FireStop Handbook

53579 2011 / 03

Introduction
FireStopping Legislation
2

Fire Protection
Fire Prevention is a critical consideration for all those who are responsible for creating the design, specification and construction of new buildings. It also has to be considered in the ongoing maintenance of occupied premesis. The causes of fire vary and are unpredictable. Often the cause is outside the area of influence of design engineers and planners. But the ability to control the spread of fire once it has started can still be influenced. Effective fire fighting within a building is generally achieved through a combination of active and passive FireStop systems. Active FireStop Sytems Active fire prevention systems are designed to react to the outbreak of a fire which is then suppressed with the help of sprinkler systems, halogen installations, fire extinguishers or other proactive machanical systems. The effects of the fire may also be lessened by the removal of smoke from the equation. By including alarms and emergency lighting, active systems also serve to provide escape paths for people inside the building. Passive Fire Prevention Sytems Passive fire prevention systems are intergrated in the structure of a building ensuring that once the fire starts it is limited to a fire compartment that is composed of fire rated walls, floor and ceilings. To maintain the FireStopping integrity of walls, floors and ceilings, all gaps, openings and channels are to be sealed to prevent the escape of fire and smoke. Therefore the Control of Fire Spread and limitation of damage is principally achieved through the compartments of a building. These compartments are bounded by fire resisting elements: Walls / Floors / Ceilings Fire resisting elements are often breached to permit access for services or functional joints. Cables / Pipes / Ventilation systems Gaps between fire resisting elements around the penetrations must be sealed so that the fire integrity of the fire-resisting element is maintained. National Regulations The following national regulations are published as statutory instruments by Parliament with respect to life safety purposes: Building Regulations (England & Wales) 1991 These regulations are expressed as functional requirements. Approved Document B (2000 Edition) Fire Safety, gives non-manditory guidance. Building Standards (Scotland) 2001 These are expressed as functional requirements. All of the provisions of Technical Standards Part D and Part E are mandatory. These provisions are wavered only by means of a relaxation. Building Regulations (Northern Ireland) 1994 Basic functional requirements with approval solutions are given in Technical Booklet E which is similar to England and Wales Approved Document B. Building Regulations (Republic of Ireland) 1997 The building regulations in the republic of Ireland are similar in arrangement and content to the England & Wales Building Regulations and are covered by Technical Guidance Document B. Q. Why does FireStopping need to be carried out? Approved Document B states the following points with regard to reinstallation of fire rated elements:

If a fire separating element is to be effective then every joint, or imperfection of fit, or opening to allow services to pass through the element should be adequately protected by sealing or FireStopping so that the fire resistance of the element is not impaired 11.2
This is quite categorical in its assertion that every opening in a fire rated element needs to be reinstalled.

Introduction
Fire Protection Continued
In addition to any other provisions in this document for FireStopping: a. Joints between fire separating elements should be FireStopped and b. All openings for pipes, ducts, conduits or cables to pass through any part of a fire separating element should be: i. kept as few in number as possible and ii. kept as small as practical and iii. FireStopped (which in the case of a pipe or duct should allow for thermal movement) 11.12 The final sentence states that FireStopping materials should allow for thermal movement rules when using sand/cement and concrete for filling round services. Technical Standards (Scotland) state: A compartment wall and compartment floor must have no openings and must provide a barrier to fire between the parts of a building to be divided including any roof space. Except for: Where there is a service opening i. Which is of suitable construction or where the services are suitably protected so that in the event of a fire the level of fire safety performance required of the compartment wall or compartment floor is maintained, and ii. Which is suitably FireStopped D3.14 BS7671 further adds: Where a wiring system passes through elements of building construction such as floors, walls, roofs, ceilings, partitions or cavity barriers the openings remaining after passage of the wiring systems shall be sealed according to the degree of fire resistance required of the element concerned. 527-02-01 where a wiring system such as conduit, cable ducting, cable trunking, busbar or busbar trunking penetrates an element of building construction having specified fire resistance it shall be internally sealed so as to maintain the degree of fire resistance of the respective element as well as being externally sealed to maintain the required fire resistance. 527-0201 Q. Why do you have to have all your FireStop products tested?
The building Regulations Approved Document B states the following with regard to testing

The product should be in accordance with a specification or design which has been shown by tests to be capable of meeting that performance or have been assessed from test evidence against appropriate standards Appendix A 1A

Provide a propriety sealing system which has been shown by test to maintain fire resistance of the wall, floor or cavity barrier. B3 11.6
Technical Standards (Scotland) require: The requirements of D3.14, D4.7, D5.8 and D6.7 for FireStopping of service openings and D6.9 for FireStopping will be met in the case When different movement is anticipated, whether in normal use or during fire exposure by the use of a proprietary sealant or sealing system which has shown by test its ability to maintain the required level of safety performance under the conditions appropriate to its end use B2.2.1

FireStopping Legislation
3

Introduction
Approvals
British Standard BS 476-20
BS EN13501-3
BS 476-20:1987 Fire tests on building materials and structures. Method for determination of the fire resistance of elements of construction (general principles). EN13501-3 Fire classification of construction products and building elements. BS EN 1366-3: 2004 Fire resistance tests for service installations - Penetration seals. BS EN 1366-4: 2006 Fire resistance tests for service installations - Linear joint seals. DIN 4102 :Part1 Fire behaviour of building material and elements - Part 1: Building materials; concepts, requirements and tests.

BS EN1366-3: 2004
BS EN1366-4: 2006

AS 1530: Part 4: 2005


BS EN ISO 140-3: 1995 BS EN ISO 717-1: 1997

AS 1530: Part4: 2005 Australian stand - Fire resistance tests of elements of construction. BS EN ISO 140-3: 1995 BS EN ISO 717-1: 1997 The laboratory measurement of airborne sound insulation of building elements. FM Certificate Recognised for use in local water-based fire extinguisher systems (Factory Mutual Research Corporation for Property Conservation, American insurance company). VdS Certificate Recognised for the use in local water-based fire extinguisher systems (formerly: Association of Property Insurers, now: VdS Damage Prevention). Fire-tested fixing Fire test classification for anchors up to 120 minutes. Zulassung Proof of compliance of the building product with the general building authority approval confirmed by a material testing facility. ETA Option 1 European Technical Approval Option 1 for cracked concrete.

ETA Option 7 European Technical Approval Option 7 for non-cracked concrete. CPD Continual Professional Development. Recognised as CPD accredited seminars.

ISO 9001 Quality assurance on systems and processes. ISO 14001 is a standard for environmental management systems.

Introduction
fischer FireStop Centres fischer Accredited Installers

fischer have a dedicated network of approved distributors (fischer FireStop Centres) stragically placed throughout the UK, keeping stock and offering nationwide coverage for the supply of passive FireStop products.

fischer are working with a group of Accredited Installers in the field of passive fire protection. All of the fischer installers are members of FIRAS or LPCB Third Party Accreditation Schemes. As members they are able to offer a Certificate of Conformity on all work carried out in the fields of Compartmentation, steel and Concrete Protection, Acoustics and Air Sealing conforming to Approved Documents B, E, &L of Building Regulations.

IFC Certification Scheme

FIRAS Third Party Certification Scheme

fischer and their range of products have been approved by the IFC Certification Scheme. International Fire Consultants Ltd. (IFC), established in 1985, is a multifaceted practice of fire engineers with a wide range of disciplines and expertise, drawn from government scientific establishments, the fire service, manufacturing industry, commercial testing laboratories and the construction sector. IFC was established to provide a source of technical expertise in the field of Fire Safety Engineering. International Fire Consultants Ltd. are committed to the advancement of fire safety engineering and to this end are heavily involved in research and development projects as well as striving to standardise practices throughout the industry. The Installer Certification Schemes are designed to ensure that certificated and tested products are installed within the approved field of application by skilled and competent operatives thus giving confidence to specifiers, users, occupiers, owners and enforcement bodies. It involves auditing of an installer companys office and site based activities, competence assessment of operatives and supervisors and certificates of conformity.

As a requirement of the FIRAS Schemes, certificated companies are required to employ, on a permanent or contract basis, competent Supervisors and Technicians (Operators) whose technical and practical competence is assessed by FIRAS Inspectors in the trade disciplines for which certification scope is held. A register of competent employees is maintained for each certificated company, which is regularly reviewed to ensure that the company maintains a competent workforce whose abilities remain current with the workscope the company provides. Once certificated, all FIRAS Registered Installer Companies are subject to ongoing random inspection of their installation work on ongoing contracts along with an annual audit of their office systems by FIRAS Inspectors to ensure that compliance with FIRAS Scheme Requirements is maintained.

Accreditation Schemes
5

Introduction
Technical Support
fischer Fixings (UK) Ltd.
At fischer our aim is to provide the very best technical support to complement our vast range of quality products. The constant investment in Reasearch & Development has resulted in more than 7000 patents awarded to date. This investment combined with a constant exchange of information between professional users, universities and technical research institutions ensures that fischer remains at the forefront of the very latest developments within the construction industry. The fischer group currently lead the way in producing technically advanced products having gained more European Technical Approvals (ETAs) than any other fixings manufacturer. All historical developments and subsequent knowledge is available to you via our highly trained Technical Services Team who can offer support, advice and specifications at all stages of the design and construction process.

Special Catalogues & Substrate Reports


Fixings Systems Catalogue
MMVII-1
Fixings Systems Catalogue

Fixings Test Report for

The Technical Handbook provides useful information for specification engineers. It contains in depth information relating to the range of technically advanced steel and resin anchor calculation details, reduction factors, spacings etc. Topics like anchor performance in fire, corrosion and design methods are also included. The Fixing Systems Catalogue provides general technical information on the range of nylon, steel and resin anchors and also information on special product ranges sanitary, foams and sealants, scaffold, insulation fixings. More specialist catalogues are available focusing on topics such as FireStop, M&E Installation Systems, EWI and ACT. Detailed substrate reports available indicating the performance of suitable fixings in specific building materials, including manufacturers such as: Bison Knauf Thermalite Tarmac Topfloor Lafarge Forticrete Tarmac Topblock Finlay Concrete Products Cobiax Deck Hanson British Gypsum

0117789

Design Software Compufix & Rebarfix


Compufix Anchor Design Programme, a must for every specification engineer. Additional features: Baseplate Design Approval Details Installation Details CAD Database New post-installed rebar calculation programme

Method Statements & COSHH Data Sheets


Method Statement for installation of Resin fixings (applicable for Eurobond glass capsule or injection resin system with RG M resin studs into solid substrates)
or Premark the hole positions by using your fixture as a template. Drill directly to the substrate on centreline of premarked fixing position, using a correct drill diameter to the required depth. (fig 1) Thoroughly clean the hole of dust and drill debris, using ABG blow-out pump and cleaning brushes. Blow-out Twice, Brush Twice, Blow-out Twice. (fig 1-3) Place the cartridge in the applicator gun and discharge resin until the colour becomes evenly mixed. Inject the resin into the hole, starting with the nozzle at the bottom of the hole. If Eurobond system is used, simply insert glass capsule in the hole (fig 4) Insert RG M rod. If injection resins are used, rod is inserted by hand, with pushing and twisting action. If glass capsule is used, insertion must be done with an impact drilling machine. (fig 5) Leave resin to cure completely before applying any load. Curing time is dependant on the temperature and the correspondent table can be found on the cartridge. Tighten the stud, not exceeding the recommended torque. (fig 6) For correct dimensions and torque values please always refer to information on product packaging or fischer literature! If in any doubt, please call fischer helpline 01491 827 920

COSHH data sheets available for a full range of chemical products. Method statemants detailing installation techniques available on request.

fig 1

fig 2

fig 3

fig 4

fig 5

fig 6

Specification Advisory Assistance


Calculations Method Statements Health & Safety Data Sheets Technical Data Sheets Full Product Support Technical Help Line Phone: 01491 827 920 Fax: 01491 827 950 Email: technical@fischer.co.uk

Compartmentation Guide
The Building - FireStop in Application
9

12

6 2 3 5 4 7 11

10

fischer coated panel system FCPS used in conjunction with FFC2 or FFC4. Use fischer Intumescent Acoustic Mastic FiAM to edge. fischer quickpass FQP. fischer cable FireStop FCbS used in conjunction with fischer Coated Panel system FCPS. fischer Conduit Intumescent FCi in conjunction with fischer FireStop Compound FFSC.

Putty Pads FiPP. fischer Cavity FireStop Expansion FCFex or fischer intumescent Acoustic Mastic FiAM. fischer FireStop Collar FFC2 or FFC4 used in conjunction with the fischer concrete screw FBS 6x40TZ for solid material and HM 6x37S for a board material. fischer Intumescent Pipe Wrap FiPW 2 oR FiPW 4 with fischer FireStop Compound FFSC.

fischer FireStop Compound FFSC. fischer intumescent Acoustic Mastic FiAM to edges. fischer cavity FireStop Clad FCFcl to be placed between steel girder and outside facade in conjunction with multi-purpose brackets. fischer FireStop Strip / Block FCFst.

10

11

12

Contents
Page Index

Image

Description fischer Intumescent Acoustic Mastic - FiAM fischer Intumescent Graphite Mastic - FiGM fischer Silicone Sealant - FFRS fischer Intumescent Putty - FiPP fischer Intumescent Pillow - FiP fischer Fire Collar - FFC fischer Intumescent Pipe wrap - FiPW fischer FireStop Compound - FFSC fischer Intumescent Fire Sleeve - FiFS FireStop Block - FBB FireStop foam and Ahesive - FBS fischer Coated Panel System - FCPS fischer Cable FireStop - FCbF fischer Conduit Intumescent - FCi fischer Cast in Device - FCiD fischer cavity FireStop clad - FCFcl fischer Ventilated Fire Barrier - FVFB fischer Cavity FireStop Strip - FCFst fischer Cavity FireStop Epansion - FiLS FireStop Foam Fxings Guide

Testing

BS

EN

IFC

AS

DIN Pages 9 11 13 16 17 19 21 23 26

28 29 30 31 32 33 35 36 37 38 39 40

acoustic testing

air seal

smoke seal

FireStop

Acoustic Mastic - FiAM


Description
fischer Intumescent Acoustic Mastic is a one part water based acrylic sealant. fischer Intumescent Acoustic Mastic is suitable for sealing joints and service penetrations in fire walls, partitions, fire rated door frames, glazing systems and linear gap seals. Tested to BS476 Parts 20, fischer Intumescent Acoustic Mastic provides up to 4 hours fire protection and up to 40db acoustic rating. 600ml foil cartridge for productivity savings and sustainability / reduced waste disposal. The mastic is fast curing approximately 20-30 minutes tack free time. Once fully cured the mastic can be painted over. High movement of +/- 10%.

Fire Rating
Joint Size Depth of Sealant Integrity 10mm 15mm 20mm 20mm 30mm 30mm 10mm 10mm 15mm 20mm 15mm 15mm 240 mins 240 mins 240 mins 240 mins 240 mins 240 mins Insulation 30 mins 30 mins 120 mins 60 mins 120 mins 60 mins Backing Backing Rod Backing Rod Backing Rod Cavity FireStop Strip Backing Rod Cavity FireStop Strip Type of Seal Single Single Dual Single Dual Single

Approvals

British Standard BS 476-20


BS EN ISO 717-1: 1997
The laboratory measurement of airborne sound insulation of building elements

Installation
fischer Intumescent Acoustic Mastic is used to seal gaps of up to 30mm in block walls, partitions and door frames. Remove all loose debris, oil and grease from the joint. Mask the adjacent surfaces to the joint. Ensure that the joint is filled using an appropriate backing material for the fire rating you are trying to achieve. (See Fire Rating) Apply mastic to required depth and width. Remove masking. Do not apply the sealant if the ambient temperature is below 5C as adhesion will be impaired.

fischer Intumescent Acoustic Mastic - FiAM


9

Acoustic Mastic - FiAM


fischer Intumescent Acoustic Mastic - FiAM
Specifcations
Type FiAM 310 FiAM 600 KP M2 Applicator gun Applicator gun 600ml Order No. 53011 56006 53117 97967 Size [ml] 310 600 Qty. Per Box 25 25 1 1 Suitable for use with FiAM 310 FiAM 600

Acoustic Rating
Weighted sound reduction Index (Rw) of up to 40 db. Please consult our technical office for more details.

Smoke Seal fischer Intumescent Acoustic Mastic will provide a cold smoke seal.

Coverage
fischer Intumescent Acoustic Mastic is available in 310ml cartridges. One cartridge will provide the following coverage rates:
Joint Size 10mm 20mm 30mm Depth of Sealant 10mm 15mm 20mm Yield Per Cartridge 3.10lin m 1.03lin m 0.51lin m

Technical Data
Density: Cartridge contents: Application temperature: Skin-forming time: Curing rate: Volume shrinkage: Movement capability: Temperature resistance: Shelf-life after production: approx. 1.60-1.65 g/cm3 310 ml +5C to +40C approx 20-30 min. approx. 2mm in 48 hours* approx. 20% +/- 10% -25C to 80C 12 months (under recommended conditions)

* dependant on substrate, air humidity and weather conditions

10

Graphite Mastic - FiGM


Description
fischer Intumescent Graphite Mastic is one part water based flexible acrylic emulsion which contains a high pressure intumescent graphite, extruded from a cartridge loaded into a standard sealant gun. The fischer Intumescent Graphite Mastic is suitable for sealing around service penetrations which pass through fire rated walls. Tested to EN1366-3 The fischer Intumescent Graphite Mastic will provide up to 4 hours integrity and 4 hours insulation. The mastic is fast curing approx 40-60 min tack free.

Fire Rating
Service Type Cable tray configuration 1 Cable tray configuration 2 Up to 75mm cable bunch Up to 32mm MDPE water pipe Up to 50mm ABS pipe Up to 110mm PVC waste pipe Depth of Sealant 2 x 40mm 50mm BR* sealed to edge 2 x 40mm 2 x 40mm 2 x 40mm 2 x 40mm Integrity 250mins 250mins 250mins 250mins 250mins 250mins Insulation 250mins 61mins 250mins 250mins 250mins 250mins

Approvals

BS EN1366-3

*All application carried out into 140mm block wall with a mineral fibre backing material FCP Coated Panel.

Installation
fischer Intumescent Graphite Mastic is used to seal service penetrations in fire rated walls. Remove all loose debris, oil and grease from the joint. Mask the adjacent surfaces to the joint. Ensure that the joint is filled using an appropriate backing material for the fire rating you are trying to achieve. (See Fire Rating) Apply mastic to required depth and width. Remove masking. All services must be adequately supported so as not to disrupt the seal during a fire. This can be achieved with the fischer Quick-Fix system which was used as part of the approval testing. Do not apply the sealant if the ambient temperature is below 4C as adhesion will be impaired.

fischer Intumescent Graphite Mastic - FiGM


11

Graphite Mastic - FiGM


fischer Intumescent Graphite Mastic - FiGM
Specifications
Type FiGM 310 KP M2 Applicator gun Order No. 508765 53117 Size [ml] 310 310 Qty. Per Box 25 1 Suitable for use with FiGM 310

Smoke Seal
fischer Intumescent Graphite Mastic will provide a cold smoke seal.

Coverage
fischer Intumescent Acoustic Mastic is available in 310ml cartridges. One cartridge will provide the following coverage rates:
Joint Size 10mm 20mm 30mm Depth of Sealant 10mm 15mm 20mm Yield Per Cartridge 3.10lin m 1.03lin m 0.51lin m

Technical Data
Form: Cure System: Colour: Specific Gravity: Extrusion Rate: Sag: Open Time: Tack Free Time: Curing Time: Shore (A) Hardness Solids: Application Temperature Range: Service Temperature Range: Expansion Rate: Shelf-life: Readt to use thixotropic Water based Dark grey 1.5 350g / min <3mm 30 minutes 60 minutes 3 to 5 days 50 >80% +4C to +30C -15C to +70C In a recent test, the expansion was measured at 25 to 30 original depth Up to 12 months when stored in unopened cartridges in and cool, dry conditions. Avoid extremes of temperature

* dependant on substrate, air humidity and weather conditions

12

Silicone Sealant - FFRS


Description
fischer Fire Rated Silicone Sealant is a one part silicone sealant. It is suitable for sealing joints and service penetrations in fire walls, partitions, fire rated door frames, glazing systems and linear gap seals. It provides primerless adhesion to a wide range of substrates such as glass, anodised and mill-finished aluminum, steel, st.steel, rigid PVC, concrete and other porous surfaces. Once cured, the sealant offers superb long-term resistance to heat and fire as well as all other general weather elements. It cross links at room temperature to give a flexible seal of low modulus which will withstand movement of + 25% in constant service throughout a wide temperature range.

Fire Rating
Joint Size 15mm 15mm 25mm 40mm Depth of Sealant 10mm 10mm 15mm 25mm Integrity 264 262 264 264 Insulation 233 264 138 264 Backing Mineral Fiber Polyethylene Backing Rod Mineral Fiber Type of Seal Dual Single Single Dual

Approvals

BS EN 1366-3 BS EN1366-4

Installation
fischer FFRS Sealant is used to seal gaps of up to 40mm in block walls, partitions and door frames. Remove all loose debris, oil and grease from the joint. Mask the adjacent surfaces to the joint. Ensure that the joint is filled using an appropriate backing material for the fire rating you are trying to achieve. (See Fire Rating) Apply mastic to required depth and width. Smooth surface with a clean wet spatula to ensure maximum adhesion to substrate. Remove masking. Do not apply the sealant if the ambient temperature is below 5C as adhesion will be impaired.

Specifications
Type Order No. Size [ml] Qty. Per Box Suitable for use with

FFRS 310 KP M2 Applicator gun

512374 53117

310 -

25 1

FFRS 310

fischer Fire Rated Silicone Sealant - FFRS


13

Silicone Sealant - FFRS


fischer Fire Rated Silicone Sealant - FFRS
Smoke Seal
fischer FFRS Sealant will provide a cold smoke seal.

Coverage
Joint Size 30mm 20mm 15mm 10mm 6mm Depth of Sealant 20mm 15mm 8mm 10mm 6mm Yield Per Cartridge 1.0 l/m 2.0 l/m 2.5 l/m 6.0 l/m 8.5lin m One 310ml cartridge will provide the following coverage rates (Left). fischer FFRS sealant is available in 310 and 600ml cartridges.

Technical Data
Cure System: Specific Gravity: Skinning Time: Tack Free Time: Full Cure: Shore A Hardness: Extrudability g/min: Movement accomodation: Mechanical Properties on a 2mm thick film (NF T 46002) Modulus at 100% elongation: Elongation at break: Tensile strength: Mechanical Proporeties on glass slabs (EN 28339) Modulus at 100% elongation: Elongation at break: Tensile strength Application Temp Range: +5 C to +40 C
o o

Alcoxy 1.35-1.38 5/10 minutes approx. (at 23oC and 50% relative humidity) 25 min approx. (at 23oC and 50% relative humidity) 2-3mm approx. per 24hrs (at 23oC and 50% relative humidity) 22 55 (standard NMRPS 495A 3mm/3 bars) + 25% 0.37 Mpa 550% 1.5 Mpa 0.32 Mpa 260% 0.55 Mpa ServiceTemp Range: -50oC to +150oC Must not be stored above 35oC Up to 12 months when stored in unopened cartridges under cool, dry conditions. When used and applied correctly the sealant will perform in excess of 20 years. The cured sealant is unaffected by water, dilute acids and alkalis, soap and household detergents. Certain solvents may soften and swell the cured rubber on prolonged contact. Must not be stored above 35oC

Range: -50oC to +150oC Shelf Life: Life Expectancy: Chemical Resistance:

14

How to calculate consumption


Calculations
a = Hole Diameter in mm b = Depth of Sealant in mm (See recommendations) c = Pipe or Bunched Cables diameter in mm d = Annular space in mm (See recommendations) e = Area of hole in mm2 f = Area of pipe in mm2 g = Amount of mastic needed per hole in ml h = Cartridge size in ml n = Number of Pipe/Bunched Cable Penetrations or Linear holes to be sealed

Round Holes No. of cartridges needed = n x g (h ) Area of hole in mm2 = x (a 2)2 Area of pipe in mm2 = x (c 2)2 Volume of mastic per hole in ml = ((e - f) x b) 1000 a = 90mm b = 40mm c = 50mm h = 310ml n = 20 e = x (a 2)2 = x 452 = 6361.73 mm f = x (c 2) = x 252 = 1963.50 mm2 = ((6361.73 - 1963.50) x 40) 1000 = 175,929.2 1000 = 175.92 ml nx(g ) h = 20 x ( 175.92 ) 310 = 20 x 0.56 = 11.35 cartridges
2 2

Square Hole lxw

Linear Hole / Sealant length Slot width (w) =20mm Slot depth (j) = 10mm Slot length (k) = 3 Meters Area = w x j

l = 90 w =100

= 20 x10 = 200mm2

e =lxw = 90000mm 1000


2

Volume = Area x k (cm3) = 200 x 3 = 600 cm3 As1 cm3 = 1 ml then 600 cm3 = 600ml

= ((9000 - 1963.50) x 40) 1000 = 281.4601000 = 281.46ml n x ( 600 ) 310 = 20 x ( 281.46 ) 310 =20 x 0.91 =18.1 cartridges = 20 x 1.94 = 38.7 = 38.7 cartridges

Calculating Mastic Consumption


15

Intumescent Putty Pads - FiPP


fischer Intumescent Putty Pads - FiPP
Description
FiPP is manufactured from a red, non-setting, silicone based intumescent

polymer and tested in accordance with the BS EN 1366-3 for a 2 hour fire rating and 2 hour insulation. fischer Intumescent Putty Pads FiPP have been developed to maintain the acoustic integrity and fire resistance of plasterboard partitions, where they are penetrated by plastic electrical socket boxes and cables. Tested to BS EN1366:3. FiPP can also be used for upgrading the acoustic performance of partitions where electrical sockets have penetrated the wall with an acoustic rating of 66dB.

FiPP / I FiPP / E

Fire Rating
Shown to maintain the fire resistance of partitions, in both 1 and 2 hour fire rated constructions.

Approvals

BS EN1366-3
BS EN ISO 717-1: 1997
The laboratory measurement of airborne sound insulation of building elements

Robust Details
The FiPP has been accepted by Robust Details Ltd as an alternative mechanism of sealing the rear of electrical service penetrations, such as sockets, in Robust Detail timber frame and metal frame seperating walls, as published in the Robust Details Part E Handbook.

Installation
FiPP are used to prevent fire penetration in plastic electrical sockets and cable bundles for specified periods up to 2 hours. FiPP are available for internal and external use.
1. 2.

Internal

3.

4.

Remove the face plates of the electrical socket box. Mould the preformed putty pads into the back of the box and around the cables. Replace the face plate.

1.

2.

External

Mould the preformed putty pads into the back of the box and around the cables.

Specification
Type FiPP / I-S FiPP / I-D FiPP / E-S FiPP / E-D Order No. 53578 54757 506261 506262 Product Dimensions [mm] 170x170 230x170 155x155 210x180 Fire Rating [hours] 2 2 2 2 Qty. Per Box 20 20 20 20

16

Intumescent Pillows - FiP


Description
The Pillows are an Intumescent Graphite based product contained in a woven fibreglass bag. The Intumescent Pillows are simply packed tightly in between penetrating services and the wall. In a floor, pillows are additionally supported by means of a mesh support system. (See diagram). Under fire conditions, Intumescent Pillows expand to form an effective seal around service penetrations. Intumescent Pillows are suitable for use with: Metal pipework Cable trays Electrical trunking (inside and outside)

Fire Rating
Intumescent Pillows will provide 4 hours fire integrity and 2 hours insulation rating as tested in accordance with BS476 Part 20 and EN 1366-3. Suitable for sealing PVC, cPVC, uPVC, PE, PP, MDPE, HDPE and ABS > 5mm.

Approvals

British Standard BS 476-20

BS EN1366-3

Estimating Quantities
Pillows are available in four sizes and the table below outlines approximate quantities of each size to fill one m2 area. Pillow size (mm) Approximate Number 300 x 50 x 30 660 per m2 opening 300 x 100 x 30 330 per m2 opening 300 x 150 x 30 220 per m2 opening 300 x 200 x 30 165 per m2 opening

Installation
Installation in Walls Push the first Intumescent Pillow into the hole to be filled, so that the longest dimension (300mm long) spans across the wall. Pack the pillows in a brick bond fashion, to ensure the joints between the pillows are staggered. For electrical trunking, remove the lid and install a pillow inside so it aligns with the depth of the wall. Replace the lid on the electrical trunking. Pack the hole tightly with more Intumescent Pillows until it is full. Ensure that the last row of pillows is tight against the edges.

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

fischer Intumescent Pillows - FIP


17

Intumescent Pillows - FiPP


fischer Intumescent Pillows - FIP
Installation
Installation in Floors Make a basket using galvanised steel mesh (50 x 50 squares x 2.5mm wire diameter) to sit into the hole in the floor slab. There should be a minimum 50mm overlap onto the surrounding floor slab or wall. Mechanically fix to top of floor slab or wall. Lay Intumescent Pillows standing on end into the wire basket. Pack the pillows tightly into the basket around the penetrating services. For electrical trunking, remove the lid and install a pillow inside so that it aligns with the depth of the floor. Replace the lid on the electrical trunking. Lay a sheet of the galvanised steel mesh over the basket and tie together using steel wire.

Specification
Type FIP / S FIP / M FIP / L FIP / XL Order No. 53040 53041 53042 53043 Dimensions 300x50x30mm 300x100x30mm
FIRE STOP

Qty. Per Box 100 50 25


FIRE STOP

300x150x30mm 300x200x30mm

40

FIRE STOP

18

FIRE STOP

Fire Collar - FFC


Description
FireStop Collars consist of a powder coated steel sleeve containing a flexible graphite based intumescent liner manufactured to suit the pipework to be FireStopped for a 1, 2 or 4 hour fire rating. Integral toggles are opened up and the collar is simply fitted around the pipe. The toggles are closed and the collar is pushed flush to the surface of the wall or underside of the floor: The collar is then securely fastened to the structure by means of fire resistant fixings threaded through fixings tabs (fire rated fixings pg 34-37). Any gaps of up to 10mm wide around the pipework should be filled with Intumescent Acoustic Mastic or fischer Intumescent Graphite Mastic. For gaps greater than 10mm wide FireStop Compound can be used.

Fire Rating
Outside diameter of Pipework 55 - 250mm 275 - 315mm 330 - 355mm Fire Rating in mins 120 or 240 180 60

Approvals

British Standard BS 476-20

BS EN1366-3

Suitable for sealing PVC, cPVC, uPVC, PE, PP, MDPE, HDPE and ABS > 5mm.

Installation
Installation in Walls Make the wall around plastic pipe good with either Intumescent Acoustic Mastic, FireStop Compound or Concrete. Undo the toggle clip on the FireStop Collar and open it out. Slide the FireStop Collar, with its fixing tabs pointing towards the face of the wall, around the plastic pipe. Lock the FireStop Collar around the pipe closing the toggle clip. Push the FireStop Collar back on to the wall. Fix the FireStop Collar to the wall by means of 32mm long, 8mm steel self- tapping screws, through the fixing tabs. Repeat for the other side of the wall.

FIRE STOP

Installation in Floors Make the floor around the plastic pipe good with either Intumescent Acoustic Mastic, FireStop Compound or Mortar. Undo the toggle clip on the FireStop Collar and open it out. Slide the FireStop Collar, with its fixing tabs pointing up towards the face of the soffit, around the plastic pipe. Lock the FireStop Collar around the pipe closing the toggle clip. Push the FireStop Collar back on to the wall. Fix the FireStop Collar to the soffit by means of 32mm long, 8mm steel self-tapping screws, through the fixing tabs.
FIRE STOP FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

fischer Fire Collar - FFC


19

Fire Collar - FFC


fischer Fire Collar - FFC
Installation
Installation in Floors Make the floor around plastic pipe good with either Intumescent Acoustic Mastic, FireStop Compound or Mortar. Undo the toggle clip on the FireStop Collar and open it out. Slide the FireStop Collar, with its fixing tabs pointing up towards the face of the soffit, around the plastic pipe. Lock the FireStop Collar around the pipe closing the toggle clip. Push the FireStop Collar back on to the wall. Fix the FireStop Collar to the soffit by means of 32mm long steel self-tapping screws, through the fixing tabs.

Specification
Type FFC 2 / 30-32 FFC 2 / 38-40 FFC 2 / 55 FFC 2 / 63 FFC 2 / 75 FFC 2 / 82 FFC 2 / 90 FFC 2 / 110 FFC 2 / 125 FFC 2 / 160 FFC 2 / 200 FFC 4 / 30-32 FFC 4 / 38-40 FFC 4 / 55 FFC 4 / 63 FFC 4 / 75 FFC 4 / 82 FFC 4 / 90 FFC 4 / 110 FFC 4 / 125 FFC 4 / 160 Order No. 52456 52480 52481 52482 52483 52486 52487 52488 52489 52500 52501 52502 52503 52532 52533 52535 52536 52537 52539 52540 52545 Outside Diameter of Pipework [mm] 30-32 38-40 55 63 75 82 90 110 125 160 200 30-32 38-40 55 63 75 82 90 110 125 160 Fire Rating [hours] 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 4 4 4 4 4 4 Qty. Per Box 32 32 100 50 50 50 40 40 25 10 10 32 32 75 50 50 50 40 40 25 10

20

Pipe Wrap - FiPW


fischer intumescent Pipe Wrap - FiPW
21

Description
Pipe Wraps comprise of layers of a graphite based intumescent sheets encapsulated in a polythene sheath. The product is manufactured to be wrapped around the outside diameter of the pipework or trunking and is secured by means of a self-adhesive strip to give a 2 hour or 4 hour fire rating. The Intumescent Pipe Wrap is then positioned within the compartment wall or floor so that the edge of the product is left exposed at the fire side of the wall or soffit. The Intumescent Pipe Wrap is then sealed into the structure with FireStop Compound. Under fire conditions, the Intumescent material expands against the structure and fills the void left by the burnt out plastic. For walls it will be necessary to fit two wraps to prevent fire spread fire spread from either side. If the thickness of the wall is smaller than the width of the wrap, then only 1 wrap is needed.

Fire Rating
Outside Diamether of Pipework 55mm 82mm 110mm 160mm Fire Rating in Hours 2 or 4 2 or 4 2 or 4 2 or 4

Approvals
British Standard BS 476-20

BS EN1366-3

Installation
fischer Intumescent Pipe Wraps FiPW are used to prevent fire penetration in plastic pipes which pass through walls or floors for specified period up to 4 hours. They are manufactured as a sealed unit to the correct length and width to suit the pipe diameter and fire rating. Check that pipe surface is clear of mortar. Ensure that the correct pipe band is installed to suit diameter and fire rating. Wrap around pipe and fix with integral self-adhesive strip. Slide into position ensuring that the bottom edge is exposed in a floor slab and both edges are exposed in the wall. Two bands need to be used when the wall thickness exceeds 150mm. Seal the pipe wrap into the structure with fischer FireStop Compound.
FIRE STOP

Pipe Wrap - FiPW


fischer Intumescent Pipe Wrap - FiPW
Description Installation
Type Order No. Outside Diameter of Pipework [mm] Fire Rating [hours] Qty. Per Pack

FiPW 2 / 30-32 FiPW 2 / 38-40 FiPW 2 / 55 FiPW 2 / 63 FiPW 2 / 75 FiPW 2 / 82 FiPW 2 / 110 FiPW 2 / 125 FiPW 2 / 160 FiPW 1 / 200 FiPW 4 / 30-32 FiPW 4 / 38-40 FiPW 4 / 55 FiPW 4 / 63 FiPW 4 / 75 FiPW 4 / 82 FiPW 4 / 110 FiPW 4 / 125 FiPW 4 / 160

52546 52547 52548 52560 52561 52562 52563 52890 52891 53000 53002 53003 53004 53005 53006 53007 53008 53009 53010

30-32 38-40 55 63 75 82 110 125 160 200 30-32 38-40 55 63 75 82 110 125 160

2 2 2 2 2 2 2 2 2 1 4 4 4 4 4 4 4 4 4

150 100 100 50 150 150 80 35 10 1 150 100 50 50 150 150 50 35 10

22

Compound - FFSC
Description
FireStop Compound is a specially formulated gypsum based mortar, which is mixed with water to be trowelled or poured around service penetrations. Tested to BS476 Part 20, FireStop Compound provides up to 6 hours fire protection. fischer FireStop Compound is used to provide a fire rated seal around service penetrations in fire rated walls and floors. In walls, FireStop Compound is mixed into a stiff consistency for trowelling into openings. Plastic pipework must be protected with either fischer Fire Collars or Intumescent Pipe Wraps. FireStop Compound sets in 30-45 minutes and is capable of accommodating foot traffic in approximately 72 hours.

Fire Rating
Thickness of Compound 75mm 100mm Fire Rating Up to 2 hours Up to 6 hours

Approvals

British Standard BS 476-20


BS EN ISO 717-1: 1997
The laboratory measurement of airborne sound insulation of building elements

Installation

fischer FireStop Compound is used to seal service penetration openings against the spread of fire. When used in floor openings it is capable of taking light foot traffic e.g. For maintenance purposes. Remove all loose material from opening of fire barrier. Fit shuttering or temporary plywood or similar material like FCPS. Add the Compound to clean water, and mix either by hand or with a power mixer. Keep dry and protect bag from impact damage. Clean all tools and equipment immediately after use with water.

FIRE STOP

Floor Openings Pouring: Mix compound with water in 2.5:1 parts by volume. Do not mix weaker than 2:1. Set the shuttering into the opening ensuring a tight fit so that once the required depth of Compound is installed it finishes flush with the floor slab/screed unless otherwise specified. Mix and pour Compound until the required thickness is achieved. Reinforcing requires 12mm dia. bars placed at a maximum of 200mm centres across the short span only. The bars may be either recessed into the surrounding structure by a minimum of 50mm on both sides or supported on an angle securely fixed to the structure, all positioned approximately 30mm above the bottom surface of the compound to ensure adequate fire protection from below. Existing compound installations can be easily drilled or sawn to allow the provision of additional or replacement servises, and subsequently re-sealed. Recommended minimum clearance between services and surrounding strucutre - 50mm or half the diameter, which ever is greater.
FIRE STOP FIRE STOP FIRE STOP FIRE STOP

FIRE STOP

23
FIRE STOP FIRE STOP

FIRE STOP

fischer FireStop Compound FFSC

Compound - FFSC
fischer FireStop Compound FFSC
Wall Openings Trowelling: 1 bag of Compound to 7 litres water (3:1). (Guide only. Varies with site conditions). Trowel the Compound, starting at the base of the opening ensuring the correct thickness of material is installed. Work progressively towards the top of the opening until the barrier is complete. If shuttering panel is set at the centre repeat process on other side.

Principal Characteristics
Mechanical: Compressive Strength: Surface Hardness:
Thermal:

(MPA) Cyl/diam 20 Cyl/diam 20 (MPA) (MPA) (j/kgoC) (j/kgoC) (W/MoC) (W/MoC) (W/MoC)

8 8 13 575 986 0.19 0.19 0.17

(80kg/cm2) (Load 4kn) (Load 15kn) (0.14kcal/kgoC) (0.14kcal/kgoC) (0.22kcal/kgoC) (0.22kcal/kgoC) (0.22kcal/kgoC)

Specific Heat

at 20oC at 1000oC at 20oC at 100oC at 500oC

Maximum Working Temperature: Fire Combustion (according to ISO 1182 and NT Fire 001) Non-combustible: Corrosive Fumes None Toxicity Nil Physical Density (Specific Gravity) (g/cm3) Expansion during curing (No explosive effect) Curing Time (Hardneing)
Chemical

0.8-0.9 1.1 1-3 days Good Good Good Negligible (les than 38 ppm) No known effect of age

Water Mineral/Oil/Petrol/Solvents Acids Halogen content (trace elements): Chlorine, Flourides, Bromine Ageing
Miscellaneous

Resistance to:

Beige Concrete 1.0 Steel 0.35 Blast resistance: (Bar) 7 Air & Gas permeability coefficient (10-14m2) Sound Insulation very good

Colour Bonding to:

(10kg/cm2) (3.5kg/cm2) 3.5 as concrete 10cm / 50dB

24

Compound - FFSC
Specifications
Type FFSC / 22Kg Order No. 53012 Weight [KG] 22 Qty. Per Box 1

Acoustic
Thickness of Compound 75mm 100mm 150mm Weighted Sound Reduction Index (Rw) 39db 46db 51db

Coverage
Thickness of Compound 75mm 100mm 150mm Number of Bags/m2 3.15 4.2 6.5

These are approximate calculations based on 22kg bags. The coverage does not take into account the percentage of the hole filled with services.

Load Bearing
Thickness of Compound 75mm 100mm Load Bearing Area Free of Services 500 x 500mm* 750 x 750mm*

The open area free of services: thickness of seal ratios for non-reinforced seals given above, allow an ample safety margin for normal foot traffic; e.g loads of two men plus equipment with a combined wight up to 200kg. * As a further safety margin, we would recommend that all floor seals with clear areas of greater than 750mm x 750mm must be reinforced.

fischer FireStop Compound FFSC


25

Insulated Sleeve - FiFS


fischer Insulated Fire Sleeves - FiFS
Description
fischer Insulated Fire Sleeves are a unique combination of Mineral Wool and Intumescent Graphite that provide all the benefits of Mineral Wools thermal, noise and fire benefits with an added intumescent effect. For insulated pipes it is normally necessary to remove the insulation at point of penetration to enable standard pipe collars to close plastic pipes. This removal of insulation results in condensation on cold pipes and loss of thermal performance on hot pipes. fischer Insulated Fire Sleeves avoids this problem by providing both FireStopping and thermal insulation. fischer Insulated Fire Sleeves are intended for use on Copper, Mild Steel, Polypropylene and PVC pipes and can provide , 1 and 2 hour fire resistance.

Fire Rating
Pipe Description - Dia Steel 22-165mm Copper 12-160mm Polypropylene 12-28mm PPVC 55-160mm X X 2 Hour Batt 2 Hour Brickwork X X X X 2 hour Plasterboard X X X X 2 Hour Solid Floor X X X X

Approvals

British Standard BS 476-20


BS EN ISO 717-1: 1997
The laboratory measurement of airborne sound insulation of building elements

Installation
fischer Insulated Fire Sleeves are supplied 300mm long and are simply cut to the desired length. The sleeve must fully cover the part of the pipe that is located within the depth of the compartment wall or floor. The sleeve may be flush fitting or may protrude from the wall/floor by 25mm (typ.) to facilitate sealing of the outer foil facing onto adjacent insulation. All joints to be taped with self-adhesive foil tape, including the joints where the Insulated fire sleeve butts to existing insulation. No specialist tools or ancillary materials are required for the fitting of fischerinsulated Fire Sleeves. fischer insulated Fire Sleeves can accommodate irregularities in the annular gap between the wall and the pipe O.D. up to 15mm. Multiple pipe penetrations can be accommodated in conjunction with fischer Coated Panel System.

Specifications
Type FiFS / 17 FiFS / 21 FiFS / 27 FiFS / 34 FiFS / 42 FiFS / 48 FiFS / 54 FiFS / 60
26

Order No. 53051 53052 53130 53171 53172 53174 53175 53176

Dimensions [mm] 300mm x 80mm 300mm x 80mm 300mm x 83mm 300mm x 85mm 300mm x 100mm 300mm x 107mm 300mm x 113mm 300mm x 120mm

Qty. Per Box 6 6 6 6 6 6 6 6

Insulated Sleeve - FiFS


Specifications
Type FiFS / 67 FiFS / 76 FiFS / 80 FiFS / 89 FiFS / 108 FiFS / 114 FiFS / 140 FiFS / 169 Order No. 53177 53181 53186 53190 53195 53230 53231 53232 Dimensions [mm] 300mm x 128mm 300mm x 133mm 300mm x 140mm 300mm x 145mm 300mm x 158mm 300mm x 160mm 300mm x 195mm 300mm x 225mm Qty. Per Box 6 6 6 6 6 6 6 6

Acoustics
The use of fischer Insulated Fire Sleeves can considerably reduce the noise emission from noisy pipework.

Service Temperature
fischer Insulated Fire Sleeves are used to FireStop pipe work operating at temperatures between 0C and 180C. At low temperatures, care should be taken to maintain the vapour barrier.

Compatibility
fischer Insulated Fire Sleeves are compatible with most materials with which it is likely to come into contact in normal building and industrial applications. Precautions should be taken when insulating austenitic stainless steel, regardless of insulation type.

Biological
fischer Insulated Fire Sleeves offer no sustenance to vermin and does not encourage the growth of fungi, moulds or bacteria.

fischer Insulated Fire Sleeves - FiFS


27

FireStop Block - FBB


FIRE STOP FIRE STOP

FireStop Block - FBB

Description
FireStop Blocks made from 2-component special polyurethane foam. Highly elastic moulded parts (similar to foam with high density). Normal flammability according to DIN 4102 B2, density 225 kg/m2, foams in case of fire; Z-19.11-1808. FireStop Blocks are placed in running bond in the component opening or fitted around installations and can be cut using a knife. Quick, easy removable FireStop solution.

FIRE STOP

FIRE STOP

Approvals
Cable bulkhead according to DIN 4102, part 9 in walls S90/S120 and ceilings S90; Z-19.15 -1826 and Z-19.15 - 1827.
FIRE STOP FIRE STOP
FIRE STOP

FIRE STOP

FIRE STOP

Installation
Max. degree of use of the seal 60 %. The installation of the seal is to be carried out according to the approvals Z-19.15 -1826 & 1827. According to the approval, retrofitting of the system is only permitted with fischer products. If the wall thickness < the required seal thickness, a reinforcing strip must be built (materials: glass-reinforced plastic, fibre-plastic boards, or calcium silicate boards). The FireStop Blocks should be installed according to the requirement and along the joints. Seals in the ceiling must be secured against breaking out using fencing or grating.
FIRE STOP FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

Specification
Type FBB Order No. 45986 Dimensions 230 x 130 x 60mm
FIRE STOP

Qty. Per Box 10


FIRE STOP

FIRE STOP

FIRE STOP

28

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FireStop Graphite Foam - FBS


Description
fischer FireStop Graphite Foam is an innovative two-component polyurethane expanding fire seal. Offering fast FireStop solutions for small to medium applications. Normal flammability according to DIN 4102 B2, P-3169/784/07-MPA BS. Yield is dependant on application temperature (cartridge contents yield 650 ml at 18C; up to 1000 ml at 23C).

Approvals

British Standard
FIRE STOP

BS 476-20
Cable bulkhead S90 according to DIN 4102, part 9, in ceilings and walls; Z-19.15-1829.

Installation

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

Max. degree of use of the seal 60%. The installation of the seal is to be carried out according to the approval Z-19.15-1829. According to the approval, retrofitting of the system is only permitted with fischer products. If the ceiling thickness < the required seal thickness, a reinforcing strip must be built (see installation data). When building up the reinforcing strip, FireStop adhesive should be used as joint adhesive. We recommend that you attach formwork on the underside for ceiling seals. Use FireStop adhesive to completely coat the embrasure in light partition walls with embrasures made of sheet steel sections.
FIRE STOP FIRE STOP FIRE STOP FIRE STOP
FIRE STOP

Specification
Type FBS 0.5 Applicator Gun FBS 0.5 Order No. 45987
FIRE STOP FIRE STOP

Contents 180g 1 45oz


FIRE STOP

Qty. Per Box 12 1 1


FIRE STOP FIRE STOP

FIRE STOP

503115 503114

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FireStop Graphite Foam - FBS


29

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

FIRE STOP

Coated Panel System - FCPS


fischer Coated Panel System - FCPS
Description
fischer Coated Panel System consists of a 50mm thick mineral fibreboard coated both sides with a white ablative coating, 1mm thick. fischer Coated Panel System is used to FireStop mechanical and electrical services where they pass through fire rated walls and floors. Tested to BS476 Parts 20 and 22, fischer Coated Panel System provides up to 4 hours fire protection. fischer Coated Panel System comprises three elements: fischer Coated Panel (FCPS) fischer Intumescent Acoustic Sealant (FiAM) fischer Panel Coating (FPC)

Fire Rating
Construction Tested Block Wall Block Wall Concrete Floor Concrete Floor Plasterboard Partition Panel Configuration 1 x 50mm 2 x 50mm 1 x 50mm 2 x 50mm 2 x 50mm Fire Rating Integrity 4 hours 4 hours 4 hours 4 hours 1 hours Fire Rating Insulation 1 hour 2 hour 1 hour 2 hour 30 mins

Approvals

British Standard BS 476-20


BS EN ISO 717-1: 1997
The laboratory measurement of airborne sound insulation of building elements

Installation The Coated Panels are simply cut and friction fitted between the services and the edges of the structure. FiAM or FiGM is then used to seal the joints and it is coated with FPC. * The fire rated coating is used as an adhesive to bond sections of panel together into a barrier and to the surrounding structure. All joints in the barrier are pointed in with intumescent Acoustic Sealant to form a monolithic layer. *(Plastic pipework needs to be sleeved with fischer Fire Collars prior to installation of the coated panel system.)
In floor applications, fischer Coated Panel has to be protected from physical damage by foot traffic (e.g. with a ply board or chequer plate platform). For large floor openings we would advise using fischer FireStop Compound, for walls, openings (unsupported) max 1200 x 600mm. Refer to fischer FireStop specialist for larger openings. fischer Coated Panel System can be used as a double board system for enchanced acoustic and insulation ratings.

Specification
Type FCPS / 50 FPC / 5lt FiAM 310 Order No. 53252 53253 53011 Contents 1200 x 600 x 50 5 litres 310 ml
FIRE STOP FIRE STOP

Qty. Per Box 1 1 25


FIRE STOP FIRE STOP

Acoustic
Weighted sound reduction Index (Rw) of up to 52db. Please consult our sales office with details of: Wall construction Acoustic rating required
FIRE STOP

Smoke Seal

Fibre Migration
fischer Coated Panel System will not allow fibre migration as all exposed edges of mineral fibre are encapsulated with an acrylic based polymer.

fischer Coated Panel System will provide a smoke seal around services penetrating through compartment walls and floors.
FIRE STOP

30
FIRE STOP FIRE STOP

Cable FireStop - FCbF


Description
fischer Cable FireStop is a compressible fire retardant foam which is laminated both sides with a graphite based intumescent polymer. fischer Cable FireStop is supplied in sections measuring 60mm wide x 25mm thick x 1m long. fischer Cable FireStop has been developed to effectively seal cable bunches in electrical trunking and cable trays where they pass through fire rated walls and floors. Tested to BS476 Part 20, fischer Cable FireStop will provide up to 4 hours fire protection.

Fire Rating
Service Penetration Cable Tray Electrical Trunking Fire Rating 4 hours 4 hours

Approvals

British Standard BS 476-20

Installation
fischer Cable FireStop will give up to 4 hours fire rating with cable bunches, electrical trunking and cable trays where they pass through compartment walls and floors. Remove all loose debris from around the tray. Cut fischer Cable FireStop along its length to fill the width of tray to be filled. Compress fischer Cable FireStop immediately under (if neccessary) and on top of cable runs. Add further layers of fischer Cable FireStop untill tray is full. Create a good seal around cable tray with fischer Coated Panel System or FireStop Compound.

Installation in electrical Trunking. Unscrew lid of trunking. Cut length to fill the width of the trunking to be filled. Compress fischer Cable FireStop into the bottom of the trunking. Lay Cable runs over the fischer Cable FireStop. Add further layers of fischer Cable FireStop untill the trunking is filled. Replace lid of trunking.

Specifications
Type FCbF Order No. 53015 Dimensions [mm] 60 x 30 x 1000 Qty. Per Box 35

fischer Cable FireStop - FCbF


31

Conduit Intumescent - FCi


fischer Conduit Intumescent - FCi
Description
fischer Conduit Intumescent is designed to provide a FireStop cable management system for passing electrical and telecommunications cables through fire rated walls and floors. Tested to BS 476 and EN1366:3 the product has achieved up to 4 hours fire rating. fischer Conduit Intumescent (FCi) allows electrical contractors to partially or completely fill the product or install and leave it empty ready for future cable installation.

Fire Rating
Percentage Cable Fill 100% 50% 0% Plasterboard Partition 100mm Wide 120 mins 120 mins 120 mins Masonry Wall 120 mins 120 mins 120 mins Concrete Floor 240 mins 240 mins 240 mins

Approvals

British Standard BS 476-20

BS EN1366-3

Installation
Drill a hole in plasterboard, masonry or concrete to suit the outside diameter of the conduit. For masonry and concrete substrates, cut the fischer Conduit Intumescent (FCi) to suit the thickness of the wall/floor and simply push through the hole. For plasterboard applications, cut the fischer Conduit Intumescent (FCi) leaving 12.5mm of the Conduit exposed on both sides of the wall. fischer Conduit Intumescent (FCi) can then be linked with standard couplings to ordinary electrical conduit. For a cold smoke seal, apply fischer Intumescent Acoustic Mastic (FiAM) into the Conduit to a depth of 10mm.

Specifications
Type Order No. Outside Diameter [mm] FCi / 20 FCi / 25 FCi / 32 53016 53017 53019 20 25 32 Internal Diameter [mm] 16 21 26 Wall Thickness [mm] 2 2 3 1 1 1 Qty. Per Box

32

Cast-In Device - FCID


Description
FCID is a cast-in-place device designed for plastic pipe applications in solid and other concrete floor assemblies. The plastic fastening flange and extension sleeve are designed to be rugged enough to withstand the force of a concrete pour yet lightweight enough to permit easy placement and handling. It has been tested with various uPVC and HDPE pipes achieving a fire resistance of up to 4 hours in accordance with BS 476.20 : 1987 & BS 476.22 : 1987. is 250mm high which is suitable for most RC slabs. Where slabs are less thick the the FCID can be cut flush to size and resealed using fischer FCIDCP caps. For Podium / Transfer slabs over 250mm thick the fischer FCID-E/1000 Fibreboard Extension Sleeves & FCID-E/C Extension Caps should be used to extend the devices as required.

System Advantages
Production: Quick installation, with only 4 nails required to fix.

Approvals

British Standard BS 476-20


AS 1530: Part 4: 2005

No timber boxes to form & less waste. Sealed cap helps provides water tightness at earlier stage. Health & Safety: No power or power tools required Reduction in HAV Exposure. Reduction in number of trip hazards. Reduction in working at height. Less bending and cropping of heavy rebar. Financial: No further collars or wraps required - Savings! One operation instead of 3-4 = Big savings over traditional methods. Innovation: Greater tolerances mean less risk of misalignment when setting out. NEW Hi-Vis Colour to reduce risk of trips & falls. Easily extended with NEW FCID-E/1000 Extension Sleeves. Increased base opening allows for connections within the device.

Installation
Position the Cast-In Device on the formwork. Nail the Cast-in Device into position through the holes provided. Do not skew the nails. Pour concrete to required depth. After form work has been stripped and the pipe is ready to be placed into position, knock out the cap from the top of the collar and insert the pipe through the collar. It should be noted that if the pipe is pushed in from the top, the rubber seal will be forced downwards. Lift the pipe slightly to ensure that the rubber seal projects upwards.

fischer Cast-In Device - FCID


33

Cast-In Device - FCID


fischer Cast-In Device - FCID
Slab less than 250mm thick Prior to installation this proceedure must be approved by a H&S Advisor. Secure the Cast-In Device on formwork. Pour concrete to required depth, leaving FCID protruding. Where a flush finish is required, prior to installing FCID, cut device to suit required slab depth & reseal with fischer FCID-CP, as indicated right, then follow installation proceedure as previous. FCID and FCID-CP cap Podium/Transfer Slabs Greater Than 250mm Thick Set out & secure Cast-In Device on formwork, as per previous instruction steps 1 2, then remove cap. Calculate Extension Sleeve length using Cutting Guide and cut to size using a fine toothed saw. Slide Extension Sleeve over FCID until it is stopped by tops of ribs and seal off with FCID-E/C Extension Cap. Pour concrete to required depth, filling cap if flush finish is required. Remove Extension Cap when pipe is ready to be installed.

FCID extension sleeve and FCID-E/C cap

Specifications
Type FCID 65 FCID 100 FCID 150 FCID 65-E/1000 FCID100-E/1000 FCID150-E/1000 FCID 65 E/C FCID100E/C FCID150E/C FCID 65-CP FCID100-CP FCID150-CP Order No. 509532 506324 509533 509791 509792 509793 511450 509794 511451 510878 510879 510880 Pipe Dia. (Inches) Height x Dia (mm) 3 4 6 3 4 6 3 4 6 3 4 6 250 x 95 250 x 140 250 x 194 1000 x 95 1000 x140 1000 x194 19 x 95 25 x140 25 x194 19 x 92 25 x136 25 x194 Base Width x Depth (mm) 154 x 154 198 x 198 253 x 253 N/A N/A N/A N/A N/A N/A N/A N/A N/A Fire Rating (hours) 4 4 4 N/A N/A N/A N/A N/A N/A N/A N/A N/A Qty. Per Box 1 1 1 1 1 1 1 1 1 1 1 1

Suitable for uPVC and HDPE pipes. Provides a smoke and water seal.

34

Cavity FireStop Clad - FCFcl


Description
FCFcl are manufactured from a high density, low phenolic binder content, rock fibre. FCFcl is supplied in one metre lengths to suit the size of the cavity to be filled. The depth of the product is dependant on the fire rating required. (See fire rating). FCFcl provides FireStopping between edge of a floor slab and curtain walling/ cladding system, or within a cavity wall construction. Tested to BS476 Part 20, FCFcl gives up to 2 hours fire protection in cavities of up to 600mm wide fitted vertically and horizontally. For cavities in excess of 100mm wide, FCFcl multi purpose brackets must be fitted to provide additional support. It is recommended that a fixing rail is positioned as close as possible to the cavity barrier to restrict movement/expansion of the cladding or curtain walling.

FireStop Clad

Multi Purpose Bracket

Fire Rating
Cavity Size 10 - 100 101 - 1000 Fire Integrity Rating 120 minutes 120 minutes Fire Insulation Rating 30 minutes 30 minutes Depth of Product 80mm 100mm

Approvals

British Standard BS 476-20

Installation
Keep material dry and protect from impact damage. Ensure correct width is installed to suit the required Fire Rating. Horizontal FireStop Apply adhesive to edge of concrete slab and push FCFcl into position, or if using multi purpose brackets spike into material at 500mm centres, insert into cavity and fix to concrete if instructed. Ensure tight butt joints. If using fischer Cavity FireStop Strip FCFst profiled blocks to cladding, coat edges with adhesive and compress and fit making sure blocks are in line with FCFcl. Where applications require a total smoke seal, coat with fischer Panel Coating as directed. For brick/block cavities insert a damp-proof membrane (DPM) between outer skin and FCFcl. Vertical Adhere FCFcl to blockwork. Ensure DPM is in place as outer skin is constructed. Ensure tight joints.

Acoustic Rating
FCFcl has been acoustically assessed in a variety of constructions. Two FCFcl (220 wide x 75mm thick) compressed into a 210mm gap between edge of slab and a 46mm insulated wall cladding. The product must be coated with fischer Panel Coating. Weighted Sound Reduction Index (Rw) of up to 48db.

Smoke Seal
FCFcl can provide a smoke seal by either: Painting the exposed faces with fischer Panel Coating FPC. Using foil encapsulated FCFcl and sealing joints with foil faced tape.

Fibre Migration
FCFcl can provide a smoke seal by either: Painting the exposed faces with fischer Panel Coating FPC, Using foil encapsulated FCFcl and sealing joints with foil faced tape.

Specification
Type FCFcl Multi Purpose Bracket Order No. 53046 58577 Dimensions Size on Application 300 x 29 x 1mm Qty. Per Box 1 2
35

fischer Cavity FireStop Clad - FCFcl

Ventilated Fire Barrier - FVFB


fischer Ventilated Fire Barrier - FVFB
Description
fischer Ventilated Fire Barriers are designed to maintain the open cavity where the external facade/rainscreen is suspended away from the building structure. The fire barriers will expand to seal the cavity in a fire situation. The Fire Barriers are suitable for a variety of cavity depths. fischer Ventilated Fire Barriers have been tested in both combustible timber frame and non-combustible constructions unlike other Fire Barrier products.

Fire Rating
Cavity Size (mm) up to 25 up to 50 up to 125 up to 450 Fire Rating (hours) 1 1 1 1

Approvals

British Standard BS 476-20

Installation
FVFB 102/25 & FVFB 102/50 have self adhesive on the back for initial positioning and should then be mechanically fixed along their centre line of the cladding system with 25 mm long small headed tacks at 250 mm centres. FVFB 109/125 & FVFB + Sytems should be mechanically fixed within the cavity. The seal should be fixed along its centre line onto steel installation spikes or fischer Multi-Purpose brackets at 250 mm centres. Care should be taken when fixing not to restrict the product from expanding in a fire situation. Adjacent Fire Barriers should be butt jointed together. All fixings used on fire systems should be fire rated as per page 34-37.

Benefits
Creates a fire barrier behind the

rainscreen.
Fire Tested for up to 60 minutes Intumescent Material expands

to fill the cavity.


Suitable for cavities up to

450mm.
Simple & quick installation -

FVFB + System

time saving of up to 50% over other fire barriers. Tested in the most demanding of combustible rainscreen designs. Fire tested both horizontally and vertically. Allows ventilation and moisture dissipation thus preventing damp problems. Cost effective. Supplied in 1 metre lengths can easily be cut with a knife. All Fire Barriers are sealed to offer excellent weather protection and are unaffected by moisture.

Installation
Type FVFB 102/25 FVFB 102/50 FVFB + System Order No. 513203 513204 *505250 Cavity Size (mm) upto 25 upto 50 upto 450 Dimensions (mm) 4 x 35 x 1000 6 x 75 x 1000 >125 x 100 x 1000 Fire Rating (hours) 1 1 1 Qty. Per Box TBC TBC TBC

*Made to size - please quote reference 505250/FVFB+ For larger cavities, please contact the fischer technical department on 01491 827 920 for more solutions.

36

Cavity FireStop Strip - FCFst


Description
fischer Cavity FireStop Strips provide FireStopping for vertical and horizontal construction joints and at the interface between compartment walls and soffits. Tested to BS476 Part 20, fischer Cavity FireStop Strips provide up to 6 hours fire protection. fischer Cavity FireStop Strip is used for FireStopping joints which are reasonably uniform in size and may be subject to movement. fischer Cavity FireStop Strip is manufactured from a high density, low phenolic binder, rock fibre. fischer Cavity FireStop Strip is supplied in one metre lengths to suit the size of the joint to be filled. The width of the strip is dependent on the fire rating required. (See Fire Rating) fischer Cavity FireStop Strip thickness is slightly oversized compared to the joint size so that the FireStop Strip is fitted or installed under slight compression.

Fire Rating
Fire Rating 1 hour 2 hour 3 hour 4 hour 6 hour Minimum Widths 75mm 100mm 150mm 175mm 200mm

Approvals

British Standard BS 476-20

fischer Cavity FireStop Strips being a component of structure satisfies both integrity and insulation requirements as shown in the table opposite.

Installation
fischer Cavity FireStop Strips are used to prevent fire penetration at the junction of compartment walls and floors/roofs for a specified period up to 6 hours. They are generally supplied to fit under slight compression. Remove all loose debris and mortar from the gap. Ensure correct width is installed to suit the required Fire Rating. Keep material dry and protect from impact damage. FireStop Strip Gaps up to 25mm. It is easier to install prior to completion of the last course of brick/blockwork wall. Larger gaps. Compress and insert the strip ensuring tight butt joints.

Acoustic Rating
fischer Cavity FireStop Strips have been acoustically assessed in a variety of applications. Two fischer Cavity FireStop Strips 30mm thick by 60mm wide compressed into a 25mm joint in 140mm thick (2000 kg) block wall is capable of providing a Weighted Sound Reduction Index (Rw) of 46db, if coated both sides with fischer Panel Coating.

Smoke Seal
fischer Cavity FireStop Strips provide a smoke seal if external faces are coated with fischer Panel Coating.

Fibre Migration
Fibre migration is prevented by either: Shrink wrapping. Painting the exposed faces of the product with Flexi-coat paint.

Specification
Type FCFst Order No. 53045 Dimensions Size on Application Qty. Per Box 1
37

fischer Cavity FireStop Strip - FCFst

Intumescent Linear Seal - FiLS


fischer Intumescent Linear Seal - FiLS
Description
fischer Intumescent Linear Seal is a highly compressible strip formed by laminating fire retardant foam to a graphite based intumescent polymer. fischer Intumescent Linear Seal is a compressible product to fill fire rated joints in compartment floors and walls. Tested to BS476 Part 20, fischer Cavity FireStop Expansion provides up to 4 hours fire protection. fischer Intumescent Linear Seal is delivered to site in pre-formed sections. The section size depends on the joint size and the fire rating that needs to be achieved (See Fire Rating). fischer Intumescent Linear Seal is simply compressed by hand and is then pushed into the gap. Adjacent pieces of the product are simply butted together. There is no need to use any adhesives or intumescent sealant in conjunction with the product. In a fire, the graphite based intumescent material swells to form a hard char which prevents the passage of fire and smoke through the joint.

Fire Rating
Joint Size 1 - 10mm 11 - 25mm 11 - 25mm 26 - 50mm Integrity 240 mins 120 mins 240 mins 120 mins Insulation 235 mins 16 mins 145 mins 23 mins Size of Product 14 x 12mm 29 x 12mm 29 x 25mm 56 x 25mm

Approvals

British Standard BS 476-20

Installation
fischer Intumescent Linear Seal is used to prevent fire penetration through movement joints and gaps in walls and concrete floors for a specified period up to 6 hours. They are manufactured oversize to fit under compression. Remove all loose debris and mortar from the gap. Ensure correct width is installed to suit the required Fire Rating. Where the gap varies in the length to be sealed, ensure that the correct thickness is installed under compression. Do not remove sleeving. Keep material dry and protect from impact damage. Compress and insert the strip into the gap ensuring tight butt joints.

Specification
Type FiLS / 12x12 FiLS / 25x12 FiLS / 25x25 FiLS / 50x25 Order No. 53047 53048 53049 53050 Dimensions 14 x 12mm 29 x 12mm 29 x 25mm 56 x 25mm Qty. Per Box 1 1 1 1

38

FireStop Hand & Gun Foam


Description
The fischer FireStop Foam is a one component polyurethane foam which is self curing via the absorbtion of moisture from the atmosphere. The foam has excellent adhesive properties joining wood, brick, stone, cement. plaster wall boards, hard board and metal surfaces. Foam sets in a semiridged structure, fixes firmly, yet yields to movement and vibration. It is ideal for areas where up to 4hour FireStop performance is required. Tested to BS EN 13501 & BS EN1366-4, the foam is perfect for sealing linear gaps in walls, ceilings and floors. Insulating pipes and electrical installation, sealing window / door joints, sills and frames.
FireStop Hand Foam FireStop Gun Foam

Fire Rating
Wall Depth 100mm 100mm 200mm 200mm Gap Width 31mm 11mm 11mm 41mm Sealant Depth 100mm 100mm 200mm 200mm Backing None None None None Integrity 50 mins 103 mins 229 mins 110 mins Insulation 50 mins 104 mins 229 mins 110 mins

Approvals
British Standard BS 476-20
BS EN1366-4: 2006
BS EN ISO 140-3: 1995
DIN 4102: Part1

Installation Installation information - Hand Foam Shake cartridge before use. Hold cartridge upside down when extruding foam. Foam yield (free foaming) up to 35 litres / 750ml can. Resistance to temperature of hardened foam: -30 C to +80 C. Non-tacky after approx. 8 minutes, load-bearing after approx. 6-12 hours, fully hardened after 24 hours (all details based on temperature of +20 C).
Installation information - Gun Foam Extrude with a choice of foam gun. Foam yield (free foaming) up to 45 litres. Resistance to temperature of hardened foam: -30 C to +80 C. Non-tacky after approx. 8 minutes, load-bearing after approx. 6-12 hours, fully hardened after 24 hours (all details based on temperature of +20 C).

Benefits
High foam yield.

Professional application with use of gun. High pressure, shear and weather resistant. Can be rendered, cut, painted and sanded. No post shrinkage or expansion CFC-free propellant.

Specification
Type Hand Foam Gun Foam Standard Gun Professional Gun Order No. 42757 43712 62400 33208 Contents 750ml 750ml n/a n/a Qty. Per Box 12 12 1 1
39

FireStop Foam

Air Seal Gun Foam


Air Seal Foam
Description
The fischer Air Seal GunFoam is a B2 rapid curing, highly elastic gun grade polyurethane foam. fischer Air Seal is ideal for use as an air tight gap filler and water resistant seal around windows and doors. It is also suitable for sealing floor to wall and wall to ceiling joints; the movement accommodation factor (MAF) of 35% ensures that the integrity of the seal is maintained in the event of movement and settlement.

Air Seal Gun Foam

Installation Installation information - Gun Foam Shake the canister vigorously at least 20 times before use. Screw the gun carefully onto the canister. Invert can and gently press on the trigger for correct flow rate. The foam will be tack free in approximately 10 minutes, trimmable within 45-60 minutes and loadable within 24 hours (depending on thickness temperature and humidity). This foam is not UV resistant. Once cured, foam should be covered with fischer FFRS sealant, Intumescent Acrylic or Fire Rated Paint. For further information check the product data sheet.

Approvals
Airtight formulation - tested to EN10260.1 m/h @10 Pa

Benefits A high performance PU foam with excellent acoustic and airtight performance. B2 Foam Rating Airtight formulation - tested to EN1026 0.1 m/h @10 Pa. Acoustic dampening - up to 58 dB joint insulation index. Up to 35% movement accomodation ensures integrity of the seal in the event of movement. Sub-zero formulation - can still be used at temperatures as low as -3C.

Specification
Type Air Seal Gun Foam Gun 1 m Order No. 512377 Contents 750ml Qty. Per Box 12

for further information please call 01491 827 900

40

Fixing Technology
Description
The following examples will help you to find the anchors intended for fire protection of your application range.
Application Regulations for use Information about anchoring Suitable fixing/anchor

Fire-proofed ventilation conduits and installation equipment L 30 to L 120

DIN 4102, part 4, 8.5.7.5

Building regulation approved steel anchors M8, double depth, 6 cm minimum anchoring depth, calculated load: max. 500 N per anchor, and max. 6 N/mm2 based on the steel crosssection or fire test certificate from a recognised test centre.

fischer Zykon anchor FZA fischer Zykon hammerset anchor FZEA II fischer anchor bolt FAZ II + FAZ A4/C fischer nail anchor FNA II fischer injection mortar FIS V fischer high performance anchor FH II fischer ceiling nail FDN fischer concrete screw FBS fischer Zykon anchor FZA fischer Zykon hammerset anchor FZEA II fischer anchor bolt FAZ II + FAZ A4/C fischer hammerset anchor EA II fischer high performance anchor FH II fischer hollow-ceiling anchor FHY

Sprinkler systems

Guidelines for sprinkler/ water spray systems from VdS [Vertrauen durch Sicherheit Schadenverhtung German Loss Prevention Safety and Security Institution] (new guidelines will appear in 2008) DIN 4102, part 4, 8.5.7.5

Made of non-flammable material and tested and approved by VdS; minimum M8.

General pipelines

Building regulation approved steel anchors M8, double depth, 6 cm minimum anchoring depth, calculated load: max. 500 N per anchor, and max. 6 N/mm2 based on the steel crosssection or fire test certificate from a recognised test centre.

fischer nail anchor FNA II fischer Zykon hammerset anchor FZEA II fischer anchor bolt FAZ II + FAZ A4/C fischer hammerset anchor EA II fischer concrete screw FBS fischer hollow-ceiling anchor FHY fischer ceiling nail FDN

Cable trays

DIN 4102, part 4, 8.5.7.5 and DIN 4102, part 12 for functional endurance

Building regulation approved steel anchors M8, double depth, 6 cm minimum anchoring depth, calculated load: max. 500 N per anchor, and max. 6 N/mm2 based on the steel crosssection or fire test certificate from a recognised test centre.

fischer Zykon anchor FZA fischer Zykon hammerset anchor FZEA II fischer anchor bolt FAZ II + FAZ A4/C fischer high performance anchor FH II fischer hollow-ceiling anchor FHY fischer hammerset anchor EA II fischer nail anchor FNA II fischer concrete screw FBS fischer injection mortar FIS V fischer anchor bolts FAZ II + FAZ A4/C fischer high performance anchor FH II fischer Zykon hammerset anchor FZEA II fischer highbond anchor FHB II fischer Zykon anchor FZA fischer injection mortar FIS V

Heavy pipelines and cable trays

DIN 4102, part 4, 8.5.7.5

Building regulation approved steel anchors M8, double depth, 6 cm minimum anchoring depth, calculated load: max. 500 N per anchor, and max. 6 N/mm2 based on the steel crosssection or fire test certificate from a recognised test centre.

Fire protection in fixing technology


41

Fixing Technology
Overview of certified fixings and anchors from fischer and Upat

Fire testing according to DIN 4102 and TR 020

applications in the concrete tensile zone


Fixing type gvz

Description

Material Max. permitted load in case of a fire [kN] A4 C F30 F60 F90 F120 (1.4529) Tensile Transverse Tensile Transverse Tensile Transverse Tensile Transverse loads loads loads loads loads loads loads loads

Test report Approval no. *

Certificate VdS FM

Application

fischer highbond anchor FHB II

FHB II-P 12 x 75

fischer highbond anchor dynamic FHB dyn

fischer Zykon anchor FZA

fischer Zykon through anchor FZA-D

fischer internally-threaded anchor FZA-I

fischer ZYKON hammerset anchor FZEA-II

FHB II 8 x 60 FHB II 10 x 60 FHB II 10 x 95 FHB II 12 x 75 FHB II 12 x 120 FHB II 16 x 95 FHB II 16 x 160 FHB II 20 x 210 FHB II 24 x 170 FHB-A dyn 12 x 100/25 FHB-A dyn 12 x 100/50 FHB-A dyn 16 x 125/25 FHB-A dyn 16 x 125/50 FHB-A dyn 20 x 170/50 FHB-A dyn 24 x 220/50 FHB-A dyn 16 x 125/50C FZA M6 FZA M8 FZA M10 FZA M12 FZA M16 FZA M6 A4/C FZA M8 A4/C FZA M10 A4/C FZA M12 A4/C FZA M16 A4/C FZA M8 D FZA M10 D FZA M12 D FZA M16 D FZA M8 D A4/C FZA M10 D A4/C FZA M12 D A4/C FZA M16 D A4/C FZA M6 I FZA M8 I FZA M10 I FZA M12 I FZA M6 I A4/C FZA M8 I A4/C FZA M10 I A4/C FZA M12 I A4/C FZEA II 10 x 40 M8 FZEA II 12 x 40 M10 FZEA II 14 x 40 M12 FAZ II M8 FAZ II M10 FAZ II M12 FAZ II M16 FAZ II 8 A4/C FAZ II 10 A4/C FAZ II 12 A4/C FAZ II 16 A4/C FH 10 B / S / H FH II 12 B / S / H /SK FH II 15 B / S / H /SK FH II 18 B / S / H FH II 24 B / S / H

2.3 3.4 3.6 4.4 5.1 8.3 9.5 14.9 18.7 7.0 7.0 15.0 15.0 2.0 25.0 15.0 1.0 1.5 4.5 8.5 13.5 2.1 10.0 18.0 22.0 24.0 1.5 4.5 8.5 13.5 10.0 18.0 22.0 24.0 1.0 1.5 4.5 8.5 2.1 10.0 18.0 22.0 1.0 1.8 1.8 1.25 2.25 4.0 9.4 1.7 2.5 4.5 8.0 0.4 0.4 0.9 1.7 3.1

2.8 4.1 4.3 4.9 6,1 9.2 11.4 17.8 20.8 0.9 2.3 2.3 1.8 3.6 6.3 11.7 0.4 0.9 1.7 3.1

1.8 2.4 2.7 3.5 3.8 6.6 7.0 11.0 14.8 4.0 4.0 7.0 7.0 9.5 12.0 7.0 0.5 0.8 2.2 3.5 6.5 1.2 4.0 7.0 9.0 12.0 0.8 2.2 3.5 6.5 4.0 7.0 9.0 12.0 0.5 0.8 2.2 3.5 1.2 4.0 7.0 9.0 0.9 1.8 1.8 1.2 2.25 4.0 7.7 1.7 2.5 4.5 8.0 0.4 0.3 0.8 1.3 2.4

2.1 2.9 3.3 4.0 4.9 7.5 9.1 14.2 17.0 0.8 1.7 2.1 1.6 2.9 4.9 9.1 0.3 0.8 1.3 2.4

1.2 1.4 1.8 2.6 2.4 4.8 4.5 7.1 10.9 2.5 2.5 5.0 5.0 7.0 9.5 5.0 0.35 0.5 1.3 2.0 4.0 0.85 1.8 3.5 5.0 7.5 0.5 1.3 2.0 4.0 1.8 3.5 5.0 7.5 0.35 0.5 1.3 2.0 0.85 1.8 3.5 5.0 0.8 1.6 1.8 0.9 1.9 3.2 6.0 1.7 2.5 4.5 8.0 0.4 0.3 0.6 1.1 2.0 0.8 1.0 1.5

1.4 1.8 2.4 3.1 3.6 5.9 6.8 10.6 13.3 0.7 1.1 1.4 1.3 2.2 3.5 6.6 0.3 0.6 1.1 2.0

0.9 0.9 1.4 2.1 1.7 4.0 3.3 5.2 8.9 4.0 4.0 5.0 7.5 4.0 0.25 0.4 0.9 1.5 3.0 0.7 1.0 2.0 3.5 6.0 0.4 0.9 1.5 3.0 1.0 2.0 3.5 6.0 0.25 0.4 0.9 1.5 0.7 1.0 2.0 3.5 0.7 1.2 1.5 0.8 1.6 2.8 5.2 1.7 2.5 4.5 8.0 0.2 0.5 0.8 1.6 0.8 1.0 1.5

1.0 1.2 1.9 2.7 3.0 5.0 5.6 8.8 11.4 0.6 0.9 1.0 1.2 1.9 2.8 5.3 0.2 0.5 0.8 1.6

PB III / B-06-065 (18.04.2006)

Cracked and non-cracked concrete

3038/8141-1 (of 12.10.2001)

Cracked and non-cracked concrete

3277/0531-1 (of 23.11.2001)

Cracked and non-cracked concrete

Cracked and non-cracked concrete Cracked and non-cracked concrete

3277/0531-1 (of 23.11.2001)

3277/0531-1 (of 23.11.2001)

Cracked and non-cracked concrete Cracked and noncracked concrete Cracked and non-cracked concrete

ETA-06/0271

fischer anchor bolt FAZ II

PB III/B-05-001 (from 10.02.2005) ETA-05/0069 PB III/B-02-316 (of 31.01.2003)

fischer high performance anchor FH/FH II

3355/0530-2 (25.5.00) ETA-07/0025

Cracked and noncracked concrete

fischer concrete screw FBS

FBS 8 FBS 10 FBS 10 A4/C

902 070 000 (of 25.06.2002)

* Detailed information regarding test reports and approvals www.fischer.co.uk Fixing Systems Products Product online catalogue

42

Fixing Technology
Overview of certified fixings and anchors from fischer and Upat
43

Applications in the concrete pressure area


Description Fixing type gvz Material A4 C (1.4529) Max. permitted load in case of a fire [kN] F30 F60 F90 F120 Test report Approval no. * Cerificate VdS FM Application

fischer bolt FBN II

Upat EXA express anchor

FBN II 8 FBN II 10 FBN II 12 FBN II 16 FBN II 20 EXA M8 EXA M10 EXA M12 UPM 44 M8 UPM 44 M10 UPM 44 M12 UPM 44 M16 UPM 44 M20 UPM 44 M24 UPM 44 M30 UPM 44 M8 A4/C UPM 44 M10 A4/C UPM 44 M12 A4/C UPM 44 M16 A4/C UPM 44 M20 A4/C UPM 44 M24 A4/C UPM 44 M30 A4/C FIS A M8 FIS A M10 FIS A M12 FIS A M16 FIS A M20 FIS A M24 FIS A M30 FIS A M8 A4/C FIS A M10 A4/C FIS A M12 A4/C FIS A M16 A4/C FIS A M20 A4/C FIS A M24 A4/C FIS A M30 A4/C FHY M6 FHY M8 FHY M10 FUR 101) FUR 102) FUR 103)

0.5 1.3 1.8 4.0 7.0 0.8 0.8 0.8 1.9 4.5 8.5 13.5 21.0 30.0 45.0 4.3 7.5 11.0 25.0 32.0 45.0 70.0 1.9 4.5 8.5 13.5 21.0 30.0 45.0 4.3 7.5 11.0 25.0 32.0 45.0 70.0 1.0 1.6 2.5 1.6 1.6 1.6

0.5 1.3 1.8 4.0 7.0 0.8 0.8 0.8 0.8 2.1 3.6 6.4 10.0 14.0 22.0 0.8 2.1 5.7 10.0 15.0 22.0 35.0 0.8 2.1 3.6 6.4 10.0 14.0 22.0 0.8 2.1 5.7 10.0 15.0 22.0 35.0 0.45 1.0 1.65

0.5 1.3 1.8 4.0 7.0 0.7 0.8 0.8 0.3 1.0 2.1 4.0 6.0 9.0 14.0 0.3 1.0 3.9 5.8 9.0 13.0 20.0 0.3 1.0 2.1 4.0 6.0 9.0 14.0 0.3 1.0 3.9 5.8 9.0 13.0 20.0 0.28 0.75 1.3 0.8 1.4 1.6

0.5 0.8 0.8 0.15 0.6 1.5 3.0 4.5 6.5 10.0 0.15 0.6 3.0 4.0 6.0 9.0 14.0 0.15 0.6 1.5 3.0 4.5 6.5 10.0 0.15 0.6 3.0 4.0 6.0 9.0 14.0 0.2 0.6 1.1 0.8 0.8

3355/0530-4 (of 23.06.2000)

Non-cracked concrete

3268/1095-3 (of 21.02.1996)

Non-cracked concrete

Upat UPM 44 Chemical mortar

3253/0291-3 (of 10.01.2002)

Non-cracked concrete

fischer injection mortar FIS V

3038/8141-3 (of 10.01.2002)

Non-cracked concrete

fischer hollow-ceiling anchor FHY

3566/3321 (of 21.06.2002)

fischer Universal frame fixing FUR

3705/4711 (of 23.11.2001)

Prestressed concrete and hollow plate ceilings Non-cracked concrete

* Detailed information regarding test reports and approvals is available at: www.fischer.co.uk Fixing Systems Products Product online catalogue. Load angle 10 Load angle 70 3) Load angle 90
1) 2)

Fixing Technology
Overview of certified fixings and anchors from fischer and Upat

Applications for suspended ceilings and for manifold fixing of non-load-bearing systems
Description Fixing type gvz Material A4 C (1.4529) Max. permitted load in case of a fire [kN] F30 F60 F90 F120 Test report Approval no. * Cerificate RWS VdS FM Application

fischer concrete screw FBS

fischer ceiling nail FDN

FBS 5 FBS 6 FBS 8 FDN 6/35 FDN 6/65 FNA II 6 x 25 FNA II 6 x 25 M6 FNA II 6 x 25 M8 FNA II 6 x 25 OE FNA II 6 x 30 FNA II 6 x 30 M6 FNA II 6 x 30 M8 EA II M63) EA II M8 x 40 EA II M10 EA II M12

0.61) 2) 0.41) 2) 0.61) 2) 0.41) 2) 0.91) 2) 0.41) 2) 0.71) 2)

0.4 0.4 0.61) 2) 0.31) 2) 0.61) 2) 0.31) 2) 0.91) 2) 0.31) 2) 0.61) 2)

0.2 0.5 0.8 0.25 0.25 0.61) 2) 0.31) 2) 0.61) 2) 0.21) 2) 0.71) 2) 0.31) 2) 0.61) 2) 0.8 0.8 0.8

0.2 0.3 0.8 0.51) 2) 0.31) 2) 0.51) 2) 0.21) 2) 0.51) 2) 0.31) 2) 0.51) 2) 0.1 0.7 0.8 0.8

902 070 000 (of 25.06.2002) Z-21.1-1731 (of 05.07.2002) PB III/B-06-267 (of 18.09.2006)

Suspended ceilings Suspended ceilings Manifold fixing of non-load-bearing systems

fischer nail anchor FNA II

fischer hammerset anchor EA II

Z-21.1-1619 (of 01.01.1998)

Suspended ceilings and noncracked concrete

1)

* Detailed information regarding test reports and approvals is available at: www.fischer.co.uk Fixing Systems Products Product online catalogue.

2) 3)

The loads apply for tensile, transverse tensile, and oblique tensile load directions at various angles and with an edge distance of at least 100 mm. For smaller edge distances, it is necessary to reduce loads according to approval no. ETA-06/0175, ETA-06/0176 and ETA-06/0177 and test report no. PB III / B-06-267. Permitted load per fixing point. A fixing point can consist of a single fixing, a group of two with s 50 mm or a group of four with s 50 mm. GU III/B-02-035 (from 12.08.2002)

Applications in masonry
Description Fixing type gvz Material A4 C (1.4529) Max. permitted load in case of a fire [kN] F30 F60 F90 F120 Test report Approval no. * Application

fischer injection mortar FIS V

FIS V M8 FIS V M10 FIS V M12

1.91) 4.01) 5.01)

0.81) 1.81) 2.71)

0.51) 1.01) 1.51)

0.41) 0.71) 1.01)

3355/0530-5 (of 21.05.2001)

Masonry

Upat UPM 44 chemical mortar

UPM 44 M8 UPM 44 M10 UPM 44 M12

1.91) 4.01) 5.01)

0.81) 1.81) 2.71)

0.51) 1.01) 1.51)

0.41) 0.71) 1.01)

3354/0520-5 (of 21.05.2001)

Masonry

* Detailed information regarding test reports and approvals is available at: www.fischer.co.uk Fixing Systems Products Product online catalogue.
1)

Values apply to sand-lime brick HLZ12, clay brick MZ12, vertically perforated brick HLZ12, and perforated sand-lime brick (ventilating) KSL12

Facade fire tests


Description Fixing type gvz Material A4 C (1.4529) Max. permitted load in case of a fire [kN] F30 F60 F90 F120 Test report Approval no. * Application

fischer universal frame fixing FUR

FUR 8 FUR 10

fischer long-shaft fixing SXS

SXS 10

0.8 0.8

Z-21.2-1204 (of 10.04.2000)

Facade

0.8

Z-21.2-1695 (of 23.03.2001)

Facade

fischer frame fixing S-R

fischer frame fixing S-H-R

S8R S 10 R S 12 R S 14 R S 10 H-R S 14 H-R

0.51) 0.81) 1.01) 1.21) 0.42) 0.62)

Z-21.2-9 (of 02.08.2000)

Facade

Z-21.2-9 (of 02.08.2000)

Facade

* Detailed information regarding test reports and approvals is available at: www.fischer.co.uk Fixing Systems Products Product online catalogue.
1) 2)

Values for concrete. Values for other building materials according to approval ! Values for perforated sand-lime brick. Values for other building materials according to approval !

44

Fixing Technology
Overview of certified fixings and anchors from fischer and Upat
45

Fire testing in accordance with ZTV-Tunnel

[Additional technical contractual conditions and regulations for the construction of road tunnels]
Fixing type gvz Material A4 C (1.4529) Max. permitted load in case of a fire [kN] F30 F60 F90 F120 Test report Approval no. * Application

Description

fischer highbond anchor FHB II

FHB II 8 x 60 C FHB II 10 x 95 C FHB II 12 x 120 C FHB II 16 x 160 C FHB II 20 x 210 C

1.0 1.7 2.8 5.0 7.2

PB III/B-06-139

Cracked and non-cracked concrete

FHB II-P 12 x 75

fischer anchor bolt FAZ

fischer nail anchor FNA II C

FAZ 8 C FAZ 10 C FAZ 12 C FAZ 16 C FNA II 6 x 30 M6 A4/C FNA II 6 x 30 A4/C FNA II 6 x 30 A4 FNA II 6 x 30 M6 A4 FNA II 6 x 40 FNA II 6 x 40 M6

1.2 2.3 3.2 6.2 0.1 0.1 0.1 0.1 0.1 0.1

PB III/B-04-289 (of 23.09.2004)

Cracked and non-cracked concrete

PB III/B-07-114 Efectis 2006 R0561 (90 min)

multiple fixings of non-structural applications

* Detailed information regarding test reports and approvals is available at: www.fischer.co.uk Fixing Systems Products Product online catalogue

Certified fischer bracket system


type Art.-No. qty pcs. length [mm] profile profile thickness [mm]

Quick-fix strap 1m Quick-fix strap 2m Quick-fix back plates

42975 48179 42974

10 10 50

1000 2000 50 x 70

3/50 3/50 3/50

3 3 3

Quick-fix pliers

42976

FireStop Handbook

46

FireStop Handbook

The information in this catalogue is non-binding. Our Technical Services Department can provide you with additional information and advice however you will need to provide an accurate description of your particular application. All information in this catalogue must be adjusted to local conditions and the materials used.

If individual items and types are not listed with detailed performance specifications, please contact your local fischer representative for further consultation. Subject to errors, technical and product line changes. Liability for printing errors and omissions is excluded. Product details are correct at time of going to print. The fischer FireStop product line is available from specialised dealers.
fischer UK Ltd - Printed in the UK

47

FireStop Handbook 2011 / 03

fischer fixings (UK) Ltd.


Whitely Road Wallingford, Oxon, OX10 9AT Tel: 01491 827 900 Fax: 01491 827 953 www.fischer.co.uk sales@fischer.co.uk

Technical Service: To arrange a visit from one of our Technical Field Engineers please contact the Technical Services Department: Phone: 01491 827 920 . Fax: 01491 827 950 Email: technical@fischer.co.uk 53579 . FireStop Handbook . 09/2011 - 03 . Printed in the UK

www.fischer.co.uk