Maihar
SL.NO DESCRIPTION OF AREA/ACTIVITY TARGET AS ON 9.8.11 TARGET AS ON 12.8.11 TARGET AS ON 16.8.11 TARGET AS ON 19.8.11 REVIEW AS ON 23.8.11
RAW MILL WITH RECIRCULATION BUILDING AND CYCLONES BUILDING 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Cyclones to mill fan ducting HAG damper fixing Raw Mill to cyclones Reject conveyors for raw mill 361 BC-1.BC-2 Preheater to mill ducting ( total ducting,only erection) weigh feeder at raw mill hopper, all alignment HAG to fans ducting bucket elevator 361 BE-1 RA fan erection ,alignment with ducting dilution air fan erection ,alignemt with ducting RABH fan to stack ducting Raw mill cyclones , RAV feeder platform raw mill main drive motor alignemt RABH fan motor alignment Raw mill fan motor alignment HAG fans motor erection and alignment RA fan motor erection and alignment 361 HP1/LC1/LI1,INTERMEDIATE HOPPER WITH LOAD CELLS AND LEVEL SWITCH 361 BF1/SG1/RA1/FN1,BAG FILTER WITH RAL AND FILTER FAN 361 BC3/BW2/MT1,BELT CONVEYOR FOR REJECT/RE CIRCULATION MATERIAL 331 BC3,BELT CONVEYOR FOR RAW MILL FEEDING 361 HP2/LC2/NG2/LI2,INTERMEDIATE HOPPER WITH LOAD CELLS AND LEVEL SWITCH 361 BC4/MT2,BELT CONVEYOR UNDER INTERMEDIATE HOPPER 361 HP2 361 MW2,DIVERTING GATE 361 BI1,BIN FOR COLLECTING THE MATERIAL 361 BF2/RA2/SG2/FN2,BAG FILTER WITH RAL AND FILTER FAN painting of unpainted stucture all ducts full welding/hand over to insulation COAL MILL Coal mill inlet and out let ducting with supporting structure Coal mill bag houseinlet and out let ducting with supporting structure coal mill main drive motor erection and alignemnt coal mill feed conveyor belt transfer tower - 3 transfer tower - 4 transfer tower - 6 coal mill root blower alignment with motors coal mill raw coal hopper venting lines completion coal mill bag house internal work coal mill bag house top shed PRE-HEATER Air blaster erection cyclone maintenance platform riser duct platform feed pipe flap valave box platform cyclone -6 equipments erection structure balance welding work pre-heater building painting work air line work in pre-heater building water line work in pre-heater building instalation of calciner coal burner and coal piping 23.8.11 18.8.11 28.8.11 21.8.11 23.8.11 25.8.11 30.8.11 20.8.11
Date : 19.8.11
PRESENT STATUS REASON FOR DELAY REAMARKS
1 2 3 4 5 6 7 8 9 10 11
1 2 3 4 5 6 7 8 9 10
Date : 19.8.11
REVIEW AS ON 2.9.11 PRESENT STATUS REASON FOR DELAY REAMARKS
TARGET AS ON 19.8.11
TARGET AS ON 23.8.11
TARGET AS ON 26.8.11
TARGET AS ON 30.8.11
COOLER ESP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Stair case and plat formas including hand railing erection of RAV and ESP discharge equipments like chain conveyor erection of roof plate at supporting insulator area erection of casing lower and side,top pannels inspection doors fixing erection of support insulator lower part erection of discharge frame assembly erection of discharge electrodes erection of discharge electrode rapping assembly erection of rapping bars,guard plates and rapping arrangement erection of balance roof plates welding of roof plates erection of transformers erection of monorail arrangement insulation and cladding
TA DUCT
1 2 3 TA duct damper erection TA duct inspection door erection