Shutdown Maintenance Turnaround Works in ExxonMobil

Plant ExxonMobil Duration July 07 - Aug 07 Jobs Completed Furnace C Shutdown Approx. Value In progress

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SCP

Page 1 of 16

Recent Shutdown Maintenance Turnaround Works in Shell Bukom, Singapore


Plant LRCCU Duration July 2006 (Unplanned) Jobs Completed Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Rotating Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace Repair Heat Exchangers Tower Tray Repair Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Reactor Cleaning & Modification Regenerator Cleaning & Modification Piping Replacement Rotating Equipment Approx. Value S$ 1,000,000

HCU

2006

S$ 800,000

LRCCU

Dec 2005

S$ 500,000

LRCCU

Nov 2004

S$ 6,500,000

HCU

2003

S$ 300,000

CD4 LOC

2002

S$ 1,600,000

HCU

2001

S$ 1,500,000

LRCCU

Nov 6 00 - Dec 3 00

S$ 6,500,000

CD5

Oct 3 - Nov 5 99

S$ 689,000

HCU

Oct 1 - Oct 10 98

S$ 910,000

LRCCU

Nov 5 - Dec 3 97

S$2,500,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Shell

Page 2 of 16

Shutdown Maintenance Turnaround Works in ExxonMobil (Jurong Refinery)


Plant LHDC/NORTH FLARE/ SRU/AMINE/VIS/VAC SRU#4 Duration Jobs Completed Approx. Value S$622,000

Jan 06 - Jan 06 Mechanical repair works

Sept 05 - Sept 05 FinFan & Exchanger repair works Supply labour Jul 05 - Aug 05 FinFan & Exchanger repair works Supply labour Mar 05 - May 05 AFC Retubing & O/H Line Replacement Heater,FG Ducting & A/Preheater Drum Maintenance works FinFan & Exchanger repair works Supply labour Aug 04 - Sept 04 Mechanical repair works

S$38,000

MPHC

S$250,000

SRU#4/CHD#2/CDU#1 VIS/LHDC/SRU#5/SWS#2

S$2,800,000

LHDC/NORTH FLARE/ SRU/AMINE/VIS/VAC

S$520,000

AMINE/CHD/MIDW/SRU SWS/CCR/SGP/XYL/BZ SULF/PAREX/MHAI LHDC/MSDW

Apr 04 - Jun 04

Catalyst change out Metal repair works

S$2,432,000.00

Oct - Nov 03

LHDC Reactor Charge Heater Towers/Drums Cleaning Exchanger/Fin fan tube cleaning Gas Compressor Piping replacement Service PSV Change/Repair Reactor Repair/Replace/Hydrojet cleaning & Hydrotest of Exchanger Metals Works Activities Feet distributor Replace 5 beds of packing

S$1,500,000

CCR MPHC/CYCLOHEX

Apr - May 03 Apr - May 03

S$210,000 S$100,000

SRU 5 Benzene Tower

May - June 03 Jan - Feb 03

S$100,000 S$200,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : MBM

Page 3 of 16

Solfolane S/D

Oct - Nov 02

Clean internal rain deck extractor Repair Trays/Recovery column Repair/Replace B/v/Gasket Pipings Revamp Towers/Drums Furnaces Additional Work For Above Furnace Repair Pipings Replacement Towers/Drums Cleaning And Trays Supports Replacement

S$210,000

CDU 2/VAC S/D CDU Plant Revamp

June - July 02 Feb - Apr 97

S$1,200,000 S$7,000,000

CDU Plant S/D Maintenance Mar - Apr 97

S$5,000,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : MBM

Page 4 of 16

Shutdown Maintenance Turnaround Works in ExxonMobil (Pulau Ayer Charwan)


Plant Lubes S/D 03 Duration Mar15 - Apr 25 ' 03 Jobs Completed Piping Works Exchangers Tower Drum Manpower Supply Heat Exchangers High Pressure Jet Cleaning Exchangers AirFin Coolers / Retube Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Tower Internal Shell Side Weld Overlay Heat Exchangers High Pressure Jet Cleaning Exchangers AirFin Coolers / Retube Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Heat Exchangers AirFin Coolers Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums Furnance Up Grading Piping Replacement Valves Replacement Logistics * Cranes 360 Ton - 20 Ton Totaling 11 units * Modules For TAR Meeting/Process * Portable Toilets etc. * Auto Weld Overlay on Shell Internal Approx. Value S$ 1,647,000

APS I TAR 00

Oct 9 - Nov 5 00

S$ 4,000,000

APS I TAR 99

Jun 13 - Oct 31 99

S$ 1,300,000

APS II TAR 98 Sep 7 - Oct 6 98 One Single Contractors Concept On Lump Sum Basis Managing Entire Plant Turnaround Including Overall Planning & Scheduling Safety Management And Other Services Such As: Scaffolding Insulation Blasting/Painting NDT Civil Single Contracting Concept APS I TAR 99

S$4,600,000

Jun 13 - Oct 31 99

Heat Exchangers AirFin Coolers / Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Heat Exchangers AirFin Coolers / Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums / Furnace Up Grading Piping & Valves Replacement Tower Internal Shell Side Weld Overlay

S$ 1,300,000

APS I TAR 00

Oct 9 - Nov 5 00

S$ 4,000,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : PAC

Page 5 of 16

Shutdown Maintenance Turnaround Works in Singapore Refinery Co.


Plant
CDU-II/VBU/VFU TAR 2004

Duration 19/08 to 03/09/2004

Jobs Completed Furnace, Tower, Drums Air Preheaters Heat Exchanger Servicing Piping Repairs Cooling Tower Air Fin Coolers Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Rotating & Stationary Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace / CO Boiler Repair Regenerator Misc Hot & Cold Works Heat Exchangers Tower Tray Renewal

Approx. Value S$1,975,000

LRCCU

July 2006 (Unplanned)

S$ 1,000,000

HCU

2006

S$ 800,000

LRCCU

Dec 2005

S$ 500,000

LRCCU

Nov 2004

S$ 6,500,000

HCU

2003

S$ 300,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SRC

Page 6 of 16

Piping Replacement Rotating Equipment Vessel Cleaning CD4 LOC 2002 Heat Exchangers Tower Tray Renewal Piping Replacement Rotating Equipment Vessel Cleaning S$ 1,600,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : SRC

Page 7 of 16

Shutdown Maintenance Turnaround Works in Seraya Chemicals


Plant Duration 2005 Jobs Completed Approx. Value

U3100

Apr 04 - May 04

MPG De- Bottlenecking Project Relocate 3 reboiler Modify platform Modify connection piping Change out column internal Boiler/Cogen Mom Inspection Open Man Holes Internal Cleaning Removal Of Steam Drum And Mud Drum Internals Hot Works Support For Chemical Cleaning Boiler/Cogen Mom Inspection Open Man Holes Internal Cleaning Removal Of Steam Drum And Mud Drum Internals Hot Works Support Fitters For Spading Work Steam Header Piping Misc Works Replacement of F-1301 Gas Ducts C-605 Repair Works Over hauling works of Sea water intake Pump -5604

$206,000.00

PODU SMPO2

Jul 03 - Dec 03

$90,000.00

PODU SMPO2

Sep 02 - Dec 02

$60,000.00

SMPO TURN AROUND SD

June 01

$400,000.00 $30,000.00 $100,000.00 $50,000.00

SMPO - UNIT 1300/600

Feb 01 - Mar 01

$15,000.00

CW intake system/Basin

March 00 - Ap 00

Inspection and cleaning of CW intake Pipe Inspection and cleaning of CW basin Assistance to Divers to do under water welding works C-602 replacement of corroded CS nozzles to SS E-613A/B/C draw bundles repair works

$35,000.00

SMPO 1 U-600

Feb 00 - March 00

$50,000.00

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Seraya

Page 8 of 16

Shutdown Maintenance Turnaround Works in Seraya Chemicals


Plant SMPO1 U-900 Duration Sep 00 - Oct 00 Jobs Completed Steam Condenser E-952A/B leaking Draw Bundles,Repair Shell cracks Statutory inspection Over hauling works of Sea water intake Pump -5603 SD spading works.Support to operations C-602 open man holes,entry and repair works,replacement of corroded nozzles C-401 internal repair works U-900 Misc works,safety valves removal F-1301 Furnace duct leak- repair works K-1303 atomising compressor open air vessels,coolers for statutory inspection Upgrade Caustic Loop Replacement of CS line to SS Replace V-109 with new SS vessel Replace E-111 tube bundle Remove shell and sent for heat treatment Inspection of Reboilers C-3201/02/03 Heat Exchangers Vessel Cleaning M&R Piping Rotating Equipment Approx. Value $150,000.00

March 00 - Apr 00

$20,000.00

SMPO plant All units

April 99 -May 99

$120,000.00

SMPO U-100

April 99 -May 99

$200,000.00

PODU (MPG plant) SMPO And Utilities Planning & Scheduling Warehouse & Material Mgt Supply of Field Supervision To Client SMPO sea cooling water exchangers inspection and repair works

April 99 -May 99 May 18 - June 5 98

$15,000.00 S$1,800,000

Sep 97 - Dec 97

Open exchangers,pull bundle and repair works overlay works for covers,tube sheet

$300,000.00

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Seraya

Page 9 of 16

Shutdown Maintenance Turnaround Works in Invista (Previously known as Dupont)


Plant Duration June 04 - July 04 Jobs Completed Control Valves, Roof Tank Repair, Boiler, Painting, PSM Non MOM List for Inspection Works and Manpower Supply Approx. Value S$ 500,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Invista

Page 10 of 16

Shutdown Maintenance Turnaround Works by FAB shop


Plant
IPG

Duration
Jun' 2005

Jobs Completed
Mechanical Works & Motor Replacement

Approx. Value S$ 250,000

Soxal Hypo Plant

Oct' 2004 - Dec' 2004

Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out Mechanical Works & Motor Replacement Mechanical Works & TCR Bundle Change Out

S$ 170,000

Soxal Hypo Plant

Jul' 2004

S$ 232,000

IPG

Oct' 2003 - Dec' 2003

S$ 150,000

Soxal Hypo Plant

Oct' 2003

S$ 180,000

IPG

Nov' 2002 - Dec' 2002

S$ 193,000

Soxal Hypo Plant

Oct' 2002

S$ 350,000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Fab

Page 11 of 16

Typical Turnaround Maintenance Work Experience


Plant
ExxonMobil (Jurong) LHDC/MSDW

Duration
Oct - Nov 03

Jobs Completed
LHDC Reactor Charge Heater Towers/Drums Cleaning Exchanger/Fin fan tube cleaning Gas Compressor Piping replacement Service PSV Furnaces Air-Preheaters Towers (Exclude 4151 E) Heat Exchangers Breechlock Exchnagers & Neutralisation Work Airfin Coolers, Drums, Rvs, Cvs, Pipings, System Blind, Additional Heat Exchangers 1042 L Dereactor 1041 L Cooler Tower 2141 L HCU 2 Flare Stack 2101 L Unplug CRU Flare Pilot Gas Line Heat Exchangers Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums Reactor/Furnance Piping & Valves Replacement Tower Internal Shell Side Weld Overlay Heat Exchangers Rotating Equipment Tower Tray Repair Piping Replacement Vessel Cleaning Furnace Repair Heat Exchangers AirFin Coolers Retube Exchangers High Pressure Jet Cleaning Exchangers Towers/Drums Furnance Up Grading Piping Replacement Valves Replacement Logistics * Crane and heavy equipment services Pipings Revamp Towers/Drums Furnaces Additional Work For Above Trays Supports Replacement

Peak Manpower
400

SRC HCU2 - TAR AUG 2003

Aug 03 - Sept. 03

350

Petrochemical Singapore Aromatics / MTBE Plant-1

Jul 03 - Aug 03

280

Shell LRCCU

Nov 99 - Dec 00

600

ESPL APS II TAR 98 One Single Contractors Concept On Lump Sum Basis Managing entire Plant Turnaround including overall planning & scheduling, safety management & other services such as: Scaffolding, Insulation, Blasting/Painting, NDT & Civil Mobil CDU Plant Revamp CDU Plant S/D Maintenance

Sep 98 - Oct 98

500

Feb - Apr 97

1000

\\vboxsrv\conversion_tmp\scratch_5\176185229.xls.ms_office : Typical SD Work - Manpower

Page 12 of 16

EPC Jobs Summary Project Name SER-DUP:8" FRP High Grade Industrial Water to Dupont Phase 1 & 2 HP Steam & Associated High Pressure Boiler Feedwater 16 nos of Metering Skid for China Project Operation Streamlining Project - EPC SCC Hydrogen and Steam Line One Unit of Waste Water Equalization Tank Gray & Black Water Tank Fabrication Work for Singapore Olefins Project Ethoxylation Plant (Detailed Engineering, Procurement And Construction)

Client SUT Sakra

Year

2002
SUT Sakra Pte Ltd Fisher-Rosemount ExxonMobil ExxonMobil Infinieum Exxon/KOCJV

2002 2002 2002 2001 2000 1999-2000

Witco

1998

Construction Jobs Summary Project Name Pfizer, Bulk Pharmaceuticals Facility Organic Synthesis Plant Client Jacobs Lend Lease Pte Ltd

Styrene Monomer Propylene Oxide 2 Project - Area X ABB Lummus Global/JGC Corp. Singapore Piping Works JV Piping Erection Work for ISBL Area on Singapore Olefins Project Electronic Polish Plant Piping Works for PCS II Project Crude Splitter Unit Project Exxon Chemical / KOCJV

Shell PCS / JGC Singapore Shell Eastern Petroleum Pte Ltd

Constrn Period Feb' 2001 - Aug'2002

Jan' 2000 - Apr'2002

1998 / 2000

Apr' 2000 - Aug' 2000 Jan' 2001 - Sep' 2001 1999-2000