Grievance dossier

For
karnet,kukkad,parvetta,lonadra
and agar vasahats
Karnet-1
Name of the project issue details
affected person
Teliabhai Pap has received 5 Survey no:336
Muchiabhai acres of land at 3
subplots,the location of
3rd plot has not been
specified

Dadaniabhai Major sons were not


chamariabhai issued the land because
they didn’t had birth
certificate.a medical
enquiry was conducted
to verify the age which
gave a age range of 20-
45 years.this report was
taken as referance to
deny the plots
Ramanbhai Same issue.land
baliabhai denied
On the basis of lack
of medical certificate
kanjibhai A substancial Photograpg
amount of his plot enclosed
has been used in the
project to construct
canal and erect
electric pole (which
has no wires),other
people also have a
similar issue
Kanjibhai’s plot

Part of another similar plot


taken away in khotar
Cracks in the augmentary
canal in karnet1

Field channel passing


through the plot of a Pap.
Trees in the allotted plot
which hinder cultivation. Paps
are not permitted to cut them
hence causing them a lot of
problem
karnet2
Name of the project issue details
affected person (pap)

Sighabhai pechibhai Even though he has


been recognized as a
deserving oustee he
hasn’t received a titled
land under his name and
tills nigam’s land

Simjibhai damjibhai The plot has a thin top


soil layer,government
has put yellow soil on
20%of plot which has
worsened the situation
Name of the pap issue details

Kalpabhai Plot allotted has no


source of irrigation
except for monsoon
Narsingh jabie Trees in the plot hinder
cultivation. Was
prohibited from cutting
them
Popat balya Plot gets waterlogged
due to pits
Jatriabhai sungabhai Major part of plot falls
under
canal.Waterlogging
during monsoon

Birmiabhai
A major part of plot lost
to canal
jemalbhai Received 5 acres in 2
subplots,location of 2nd
subplot not specified
Name of pap issue details

Busribhen guzaria dadla Lot of trees in the plot.


Prohibited to cut them
Damania linga Land allotted in two
Bhukaria linga subplots ,the location of
the second subplot has
not been specified
Plot of a pap taken away in
construction of field
channel. The construction
may also cause water
logging during monsoon.

A broken field channel at


karnet 2
A pap’s part of plot of land
lost away in khotar at
karnet 2
parvetta
Name of the pap issue details

Bapu kodai/ukad bapu Excessive grass/weed Picture enclosed


(khadi grass)
Ambaben jagon Excessive weeds Survey no 130
(dab grass) Picture enclosed
Ramanbhai Excessive weeds
(dab grass),top soil gets
eroded in khotar
Narayan bhai Excessive weeds (dab
grass),khotar is let out at
his field and drains away
top soil
Jhinga vaja Multiple khotars in entire Survey no 144
plot.plot allotted is
uncultivable
Bapu kodai’s plot
containing khadi grass
which makes plot
uncultivable

Ambaben’s plot containing


dab grass (weeds)
raman bhai’s plot containing
dab grass

Incomplete field
channel which would
cause water logging
during monsoon
Field channel broken.in
parvetta field channels are
broken at multiple locations
because of not quenching
them while construction and
because of use of inferior
material

No soil support provided


to the field channel in
parvetta unlike other
places
lonadra
Name of the pap issue details

Ramsinghji bhaisinghji The underground


drainage opens into his
field draining away the
topsoil

bhavnabhaiprabhubhai
Drainage and khotars
pass through his field
draining the top soil
away

Community issues-
School compound gets waterlogged.
Hand pumps infested and drinking water not available .
Road blockage due to waterlogging
Water logging in the field
due to improper
construction of field
channel .a similar problem
in karnet 2

Massive drainage opening into


one of the fields
agar
Name of the pap issue details

Damanbhai dalpabhai Waterlogging in the field


suma chellu Not received land till
Manilal lallu date
Bhikha lallu Received appox.3 acres
Lallu surtha Received 4 acre
Chagan narayan Received 13 gunthas
Hirabhai sonjibhai Plot shared by another
pap

General issues
Defective field channel
Crossover bridge on canal not constructed
Field channel doesn’t reach at all fields and has broken down at multiple
places
Field channel has been
constructed at the level of the field