Вы находитесь на странице: 1из 1

51470 Federal Register / Vol. 61, No.

192 / Wednesday, October 2, 1996 / Notices

fact that a transaction is subject to an NUCLEAR REGULATORY Washington, DC, and at the local public
administrative or statutory exemption is COMMISSION document room located at the Athens
not dispositive of whether the Public Library, South Street, Athens,
[Docket No. 50–296]
transaction is in fact a prohibited Alabama 35611.
transaction; and Tennessee Valley Authority; Notice of Dated at Rockville, Maryland, this 26th day
(3) The availability of these Denial of Amendment to Facility of September, 1996.
exemptions is subject to the express Operating License and Opportunity for For The Nuclear Regulatory Commission.
condition that the material facts and Hearing Frederick J. Hebdon,
representations contained in each Director, Project Directorate, Division of
The U.S. Nuclear Regulatory
application accurately describes all Reactor Projects—I/II, Office of Nuclear
Commission (the Commission) has Reactor Regulation.
material terms of the transaction which denied a request by the Tennessee
is the subject of the exemption. [FR Doc. 96–25176 Filed 10–1–96; 8:45 am]
Valley Authority, (the licensee) for an
BILLING CODE 7590–01–P
Signed at Washington, DC, this 26th day of amendment to Facility Operating
September 1996. License No. DPR–68 issued to the
Ivan Strasfeld, licensee for operation of the Browns [Docket No. 40–6940]
Ferry Nuclear Plant (BFN) Unit 3,
Director of Exemption Determinations, Finding of No Significant Impact and
Pension and Welfare Benefits Administration,
located in Limestone County, Alabama.
The purpose of the licensee’s Notice of Opportunity for a Hearing,
U.S. Department of Labor.
amendment request was to revise the Renewal of Source Material License
[FR Doc. 96–25145 Filed 10–1–96; 8:45 am]
Technical Specifications (TS) to permit SMB–920, Cabot Performance
BILLING CODE 4510–29–P Materials Boyertown, PA
continued operation of BFN Unit 3 for
up to 7 days with one reactor coolant The U.S. Nuclear Regulatory
recirculation loop out of service. This Commission is considering the renewal
[Application No. D–9627] amendment was submitted on of source Material License SMB–920 for
September 15, 1996 as an emergency the continued operation of Cabot
Hassan Zekavat, M.D., P.A. Money request under the provisions of 10 CFR
Purchase Pension Plan (the Plan) Performance Materials (CPM) facility
50.91. located in Boyertown, Pennsylvania.
Located in Moorestown, NJ The NRC staff has concluded that the
CPM processes tin slags, tantalite, and
licensee’s request cannot be granted.
AGENCY:Pension and Welfare Benefits columbite ores to extract tantalum and
The licensee was verbally notified that
Administration. niobium. The ores and slags contain
the request would not be granted on
uranium and thorium, and sludges
ACTION:Withdrawal of proposed September 15, 1996. Written
resulting from the slag and ore
exemption. notification of the Commission’s denial
processing contain in excess of 0.05
of the proposed change was issued by a
percent uranium and thorium.
letter dated September 26, 1996.
In the Federal Register dated January By November 1, 1996, the licensee Therefore, the sludges are source
31, 1996 (60 FR 3483), the Department may demand a hearing with respect to material as defined and regulated by 10
of Labor (the Department) published a the denial described above. Any person CFR Part 40, and their possession by
notice of pendency of a proposed whose interest may be affected by this CPM is licensed by the Nuclear
exemption from the prohibited proceeding may file a written petition Regulatory Commission.
transaction restrictions of the Employee for leave to intervene. Summary of the Environmental
Retirement Income Security Act of 1974 A request for hearing or petition for Assessment
and from certain taxes imposed by the leave to intervene must be filed with the
Internal Revenue Code of 1986. The Secretary of the Commission, U.S. Identification of the Proposed Action
notice of pendency concerned an Nuclear Regulatory Commission, The proposed action is the renewal of
application filed on behalf the Plan. Washington, DC 20555, Attention: CPM’s source material license for five
By a letter dated September 10, 1996, Docketing and Services Branch, or may years. With this renewal, CPM will
the applicant’s representatives informed be delivered to the Commission’s Public continue to operate the Boyertown
the Department that they wanted to Document Room, the Gelman Building, facility to process tin slags, tantalite,
withdraw the application from 2120 L Street, NW., Washington, DC, by and columbite ores, and will revise their
consideration. the above date. process to use the stored sludges as
A copy of any petitions should also be supplemental feedstock in addition to
Notice is hereby given that the sent to the Office of the General new ores and ore concentrates. CPM is
Department has made a final decision to Counsel, U.S. Nuclear Regulatory licensed to possess and use up to 400
withdraw the notice of pendency for the Commission, Washington, DC 20555, tons of elemental uranium and thorium
proposed exemption from the Federal and to General Counsel, Tennessee in slag, ores, and sludges.
Register. Valley Authority, 400 West Summit Hill
Need for the Proposed Action
Accordingly, the notice of pendency Drive, ET 11H, Knoxville, Tennessee
is hereby withdrawn. 37902, attorney for the licensee. CPM performs a necessary service for
For further details with respect to this the commercial electronics industry by
Signed at Washington DC, this 26th day of
action, see (1) the application for extracting tantalum and niobium from
September 1996.
amendment dated September 15, 1996, slag and ores. Denial of the license
Ivan Strasfeld, and (2) the Commission’s letter to the renewal application is an alternative
Director of Exemption Determinations, licensee dated September 26, 1996. available to the NRC, but would require
Pension and Welfare Benefits Administration, These documents are available for expansion of tantalum and niobium
U.S. Department of Labor. public inspection at the Commission’s production capacity at an existing
[FR Doc. 96–25144 Filed 10–1–96; 8:45 am] Public Document Room, the Gelman facility or transfer of extraction
BILLING CODE 4510–29–P Building, 2120 L Street, NW., activities to a new facility. Denial of the

Вам также может понравиться