A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
1
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?
PROBLEM 1:
A quality analyst wants to construct a sample mean chart for controlling a packaging process. Each day last week, he randomly selected four packages and weighed each. The data from that activity appears below. Weight Package 2 Package 3 22 43 21 19 44 24 19 20 20 22
Package 1 75 23 40 18 77
Package 4 24 44 21 19 20
a. Calculate 3 upper and lower control limits for the Means. b. Calculate 3 upper and lower control limits for the Range. c. Is this process in control?