METHOD STATEMENT
CONTRACT : CONSTRUCTION OF A THREE BEDROOM BUNGALOW DATE : 30TH MARCH, 2013 BY : WISDOM KWAME AGBOZO (20281748) S/No OPERATIONS SUBSTRUCTURE 1 CLEAR SITE VEGETATION 720m
2
SHEET NO. 1 OF 2
Q'TY
METHOD
OUTPUT CONSTANT
DURATION
REMARKS
Clear site vegetation using a dozer. Load cleared vegetation into lorries and cart away to tip Excavate using dozer. Push excavated material 15m away from excavations Excavate foundations manually using pickaxes and shovels Load excavated material using shovels into barrows and cart away to tip 10m away from excavations Load excavated material using shovels into barrows and cart away to tip 5km away from site Mix concrete to required specification using a mixer and discharge into foundations with the aid of buckets or headpans Mark out and cut mild steel reinforcement, bend into required shape and fix in place with the aid of binding wires Mix concrete to required specification using a mixer and discharge into foundations with the aid of buckets or headpans Mark out the position of blockwork on the surface of foundation. Mix mortar using concrete mixer and lay blocks Measure and mark out the shape of the formwork on timber boards and cut out. Oil the surfaces of the board to received concrete and fix into position Mix concrete to required specification using a mixer and discharge into formwork with the aid of buckets or headpans and vibrate using a poker vibrator Fill excavations with material arising from excavations using shovels and pick-axes. Compact filled surfaces with a plate compactor Fill to make up levels with material obtained off site using shovels. Compact filled surfaces with a plate compactor Measure and mark out the shape of the formwork on timber boards and cut out. Oil the surfaces of the board to received concrete and fix into position Mix concrete to required specification using a mixer and discharge into formwork with the aid of buckets or headpans and vibrate using a poker vibrator
CAT Dozer, D6
1 Banksman
500m day
2/
1.44
2 3 4
EXCAVATION TOPSOIL EXCAVATE PITS AND TRENCHES DISPOSAL OF EXCAVATED MATERIAL ON SITE
500m 96m
CAT Dozer, D6
1 Banksman 10 Labourers
500m day 1.8m /man day 2.68m3/man day 5m tipper truck with 5-man day loading gang
3 3
2/
1 5.33 3.58
96m3
Barrow
10 Labourers
36m
Tipper truck
5 Labourers
1.5m
Concrete mixer
1 operator, 2 masons, 2 3 2.7m /gang day labourers (gang size of 1) 2 steel benders 0.42t/gang day 2 labourers 1 operator,2 masons, 7 3 2.7m /gang day labourers (gang size of 4) 2 masons 2 labourers (gang 10m/gang-days size of 5)
0.56
1.9t
4.52
14m
Concrete mixer
1.30
BLOCKWORK IN FOUNDATION
156m
Concrete mixer
3.12
10
66m
2 carpenters 2 labourers
7.6m/gang-days
2.89
11
4m3
Concrete mixer
1 operator, 2 masons, 7 3.1m3/gang day labourers (gang size of 1) 5 Labourers (gang size of 6.13m3/man day 2) 5 Labourers (gang size of 6.13m3/man day 2) 2 carpenters 2 labourers(gang size of 2)
1.29
12
FILLING TO EXCAVATIONS
65m
Plate Compactor
5.30
13
80m3
Plate Compactor
6.53
14
101m
30m/gang day
1.68
15
38m
Concrete mixer
2.24
SUPERSTRUCTURE Mark out and cut mild steel reinforcement, bend into required shape and fix in place with the aid of binding wires Measure and mark out the shape of the formwork on timber boards and cut out. Oil the surfaces of the board to received concrete and fix into position Mix concrete to required specification using a mixer and discharge into formwork with the aid of buckets or headpans and vibrate using a poker vibrator 2 Steel Fixer/Bender 2 labourers (gang size of 2) 2 carpenters 2 labourers (gang size 5)
16
3.44t
0.3t/gang day
5.73
17
77m
7.6m/gang-days
2.03
18
18m3
Concrete mixer
1.16
5. Prepare a method statement (Tabular Format) for a small three (3) bedroom bungalow.
METHOD STATEMENT
CONTRACT : CONSTRUCTION OF A THREE BEDROOM BUNGALOW DATE : 30TH MARCH, 2013 BY : WISDOM KWAME AGBOZO (20281748) S/No OPERATIONS Q'TY METHOD RESOURCES PLANT LABOUR OUTPUT CONSTANT DURATION REMARKS SHEET NO. 2 OF 2
19
BLOCKWORK
625m2
Mark out the position of blockwork on the surface of concrete bed. Mix mortar using concrete mixer and lay blocks Measure and mark out the roof truss members and cut into shape. Apply preservative treatment by surface brushing and fabricate into position Place and nail corrugated aluminium roofing sheets to hard wood purlins Mix mortar to specification, prepare surfaces to receive render and apply mortar Prime fabricated frames. Bonded and pointed to masonry in cement sand mortar Prepare surfaces to receive finish. Mix mortar as backing to specification and lay backing. Apply finish, ground and polish Fix pvc piped conduits through walls and ceiling including all associated bends Fix pvc pipes through walls and floors including all associated bends. Laying to required gradient using a spirit level Measure and mark out ceiling boards and cut into shape. Fix into position by nailing to hardwood noggins Fix carriers including screwing or nailing louvre carreirs to hardwood window frames Install blades into louvre carriers including fixing mosquito proof neting with cover battens Fix doors into frames including installing mortice lock Mark out the position of holes to fix brackets to receive basins and install wc, shower rose and associated fittings Prepare surfaces to receive painting. Mix paint and apply onto the surfaces in the required number of coats Install flourescent lamp and fitting as well as ceiling fan. Mark out and fix switches
Concrete mixer
12.5
20
685m
2 carpenters, 2 labourers (gang 30m2/gang day size of 2) 2 carpenters, 2 labourers (Use 70m2/gangday a gang of 3) Concrete mixer 2 masons, 2 labourers (Use 30m2/gangday a gang of 5) 2 carpenters, 2 labourers (Use 2 gangs) 6 Nr/gangday
4.89
21
ROOF COVERING
685m
3.26
22
RENDERING
652m2
4.35
23
55 Nr.
24
150m
2 masons, 2 labourers (Use 12.5m2/gangday a gang of 2) 1 electrician 1 apprentice (use 18.3m/gang day 1 gang size) 1 Plumber 1 apprentice (use 2 gang size)
25
120m
6.56
26
90m
16m/gang day
2.81
27
CEILING BOARDING(PLYWOOD)
120m
28
90Nr.
29
GLAZING
250Nr.
30
FIX DOORS
10Nr.
2 Carpenters 2 Labourers 20m/gangdays (use 2 gang size) 2 Carpenters 2 Labourers 16Nr./gang day (use 2 gang size) 2 Carpenters 2 Labourers 80Nr./gang day (use 3 gang size) 1 Carpenters 1 Labourers 8Nr./gang day (use 1 gang size) 2 Plumber 1 apprentice (use 1 gang size) 3Nr./gang day
2.81
1.04
1.25
31
8Nr.
32
GENERAL PAINTING
750m2
2 painters 1 labourer (use 3 40m/gang days gang size) 1 electrician 1 apprentice (use 30Nr./gang day 1 gang size) 1 electrician 1 apprentice(use 80Nr./gang day 1 gang size) 1 electrician 1 apprentice (use 1 gang size) 2Nr./gang day
6.25
33
FIX AND INSTALL GENERAL APPLIANCES FOR LIGHTING FIX AND INSTALL GENERAL APPLIANCES FOR POWER FIX AND INSTALL LIGHTNING PROTECTION SYSTEM
30Nr.
34
12Nr.
0.15
35
2Nr.
Install air termination rod, tapes, earth termination rod and electrode
Question: A three storey residential property is to be built on Accra Poly campus. Select a site on campus for the location of this building and making reasonable assumptions about size and other perimeters, prepare a Pre-Tender Method Statement for the sub-structure phase of the project
METHOD STATEMENT
CONTRACT : CONSTRUCTION OF A THREE BEDROOM BUNGALOW DATE : 30TH MARCH, 2013 BY : WISDOM KWAME AGBOZO (20281748) S/No OPERATIONS PRELIMINARIES Set out the plan area of hoarding, establish wooden studs at required distances, brace studs , nail roofing sheet to studs and paint Clear site and excavate topsoil. Set out structure, excavate foundations, place concrete in foundation, erect blockwork, fill excavations,place concrete in beds, fix frames, roof the structure and install all associated fittings and appliances Approve and install the connection of water and electricity by GWCL and ECG respectively. 300m Establish a grid and take stop heights on site.Establish the coners of the building and fix pegs and profile boards using the theodolite as well as all associated details Theodolite 1 surveyor, 2 carpenters, 2 labourers 100m/ gang day 3 carpenters, 5 labourers (4Nr Gang) 16m/gang day Q'TY METHOD RESOURCES PLANT LABOUR OUTPUT CONSTANT DURATION REMARKS
HOARDING OF SITE
750m
12
Concrete mixer
10
1 2 3
Clear site vegetation using a dozer. Load cleared vegetation into lorries and cart away to tip Excavate using dozer. Push excavated material 15m away from excavations Excavate foundations using backhoe
2/
17 1 9
3 0F 9
METHOD STATEMENT
CONTRACT : CONSTRUCTION OF A THREE BEDROOM BUNGALOW DATE : 30TH MARCH, 2013 BY : WISDOM KWAME AGBOZO (20281748) S/No 4 OPERATIONS DISPOSAL OF EXCAVATED MATERIAL ON SITE Q'TY 150m
3
METHOD Load excavated material using shovels into barrows and cart away to tip 10m away from excavations
OUTPUT CONSTANT 25m / day 20m3 tipper truck with 3man day loading gang
3
DURATION 2
REMARKS
10 Labourers
250m
Load excavated material using shovels into barrows and cart away to tip 5km away from site
3 Labourers
65m
Mix concrete to required specification using a mixer and discharge into foundations with the aid of buckets or headpans
1 operator, 2 masons, 2 labourers (gang size of 1) 2 steel benders 2 labourers (gang size of 4) 1 operator, 2 masons, 2 labourers (gang size of 1)
12m3/trip
0.50
20tn
Mark out and cut mild steel reinforcement, bend into required shape and fix in place with the aid of binding wires
.5t/gang day
10.00
80m
Mix concrete to required specification using a mixer and discharge into foundations with the aid of buckets or headpans
12m3/trip
1.00
BLOCKWORK IN FOUNDATION
1200m
Mark out the position of blockwork on the surface of foundation. Mix mortar using concrete mixer and lay blocks Measure and mark out the shape of the formwork on timber boards and cut out. Oil the surfaces of the board to received concrete and fix into position
2 masons 2 10m/gangConcrete mixer labourers (gang days size of 10) 2 carpenters 2 labourers 7.6m/gangdays
12
10
166m
4 0F 9
METHOD STATEMENT
CONTRACT : CONSTRUCTION OF A THREE BEDROOM BUNGALOW DATE : 30TH MARCH, 2013 BY : WISDOM KWAME AGBOZO (20281748) S/No OPERATIONS IN SITU CONCRETE IN COLUMN Q'TY RESOURCES OUTPUT CONSTANT PLANT LABOUR 1 operator, 2 Mix concrete to required specification using a mixer and Concrete masons, 2 3 discharge into formwork with the aid of buckets or headpans 12m /trip Transist Truck labourers (gang and vibrate using a poker vibrator size of 1) Fill excavations with material arising from excavations using 5 Labourers Plate 6.13m3/ma shovels and pick-axes. Compact filled surfaces with a plate (gang size of Compactor n day compactor 2) 5 Labourers Fill to make up levels with material obtained off site using Plate 6.13m3/ma (gang size of shovels. Compact filled surfaces with a plate compactor Compactor n day 2) METHOD Measure and mark out the shape of the formwork on timber boards and cut out. Oil the surfaces of the board to received concrete and fix into position Mix concrete to required specification using a mixer and Concrete discharge into formwork with the aid of buckets or headpans Transist Truck and vibrate using a poker vibrator 2 carpenters 30m/gang 2 labourers(gang day size of 2) 1 operator, 2 masons, 2 labourers (gang size of 1) DURATION REMARKS
11
18m
1.00
12
FILLING TO EXCAVATIONS
165m3
13
13
120m3
9.79
14
300m
5.00
15
100m
12m3/trip
1.00
5 0F 9