Assumptions
All Sites of UP (West) handed over to NSN are RFAI. All Sites will be provided with additional Poles for 3G antenna.
RF Scenarios Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Scenario 1- System Module inside the Out door Transmission Rack & RF Module on Pole
Proposed 3G System Module inside the Outdoor Transmission Rack & RF Module on Pole.
Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Sect 1 Sect 2
Sect 3
FRGP
NodeB deployment
Existing 2G Outdoor
PP
For internal use only 6 Nokia Siemens Networks
BB1
/
Scenario 1 OD Distributed BBU + RRU (Node B inside the Existing Outdoor Transmission Rack/ OD Flexi BTS & RF Module on Pole)
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module inside the Outdoor Transmission Rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole and feeder Routing for Two sectors Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Proposed 3G System Module & RF Module on Pole. New 3G antenna needs to be added.
Scenario 2 OD Classic On RTT (System Module & Less than 25 kg weight for the RF module to mounted RF Module on Pole) Sectors
Sect 1 Sect 2 Extreme Flexible NodeB deployment Better coverage Sect 3 No MHA No long Feeders Zero Footprint Note the Jumper cable can be of Max. 7 mtrs. length
Jumper Cable Power Cable E1/Ethernet Cable
PP
BB1
BB2
Door
RTT
Existing 2G BTS
For internal use only 11 Nokia Siemens Networks /
DDF
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module and RF Module On RTT. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Proposed 3G System Module Inside Existing Transmission rack & RF Module on Pole. New 3G antenna needs to be added.
Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Sect 1 Sect 2 No additional footprint inside the shelter. Sect 3Use of existing 19 rack. Triple RF Unit on Pole and System Module Indoor, No additional feeder Better coverage
PP
BB1
BB2
Door
FRGP
O V P
RTT/ GBT
Existing TX Rack
Proposed 3G FSIA
Scenario 3 ID Distributed (System Module Inside Existing Transmission rack / Flexi BTS & RF Module on Pole)
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module Inside Existing Transmission Rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Proposed 3G System Module & RF Module on Pole where Existing 3G is Outdoor. New 3G antenna needs to be added.
Sect 1
Sect 2
Existing 2G Outdoor
For internal use only 21 Nokia Siemens Networks /
Optical Cable
PP
BB1
DDF
Power Cable
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Proposed 3G System Module inside the shelter Tx rack. RF Module would be installed on the Pole. 2G Antenna needs to be swapped with Dual or Tri-band antenna.
Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Sect 1 Sect 2 Sect 3
Day Activity
Night Activity
FRGP
PP
BB1
BB2
Door
No additional footprint inside the shelter. Use of existing 19 rack. Triple RF and System Module Inside Tx Rack, No tower loading Better coverage
Proposed 3G FSIA
Scenario 5 ID Distributed with Antenna Swap (System Module inside the existing Transmission rack & RF Module on Pole
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System Module inside the shelter Tx rack and RF Module On Pole. Routing of Power Cable to System Module Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Swapping of 2G Antenna & Installation of 3G Night Activity Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 3 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Proposed 3G System & RF Module inside the Existing BTS Room in the existing Transmission Rack. New 3G antenna needs to be added.
Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Sect 1 Sect 2 Sect 3
PP
BB1
BB2
Door
No additional footprint inside the shelter. Use of existing 19 rack. Triple RF and System Module Inside Tx Rack, No tower loading Better coverage
Existing Tx Rack
Scenario 6 ID Classic (System & RF Module Inside the Shelter in the existing Transmission Rack)
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B Installation Of System & RF Module in the Existing Transmission rack beside existing BTS. Routing of Feeder Cable Routing of Power and Fiber Cable from System Module to RF Module Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole Connecting the Jumpers from RF Module to Antenna
Duration
Day 1 2 Hours - Day 2 2 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Proposed 3G System module inside the Transmission rack & Single RF Module on Pole. New 3G antenna needs to be added.
the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Sect 1 Sect 2
Existing 2G Antenna
Sect 3
Additional 3G Antenna
FRGG
FRGG
FRGG
PP
BB1
BB2
Door Note the Jumper cable can be of Max. 7 mtrs. length
Existing 2G Indoor
Existing Tx rack
Proposed 3G FSIA
Power Cable
Scenario 7 ID Distributed (System Module inside the shelter Transmission rack / Flexi BTS & Single RF Module on Pole)
Sr. No.
1 2 3 4 5 6 7
Activity
Material Delivery-- 3G Antenna & Node B
Duration
Day 1
Installation Of System Module inside the shelter Transmission rack and Single RF Modules On sector 2 Hours - Day 2 Poles. Routing of Power Cable to System Module Routing of Power and Fiber Cables from System Module to RF Modules Ethernet Cable Routing From DDF to System Module Installation of 3G Antenna On Pole. Connecting the Jumpers from RF Module to Antenna 1 Hour - Day 2 1 Hour - Day 2 1 Hour - Day 2 2 Hours - Day 2 0.5 Hours -Day 2
Sr. No.
Activity
Duration
Commissioning of Node B
1 Hour - Day 3
Acceptance Testing
3 Hours - Day 3
Reverse Logistics
Sr. No.
Activity
Duration
2 Hours - Day 3
2 Hours - Day 3
2 Hours - Day 3
Scenario 1 : 2 New SDH Hybrid+ 1 New PDH Hybrid Scenario 2 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper) Scenario 3 : 2 New SDH Hybrid Links Scenario 4 : 2 New SDH Hybrid, 2 New PDH Hopper Scenario 5 : 2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper) Scenario 6 : Existing Single PDH Hopper Scenario 7 : 2 PDH (1 New Hybrid+1 Existing Hopper) Scenario 8 : 3 New Flexi Hybrid + 1 New PDH Hopper Scenario 9 : 2 New SDH Hybrid, 1 New PDH Hopper Scenario 10: 2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid) Scenario 11: 1 New PDH Hybrid
Connectivity Cluster-1
Scenario-4
Scenario-3
Scenario-5
Scenario-2
Scenario-7 Scenario-6
Scenario-1
For internal use only 42 Nokia Siemens Networks
Connectivity Cluster-2
Scenario-9
Scenario-11
Scenario-8
Connectivity Cluster-3
Scenario-10
Scenario 1
SADARBZR(POP Location)
Flexihybrid
2GBTS
E1/ T1 F T I B
Flexihybr id
Arjun
NodeB
AI_MOHANPURA
Fiber MUX
Flexihybrid (2+0)
A_BALU GANJ
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Sr. No.
Activity
Duration
2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2
Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage
Scenario 1.1
SADARBZR(POP Location)
2 New SDH Hybrid+ 1 New PDH Hybrid
Flexihybrid
2GBTS
R R I F T I B
Flexihybr id
Arjun
NodeB
AI_MOHANPURA
Fiber MUX
Flexihybrid (2+0)
FIU19
Flexihybrid
A_BALU GANJ
FLEXIHYBRID 1+0
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Sr. No.
Activity
Duration
2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2
Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage
Scenario 2
Flexihybrid
2GBTS
F I P A
Flexihybr id
SADARBZR
SHAHGANJ
Flexihybrid (2+0)
PDH Hopper PDH Hopper
FIU19 IDGAH
Balu
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
Non Outage
Non Outage
Non Outage
Configuration of FIU
Outage
E1 Testing
Outage
Traffic Shifting
Outage
Acceptance Testing
1 Hour - Day 2
Outage
Scenario 2.1
Flexihybrid
2GBTS
F I F A
Flexihybr id
SADARBZR
SHAHGANJ
Flexihybrid (2+0)
PDH Hopper PDH Hopper
IDGAH
FIU19 + FB3/FB4
Balu
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Non Outage
Non Outage
Non Outage
Configuration of FIU
Outage
E1 Testing
Outage
Traffic Shifting
Outage
Acceptance Testing
1 Hour - Day 2
Outage
Scenario 3
SHAHGANJ
2 New SDH Hybrid Links
Flexihybrid
2GBTS
E1/ T1 F T I B
Manas
Flexihybr id
AI_MOHANPURA
NodeB
Flexihybrid (2+0)
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Sr. No.
Activity
Duration
2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2
Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage
Scenario 3.1
SHAHGANJ
2 New SDH Hybrid Links
Flexihybrid
2GBTS Flexihybr id
R R I
Manas
F T I B
AI_MOHANPURA
NodeB
Flexihybrid (2+0)
FIU19
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 4
Manas
2 New SDH Hybrid, 2 New PDH Hopper
Flexihybrid
E1/ T1
2GBTS Flexihybr id
Arjun
NodeB
F T I B
SHAHGANJ
Flexihybrid (2+0)
PDH Hopper PDH Hopper
T_Sivaji
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 4.1
Manas
2 New SDH Hybrid, 2 New PDH Hopper
Flexihybrid
R R I
2GBTS Flexihybr id
Arjun
NodeB
F T I B
SHAHGANJ
Flexihybrid (2+0)
PDH Hopper PDH Hopper
FIU19
T_Sivaji
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 5
Arjun
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
Flexihybrid
2GBTS Flexihybr id
E1/ T1
Manas
NodeB
F T I B
SADARBZR
Flexihybrid (2+0)
PDH Hopper PDH Hopper
A_Kedar Nagar
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 5.1
Arjun
2 New SDH Hybrid, 2 PDH (1 New Hopper+1 Existing Hopper)
Flexihybrid
2GBTS
R R I
Flexihybr id
Manas
NodeB
F T I B
SADARBZR
Flexihybrid (2+0)
PDH Hopper PDH Hopper
A_Kedar Nagar
FIU19
FIU19
A_Arjun Nagar
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 6
A_Arjun Nagar
Existing Single PDH Hopper
2GBTS
F I F A
PDH Hopper
Arjun
NodeB
F T F B
FTFB
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Scenario 6.1
A_Arjun Nagar
Existing Single PDH Hopper
2GBTS
F I P A
PDH Hopper
Arjun
NodeB
F T I B
FIU19
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
Scenario 7
A_BALU GANJ
2 PDH (1 New Hybrid+1 Existing Hopper)
Flexihybrid
2GBTS
F I P A F T I B
PDH Hopper
SADARBZR
A_Adresh Nagar
NodeB
Flexihybrid (1+0)
FIU19
Similar scenario would be applicable for Ultra 2G BTS with E1/T1 Card
Scenario 7.1
A_BALU GANJ
2 PDH (1 New Hybrid+1 Existing Hopper)
Flexihybrid
2GBTS
F I F A F T I B
PDH Hopper
SADARBZR
A_Adresh Nagar
NodeB
Flexihybrid (1+0)
FIU19
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Scenario 8
SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper
Flexihybrid
2GBTS Flexihybr id
E1/ T1
Sanjay Complex-B
F T I B
Kamlangr Entry
NodeB
Fiber MUX
Flexihybrid (2+0)
PDH Hopper
FIU19
Flexihybrid
Nehru
Akriti
FLEXIHYBRID 1+0
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 8.1
SANJAYCPLX(POP Location)
3 New Flexi Hybrid + 1 New PDH Hopper
Flexihybrid
2GBTS
R R I
Sanjay Complex-B
F T I B
Flexihybr id
Kamlangr Entry
NodeB
Fiber MUX
Flexihybrid (2+0)
PDH Hopper
FIU19
Flexihybrid
Nehru
Akriti
FLEXIHYBRID 1+0
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 9
WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper
Flexihybrid
2GBTS Flexihybr id
E1/ T1
Khandari
F T I B
Akriti
NodeB
Flexihybrid (2+0)
PDH Hopper
FIU19
Khandari 1
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 9.1
WHITEHOUSE
2 New SDH Hybrid, 1 New PDH Hopper
Flexihybrid
2GBTS
R R I F T I B
Khandari
Flexihybr id
Akriti
NodeB
Flexihybrid (2+0)
PDH Hopper
FIU19
Khandari 1
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 10
Delhi Gate
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)
IP - 10
E1/ T1
2GBTS
IP - 10 RAJA_KI_MANDI
A_Loha mandi
NodeB
F T I B
CERAGON-IDU
Fiber MUX
ECI-BG-20 Mux
PDH Hopper
Flexihybrid
Hariparvat
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 10.1
Delhi Gate
2 New SDH IP-10, 2 New PDH (1 Hopper + 1 Hybrid)
IP - 10 A_Loha mandi
NodeB
F T I B R R I
2GBTS
IP - 10 RAJA_KI_MANDI
Fiber MUX
CERAGON-IDU
ECI-BG-20 Mux
PDH Hopper
Flexihybrid
Hariparvat
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Scenario 11
Gandhi
1 New PDH Hybrid
2GBTS
E1/ T1 F T I B
Flexihybr id
Kamlangr Entry
NodeB
Flexihybrid (1+0)
Similar scenario would be applicable for Flexi 2G BTS with FIPA Card
Scenario 11.1
Gandhi
1 New PDH Hybrid
2GBTS
R R I
Flexihybr id
Kamlangr Entry
NodeB
F T I B
Flexihybrid (1+0)
FIU19
Similar scenario would be applicable for Flexi 2G BTS with FIFA Card
Link Details
1 2 3
For internal use only 72 Nokia Siemens Networks
SA
Haryana
MW Scenario Idea
Scenario Existing 1 : 1 PDH , 1 NEW PDH Hops 1 PDH Hop Scenario Existing 2 : Scenario 31 :SDH , 1 NEW PDH 2 PDH Hops Scenario Existing 4: Scenario 5 :1 NEW PDH Scenario 6 :Hop PDH Replace with Flexi Hybrid Scenario 1 7NEW : HYBRID , 1 UPGRADE TO HYBRID
Cluster 1
Scenario 4
Scenario 2
Cluster 2
Scenario 7
Scenario 6
Cluster 3
Scenario 5 Scenario 3
Scenario 1
For internal use only 77 Nokia Siemens Networks
Scenario 1
Barshat Road
MillPDH
Samrat Woolen
FTFB
EIPU Card
FIU 19
Similar scenario would be applicable for Ultra 2G BTS with RRI Card
Non Outage
Non Outage
Non Outage
Configuration of FIU
Outage
E1 Testing
Outage
Traffic Shifting
Outage
Acceptance Testing
1 Hour - Day 2
Outage
Scenario 2
Sethi Chowk
PDH
2GBTS
R R I
PDH
2GBTS
E 1 T 1
Towards Pachranga
NodeB
F T F B
NodeB
Towards Pachranga
F T I B
FTFB
FIU 19
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Scenario 3
Yamuna Enclave
FIU19
For internal use only 82 Nokia Siemens Networks
Towards Bichpuri
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Non Outage
Non Outage
Non Outage
Configuration of FIU
Outage
E1 Testing
Outage
Traffic Shifting
Outage
Acceptance Testing
1 Hour - Day 2
Outage
FIU19
For internal use only 84 Nokia Siemens Networks
Towards Bichpuri
Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card
Non Outage
Non Outage
Non Outage
Configuration of FIU
Outage
E1 Testing
Outage
Traffic Shifting
Outage
Acceptance Testing
1 Hour - Day 2
Outage
Scenario 4
Towards Sukhdevnagar
NodeB
F T I B R R I
PDH
FIU 19
For internal use only 86 Nokia Siemens Networks
FIU 19
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Scenario 5
Bichpuri
2GBTS
R R I
2GBTS
E 1 T 1
PDH
NodeB
F T F B
NodeB
F T F B
FTFB
FIU 19
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
Duration
1 2 3 4 5 6 7 8 9
ODU & Antenna Installation. IF Cable Laying and termination Hybrid IDU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. Commissioning Near End and Far End Link Alignment E1 Patching and testing Acceptance Testing
2 Hours - Day 2 1 Hour - Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 0.25 Hour -Day 2 2 Hours - Day 2 0.5 Hour - Day 2 2 Hours - Day 2
Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage Non Outage
Scenario 6
Gur Mandi Panipat
NodeB
F T I B
NodeB
F T I B
FLEXIHYBRID 1+0
FLEXIHYBRID 1+0
FIU19
For internal use only 89 Nokia Siemens Networks
FIU19
Similar scenario would be applicable for FLEXI 2G BTS with FIPA Card
1 2 3 4 5 6 7 8 9 10
Hybrid IDU Installation. New FIU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. ODU Replacement with IF Connectorisation at Antenna end. Coaxial cable connectivity from FIU to existing RRI. Commissioning Near End and Far End E1 Testing Traffic Shifting on new Flexi Hybrid Hop Acceptance testing
0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 1 Hour -Day 2
Non Outage Non Outage Non Outage Non Outage Outage Outage Outage Outage Outage Outage
Scenario 7
Lal Bati Panipat
Upgrade to Hybrid
Similar scenario would be applicable for FLEXI 2G BTS with FIFA Card
1 2 3 4 5 6 7 8 9 10
Hybrid IDU Installation. New FIU Installation in 19 Rack. Power Cable Laying & termination. DDF Block Installation, E1 & Ethernet Termination. ODU Replacement with IF Connectorisation at Antenna end. Coaxial cable connectivity from FIU to existing RRI. Commissioning Near End and Far End E1 Testing Traffic Shifting on new Flexi Hybrid Hop Acceptance testing
0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 0.5 Hours- Day 2 1 Hour -Day 2
Non Outage Non Outage Non Outage Non Outage Outage Outage Outage Outage Outage Outage
Sr No
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Node IDPop Priorit Site_A_Name Locatio y n PNP141 Samrat P1 Samrat Woolen Mill Woolen PNP142 Mill P2 Barshat Road
PNP159 PNP169 PNP182 PNP184 PNP3513 PNP3520 PNP3523 PNP346 PNP3580 PNP51 PNP144 PNP153 PNP347 PNP348 PNP3510 PNP3516 PNP3524 PNP3525 PNP3581 PNP3518 P2 P2 P2 P2 P3 P3 P3 P3 P3 P3 P2 Babarpur Yamuna Enclave Narula_Panipat Jawahar_Panipat Kabri Road Siddharth Nagar Barsat Road Bichpuri Kabri Noorwala Gur Mandi Panipat Lal Bati, Panipat Ashok Vihar Sukhdevnagar Sethi Chowk Pachranga Ashram Road
Site Type
GBT RTT RTT GBT RTT GBT GBT RTT RTT RTT GBT GBT RTT RTT GBT RTT RTT RTT RTT
Link Status
Site Name_B
Samrat Woolen Mill
2G/3G Tx Scenario _B
3G 3G 3G 3G 3G 3G 3G Connected on Fiber Scenario 1 Scenario 2 Scenario 3 Scenario 4 Scenario 1 Scenario 4 Scenario 2 Scenario 5 Scenario 5 Scenario 2 Scenario 5 Scenario 6 Scenario 7 Scenario 4 Connected on Fiber Scenario 2 Scenario 4 Scenario 7 Scenario 6 Scenario 2 Scenario 2
Outdoor FLEXI EDGE PNP141 Outdoor ULTRASITE PNP141 Indoor Indoor Indoor Indoor Indoor ULTRASITE PNP141 ULTRASITE PNP141 ULTRASITE PNP141 ULTRASITE 3503 ULTRASITE PNP182
Existing PDH Existing PDH Existing Ceragon IP-10 Existing PDH Existing PDH Existing PDH Existing PDH New PDH New PDH Existing PDH NEW PDH
Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill Samrat Woolen Mill
3G 3G 3G 3G 3G 3G 3G 3G 3G
Outdoor FLEXI EDGE PNP184 Indoor Indoor ULTRASITE PNP169 FLEXI EDGE 3513
Upgrade to hybrid Lal Bati, Panipat New Hybrid Existing PDH Ashram Road Sukhdevnagar
Sukhde vnagar
P2 P2 P1 P3 P2 P2 P2 P3 P3
Outdoor ULTRASITE PNP3524 Indoor Indoor Indoor Indoor Indoor Indoor Indoor Indoor ULTRASITE PNP348 FLEXI EDGE ULTRASITE PNP3516 ULTRASITE PNP348 ULTRASITE PNP153 ULTRASITE PNP3524 FLEXI EDGE PNP347 ULTRASITE PNP182
3G 3G 3G 3G 3G 3G
Adarsh Nagar Panipat RTT Indira Colony Patel Nagar Panipat RTT RTT
Upgrade to hybrid Ashram Road Existing PDH Existing PDH Ashok Vihar Narula_Panipat
Agra Zone
D dun RNC
MSS 8
Meerut Zone
GCS 2
Agra RNC
GMGW 3
MSS 5
MGW 15 GCS 3
MGW 9
MGW 17
GCS 1
MSS 2
GMGW 1
GMGW 2
GMGW 4
GMGW 5
MGW 4
MGW 12
Mrt RNC
SCP
MGW 2
VAS Zone
SMS
MGW 10 MGW 16
MGW 1
MSS 9
MGW 18
MGW 7
MGW 8
MSS 1
MSS 4
MSS 6
Mbd RNC
MGW 6
Moradabad Zone
User Plane over IP For internal use only 95 Nokia Siemens Networks User Plane over TDM
Soni RNC
MGW 1
MSC 1 MGW 4
MSS 1
Amb RNC
MGW 3
MSS 2
MSS 6 MGW 3
MSC 2
HLR1
SCP
VAS Zone
SMS
GMGW 1
GCS 1
Hiss RNC
Hissar Zone
For internal use only 96 Nokia Siemens Networks
MGW 5
Ambala Zone
User Plane over IP Presentation / Author / Date User Plane over TDM
U4 U4
MGW Exp 12K U4 to 20K MGW Exp 12K U4 to 20K MSS M14 600K MGW 20K Model U4 HW **
UDAAN UDAAN
Ambala Ambala
MSS03 MGW07
29 - Sep - 10 30 - Sep - 10
24 days 24 days
** The duration mentioned includes Installation , C & I , Acceptance Testing & Live Cutover For internal use only 97 Nokia Siemens Networks
Estimated / Rated Power Typical / Operating In Watts Power In Watts 4800 2300 4800 2200 4800 2100 Estimated / Rated Power 4800 In Watts 4800 Typical / Operating Power 2600 In Watts 2800
MCB / Fuse Requirements / Rack 2x100A 2x100A 2x100A MCB / Fuse Requirements / Rack 2X125A 2X125A