Вы находитесь на странице: 1из 2

Federal Register / Vol. 5, No.

11 / Tuesday, January 18, 2000 / Notices 2647

•–Enhance the quality, utility, and collection instruments are clearly II. Desired Focus of Comments
clarity of the information to be understood, and the impact of collection The Department of Labor
collected; and requirements on respondents can be (Department) is particularly interested
•–Minimize the burden of the properly assessed. Currently, the in comments which:
collection of information on those who Pension and Welfare Benefits • Evaluate whether the proposed
are to respond, including through the Administration is soliciting comments collection of information is necessary
use of appropriate automated, concerning the proposed extension of a for the proper performance of the
electronic, mechanical, or other currently approved collection of functions of the agency, including
technological collection techniques or information, Definition of Plan Assets— whether the information will have
other forms of information technology, Participant Contributions, CFR practical utility;
e.g., permitting electronic submission of § 2510.3–102. A copy of the proposed • Evaluate the accuracy of the
responses. agency’s estimate of the burden of the
information collection request can be
Agency: Employment Standards proposed collection of information,
Administration. obtained by contacting the individual
listed below in the address section of including the validity of the
Title: Executive Order 12933, 29 CFR
this notice. methodology and assumptions used;
Part 9, Nondisplacement of Qualified
• Enhance the quality, utility, and
Workers Under Certain Contracts. DATES:Written comments must be clarity of the information to be
OMB Number: 1215–0190. submitted on or before March 20; 2000.
Frequency: On occasion. collected; and
Affected Public: Business and other ADDRESSES: Gerald B. Lindrew, • Minimize the burden of the
for-profit, Individuals or households, Department of Labor, Pension and collection of information on those who
Federal government. Welfare Benefits Administration, 200 are to respond, including through the
Number of Respondents: 88. Constitution Avenue, NW, Washington, use of appropriate automated,
Estimated Time Per respondent: 15 electronic, mechanical, or other
D.C. 20210, (202) 219–4782 (not a toll-
minutes. technological collection techniques or
free number), FAX (202) 219–4745.
Total Burden Hours: 22 hours. other forms of information technology,
Total Annualized capital/startup SUPPLEMENTARY INFORMATION: e.g., permitting electronic submissions
costs: $0. of responses.
I. Background
Total annual costs (operating/ III. Current Actions
maintaining systems or purchasing This regulation describes when
services): $0. The regulation provides guidance for
certain monies, which a participant
Description: These rules provide fiduciaries, participants, and
pays to or has withheld by an employer
recordkeeping requirements in certain beneficiaries of employee benefit plans
for contribution to an employee benefit
building service contracts documenting on the requirements for transmission of
plan, are ‘‘plan assets’’ for purposes of employee contributions withheld from
offers of employment of a successor Title I of the Employee Retirement
contractor. wages. Extension of the information
Security Act of 1974 (ERISA) and the collection provision of the regulation is
Ira L. Mills, related prohibited transaction important because delays in the
Departmental Clearance Officer. provisions of the Internal Revenue Code transmittal of funds may result in lost
[FR Doc. 00–1092 Filed 1–14–00; 8:45 am] (IRC). The regulation establishes that earnings to pension plan participants
BILLING CODE 4510–27–M participant contributions to an and beneficiaries. In addition, for those
employee pension benefit plan become employers who may have difficulty
plan assets on the earliest date that they meeting regulation deadlines for
DEPARTMENT OF LABOR can reasonably be segregated from an participant contribution transmissions,
employer’s general assets, but in no the extension provision of the regulation
Pension and Welfare Benefits event later than 15 business days for provides an alternate means of employer
Administration pension plans, 90 days for welfare compliance with the regulation, while
plans, and, in the case of SIMPLE providing participants, beneficiaries,
Proposed Extension of Information
Retirement Accounts, 30 days following and the Department with sufficient
Collection Request Submitted for
the month in which the contribution information to protect their rights under
Public Comment and
amounts would otherwise have been ERISA.
Recommendation; Definition of ‘‘Plan
payable to the participant in cash. This notice requests comments on the
Assets’’—Participant Contributions
extension of the ICR included in the
The regulation also establishes a
ACTION: Notice. regulation governing the definition of
procedure (for pension plans only) ‘‘plan assets.’’ The Department is not
SUMMARY: The Department of Labor (the
whereby an employer may obtain an proposing or implementing changes to
Department), as part of its continuing additional 10 business days to comply the existing ICR at this time. Comments
effort to reduce paperwork and with the contribution time limits. In received in response to this notice will
respondent burden, provides the general order to take advantage of this be incorporated in the submission to
public and Federal agencies with an opportunity, an employer is required to OMB for continued clearance of the ICR.
opportunity to comment on proposed satisfy certain exemption conditions, Type of Review: Extension.
and/or continuing collections of including notification to participants, Agency: Pension and Welfare Benefits
information in accordance with the bonding, and certification to the Administration.
Paperwork Reduction Act of 1995 (PRA Secretary of the Department of Labor Title: Definition of Plan Assets—
95) (44 U.S.C. 3506(c)(2)(A)). This when the funds are transmitted. These Participant Contributions.
program helps to ensure that requested conditions are intended to protect OMB Number: 1210–0100.
data can be provided in the desired participant contributions and provide Affected Public: Business or other for-
format, reporting burden (time and the Department with adequate notice of profit, Not-for-profit institutions,
financial resources) is minimized, an employer’s compliance. Individuals.

VerDate 04<JAN>2000 23:09 Jan 14, 2000 Jkt 190000 PO 00000 Frm 00073 Fmt 4703 Sfmt 4703 E:\FR\FM\18JAN1.XXX pfrm03 PsN: 18JAN1
2648 Federal Register / Vol. 5, No. 11 / Tuesday, January 18, 2000 / Notices

Total Respondents: 1. required to be submitted by licensees to NUCLEAR REGULATORY


Frequency: On occasion. enable the NRC to assess (a) the COMMISSION
Total Responses: 1. financial protection required of
Average Time Per Response: 6 hours. [Docket Nos. 50–361 and 50–362]
licensees and for the indemnification
Estimated Total Burden Hours: 2.
Total Burden Cost (Operating and and limitation of liability of certain Southern California Edison Company;
Maintenance): $300. licensees and other persons pursuant to San Onofre Nuclear Generating
Comments submitted in response to Section 170 of the Atomic Energy Act of Station, Units 2 and 3; Notice of
this notice will be summarized and/or 1954, as amended, and (b) the liability Consideration of Issuance of
included in the request for Office of insurance required of uranium Amendments to Facility Operating
Management and Budget approval of the enrichment facility licensees pursuant Licenses, Proposed No Significant
information collection request; they will to Section 193 of the Atomic Energy Act Hazards Consideration Determination,
also become a matter of public record. of 1954, as amended. and Opportunity for a Hearing
Dated: January 11, 2000. Submit, by March 20, 2000, comments The US Nuclear Regulatory
Gerald B. Lindrew, that address the following questions: Commission (the Commission) is
Deputy Director, Office of Policy and 1. Is the proposed collection of considering issuance of amendments to
Research, Pension and Welfare Benefits information necessary for the NRC to Facility Operating Licenses Nos. NPF–
Administration. 10 and NPF–15 issued to Southern
properly perform its functions? Does the
[FR Doc. 00–1093 Filed 1–14–00; 8:45 am] information have practical utility? California Edison Company (SCE, the
BILLING CODE 4510–29–M licensee) for operation of the San Onofre
2. Is the burden estimate accurate? Nuclear Generating Station (SONGS),
3. Is there a way to enhance the Units 2 and 3, located in San Diego
NUCLEAR REGULATORY quality, utility, and clarity of the County, California.
COMMISSION information to be collected? The proposed amendments would
4. How can the burden of the revise the SONGS Units 2 and 3
Agency Information Collection Technical Specification (TS) 3.7.6,
Activities: Proposed Collection; information collection be minimized,
including the use of automated ‘‘Condensate Storage Tank (CST T–121
Comment Request and T–120)’’ to change the minimum
collection techniques or other forms of
AGENCY: U.S. Nuclear Regulatory inventory of water maintained in the
information technology?
Commission (NRC). condensate storage tank (T–120) from
ACTION: Notice of pending NRC action
A copy of the draft supporting 280,000 gallons to 360,000 gallons
to submit an information collection statement may be viewed free of charge during plant operation Modes 1, 2 and
request to OMB and solicitation of at the NRC Public Document Room, 3.
public comment. 2120 L Street, NW (lower level), Before issuance of the proposed
Washington, DC. OMB clearance license amendments, the Commission
SUMMARY: The NRC is preparing a requests are available at the NRC will have made findings required by the
submittal to OMB for review of worldwide web site (http:// Atomic Energy Act of 1954, as amended
continued approval of information www.nrc.gov/NRC/PUBLIC/OMB/ (the Act) and the Commission’s
collections under the provisions of the index.html). The document will be regulations.
Paperwork Reduction Act of 1995 (44 available on the NRC home page site for The Commission has made a
U.S.C. Chapter 35). 60 days after the signature date of this proposed determination that the
Information pertaining to the notice. amendment request involves no
requirement to be submitted: significant hazards consideration. Under
1. The title of the information Comments and questions about the the Commission’s regulations in 10 CFR
collection: 10 CFR Part 140, ‘‘Financial information collection requirements 50.92, this means that operation of the
Protection Requirements and Indemnity may be directed to the NRC Clearance facility in accordance with the proposed
Agreements’’. Officer, Brenda Jo. Shelton, US Nuclear amendments would not (1) Involve a
2. Current OMB approval number: Regulatory Commission, T–6 E6, significant increase in the probability or
3150–0039. Washington, DC 20555–0001, by consequences of an accident previously
3. How often the collection is telephone at 301–415–7233, or by evaluated; or (2) Create the possibility of
required: As necessary in order for NRC Internet electronic mail at a new or different kind of accident from
to meet its responsibilities called for in BJS1@NRC.GOV. any accident previously evaluated; or
Section 170 and 193 of the Atomic (3) Involve a significant reduction in a
Energy Act of 1954, as amended (the Dated at Rockville, Maryland, this 11th day
of January 2000. margin of safety. As required by 10 CFR
Act). 50.91(a), the licensee has provided its
4. Who is required or asked to report: For the Nuclear Regulatory Commission.
analysis of the issue of no significant
Licensees authorized to operate reactor Brenda Jo. Shelton, hazards consideration, which is
facilities in accordance with 10 CFR NRC Clearance Officer, Office of the Chief presented below:
part 50 and licensees authorized to Information Officer.
construct and operate a uranium 1. Involve a significant increase in the
[FR Doc. 00–1039 Filed 1–14–00; 8:45 am] probability or consequences of an accident
enrichment facility in accordance with
BILLING CODE 7590–01–P previously evaluated?
10 CFR parts 40 and 70.
Response: No.
5. The number of annual respondents: The purpose of the increased water volume
Approximately 178. is to ensure that the required volume of water
6. The number of hours needed preserved by Technical Specification 3.7.6 is
annually to complete the requirement or sufficient to meet the San Onofre Units 2 and
request: 821. 3 Licensing and Design Basis. To meet the
7. Abstract: 10 CFR part 140 of the guidance of Reactor Systems Branch
NRC’s regulations specified information Technical Position RSB–5–1, the Southern

VerDate 04<JAN>2000 23:09 Jan 14, 2000 Jkt 190000 PO 00000 Frm 00074 Fmt 4703 Sfmt 4703 E:\FR\FM\18JAN1.XXX pfrm03 PsN: 18JAN1

Вам также может понравиться