C3 C2 C1 MTM 51

87/T
I

C4 C5 C1 67/L

87/L
I mA

C3 C2 C1 87/BT C1 C1
FROM ADJACENT TIE ACCB

mA O/C

MTA

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 100/1 0.15PL50R0.3 C5: 100/1 10P50F20
I mA

E/F BUCHHOLZ

87/B

FEEDER 1 ACCB

TO 415V ACCB

FEEDER 3 ACCB DISTRIBUTION Tx ACCB

TIE ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 51, 67/L: 87/B, 87/BT: 87/T: AREVA MiCOM P521 AREVA MiCOM P127 AREVA MCAG34 AREVA MiCOM P632

11KV SWITCHBOARD CONFIGURATION 3FtT 13/6/2007

Figure 15 Type 3FtT (Note 2nd feeder shown on top of busbar. This is diagrammatic only it is not an incomer but shown here to fit across the page)

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 48 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

11kV BUSBAR

VT

FEEDER (NON AUTO) ACCB

NETWORK LOAD DISCONNECTOR & EARTHSWITCH (SCADA INDICATION ONLY)

Figure 16 Type 1FnaD


TRIPS (all TC2): FEEDER ACCB

MTM

11kV BUSBAR

TC2 TC1

VT 67/L

87/L
I mA

C3 C2 C1 FEEDER ACCB C1 NETWORK LOAD DISCONNECTOR & EARTHSWITCH (SCADA INDICATION ONLY) 87/B

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0
I

mA

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: 67/L: AREVA MiCOM P521 AREVA MiCOM P127

Note: 1. The requirement for busbar protection will be specified at time of order.

Figure 17 Type 1FD

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

INTERTRIP INITIATE

Page 49 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

The switch shown in Figure 17 Type 1FD includes a CT for a busbar protection scheme. The need for a busbar scheme will be specified at time of order. If the busbar scheme is not required the switch will not require a CT.

33/11KV Tx ACCB C1 51/L


I mA

C4
BREAKER FAIL

TRIPS (all TC2): 33/11KV Tx ACCB (both ACCB's) FEEDER 1 ACCB BUS-SECTION ACCB TRIPS (all TC2): FEEDER 2 ACCB DISTRIBUTION Tx ACCB BUS-SECTION ACCB

TO 33KV PANEL FROM 33KV PANEL


TC2 TC1

C5 VT

MTM 87/B1 MTM

SECTION 1
BREAKER FAIL

C1

C1

SECTION 2
BREAKER FAIL

TC2 TC1

TC2 TC1

TC1

TC2

87/L VT 67/L
I mA

C3 C2 C1 67/L

87/L
I mA

C3 C2 C1 FEEDER 2 ACCB 51

87/T
I mA O/C

C6 C7 C1
FROM ADJACENT TIE ACCB

MTA

INTERTRIP INITIATE

CT & RELAY DETAILS C1: 600/1 0.03PL120R2.0 C2: 300/150/1 10P50F20 C3: 300/1 0.05PL50R1.0 C4: 450/ 1 10P50F20 C5: 450/0.577 0.02PL100R3.0 (based on 6.25MVA tx)
I mA

87/B2

E/F

MTM FEEDER 1 ACCB


TO 415V ACCB

BUCHHOLZ

DISTRIBUTION Tx ACCB

Current transducer

TC1: ACCB TRIP COIL 1 TC2: ACCB TRIP COIL 2 87/L: AREVA MiCOM P521 51/L, 67/L: AREVA MiCOM P127 87/B1, 87/B2: AREVA MCAG34

11KV SWITCHBOARD CONFIGURATION S1FB1Ft 13/6/2007

Figure 18 Type ST1FB1Ft

8.3

Rated Insulation Level


All switchgear shall have the same Rated Peak Lightning Impulse Withstand Voltage.

8.4

Control Voltage DC auxiliary supply voltage


The auxiliary supply voltage shall be either 125 V dc or 48 V dc (nominal). Switchboards are to be suitable for either voltage. The specific voltage will be nominated at time of order (see Appendix B.3Error! Reference source not found.). Auxiliary supply voltage requirements are specified in EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 50 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.5

Busbar
All joints and tees in busbars and busbar connections shall be made with an approved connection type. If bolts, nuts and washers are used they shall be suitably protected against corrosion in accordance with ISO 9227. If any part of the busbar is air insulated or requires routine service then bus bar earthing facilities shall be provided.

8.6

Gas insulation (where applicable)


Sulphur-hexafluoride (SF6) insulated switchgear shall be filled with SF6 that complies with the requirements of IEC 60376. Cladded gas compartments shall be designed as hermetically sealed pressure system according to AS 62271200. The switchgear shall be factory sealed so as not require any routine gas replenishment during installation or in normal service. The complete busbar system shall be integrated completely and throughout within the gas filled cladded compartments of the switchgear. All HV conducting parts are to be isolated from the external environment. The design, construction and sealing of gas compartments shall be such that the gas will not require replenishment for at least 30 years. Gas compartment seals of static bushings and pressure relief devices shall be kept to a minimum. A common gas tight rotary bushing shall be used for any rotary actuators. Gas compartments are to be welded and static bushings must be sealed by pressure gaskets for operational life. The operational leak rate for gas insulation must not exceed 0.1% per year. Bushings are to be used between the internal gas filled clad compartment and the external atmosphere for cable connections and for the flanging of metal enclosed components (VTs etc). It is preferred that switchgear that requires gassing after panels are assembled into switchboards be gassed at the factory and transported to site as a single unit. Only if specifically approved by RailCorp, shall gas compartments be assembled, gassed and sealed on site. In this situation the supplier shall test the tightness, in accordance with AS 2650 clause 6.1, and shall certify and warrant for gas tightness. A device for monitoring the SF6 pressure in each gas compartment while in service shall be provided. This device shall provide indication of the minimum

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 51 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

permissible pressure level for safe operation and shall provide two level alarms level 1 alarm, level 2 alarm. The pressure level monitoring device shall be clearly visible to the operator from the operating side of the switchgear panel. Remote signalling contacts for SCADA connection for alarm conditions are to be provided. 8.6.1 Pressure relief for gas compartments Pressure relief devices of each gas-filled cladded compartment are to be effected by appropriate relief devices into a pressure relief area. The pressure relief area shall be partitioned against the cable connection compartment using metallic cover. Direction for pressure relief is, for the cable compartment directed downwards; for other compartments upward to the rear. 8.6.2 On-site installation and possible extension Individual functional units shall be designed so that they can be lined up on site without undue dismantling of existing equipment or the need to regas. A coupling section is to be available to connect busbars of adjacent modules. This coupling arrangement shall provide for subsequent extension without requiring interventions into existing modules. This shall be documented conclusively in the equipment manuals. 8.6.3 Current transformers The switchgear is to be equipped for current measurement of the functional units, with low voltage CTs which are separately accessible in the cable connection compartment and which must be mounted outside of the gas compartment onto the extended outer cone-type bushing. Retrofitting or replacement of the CT shall be possible without intervention in the gas compartment from the switchgear side. 8.6.4 Voltage transformers Metal enclosed, touch safe and grounded inductive voltage transformers should be provided. VT requirements are specified in EP 19 00 00 02 SP. VTs on the busbar are to be direct plug-in to the switchgear outside of the gas filled cladded compartment. VTs on outgoing (or incoming) circuits are to be located outside of the gas compartment. They can be plug-in directly or connected via a pluggable cable connection. Direct plug-in VTs in the outgoing (incoming) circuit is acceptable to Railcorp. Transformer isolation and earthing on the primary side where required shall be provided.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 52 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.6.5

End of life gas recovery After the operational life of the switchboard it must be possible to recover the complete SF6 gas of every gas filled compartment by a serial recovery valve.

8.7

Earthing bar
To assist with stray current mitigation measures from the dc traction system, it may be necessary to connect 11kV cable screens to a separate cable screen earth bar on feeder panels only. This arrangement is to facilitate future installation of a transient earth clamp. The transient clamp acts as a DC decoupler, to provide DC isolation between earthing points that are still AC connected. Under an AC earth fault the clamp impedance momentarily changes state to a virtual short circuit, acting to provide a direct connection of HV cable screens to the switchboard earth bar. The transient earth clamp blocks the path to dc stray current that could otherwise flow via the cable screen. Note some HV panels will require all HV earth screens to be directly connected to the switchboard earth bar. Each switchgear panel shall include two copper earthing bars, rated for maximum fault levels and not less than 120 mm2 cross section area to facilitate earthing. The cable screen earth bar shall be connected to the switchboard earth bar via removable links and shall be isolated from similar bars in adjacent panels. It shall be insulated from the frame of the switchboard by insulated mounts that have been rated for maximum earth potential rise and tested for at least 11/3 kV for 1 minute. The cable screen earth bar shall provide for connection of the removable link, three HV cable screens and two cable connections holes for a transient earth clamp. The switchboard earth bar shall interconnect adjacent switchgear panels and provide: for all switchgear bonding for two cable connections to the main substation earth grid for a removable link per feeder panel for connection to the insulated earth screen earthing bar for three cable screens for panels other than feeders requirements for circuit test facility (see clause 8.19)

Earth termination requirements are provided in EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 53 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.8

Current Transformers
The circuit-breaker panels shall be provided with three phase sets of protection current transformers in compliance with EP 19 00 00 02 SP Protection System Requirements for the High Voltage Network.

8.8.1

CT rating plate A rating plate shall be fitted to each current transformer. A second identical plate is to be fixed within the LV compartment in such a position that facilitates ease of access to read the information.

8.9
8.9.1

Voltage Transformers
General A three-phase (or three single phase) voltage transformer(s) in compliance with EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network shall be provided for each switchboard. A voltage transformer is required for each incoming supply transformer ACCB. For maintenance, and for the commissioning of protection relays, it shall be possible to simulate the voltage conditions that would occur during earth faults and the supplier shall explain how this is achieved (see the Technical Schedule at Appendix A ). A typical way to achieve this is to remove the high-voltage fuse in any one phase and earth that phase of the voltage transformer.

8.9.2

Directional Protection Supply Alarm Within each panel the low voltage side of the voltage transformer supply to protection relays shall be protected by a separate circuit-breaker of adequate breaking capacity complete with voltage free contacts. The circuit breaker(s) shall have an normally closed voltage free auxiliary contact which is connected to the SCADA system to give an FEEDER XXX DIRECTIONAL VOLTAGE FAIL' alarm The main voltage transformer secondary circuit-breaker should discriminate for faults protected by the individual panel circuit breakers.

8.9.3

Voltage Transformer Alarm A three phase, phase failure relay in compliance with EP 19 00 00 02 SP, Protection System requirements for the High Voltage Network shall be connected to the secondary of the voltage transformer on the load side of the main LV circuit breaker.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 54 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.10

Low voltage cabinet


The secondary equipment for protective relays, controls, measurements, metering and other systems shall be housed in a low voltage cabinet located in or immediately above the relevant circuit breaker panel. The low voltage panel is to be a lockable, closed, fully shrouded and arc resistant cabinet to IP3X standard with mechanical and electrical interface to accommodate digital protection relays and other secondary equipment for control and measurement. Where appropriate equipment may be mounted on a torsion resistant panel door. Mechanical drive elements must not be installed in the low voltage cabinet.

8.11

Circuit-Breakers

8.11.1 General Circuit-breaker panels shall comprise a fixed circuit breaker, switch-disconnector and earthing switch. Circuit-breakers shall comply with the requirements of AS 2650 and IEC 62271 100. Circuit-breakers, switch-disconnectors and earthing switches that have long mechanical and electrical endurance (as defined in IEC 62271 parts 100 & 102) are preferred. The secondary equipment for protective relays, controls, measurements, metering and other systems shall be housed in a low voltage cabinet located in or immediately above the relevant circuit breaker panel. Mechanical drive elements must not be installed in the low voltage cabinet. Details of the required protection schemes are specified in RailCorp standard EP 19 00 00 02 SP Protection System requirements for the high voltage network. The switchboard shall incorporate the applicable requirements of EP 19 00 00 02 SP. 8.11.2 Circuit Breaker Type The interrupting medium shall be either vacuum (preferred) or SF6. Interrupters must enable at least 10,000 operations at rated current and at least 50 operations at rated short circuit breaking current. 8.11.2.1 Vacuum Circuit-Breakers

The contacts of the interrupter shall be held open by a positive fail-safe device independent of interrupter vacuum. The closing arrangement shall be designed so as to give a positive closing action whilst overcoming the contact hold open device.
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 55 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.11.2.2

SF6 Circuit-breakers

Each circuit breaker shall consist of three separate "pole units" mounted on a single piece frame and shall be mechanically interconnected. The design of the interrupting mechanism and contacts shall be such that the energy dissipated in the SF6 gas is low and does not cause appreciable degradation of gas. Each pole shall be provided with a separate and independent set of main and arcing contacts to minimise degradation of main contacts during fault interruption. The arcing contacts shall be terminated by tungsten or similar tips and shall be of a high electrical endurance. The main contacts shall be capable of carrying the maximum short circuit current without damage. If butt type arcing contacts are provided, it shall be possible to check the wear of arcing contacts without the necessity to open pole units. The internal surfaces of all porcelains shall not be glazed. The gas tightness shall not depend on any part likely to wear or age. Certificates and details of tests for tightness carried out on pole units of breakers shall be maintained. 8.11.3 Circuit-breaker operating mechanisms The circuit-breaker operating mechanism shall be an integral part of the circuit breaker. The busbar isolator and associated earth switch is to be actuated mechanically. Auxiliary switches shall provide indication of each switch position. See 8.25.1. Any part of the circuit breaker mechanism that requires routine inspection and maintenance shall not be enclosed in any gas tight compartment. Solenoid based mechanisms are not to be used. All circuit breaker panels shall be the XEM type (stored energy operation by means of energy stored in a motor-charged spring with manual or electrical release). All circuit breakers in the closed position shall be able to trip-close-trip before the spring needs to be charged again. 8.11.4 Circuit-breaker Operation and Control The circuit-breaker closing mechanism shall be electrically operated, trip-free. The circuit-breaker mechanism shall provide lockout preventing closing, as specified in Clause 441-14-23 of AS 1852 (441) - 1985 The circuit breakers shall be arranged for operation by local control or by remote supervisory control. The supervisory equipment will provide an open or close command signal of 1.0 A maximum at the nominated DC control voltage continuous for 1.0 second and up to 2 seconds duration.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 56 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

The circuit breaker shall close without delay when the close command signal is applied. While this command signal is applied, the circuit breaker shall not make a second attempt to close if it fails to close on the first attempt. The circuit breaker shall open without delay when the open command signal is applied independently to any of the trip coils or to all trip coils simultaneously. A mechanical push-button or similar device for tripping the circuit breaker shall be provided. Continuously rated control equipment shall be provided to make the successful closing of the circuit-breaker independent of the length of time that the control switch is held in the CLOSE position and to ensure that only one closing attempt can be made if the control switch is held in the CLOSE position.

8.12

Indication
The circuit-breaker and switch panel shall have indication clearly visible from the front of the panel (i.e. either on the circuit breaker or on the circuit-breaker panel). The circuit-breaker / switch switchgear panel shall have the following definite indication: 1) 2) 3) 4) 5) Circuit-breaker open/close; Switch disconnector open/close (if applicable); Earth switch position; Stored energy device charged/discharged; Non-resettable mechanical operation counter.

8.13

Auxiliary Equipment
Each switchgear panel shall be fitted with: 1) A control panel with: a) b) c) A local CLOSE and OPEN switch or push-buttons coloured red and green respectively. LOCAL REMOTE (SUPERVISORY) changeover switch; Capability for installation of instrumentation to measure: Voltage Current

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 57 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Energy

The requirement for which instruments are to be installed will be specified at the time of order. The requirements of any instrumentation to be fitted, are set out in section 8.23 Instruments, Transducers and Metering 2) Two normally open and two normally closed auxiliary switches rated at 5 amperes in a 125 V d.c. inductive circuit or a 415 V a.c. circuit. (These auxiliary switches shall be provided in addition to those essential to the circuit-breaker operation). A mechanically operated indicator, indelibly marked, to show whether the circuit breaker is open or closed. The word OPEN shall be visible only if the circuit breaker is open and the word CLOSED shall be visible only if the circuit breaker is closed. If colours are used in addition, then the colour green shall indicate the open condition and the colour red shall indicate the closed condition. Electrically operated indicating lights of the LED type. A non-resettable operation counter. A set of terminals for the termination of auxiliary wiring. All auxiliary wiring such as for remote closing and tripping circuits, incoming DC control supplies and all spare auxiliary switches shall be connected to these terminals. Mechanical interlocks shall be provided in compliance with 8.14 and clause 5.11 of AS 62271-200 to prevent unsafe operation, including: a) b) Automatic opening of a circuit-breaker when it is used to earth a circuit or the bus bar Closing of an earthing switch unless the circuit-breaker is in the open position

3)

4) 5) 6)

7)

Each switchboard shall be fitted with a voltmeter and associated phase selection switch to indicate the bus voltage. Anti-condensation heaters where required shall be provided. A current detection circuit using a supervised reed relay shall be incorporated in the heater control scheme. The requirement for which instruments are to be installed will be specified at the time of order.

8.14

Interlocks
Interlocking requirements regarding operating lever actuation must be designed to interrogation interlock principals: Operating lever(s) can only be inserted or

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 58 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

that actuating forces may only act on the components if this is permitted by the appropriate operating condition of the associated functional unit. Digital switchgear interlock units are not accepted. It must only be possible to remove or insert actuating levers in clearly defined positions Close or Open. The interlocking should comply with the following interlocking conditions: Double acting interlock between busbar isolator and outgoing earthing switch Double acting interlock between busbar isolator and circuit breaker Double acting mechanical interlock between the switch disconnector and the outgoing earthing switch Double acting interlock between the cable compartment cover and the outgoing earthing switch (for cable testing, specific equipment must be provided to eliminate the outgoing earth).

Facilities provided for operational access to parts of the switchgear panel that contain live components shall be mechanically interlocked so that access to such parts is not possible unless all live parts have been rendered safe, either by a visibly applied earth connection or by being positively disconnected and screened from the remaining live parts. Mechanical interlocks shall be provided to ensure positive and substantial protection against malfunction, and shall be so designed and constructed as to ensure dependable fail-safe operation. Interlocks shall ensure that the disconnector cannot be moved or operated unless the circuit breaker is open. Interlocks shall ensure that the circuit breaker cannot be closed unless the disconnector is fully in the closed, isolated or earth position. Positive mechanical interlocking shall be provided to prevent inadvertent switching from the ON position to the EARTH position without a definite stop in the OFF position, or from the EARTH position to the ON position without a definite stop in the OFF position. Access to the test terminals shall only be possible when the associated earth switch is in the EARTH position. When the circuit test facility is in use, it shall not be possible to close the disconnector. It is highly desirable that the making of the contacts in the circuit EARTH position shall be directly observable by the operator.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 59 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

If the earthing of a circuit is not visible, the corresponding indication shall be directly coupled to the earthing mechanism, to ensure fail-safe indication. If the switchgear panel is designed so that the circuit to be earthed is earthed through the main contacts of the circuit breaker, then the circuit breaker must be interlocked so that it cannot be tripped by the protection relays or SCADA control while the circuit is earthed. An analysis shall be provided detailing the integrity of the interlocking system. The analysis shall include all possible failure modes and the controls employed to prevent an unsafe operation. A table shall be produced of all possible and inhibited states the switchgear may occupy.

8.15

HV Cable Interface

8.15.1 General Each circuit-breaker and switch panel shall be equipped with a front 11kV cable compartment interlocked with the ACCB providing for connection of 11kV cables. The cable bushings shall be arranged side by side facing the front of the switchboard. Bushings shall be positioned suitable for connection of 3 core cables with tails of equal length to facilitate phase transposition without reterminating the cable. All cable compartments shall be adequately sealed to prevent entry of vermin and dust to at least IP3X. Each circuit breaker and switch panel is to provide the means to perform a DC cable test on the HV cables, without disturbing existing HV cable connections. See section 8.19 Circuit Test Facilities. 8.15.2 Fully insulated cable terminations All cable termination compartments shall be suitable for dead-break, separable, fully insulated and shielded system for connection of HV cables. The separable, insulated, shielded connection system is to be compliant with AS 2629 (or equivalent IEC, EN) and relevant ratings specified in section 7. Elastimold, bolted, field disconnectable are preferred. Railcorp to approve particular type. 8.15.3 Non fully insulated cable terminations All cable termination compartments shall be suitable for air insulated termination. The compartment shall have at a minimum the clearances in accordance with AS 2067.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 60 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

To provide protection against flashover due to rodents or high humidity Raychem removable and reinstallable elastomeric insulating boots (or approved alternative) for bushings type RCAB shall be fitted. Cable terminations to be approved by Railcorp. 8.15.4 Cable compartment size The cable compartment shall be required to accept single, three-conductor belted or three core dry type cables including: separately lead sheathed paper or XLPE insulated cables of up to 240mm2 cross section. Where three phase cables are to be terminated the dimension of the cable compartment shall be such as to enable adequate clearances for crossing of cable cores. All cable compartments shall be of dimensions such that full standard cable withstand power frequency tests as specified in Table 1 of AS 2650 can be conducted after cable termination is complete. The cables shall enter the cable compartment from below. The minimum of one cable shall be achieved without sacrificing space for surge arrester equipment if required. The non standard configuration is top entry of power cables. Some situations may require this configuration if possible. Details of the cable connections options shall be nominated in the Technical Schedule at Appendix A

8.16

Surge arresters
The switchgear may be installed with short cable feeds from overhead lines. Sufficient space shall be provided within the cable compartment of each feeder cubicle to install surge diverters if required for the specific feeding configuration. Surge arrester type and restrictions shall be nominated in the Technical Schedule at Appendix A.

8.17

Circuit Earthing Facilities


Each panel shall be equipped with circuit earthing switches manufactured and tested the relevant standard nominated in chapter 7. Earth switches shall be the integral type. It is preferred that earthing of the circuit cables is effected via a separately designed make-proof earthing switch. The earthing being located directly on the circuit cable and designed without interposing further switching devices. The earthing system shall be designed and tested for making a live circuit with a prospective peak fault current to at least as specified in 7.1. Each circuitearthing switch shall be mechanically interlocked with the corresponding circuit breaker or switch. Interlocking requirements are detailed section 8.14.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 61 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

The earthing switch shall be fully rated for fault making to the requirements specified in chapter 7. Each switch shall be provided with a failsafe indicating device to positively indicate whether it is in the OPEN OR EARTH position and the words "OPEN" and "EARTH" shall be used for the respective indication of these positions. It is highly desirable the equipment shall be configured to allow the position of the earth switch contacts in the EARTH position to be directly observable. Appropriate illumination shall be provided. The preferred light source is white LEDs. It shall be possible to replace the light source without the need for isolating of HV equipment or significant disassembly of the switchgear.

8.18

Voltage detecting system


A voltage detection system (VDS) to (IEC 61243-5) with integrated display to detect: the dead state, the operating voltage and phase balance shall be provided for all HV circuits. Suitable capacitive voltage dividers fitted in the cable connection area is acceptable to Railcorp. Appropriate connections shall be provided to enable phase comparison in normal operating conditions. A highly desirable feature is for remote indication of cable voltage status and interlocking with the earth switch. Interlocking should inhibit the earthing of live circuit conductors.

8.19

Circuit Test Facilities


Each circuit-breaker panel shall incorporate an integral type circuit test facility. All test facilities shall be suitable for the application of dc test voltages associated with the after-installation testing of power cables, and shall be rated for the same system voltage as the switchgear. The test facility shall facilitate the connection of test equipment with the circuit earthed and then allow the earths to be removed with the test equipment still connected. It shall be possible to connect a hand applied earthing set to the circuit side of each circuit breaker panel for use in conjunction with test equipment. It shall be possible to apply or remove the earth connection independent of the application or removal of the test equipment connection. It is permissible that external removable accessories be used to achieve this function.

8.20

Padlocking
Facilities shall be provided to padlock:

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 62 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

The disconnector in the closed, open and earth positions. The circuit-breaker in the open positions and the closed position while the disconnector is in the earthed position, and The circuit test facility, if applicable (see section 8.13 Auxiliary Equipment)

All padlocking facilities shall be suitable for padlocks with a 6mm shank diameter.

8.21

Floor fixing and penetration details


All equipment required for the fixing of the switchgear to the floor shall be provided, inclusive with the switchboard. If no figures are included (and accepted by RailCorp) in the tender, It will be understood that a tolerance of 1.5mm over any 1m diameter circle and a tolerance of 6mm over the complete switchboard floor area will be provided by the principal.

8.22

Segregation of LV wiring in HV compartment


Any low voltage wiring within HV compartments shall be segregated, mechanically protected and installed to provide adequate protection from a HV fault damaging the LV circuits. Compliance with this requirement shall be detailed in technical schedule Appendix A.

8.23

Instruments, Transducers and Metering

8.23.1 General All instruments, transducers and metering equipment that are required to be fitted shall comply with this section and the relevant requirements in EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment. All indicating instruments shall be flush-mounted industrial type instruments that comply with the requirements of the relevant of IEC standards: IEC 60051-1, IEC 60051-2, IEC 60051-3, IEC 60051-7, IEC 60051-8 and IEC 60051-9. The instruments shall be clearly visible and easily readable from a standing position in front of the panel. Analogue instruments shall have a scale length of at least 90 mm. All instruments on a switchboard shall be scaled with the same type of characters of the same size. The instruments shall be 96mm x 96mm in size, with black scales on a white background. All current-operated instruments shall be protected against continuous over current up to 120% of nominal value and high current surges up to the fault rating of the circuit breaker.
Version: 2.0 Issue Date: JUNE 2007 Rail Corporation Page 63 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.23.2 Current transducers Each feeder/transformer panel shall have one current transducer connected to B of the protection CTs. The output of the current transducer shall be used to also drive the ammeter and then be connected to the SCADA RTU for remote indication. The approved transducers to be used to measure current are of the 0 20mA type and are specified in RailCorp standard: EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network. 8.23.3 Voltage transducers A voltage transducer shall be connected to each VT and connected to the SCADA RTU for remote indication. The approved transducer to be used to measure voltage are of the 0 20mA type and are specified in RailCorp standard: EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network. 8.23.4 Ammeters Ammeters shall have two scales that are essentially linear, the main scale shall allow for 120% of the primary current rating of the current transformer. The second scale will be equivalent to the main scale divided by 5, to allow reading of lower currents. A pushbutton fitted to the front of the ammeter shall activate the minor scale. The current transformer ratio shall be clearly marked on the face of the ammeter. The accuracy of ammeters shall be 3% or better and shall be stated in the Technical Schedule. 8.23.5 Voltmeters Voltmeter shall have analogue indication with scales that have an indicating range of 80% to 120% of the nominal system voltages. Where voltmeters that have a nominal range from 0% to 120% are required, this will be specified at time of order. The nominal voltage shall be marked in red on the scale. 8.23.6 Watthour meter kWh meters shall be three phase, with pulse output. The pulse output rate shall be 10 per kWh. Where required for revenue metering the kWh meter is to be connected to a metering CT of suitable rating and accuracy class.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 64 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.24

Busbar and Circuit Protection

8.24.1 General Protection schemes shall be in accordance with RailCorp specification EP 19 00 00 02 SP - Protection System Requirements for the High Voltage Network. The protection scheme shall be specified in the protection concept which is required at time of switchboard procurement. See Appendix B.3 8.24.2 Feeder Protection The protection for feeders will consist of overcurrent and earth fault protection and at strategic locations pilot wire protection will also be required. The protection scheme shall be specified in the protection concept which is required at time of switchboard procurement. 8.24.3 System Transformer Protection The relays and associated equipment for the protection of system transformers are normally located with the protection and control equipment for the higher voltage winding. The 11kV circuit breaker panel for a system transformer shall therefore be configured for connection to the required protection equipment located elsewhere. The neutral leakage relay is normally located on the 11kV panel. 8.24.4 Distribution Transformer Protection The protection functions required for distribution transformers shall be implemented within the 11kV panel. Inputs from gas relays / gas over pressure voltage free contacts, low voltage equipment voltage free contacts and high temperature RTDs inputs shall form part of the tripping circuit of the circuit breaker. EP 19 00 00 02 SP - Protection System Requirements for the High Voltage Network.defines two schemes for distribution transformers: Primary protection is a transformer differential scheme, with overcurrent & earth fault protection as backup. Primary protection is overcurrent & earth fault protection - no backup. Where a differential scheme is required terminals shall be provided for the connection of current transformers on the secondary side of the transformer and the protection equipment shall provide a trip output to trip the low voltage circuit breaker.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 65 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.25

SCADA Indications and Controls


The SCADA alarms from equipment will be implemented by a combination of hard wiring and using the serial link on the electronic protection relays. The serial communication port on all electronic protection relays within a switchboard shall be connected together and wired to a terminal strip for connection to the the SCADA RTU. Certain information is critical for system operation and must be independent on the protection relay or communication link to the RTU.

8.25.1 Binary Indication & ACCB Control The following list details the SCADA alarms and control that are required to be hard wired to the RTU. There maybe other desirable alarms to the list below:

I/O Point Description. Circuit Breaker (Open, Closed). Isolator Position (Open, Closed) Earthing switch Position (Open, Closed) Circuit Breaker Alarms (eg spring charge motor). Trip Circuit Supervision Alarms. Gas/vacuum Monitoring Alarms Protection Relay Watchdog Alarms Bus Zone Trip ACCB Open Control ACCB Close Control Table 22 I/O Points 8.25.2 Analogue Indication

Hard Wired

The following analogue indications shall be provided to SCADA: Circuit current ( at least 1 phase ) for each circuit breaker. Bus Voltage ( at least 1 phase ) for each switchboard.

Current transducers shall be provided to allow monitoring of primary circuit currents by SCADA. Transducers shall be connected in series with B phase of the protection CT circuit. Approved types and details are provided in specification EP 19 00 00 02 SP, Protection System Requirements for the High Voltage Network.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 66 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.25.3 Controls The following control functions from the SCADA system are to be provided for: Circuit Breaker Open (trip). Circuit Breaker Close.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 67 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

9 9.1

Integrated System Support Requirements Integrated Support Objectives


The switchgear manufacturer must establish and provide the information required to operate and maintain the equipment throughout its operational life, in a cost effective manner and to a level that is consistent with the planned operational performance and usage of the switchgear. This includes: Specifying Maintenance Requirements, Spares Support, Operations and Maintenance Manuals, Training, and Support Equipment and Tooling.

9.2

Equipment Supplier Deliverable


The integrated support requirements are a significant deliverable in the procurement of new Switchgear. Manuals, training, documentation and other support deliverable's shall be in accordance with EP 00 00 00 12 SP, Electrical Power Equipment - Integrated Support Requirements.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 68 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

10

Tests
Testing requirements are to be read in conjunction with the specification EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment.

10.1

Routine tests
For each panel the following tests are to be carried out. Routine test reports shall be provided to Railcorp. Switchgear routine tests as listed in: AS 2650, Clause 7 AS 62271-100, Clause 7 AS 60694 & AS 62271-200, all Clause 7. For non GIS clause 7.2 is applicable.

CTs and VTs AS 1675, Current transformer routine tests AS 1243, Voltage transformer routine tests

10.2

Type tests
The results of type tests as required in: AS 2650 AS 62271-100 AS 62271-200 AS 62271-200, appendix A7, test report for internal arc

Shall be made available by the supplier upon request. Test certificate details, demonstrating compliance with the above standards, including the date, results and name of the testing body shall be supplied in the Technical Schedule at Appendix A. Type test certificates for each of these tests will be accepted where it can be demonstrated that the switchgear supplied is of a similar design to previously type tested switchgear.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 69 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

11

Data Set associated with the Equipment


The following data shall be supplied by the manufacturer and maintained for the switchgear. This data will remain the property of RailCorp.

11.1

Information
AS 2650, Appendix A2, drawings: This is the base set of drawings required. Additional information and requirements as a deliverable under equipment supply is documented in the following specifications: EP 00 00 00 12 SP, Electrical Power Equipment Integrated Support Requirements. EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment. EP 19 00 00 02 SP, Protection System Requirements for High Voltage Network.

11.2

Technical Schedule at Appendix A


The information listed in the technical schedule at Appendix A, supplied by the manufacturer, shall be maintained for each switchboard.

11.3

Life Cycle Costing


All the data and assumptions pertaining to the determination of the whole-of-life cost calculations shall be recorded.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 70 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Appendix A

Technical Schedule

The manufacturer shall supply the information listed in this technical schedule. Item Description Tenderer Supplied Information

1.

General Switchgear Information: Manufacturer Country of origin

2.

Catalogue/type Designation Feeder ACCB (code F) Bus-coupling ACCB (code B) Bus-tie cable ACCB (code T) System Transformer ACCB (code ST) Distribution Transformer ACCB (code t) Capacitor/Harmonic Filter ACCB (code C) Feeder network switch (code D) Feeder (non auto) ACCB (code Fna)

3.

Switchgear Ratings: Rated System Voltage (Ur) Rated frequency (fr) Rated Busbar Normal Current (Ir) Switchboard Class Busbar Insulation medium Rated lightning impulse withstand voltage (Up) Common value (kV) Across the isolating distance (kV) Rated short-duration power-frequency withstand voltage (Ud) Common value (kV) Across the isolating distance (kV)

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 71 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Rated short time withstand current (Ik) (for main and earthing circuits) Rated peak withstand current (Ip) (for main and earthing circuits) Rated duration of short circuit (tk) (for main and earthing circuits) Internal Arc Classification (IAC) Arc test current (kA) Arc test current duration (s) Rated Short Circuit Making Current (kA) Rated short circuit breaking current (kA) Short duration power frequency withstand voltage Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Partition class (as defined in AS 62271 200, Annex A) Partial discharge level of complete switchboard including all components Rated normal current (Ir) Feeder ACCB (code F) Bus-coupling ACCB (code B) Bus-cable tie ACCB (code T) System Transformer ACCB (code ST) Distribution Transformer ACCB (code t) Capacitor/Harmonic Filter ACCB (code C) Feeder (non auto) ACCB (code Fna) Feeder network load switch (code D) Provide applicable derating factors for ambient conditions to a maximum of 50C (derating factors should be in a form of table or graph). Interrupter type Rated supply voltage of closing and opening devices and of auxiliary and control circuits (Ua) Number of trip coils Number of close coils Breaking time (max) Vacuum / SF6

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 72 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Command response time both ON and OFF (max) Rated switch sequence Type of circuit-breaker closing mechanism offered Circuit breaker mechanical durability class Circuit breaker electrical durability class Supply voltage, peak power and steady power of the spring charge motor (where applicable) Voltage and peak power ratings for the continuous operation of the circuit-breaker coils Number of circuit breaker spare auxillary contacts Normally Open Normally Closed Rating of ACCB spare auxillary contacts Description of all operational and safety interlocking arrangements Table of all possible and inhibited states that the circuit breakers and switches in the switchgear may occupy Analysis demonstrating the integrity of all interlocking arrangements which includes an analysis of all possible failure modes and the controls designed in to manage them Does the circuit-breaker panel include in-line offload disconnectors? Description of the panel busbar interconnection arrangements Type, ratings, details of circuit Votage detection system Surge arrester types accommodated Surge arrester mounting details/restrictions. Details of Segregation, mechancal protection of LV wiring in HV compartments Internal arc fault detection and protection scheme details. If offered as alternative to high impedance bus protection.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 73 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

4.

HV Cable Access, Testing & Termination Details Provide details of how the HV cables are accessed.

Maximum size and number of HV cables that can be terminated in each circuit-breaker panel. Clearly specify clearances between each cable termination of each phase. Provision of a detailed dimensioned drawing of the arrangement is required.

Type of cable termination offered. Specify manufacturer, model and full details of separable insulated connector. Detail shielding arrangement to be included

Type of circuit test facility offered.

Describe the test plugs

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 74 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

5.

Gas Insulated Switchgear Type of gas used for insulation In which compartments is the gas used?

Provide details of the gas pressure monitoring system/device.

Quantity of the SF6 to be used in each separately filled compartment?

Specify the degree of SF6 gas tightness for the switchgear

If the circuit-breaker is a vacuum type state the method of indicating vacuum loss (if any)

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 75 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

6.

Earth Switch & Earthing Facilities Rated normal current (Ir) Rated make fault current rating Earth switch mechanical durability class Earth switch electrical durability class Provide details of the circuit earthing facilities offered including the method of indicating the position of the earthing switch and guaranteeing the integrity of that indication.

Provide details of the earthing bars for feeder ACCB panels, and how the requirements of insulated cable screen earth bar is met.

7.

Network load Switch (code = D) Rated System Voltage (Ur) Rated normal current (Ir) Details of fault making switch offered Is the switch offered 2-way or 3-way? Switch mechanical durability class Switch electrical durability class Load break capability

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 76 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Load make capability Method of Interlocking with fully rated earth switch

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 77 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

8.

Details Relating To Capacitor/Harmonic ACCB Has the switchgear been used for un-earthed, straight (no reactors) capacitor bank switching previously? Has allowance been made for the capacitor bank circuit breakers to be pre-conditioned ready for service with negligible probability of re-strike? Has the switchgear been tested for 150% DC offset and nominal AC voltage across the open contacts, successfully passing with no discharge in the contact dielectric? Has allowance been made for capacitor bank energisation currents to be reviewed for use based on the particular site design?

9.

Low Voltage Panel/Equipment Where are the protection relays, test blocks, meters and low voltage fuses located ?

Describe LV termination and cable access arrangements

Rating plate attachment method:

Labels attachment method

Provide details of paint coatings on the switchgear.

Provide details of colours of custom paint coatings available.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 78 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

10.

Current Transformers (CT) Type of CTs being offered

Where are the CTs located and how are they mounted.

Detail the physical space limitations

Are the CTs offered the same ratio & class as specified in the standard? If not please provide details of variances.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 79 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

11.

Busbar Protection Scheme Is the busbar protection scheme offered a high impedance scheme ? If the busbar protection scheme offered is not a high impedance scheme please provide details of the alternate scheme including: detailed operating documentation detailed maintenance documentation copies of test certificates YES/NO

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 80 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

12.

Voltage Transformers Describe the physical location of the VTs (busbar and incomer) and relevant dimensions.

How are the VTs connected/isolated ?

Are fuses fitted to the primary side of the VTs.

Describe the method(s) for simulation of system earth faults during test & commissioning of directional relays.

Details of voltage transformers offered: name of manufacturer ratio & class burden,VA voltage factor location and type of fuses

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 81 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

13.

Site Installation Details How are the switchboards transported to site ? Detail whether panels are assembled on site and then gassed or assembled and gassed prior.

Are there any site specific requirements for installation (eg. floor surface requirements)

Provide details of how the panels/switchboards are lifted and moved into position on site.

14.

Switchboard Dimensions & Weights Switchboard Provide general arrangement drawings showing overall dimensions (h, w, d in mm), cable termination locations and required space for access and arc venting requirements for ST1FT, ST2FtT, 1FnaD, 1FD configurations. Required side clearance of switchboard (mm) Required rear clearance of switchboard (mm) Required clearance on top of switchboard (mm) Required clearance at front of switchboard for installation and removal (mm) Recommended cable trench width (mm) Depth of protrusions into cable trench (if applicable) Weight of heaviest configuration (kg)

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 82 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

15.

Reliability Data: Failure Modes (for early, Normal life & wear out periods)

Mean Operating Hours between failure modes

Mean Time To Repair. Provide details of any special requirements, test and support equipment etc

Number of units in service in Australia

Period (years) this model/type has been available for purchase. Estimated period before replacement with new model. Number of units in service worldwide

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 83 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Appendix B

RFT Checklist
Application

Appendix B.1

The following material is for guidance in the preparation of a Request for Tender for this type of equipment. This checklist itself is not intended to directly form part of any contract. This section to be read in conjunction with the RFT Checklist in specification EP 00 00 00 15 SP, Common Requirements for Electric Power Equipment.

Appendix B.2

Information to be Sought From the Tenderer

Integrated Support information as per RailCorp Standard Tenders to complete and submit Technical Schedule at Appendix A

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 84 of 86

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Appendix B.3

Information to be supplied at time of order

When needed for procurement of equipment for a particular location, in addition to the general requirements in this specification the following information related to the particular site shall be supplied as part of the order: Approved (for purchase) HV operating diagram for each substation. This diagram is under configuration control. Required quantity and associated switchboard code. This information must be consistent with the approved (for purchase) operating diagram. The position of each functional unit within the switchboard will be in accordance with the approved (for purchase) operating diagram. The number of sets, position and specification of the CTs, protection relay and protection scheme will be detailed in the authorised protection concept (approved for purchase) associated with each switchboard. The protection concept (approved for purchase) must be provided with each switchboard order. DC control voltage to be specified for each switchboard order. Choice is either 125 V dc or 48 V dc. This will be a requirement in the authorised protection concept for the location. Associated protection relays, RTU, switchgear etc will need to be compatible with the location battery supply. Busbar rating of 630 or 1250 Amp. Panel location of busbar high impedance unit scheme components: relay, test block, MTM relay, links and associated wiring. The specific configuration of instruments, transducers and metering equipment (voltage, current and energy), to be installed on switchgear panels. The required number of cables and size per phase, per panel. Feeder specific surge arrester requirements. Any site specific restrictions on the dimensions or placement of the switchgear. Special transport or unloading requirements. Notice that the supplier will be required to provide appropriate seals for switchboard and associated components to prevent contamination during storage and transport. Requirement for specific deliverables including: Installation and on-site operational testing if to be carried out by the supplier
Rail Corporation Page 85 of 86

Version: 2.0 Issue Date: JUNE 2007

Electrical Engineering Specification: High Voltage AC Switchgear (non withdrawable) switching devices

11kV AC Indoor SCADA controlled switchgear fitted with stationary EP 01 00 00 02 SP

Requirements for training Requirements for spares Recovery and replenishment of SF6 gas after its service life (must be rendered by the supplier of SF6 switchgear). Two spare sets of fuses for each voltage transformer.

Version: 2.0 Issue Date: JUNE 2007

Rail Corporation

Page 86 of 86