Вы находитесь на странице: 1из 98

UP (West) 3G Rollout Plan

For internal use only 1 Nokia Siemens Networks

3G Node B solutions for UP (West)

For internal use only 2 Nokia Siemens Networks

Assumptions

All Sites of UP (West) handed over to NSN are RFAI. All Sites will be provided with additional Poles for 3G antenna.

For internal use only 3 Nokia Siemens Networks

RF Scenarios Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)

Scenario 2 OD Classic On RTT (System Module & RF Module on Pole)

Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)

Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)

Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole

Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)

Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)

For internal use only 4 Nokia Siemens Networks

Scenario 1- System Module inside the Out door Transmission Rack & RF Module on Pole
Proposed 3G System Module inside the Outdoor Transmission Rack & RF Module on Pole.

New 3G antenna needs to be added.

For internal use only 5 Nokia Siemens Networks

Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Sect 1 Sect 2

Existing 2G Antenna Additional 3G Antenna


O V P

Sect 3

FRGP

eight for the RF module to mounted on Pole for 3

NodeB deployment

Note the Jumper cable can be of Max. 7 mtrs. length


O V P

Existing 2G Outdoor

Outdoor Trx Rack

Jumper Cable towards RF Module Jumper Cable Feeder Cable

PP
For internal use only 6 Nokia Siemens Networks

BB1
/

Optical Cable Power Cable Proposed 3 G FSMD

Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module inside the Outdoor Transmission Rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole and feeder Routing for Two sectors Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 7 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 8 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 9 Nokia Siemens Networks

Scenario 2- OD Classic On RTT (System Module & RF Module on Pole)

Proposed 3G System Module & RF Module on Pole. New 3G antenna needs to be added.

For internal use only 10 Nokia Siemens Networks

Scenario 2 OD Classic On RTT (System Module & Less than 25 kg weight for the RF module to mounted RF Module on Pole) Sectors
Sect 1 Sect 2 Extreme Flexible NodeB deployment Better coverage Sect 3 No MHA No long Feeders Zero Footprint Note the Jumper cable can be of Max. 7 mtrs. length
Jumper Cable Power Cable E1/Ethernet Cable

Existing 2G Antenna Additional 3G Antenna

PP

BB1

BB2
Door

RTT

Proposed 3G FSMD & FRGP

Existing 2G BTS
For internal use only 11 Nokia Siemens Networks /

DDF

Scenario 2 OD Classic On RTT (System Module & RF Module on Pole)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module and RF Module On RTT. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 12 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 13 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 14 Nokia Siemens Networks

Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)

Proposed 3G System Module Inside Existing Transmission rack & RF Module on Pole. New 3G antenna needs to be added.

For internal use only 15 Nokia Siemens Networks

Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Sect 1 Sect 2 No additional footprint inside the shelter. Sect 3Use of existing 19 rack. Triple RF Unit on Pole and System Module Indoor, No additional feeder Better coverage

Existing 2G Antenna Additional 3G Antenna

Note the Jumper cable can be of Max. 7 mtrs. length

PP

BB1

BB2
Door
FRGP
O V P

RTT/ GBT

Existing 2G Indoor BTS

Existing TX Rack
Proposed 3G FSIA

For internal use only 16 Nokia Siemens Networks

Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module Inside Existing Transmission Rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 17 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 18 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 19 Nokia Siemens Networks

Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)

Proposed 3G System Module & RF Module on Pole where Existing 3G is Outdoor. New 3G antenna needs to be added.

For internal use only 20 Nokia Siemens Networks

Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)


Less than 50 Kg weight for the entire Node B! Sect 3Extreme Flexible Node B Deployment Zero Foot Print

Sect 1

Sect 2

Existing 2G Antenna Additional 3G Antenna


Proposed 3G FSMD & FRGP

Note the Jumper cable can be of Max. 7 mtrs. length

E1/Ethernet Cable Jumper Cable Feeder Cable

Existing 2G Outdoor
For internal use only 21 Nokia Siemens Networks /

Optical Cable

PP

BB1

DDF

Power Cable

Scenario 4- OD Classic On Pole (System Module & RF Module on Pole)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 22 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 23 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 24 Nokia Siemens Networks

Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole

Proposed 3G System Module inside the shelter Tx rack. RF Module would be installed on the Pole. 2G Antenna needs to be swapped with Dual or Tri-band antenna.

For internal use only 25 Nokia Siemens Networks

Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Sect 1 Sect 2 Sect 3
Day Activity

Existing 2G Antenna Swap of 2G antenna with Dual Band Antenna


O V P

Night Activity

FRGP

PP

BB1

BB2
Door

No additional footprint inside the shelter. Use of existing 19 rack. Triple RF and System Module Inside Tx Rack, No tower loading Better coverage

Existing TX Rack Existing 2G Indoor


For internal use only 26 Nokia Siemens Networks /

Proposed 3G FSIA

Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module inside the shelter Tx rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Swapping of 2G Antenna & Installation of 3G Night Activity Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 3 Hours - Day 2 0.5 Hours -Day 2

For internal use only 27 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 28 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 29 Nokia Siemens Networks

Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)

Proposed 3G System & RF Module inside the Existing BTS Room in the existing Transmission Rack. New 3G antenna needs to be added.

For internal use only 30 Nokia Siemens Networks

Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Sect 1 Sect 2 Sect 3

Existing 2G Antenna Additional 3G Antenna

PP

BB1

BB2
Door

No additional footprint inside the shelter. Use of existing 19 rack. Triple RF and System Module Inside Tx Rack, No tower loading Better coverage

Existing Tx Rack

Existing Indoor BTS

Proposed 3G FSIA & FRGP Modules inside Existing Tx Rack

For internal use only 31 Nokia Siemens Networks

Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B Installation Of System & RF Module in the Existing Transmission rack beside existing BTS. Routing of Feeder Cable Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna

Duration
Day 1 2 Hours - Day 2 2 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 32 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 33 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 34 Nokia Siemens Networks

Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)

Proposed 3G System module inside the Transmission rack & Single RF Module on Pole. New 3G antenna needs to be added.

For internal use only 35 Nokia Siemens Networks

the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Sect 1 Sect 2

Existing 2G Antenna
Sect 3

Additional 3G Antenna

FRGG

FRGG

FRGG

PP

BB1

BB2
Door Note the Jumper cable can be of Max. 7 mtrs. length

Existing 2G Indoor

Existing Tx rack

Proposed 3G FSIA

Jumper Cable Feeder Cable Optical Cable

For internal use only 36 Nokia Siemens Networks

Power Cable

Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)

Sr. No.
1 2 3 4 5 6 7

Activity
Material Delivery-- 3G Antenna & Node B

Duration
Day 1

Installation Of System Module inside the shelter Transmission rack and Single RF Modules On sector 2 Hours - Day 2 Poles. Routing of Power Cable to System Module Routing of Power and Fiber Cables from System Module to RF Modules Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole. Connecting the Jumpers from RF Module to Antenna 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2

For internal use only 37 Nokia Siemens Networks

Commissioning, Integration and Acceptance testing of Node B

Sr. No.

Activity

Duration

Powering The Node B

0.5 Hours - Day 3

Commissioning of Node B

0.5 Hours - Day 3

Integrating of Node B with RNC

1 Hour - Day 3

Acceptance Testing

3 Hours - Day 3

For internal use only 38 Nokia Siemens Networks

Reverse Logistics

Sr. No.

Activity

Duration

Dismantling of Unused Antenna

2 Hours - Day 3

Packing of Extra Material at site

2 Hours - Day 3

Transportation of packed unused material to warehouse

2 Hours - Day 3

For internal use only 39 Nokia Siemens Networks

MW Scenario Idea UP-West

For internal use only 40 Nokia Siemens Networks

MW Scenario Idea UP-West

Scenario 1 : 2 New SDH Hybrid+ 1 New PDH Hybrid Scenario 2 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper) Scenario 3 : 2 New SDH Hybrid Links Scenario 4 : 2 New SDH Hybrid, 2 New PDH Hopper Scenario 5 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper) Scenario 6 : Existing Single PDH Hopper Scenario 7 : 2 PDH (1 New Hybrid+1 Existing Hopper) Scenario 8 : 3 New Flexi Hybrid + 1 New PDH Hopper Scenario 9 : 2 New SDH Hybrid, 1 New PDH Hopper Scenario 10: 2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid) Scenario 11: 1 New PDH Hybrid

For internal use only 41 Nokia Siemens Networks

Connectivity Cluster-1

Scenario-4

Scenario-3

Scenario-5

Scenario-2

Scenario-7 Scenario-6

Scenario-1
For internal use only 42 Nokia Siemens Networks

Connectivity Cluster-2

Scenario-9

Scenario-11

Scenario-8

For internal use only 43 Nokia Siemens Networks

Connectivity Cluster-3

Scenario-10

For internal use only 44 Nokia Siemens Networks

Scenario 1

SADARBZR(POP Location)

2 New SDH Hybrid+ 1 New PDH Hybrid

Flexihybrid

2GBTS
E1/ T1 F T I B

Flexihybr id

Arjun
NodeB

AI_MOHANPURA

Fiber MUX

Flexihybrid (2+0)

Flexihybri d FLEXIHYBRID 1+0

A_BALU GANJ

For internal use only 45 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 1 NEW SDH


1 2 3 4 5 6 7 8 9 ODU & Antenna Installation. IF Cable Laying and termination Hybrid IDU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. Commissioning Near End and Far End Link Alignment E1 Patching and testing Acceptance Testing

Sr. No.

Activity

Duration

Outage/ Non Outage

2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2

Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage

For internal use only 46 Nokia Siemens Networks

Scenario 1.1

SADARBZR(POP Location)
2 New SDH Hybrid+ 1 New PDH Hybrid

Flexihybrid

2GBTS
R R I F T I B

Flexihybr id

Arjun
NodeB

AI_MOHANPURA

Fiber MUX

Flexihybrid (2+0)

FIU19
Flexihybrid

A_BALU GANJ

FLEXIHYBRID 1+0

For internal use only 47 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 1.1 NEW SDH/PDH


1 2 3 4 5 6 7 8 9 ODU & Antenna Installation. IF Cable Laying and termination Hybrid IDU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. Commissioning Near End and Far End Link Alignment E1 Patching and testing Acceptance Testing

Sr. No.

Activity

Duration

Outage/ Non Outage

2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2

Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage

For internal use only 48 Nokia Siemens Networks

Scenario 2

AI_MOHANPURA (2G Site)


2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)

Flexihybrid

2GBTS
F I P A

Flexihybr id

SADARBZR

SHAHGANJ

Flexihybrid (2+0)
PDH Hopper PDH Hopper

FIU19 IDGAH

Balu

For internal use only 49 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card

Scenario 2 Existing PDH with FIU & EPIU


Sr. No. Activity Duration Outage/ Non Outage

New FIU with EPIU Installation in 19 Rack.

0.5 Hours - Day 2

Non Outage

Power Cable Laying & termination.

0.5 Hours - Day 2

Non Outage

DDF Block Installation, E1 & Ethernet Termination.

0.5 Hours - Day 2

Non Outage

Configuration of FIU

0.5 Hours - Day 2

Outage

E1 Testing

0.5 Hours - Day 2

Outage

Traffic Shifting

0.5 Hours - Day 2

Outage

Acceptance Testing

1 Hour - Day 2

Outage

For internal use only 50 Nokia Siemens Networks

Scenario 2.1

AI_MOHANPURA (2G Site)


2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)

Flexihybrid

2GBTS
F I F A

Flexihybr id

SADARBZR

SHAHGANJ

Flexihybrid (2+0)
PDH Hopper PDH Hopper

IDGAH

FIU19 + FB3/FB4

Balu

For internal use only 51 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with RRI Card

Scenario 2.1 Existing PDH with FIU & EPIU + FB3/FB4


Sr. No. Activity Duration Outage/ Non Outage

New FIU with EPIU & FB3/FB4 Installation in 19 Rack.

0.5 Hours - Day 2

Non Outage

Power Cable Laying & termination.

0.5 Hours - Day 2

Non Outage

DDF Block Installation, E1 & Ethernet Termination.

0.5 Hours - Day 2

Non Outage

Configuration of FIU

0.5 Hours - Day 2

Outage

E1 Testing

0.5 Hours - Day 2

Outage

Traffic Shifting

0.5 Hours - Day 2

Outage

Acceptance Testing

1 Hour - Day 2

Outage

For internal use only 52 Nokia Siemens Networks

Scenario 3

SHAHGANJ
2 New SDH Hybrid Links

Flexihybrid

2GBTS
E1/ T1 F T I B

Manas

Flexihybr id

AI_MOHANPURA

NodeB

Flexihybrid (2+0)

For internal use only 53 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 3 NEW SDH


1 2 3 4 5 6 7 8 9 ODU & Antenna Installation. IF Cable Laying and termination Hybrid IDU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. Commissioning Near End and Far End Link Alignment E1 Patching and testing Acceptance Testing

Sr. No.

Activity

Duration

Outage/ Non Outage

2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2

Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage

For internal use only 54 Nokia Siemens Networks

Scenario 3.1

SHAHGANJ
2 New SDH Hybrid Links

Flexihybrid

2GBTS Flexihybr id
R R I

Manas
F T I B

AI_MOHANPURA

NodeB

Flexihybrid (2+0)

FIU19

For internal use only 55 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 4

Manas
2 New SDH Hybrid, 2 New PDH Hopper

Flexihybrid
E1/ T1

2GBTS Flexihybr id

Arjun
NodeB
F T I B

SHAHGANJ

Flexihybrid (2+0)
PDH Hopper PDH Hopper

FIU19 T_Anjani puram

T_Sivaji

For internal use only 56 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 4.1

Manas
2 New SDH Hybrid, 2 New PDH Hopper

Flexihybrid
R R I

2GBTS Flexihybr id

Arjun
NodeB
F T I B

SHAHGANJ

Flexihybrid (2+0)
PDH Hopper PDH Hopper

FIU19 T_Anjani puram

FIU19

T_Sivaji

For internal use only 57 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 5

Arjun
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)

Flexihybrid

2GBTS Flexihybr id
E1/ T1

Manas
NodeB
F T I B

SADARBZR

Flexihybrid (2+0)
PDH Hopper PDH Hopper

A_Kedar Nagar

FIU19 A_Arjun Nagar

For internal use only 58 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 5.1

Arjun
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)

Flexihybrid

2GBTS
R R I

Flexihybr id

Manas
NodeB
F T I B

SADARBZR

Flexihybrid (2+0)
PDH Hopper PDH Hopper

A_Kedar Nagar

FIU19

FIU19

A_Arjun Nagar

For internal use only 59 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 6

A_Arjun Nagar
Existing Single PDH Hopper

2GBTS
F I F A

PDH Hopper

Arjun

NodeB

F T F B

FTFB

For internal use only 60 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with RRI Card

Scenario 6.1

A_Arjun Nagar
Existing Single PDH Hopper

2GBTS
F I P A

PDH Hopper

Arjun

NodeB

F T I B

FIU19

For internal use only 61 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card

Scenario 7

A_BALU GANJ
2 PDH (1 New Hybrid+1 Existing Hopper)

Flexihybrid

2GBTS
F I P A F T I B

PDH Hopper

SADARBZR

A_Adresh Nagar

NodeB

Flexihybrid (1+0)

FIU19

For internal use only 62 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card

Scenario 7.1

A_BALU GANJ
2 PDH (1 New Hybrid+1 Existing Hopper)

Flexihybrid

2GBTS
F I F A F T I B

PDH Hopper

SADARBZR

A_Adresh Nagar

NodeB

Flexihybrid (1+0)

FIU19

For internal use only 63 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with RRI Card

Scenario 8

SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper

Flexihybrid

2GBTS Flexihybr id
E1/ T1

Sanjay Complex-B
F T I B

Kamlangr Entry

NodeB

Fiber MUX

Flexihybrid (2+0)
PDH Hopper

FIU19
Flexihybrid

Nehru

Akriti

FLEXIHYBRID 1+0

For internal use only 64 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 8.1

SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper

Flexihybrid

2GBTS
R R I

Sanjay Complex-B
F T I B

Flexihybr id

Kamlangr Entry

NodeB

Fiber MUX

Flexihybrid (2+0)
PDH Hopper

FIU19
Flexihybrid

Nehru

Akriti

FLEXIHYBRID 1+0

For internal use only 65 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 9

WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper

Flexihybrid

2GBTS Flexihybr id
E1/ T1

Khandari
F T I B

Akriti

NodeB

Flexihybrid (2+0)
PDH Hopper

FIU19

Khandari 1

For internal use only 66 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 9.1

WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper

Flexihybrid

2GBTS
R R I F T I B

Khandari

Flexihybr id

Akriti

NodeB

Flexihybrid (2+0)
PDH Hopper

FIU19

Khandari 1

For internal use only 67 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 10

Delhi Gate
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)

IP - 10
E1/ T1

2GBTS

IP - 10 RAJA_KI_MANDI

A_Loha mandi
NodeB
F T I B

CERAGON-IDU

Fiber MUX

ECI-BG-20 Mux

PDH Hopper

Flexihybrid

FIU19 FLEXIHYBRID 1+0

Hariparvat

A_TRANSPORT NGR SEC-4


For internal use only 68 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 10.1

Delhi Gate
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)

IP - 10 A_Loha mandi
NodeB
F T I B R R I

2GBTS

IP - 10 RAJA_KI_MANDI

Fiber MUX

CERAGON-IDU

ECI-BG-20 Mux

PDH Hopper

Flexihybrid

FIU19 FLEXIHYBRID 1+0

Hariparvat

A_TRANSPORT NGR SEC-4


For internal use only 69 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Scenario 11

Gandhi
1 New PDH Hybrid

2GBTS
E1/ T1 F T I B

Flexihybr id

Kamlangr Entry

NodeB

Flexihybrid (1+0)

For internal use only 70 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIPA Card

Scenario 11.1

Gandhi
1 New PDH Hybrid

2GBTS
R R I

Flexihybr id

Kamlangr Entry

NodeB

F T I B

Flexihybrid (1+0)

FIU19

For internal use only 71 Nokia Siemens Networks

Similar scenario would be applicable for Flexi 2G BTS with FIFA Card

Link Details

Sr. N oPOP Site A Site

1 2 3
For internal use only 72 Nokia Siemens Networks

3209 3252 3236

SA

MW Scenario Idea Haryana

For internal use only 73 Nokia Siemens Networks

Haryana

MW Scenario Idea

Scenario Existing 1 : 1 PDH , 1 NEW PDH Hops 1 PDH Hop Scenario Existing 2 : Scenario 31 :SDH , 1 NEW PDH 2 PDH Hops Scenario Existing 4: Scenario 5 :1 NEW PDH Scenario 6 :Hop PDH Replace with Flexi Hybrid Scenario 1 7NEW : HYBRID , 1 UPGRADE TO HYBRID

For internal use only 74 Nokia Siemens Networks

Cluster 1

Scenario 4

Scenario 2

For internal use only 75 Nokia Siemens Networks

Cluster 2

Scenario 7

Scenario 6

For internal use only 76 Nokia Siemens Networks

Cluster 3
Scenario 5 Scenario 3

Scenario 1
For internal use only 77 Nokia Siemens Networks

Scenario 1
Barshat Road

Existing 1 PDH,1 NEW PDH Hops

Option 1 : Existing FB interface Towards 2GBTS Towards Noorwala


PDH
NodeB
F T F B F I F A

Samrat Woolen Mill


PDH PDH

Option 2 : Existing E1 interface 2GBTS Towards


NodeB Towards Noorwala
F T I B F I P A

MillPDH

Samrat Woolen

FTFB
EIPU Card

FIU 19

For internal use only 78 Nokia Siemens Networks

Similar scenario would be applicable for Ultra 2G BTS with RRI Card

Scenario 1 Existing PDH with FIU & EPIU


Sr. No. Activity Duration Outage/ Non Outage

New FIU with EPIU Installation in 19 Rack.

0.5 Hours - Day 2

Non Outage

Power Cable Laying & termination.

0.5 Hours - Day 2

Non Outage

DDF Block Installation, E1 & Ethernet Termination.

0.5 Hours - Day 2

Non Outage

Configuration of FIU

0.5 Hours - Day 2

Outage

E1 Testing

0.5 Hours - Day 2

Outage

Traffic Shifting

0.5 Hours - Day 2

Outage

Acceptance Testing

1 Hour - Day 2

Outage

For internal use only 79 Nokia Siemens Networks

Scenario 2
Sethi Chowk

1 Existing PDH Hop

PDH

2GBTS
R R I

PDH

2GBTS
E 1 T 1

Towards Pachranga

NodeB
F T F B

NodeB

Towards Pachranga
F T I B

FTFB

FIU 19

For internal use only 80 Nokia Siemens Networks

Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card

Scenario 2 Existing PDH with FTFB


Sr. No. Activity Duration Outage/ Non Outage
1 2 3 4 5 6 7 FTFB Installation in NodeB. DDF Block Installation, E1 & Ethernet Termination. IF Cable Replacement with IF Connectorisation at Antenna end. Coaxial cable connectivity from FTFB to existing FIFA/RRI. Commissioning Near End and Far End E1 Testing Acceptance testing 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 1 Hour -Day 2
Non Outage Non Outage Outage Outage Outage Outage Outage

For internal use only 81 Nokia Siemens Networks

Scenario 3
Yamuna Enclave

1 SDH , 1 NEW PDH


2GBTS
R R I F T F B

Ceragon IP10 Towards Samrat Woolen Mill

Ceragon-IDU Fibe r MUX ECI-BG-20 Mux


PDH

FIU19
For internal use only 82 Nokia Siemens Networks

Towards Bichpuri

Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card

Scenario 3 Existing PDH with FIU & EPIU


Sr. No. Activity Duration Outage/ Non Outage

New FIU with EPIU Installation in 19 Rack.

0.5 Hours - Day 2

Non Outage

Power Cable Laying & termination.

0.5 Hours - Day 2

Non Outage

DDF Block Installation, E1 & Ethernet Termination.

0.5 Hours - Day 2

Non Outage

Configuration of FIU

0.5 Hours - Day 2

Outage

E1 Testing

0.5 Hours - Day 2

Outage

Traffic Shifting

0.5 Hours - Day 2

Outage

Acceptance Testing

1 Hour - Day 2

Outage

For internal use only 83 Nokia Siemens Networks

Scenario 3 . 1 Yamuna Enclave


1 SDH , 1 NEW PDH
2GBTS
E 1 T 1 F T F B

Ceragon IP10 Towards Samrat Woolen


Mill

Ceragon-IDU Fibe r MUX ECI-BG-20 Mux


PDH

FIU19
For internal use only 84 Nokia Siemens Networks

Towards Bichpuri

Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card

Scenario 3.1 Existing PDH with FIU & EPIU


Sr. No. Activity Duration Outage/ Non Outage

New FIU with EPIU Installation in 19 Rack.

0.5 Hours - Day 2

Non Outage

Power Cable Laying & termination.

0.5 Hours - Day 2

Non Outage

DDF Block Installation, E1 & Ethernet Termination.

0.5 Hours - Day 2

Non Outage

Configuration of FIU

0.5 Hours - Day 2

Outage

E1 Testing

0.5 Hours - Day 2

Outage

Traffic Shifting

0.5 Hours - Day 2

Outage

Acceptance Testing

1 Hour - Day 2

Outage

For internal use only 85 Nokia Siemens Networks

Scenario 4

Existing 2 PDH Hops


Pachranga

Option 1 : Existing FB interface


2GBTS

Option 2 : Existing E1 interface 2GBTS


Towards Sukhdevnagar
PDH PDH NodeB
F T I B E 1 T 1

Towards Sukhdevnagar
NodeB
F T I B R R I

Towards Sethi Chowk

Towards Sethi Chowk


PDH

PDH

FIU 19
For internal use only 86 Nokia Siemens Networks

FIU 19

Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card

Scenario 5
Bichpuri

1 NEW PDH Hop

Towards Yamuna Enclave

2GBTS
R R I

Towards Yamuna Enclave


PDH

2GBTS
E 1 T 1

PDH

NodeB
F T F B

NodeB
F T F B

FTFB

FIU 19

For internal use only 87 Nokia Siemens Networks

Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card

Scenario 5 NEW PDH Sr. No. Activity

Duration

Outage/ Non Outage

1 2 3 4 5 6 7 8 9

ODU & Antenna Installation. IF Cable Laying and termination Hybrid IDU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. Commissioning Near End and Far End Link Alignment E1 Patching and testing Acceptance Testing

2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2

Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage

For internal use only 88 Nokia Siemens Networks

Scenario 6
Gur Mandi Panipat

PDH Replace with Flexi Hybrid


Option 1 : Existing FB interface
2GBTS
R R I

Option 1 : Existing E1 interface


2GBTS
E 1 T 1

Towards Lal Bati Panipat

Towards Lal Bati Panipa

NodeB
F T I B

NodeB
F T I B

FLEXIHYBRID 1+0

FLEXIHYBRID 1+0

FIU19
For internal use only 89 Nokia Siemens Networks

FIU19

Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card

Scenario 6 PDH TO SDH


Sr. No. Activity Duration Outage/ Non Outage

1 2 3 4 5 6 7 8 9 10

Hybrid IDU Installation. New FIU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. ODU Replacement with IF Connectorisation at Antenna end. Coaxial cable connectivity from FIU to existing RRI. Commissioning Near End and Far End E1 Testing Traffic Shifting on new Flexi Hybrid Hop Acceptance testing

0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 1 Hour -Day 2

Non Outage Non Outage Non Outage Non Outage Outage Outage Outage Outage Outage Outage

For internal use only 90 Nokia Siemens Networks

Scenario 7
Lal Bati Panipat

1 NEW HYBRID , 1 UPGRADE TO HYBRID


2GBTS
R R I F T I B

Flexihybri d Towards Ashram Road


NodeB

Upgrade to Hybrid

Towards Gur Mandi Panipat

Flexihybrid (2+0) FIU19


For internal use only 91 Nokia Siemens Networks

Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card

Scenario 7 PDH TO SDH


Sr. No. Activity Duration Outage/ Non Outage

1 2 3 4 5 6 7 8 9 10

Hybrid IDU Installation. New FIU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. ODU Replacement with IF Connectorisation at Antenna end. Coaxial cable connectivity from FIU to existing RRI. Commissioning Near End and Far End E1 Testing Traffic Shifting on new Flexi Hybrid Hop Acceptance testing

0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 1 Hour -Day 2

Non Outage Non Outage Non Outage Non Outage Outage Outage Outage Outage Outage Outage

For internal use only 92 Nokia Siemens Networks

Sr No
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Node IDPop Priorit Site_A_Name Locatio y n PNP141 Samrat P1 Samrat Woolen Mill Woolen PNP142 Mill P2 Barshat Road
PNP159 PNP169 PNP182 PNP184 PNP3513 PNP3520 PNP3523 PNP346 PNP3580 PNP51 PNP144 PNP153 PNP347 PNP348 PNP3510 PNP3516 PNP3524 PNP3525 PNP3581 PNP3518 P2 P2 P2 P2 P3 P3 P3 P3 P3 P3 P2 Babarpur Yamuna Enclave Narula_Panipat Jawahar_Panipat Kabri Road Siddharth Nagar Barsat Road Bichpuri Kabri Noorwala Gur Mandi Panipat Lal Bati, Panipat Ashok Vihar Sukhdevnagar Sethi Chowk Pachranga Ashram Road

Site Type
GBT RTT RTT GBT RTT GBT GBT RTT RTT RTT GBT GBT RTT RTT GBT RTT RTT RTT RTT

BTS Flexi/Ultra Site_B Type


Indoor ULTRASITE

Link Status

Site Name_B
Samrat Woolen Mill

2G/3G Tx Scenario _B
3G 3G 3G 3G 3G 3G 3G Connected on Fiber Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 1 Scenario 4 Scenario 2 Scenario 5 Scenario 5 Scenario 2 Scenario 5 Scenario 6 Scenario 7 Scenario 4 Connected on Fiber Scenario 2 Scenario 4 Scenario 7 Scenario 6 Scenario 2 Scenario 2

Outdoor FLEXI EDGE PNP141 Outdoor ULTRASITE PNP141 Indoor Indoor Indoor Indoor Indoor ULTRASITE PNP141 ULTRASITE PNP141 ULTRASITE PNP141 ULTRASITE 3503 ULTRASITE PNP182

Existing PDH Existing PDH Existing Ceragon IP-10 Existing PDH Existing PDH Existing PDH Existing PDH New PDH New PDH Existing PDH NEW PDH

Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill

Narula_Panipat Jawahar_Panipat Yamuna Enclave Kabri Road Barshat City

3G 3G 3G 3G 3G 3G 3G 3G 3G

Outdoor FLEXI EDGE PNP184 Indoor Indoor ULTRASITE PNP169 FLEXI EDGE 3513

Outdoor FLEXI EDGE PNP142 Indoor ULTRASITE PNP153

Upgrade to hybrid Lal Bati, Panipat New Hybrid Existing PDH Ashram Road Sukhdevnagar

Sukhde vnagar

P2 P2 P1 P3 P2 P2 P2 P3 P3

Outdoor ULTRASITE PNP3524 Indoor Indoor Indoor Indoor Indoor Indoor Indoor Indoor ULTRASITE PNP348 FLEXI EDGE ULTRASITE PNP3516 ULTRASITE PNP348 ULTRASITE PNP153 ULTRASITE PNP3524 FLEXI EDGE PNP347 ULTRASITE PNP182

Existing PDH Existing PDH Existing Ceragon IP-10

Pachranga Sukhdevnagar Lal Bati, Panipat

3G 3G 3G 3G 3G 3G

Adarsh Nagar Panipat RTT Indira Colony Patel Nagar Panipat RTT RTT

Upgrade to hybrid Ashram Road Existing PDH Existing PDH Ashok Vihar Narula_Panipat

For internal use only 93 Nokia Siemens Networks

3G Core Upgrades for UP (West) & Haryana

For internal use only 94 Nokia Siemens Networks

UP-West Network User Plane (3G Phase1)


Dehradun Zone
MGW 13

Agra Zone

D dun RNC
MSS 8

Meerut Zone

HLR1 HLR2 HLR3

GCS 2

Agra RNC
GMGW 3

MSS 5

MGW 15 GCS 3

MGW 9

MGW 17

GCS 1

MSS 2

GMGW 1

GMGW 2

GMGW 4

GMGW 5

MGW 4

MGW 12

Mrt RNC

SCP

MGW 2

VAS Zone

SMS
MGW 10 MGW 16

MGW 1

MSS 9

MGW 18

MGW 7

MGW 8

MSS 1

MGW 5 MGW 11 MSS 7 MGW 14 MSS 3

MSS 4

MSS 6

Mbd RNC

MGW 6

Moradabad Zone
User Plane over IP For internal use only 95 Nokia Siemens Networks User Plane over TDM

Haryana Network User Plane (3G Phase1)


Sonipat Zone

Soni RNC

MGW 1

MSC 1 MGW 4

MSS 1

Amb RNC

MGW 3

MSS 2

MSS 6 MGW 3

MSC 2

HLR1
SCP

VAS Zone

SMS

GMGW 1

GCS 1

Hiss RNC
Hissar Zone
For internal use only 96 Nokia Siemens Networks
MGW 5

Ambala Zone

User Plane over IP Presentation / Author / Date User Plane over TDM

Core 2G Nodes Rollout Plan UP ( West )


Node Project Site Node Name RFS Date Duration Current Status Delivered Onsite Delivered Onsite Installation In Progress Installation In Progress Delivered Onsite

U4 U4

MGW Exp 12K U4 to 20K MGW Exp 12K U4 to 20K MSS M14 600K MGW 20K Model U4 HW **

UDAAN UDAAN UDAAN UDAAN

Moradabad Dehradun Moradabad Moradabad Meerut

MGW14 MGW15 MSS09 MGW18 GMGW07

10 - Sep - 10 10 - Sep - 10 17 - Sep - 10 10 - Sep - 10 10 - Sep - 10

3days 3days 24 days 24 days 18 days

GMGW 20K Model U4 HW ** UDAAN

Core 2G Nodes Rollout Plan Haryana


Node Project Site Node Name RFS Date Duration Current Status In Transit In Transit

MSS M14 600K ** MGW 20K Model U4 HW **

UDAAN UDAAN

Ambala Ambala

MSS03 MGW07

29 - Sep - 10 30 - Sep - 10

24 days 24 days

** The duration mentioned includes Installation , C & I , Acceptance Testing & Live Cutover For internal use only 97 Nokia Siemens Networks

Details of Activities & Timelines for various CORE rollouts .


MGW/GMGW Expansion 12K U4 to 20K U4 (3 Days):
Creation of Units(TCU, ISU,IWS1, MXU), Diagnosis of new Units, IP Allocation, VMGW Creation NIWU shifting

MSS 600K/MGW 20K (24 Days):


The duration mentioned includes Installation , C&I ,Acceptance Testing & Live Cutover

GMGW (18 days):


The duration mentioned includes Installation , C&I ,Acceptance Testing & Live Cutover

Power & Space Requirements :


NETWORK ELEMENT MGW Exp 12K to 20K NETWORK ELEMENT MGW U4 20K / GMGW Max No . Of Rack (s) 1 Cabin Cabinet et ( WxDxH ) mm CAMC Size 600x600x2100 Estimated / Rated Power Typical / Operating In Watts Power In Watts 4800 2100 MCB / Fuse Requirements / Rack 2x100A

Max No . Of Rack ( s ) 3 Max No . Of Rack ( s ) 2

Cabin et CAMA CAMB CAMC

Cabinet Size ( WxDxH ) 600x600x2100 mm 600x600x2100 mm 600x600x2100 mm

Estimated / Rated Power Typical / Operating In Watts Power In Watts 4800 2300 4800 2200 4800 2100 Estimated / Rated Power 4800 In Watts 4800 Typical / Operating Power 2600 In Watts 2800

MCB / Fuse Requirements / Rack 2x100A 2x100A 2x100A MCB / Fuse Requirements / Rack 2X125A 2X125A

NETWORK ELEMENT RNC

Cabin Cabinet et Size ( WxDxH ) RNAC 600x600x2100 mm RNBC 600x600x2100 mm

For internal use only 98 Nokia Siemens Networks