Informatica Deployment Checklist <Project Name > Sr # General 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 18 19 20 21 Power Center 1 2 3 4 5 6 7 8 9

INTERNAL

INTERNAL

Ye No

INTERNAL

INTERNAL

Informatica Deployment Checklist <Project Name > Description General Is the UAT completed ? Has the sign-off been obtained from the business units for code deployment in the Production environment? Documentation provided (SRS, SPDD, PowerCenter Design Specification, Unit Test Case, Job Details) Approval for Application Downtime required for the deployment is available ? Application owners notified for the deployment date and downtime File system space added on Unix box, if required as part of enhancement / development Target system (External / Internal) has ensured addition of tablespace; if required as part of enhancement / development Table created / altered as per the project requirement If there are any pre-requisites for each migration step, then have they been mentioned? Are the pre-requisites Is the Informatica object deployment list provided for deployment (Informatica_Deploymentlist_Project_Name.xls) Shared objects ( if any) listed in the (Informatica_Deploymentlist_Project_Name.xls) are verified for the What would be the method of migration (i.e., object copy, folder copy, repository copy or deployment group) Are the objects which are to be deployed valid? (Objects are valid and all objects are checked in) Are the correct versions of the objects to be deployed available? Do the required permissions exist for the objects and on folders to be migrated? Are there any dependencies between the objects to be deployed which needs to take care of? Parameter file provided Informatica command line scripts for workflow execution provided Has the consistency of the database connection names across environments been maintained? (If not, connections in session has to be changed) Developer team has highlighted findings based on testing carried out, experience and problem faced during Roll back plan for production failure is available? Power Center Tns_names.ora entries for the production source and target system available Tns_names.ora entries added on the server hosting Informatica Server Login Credentials for the source and target system provided, in case login details are not available FTP connection details are available, if required If a sequence generator transformation is being used, sequence number of the transformation is noted prior to deployment If there is a mapping variable used, mapping variable value is noted prior to deployment In cases of parameters and variables, have the correct values being provided in the parameter file or they would be using the default value in the first run? For session properties like cache sizes, DTM buffer size has proper values (optimum for the production Informatica Job scheduling provided

INTERNAL

INTERNAL

Yes No

INTERNAL

INTERNAL

Verified (Yes /No)

Remarks

INTERNAL

INTERNAL

Yes No

INTERNAL

Вам также может понравиться