Вы находитесь на странице: 1из 57

CARE Industries Ltd.

Innovative and Custom Manufacturing


7762-47th Avenue Close, Red Deer Alberta Ph. 403.347.7337 Fax. 403.347.7755 www.careindustries.ca

Founded in Red Deer, Alberta, Canada, CARE Industries is a Canadian owned and operated company committed to manufacturing innovative and custom oilfield equipment. Experienced in manufacturing new turnkey Drilling and Servicing Rig packages, CARE Industries works with each customer to ensure that their design needs are met and that the equipment exceeds both their expectations and industry standards. Serving the National and International oilfield market, CARE Industries has developed a strong reputation for our commitment to safe and quality work. In 2012 CARE Industries was recognized by the Red Deer Chamber of Commerce with the Business of the Year Award. The same year, CARE was honored with the New Exporter Awards, organized through the Alberta Division of the Canadian Manufacturers and Exporters in recognition of our success in the international market. CARE has grown to employ over 90 knowledgeable and dedicated employees, led by a top management team with over 100 years of combined manufacturing and industry experience. CARE Industries will strive to continually develop the technical and creative capabilities needed in order to produce integrated rig packages, delivered on time and on budget.

In order to accommodate the expanding needs of the Oil and Gas Industry, CARE will be relocating to Blackfalds in early 2013 into a brand new state of the art, 70,000 square foot facility. This relocation will provide CARE and its employees with the equipment and space needed to better serve CAREs energy industry partners with customizable and innovative equipment delivered on time and on budget.

Drilling Rig Packages

7762-47th Avenue Close, Red Deer, Alberta PH: 403.374.7337 FAX: 403.347.7755 www.careindustries.ca

CIL- 440
CIL - 440 850 HP Pad Drilling
Rig Type: Rig Make:
l

850 HP Telescopic Double Drilling Rig CARE Industries (2011) TSM 850 Detroit Diesel 12V2000 Eaton 324 Brake c/w Cooling Package Freno Auxiliar CARE industries
105x 440,000 Lbs. Static Hook Load w/8 lines

Drawworks: Power: Auxiliary Brake: Mast: Sub Structure:

CARE Industries - (20 floor height) Rotary Capacity - 440,000 Lbs. Setback Capacity - 350,000 Lbs. BOP Handling system 2 Mouse Holes Mckissick: 250 Ton Unitized Block/Hook Warrior (Intergraded In Top Drive)

Travelling Block: Swivel:

Top Drive:
Rotary Table: Mud Pump 1: Mud Pump 2:

Warrior Model: 250 Hydraulic (250 Ton)


27 TSM: 350 Ton Weatherford MP - 10 (1000 HP) Detroit Diesel 12V2000 Weatherford MP - 10 (1000 HP) Detroit Diesel 12V2000

CIL- 440
CIL - 440 850 HP Pad Drilling
Mud System: 2 tank system Roofs hydraulically raised and lowered Active system: 1000 BBLs Five (5) 7.5 HP Agitators
Two (2) Linear Shakers (King Cobra)located on Scalping tank

Solids Control:

One (1) King Cobra Mud Cleaner Centrifugal Pumps: Three (3) Mission Magnums
5x6 c/w 50 HP motors 2 mix hoppers

One (1) Mission Magnum 6x8 c/w 50 HP motors Mud cleaner BOP Equipment: One (1) 11 x 5, 000 psi Hydril Annular One (1) 11 x 5, 000 psi Shaffer Double Gate Two (2) 2 x 5,000 psi manual gate valves (Kill Side) One (1) 3-1/16 x 5,000 psi manual gate valve One (1) 3-1/16 x 5,000 psi HCR gate valve 3-1/16 x 5000 psi manual gate valves One (1) manual choke valve: 2-1/16 x 5,000 psi One (1) Swaco Hydraulic Choke valve: 2-1/16 x 10,000 psi

Choke Manifold:

BOP Closing Unit: OCO 5 station, 180 gallon Power Generations: Two (2) Detroit Diesel (850 HP each) Two (2) Marathon (650 KW each)

CIL- 440
CIL - 440 850 HP Pad Drilling
Water Tank: 460 BBL Independent Tank

Fuel Tank:

430 BBL Independent Tank

Tubular Handling: Five (5) Hydraulic Pipe Tubs One (1) Powered catwalk (Hands free) Three (3) Sets Pipe Racks Drill String: Drill Pipe: 10,500 feet of 4 Drill Collars: (21) Joints 6 Heviwate: (30) X 4 As required for drill string

Handling Tools:

Casing Handling Tools: Side door casing elevator for, 9-5/8, 7, 5-1/2, 5 Single joints elevators for 9-5/8, 7, 5-1/2,5 Rotary casing slips for 9-5/8, 7, 5 , 5 350 Ton, air operated elevator and slips for 95/8, 7, 5 , 5 Instrumentation: Weight Indicator: Martin DECKER Stroke Counter, RPM for RT Pressure Gauges Rotary RPM counter and pumps Stroke counter Digital Drilling Recorder Hook Load, rotary RPM, Rotary Torque, Drilling Rate, Pump Pressure, Pump SPM Active tanks mud levels with alarm system 4 Point intercom system

CIL- 440
CIL - 440 850 HP Pad Drilling
Skidding Package: Complete walking system Include 250 BBL Scalping Tank Two (2) King Cobra Scaling Shakers Two (2) 5x6 Mission Magnums Transfer Pumps All Suitcases to Skid up to 300 feet Forklift: Trailers: To suit contract As required by Operator

CIL- 440
CIL - 440 850 HP Pad Drilling

CIL- 550
CIL - 550 1000 HP AC Pad Drilling
Rig Type: AC Drive Cantilever Triple

Rig Make:
Drawworks: Auxiliary Brake: Mast:

CIL- 550 AC Pad Rig


1000 HP AC Drive Eaton 336 WCSB Auxiliary Brake CARE Industries 46 x 550,000 Lbs. Static Hook Load w/ 10 lines

Sub Structure:

CARE Industries - Swing Up (25 floor height) Rotary Capacity - 550,000 Lbs. Setback Capacity - 400,000 Lbs. BOP Handling system 2 Mouse Holes
American Block 350 Ton Unitized Block/Hook American Block 350 Ton (for standby) Tesco Model: 350 EXI 600 AC Drive (350 Ton) 30,000 ft./lbs. Make up Torque:45,000 ft./lbs. 27 National 500 ton (or equivalent)

Travelling Block: Swivel: Top Drive: Rotary Table:

Mud Pump 1:
Mud Pump 2:

Gardner Denver PZ-9 (1000 HP) One (1) 1000 HP AC Drive Motor
Gardner Denver (1000 HP) One (1) 1000 HP AC Drive Motor

CIL- 550
CIL - 550 1000 HP AC Pad Drilling
Mud System: 3 tank system Roofs hydraulically raised and lowered Active system: 1200 BBLs Seven (7) 10 HP Agitators One (1) Vacuum Degasser (750 GPM) Two (2) Brandt Linear Shakers ( King Cobras ) One (1) Brandt mud cleaner c/w 2 cone Desander and 12 Cone Desilter

Solids Control:

Centrifugal Pumps: Two (2) Mission Magnums 5x6 c/w 75 HP motors 2 mix hoppers Two (2) Mission Magnums 6x8 c/w 75 HP motors Mud cleaner BOP Equipment: One (1) 13 x 5, 000 psi Hydril (GL) Annular One (1) 13 x 5, 000 psi Cameron Double Gate One (1) 13 x 5, 000 psi Cameron Single Gate Two (2) 3-1/16 x 5,000 psi manual gate valves One (1) 3-1/16 x 5,000 psi manual gate valve One (1) 3-1/16 x 5,000 psi HCR gate valve 3 1/16 x 5000 psi manual gate valves One (1) manual choke valve: 2 1/16 x 5,000 psi One (1) Swaco Hydraulic Choke valve: 2-1/16 x 5,000 psi

Choke Manifold:

BOP Closing Unit: OCO 6 station, 240 gallon

CIL- 550
CIL - 550 1000 HP AC Pad Drilling
Power Generations: Three (3) Caterpillar 3512C (1480 HP each) Three (3) Kato Generators (1225 KW each)
Power Distribution: Complete AC VFD drive Water Tank: Fuel Tank: 460 BBL Independent Tank 530 BBL Independent Tank

Tubular Handling: Six (6) Hydraulic Pipe Tubs One (1) Powered catwalk (Hands free) Four (4) Sets Pipe Racks One (1) Iron Roughneck Drill String: Drill Pipe: 12,000 feet of 5 x 19.5 lb./ft. S-135 (4 IF) Drill Collars: (21) Joints 6 x 4 XH Drill Collars: (6) Joints 8-1/4 x 6- Reg. Heviwate: (18) Joints 5 x 4 IF As required for drill string

Handling Tools:

Casing Handling Tools: Side door casing elevator for, 13-3/8, 9-5/8, 7, 5-1/2, 5 Single joints elevators for 13-3/8, 9-5/8, 7, 5-1/2,5 Rotary casing slips for 13-3/8, 9-5/8, 7, 5 , 5 350 Ton, air operated elevator and slips for 13-3/8, 9..5/8, 7, 5 , 5

CIL- 550
CIL - 550 1000 HP AC Pad Drilling
Instrumentation: Weight Indicator: (Drillers Control Panel Dog House) Command Centre, Stroke Counter, RPM for RT Pressure Gauges Rotary RPM counter and pumps Stroke counter Digital Drilling Recorder includes: Hook load, rotary RPM, Rotary torque, Drilling rate, Pump pressure, Pump SPM Active tanks mud levels w/ alarm system 4 point intercom system: CO/man trailer, Toolpusher trailer, Driller, Mud Tank

Skidding Package: Complete walking system (OPTIONAL) Includes 250 BBL Scalping tank (OPTIONAL) Two (2) King Cobra Scalping Shakers Two (2) 5x6 Mission Magnums Transfer pumps. All Suitcases to Skid up to 300 feet
Forklift: As per customer request Trailers: As required for contract

CIL- 550
CIL - 550 1000 HP AC Pad Drilling

CIL- 750
CIL 750 Triple 1500HP AC
Rig Type: Rig Make/Brand: Drawworks: Mast: Sub Structure: AC Diesel Electric Cantilever Triple CARE industries CIL - 750 TSM 1500 HP AC w/ Eaton 336 WCSB Brake CIL - Cantilever Triple Mast
156 ft x 750,000 lbs Static Hook Load Capacity w/ 12 Lines

CARE Industries Swing up Style (30) Floor Height) Rotary Capacity: 750,000 lbs.; Setback Capacity: 600,000 lbs.

Traveling Equipment: American Block 350 ton Unitized Block/Hook Swivel: American Block 350 swivel w/ 350 ton Static Load Capacity

Top Drive:
Rotary Table: Mud Pumps (2):

Canrig AC Electric 375 ton Load Capacity


27 Model: RT-275 - 500 ton Two (2) Gardner Denver Model: PZ-11 Triplex Pump

Mud Pump Power: 1600 HP AC Drive Motor for each mud pump Mud System: Five (5) - Tank System with twelve compartments Active Capacity: Estimated at 2,000 bbls

CIL- 750
CIL 750 Triple 1500HP AC
Solids Control: Three (3) Brandt King Cobra Linear Motion Shale One Brandt Mud Cleaner One (1) Desander - 2 x 12 Cones One (1) Desilter - 10 x 4 Cones

Centrifugal Pumps: Four (4) Mission Magnum 5 x 6 c/w 60 HP Electric Motors Two (2) for Desander /Desilter and two (2) for Mixing
BOP Equipment: One (1) 13 x 10 000 psi Hydril (GL) Annular One (1) 13 x 10,000 psi Shaffer Double Gate One (1) 13 x 10,000 psi Shaffer Single Gate 4 x 10,000 psi Gut Line with Two (2) 3 manual chokes

Choke Manifold:

BOP Closing Unit: 7 Station, 240 Gallon Accumulator Power Generation: Three (3) Caterpillar Model: 3512-C Engines (1,225 KW) Power Distribution: Complete AC VFD Drive Instrumentation: CARE Industries command control center (dog house) Water Tank: 500 bbls - Independent water tank

Fuel Tank:

500 bbls - Independent fuel tank

CIL- 750
CIL 750 Triple 1500HP AC
Tubular Handling: Hydraulic Catwalk and 3 Sets of Pipe Racks Seven (7) hydraulically operated Pipe Tubs Drill String: Drill Pipe: 16,000 ft of 5 x 19.5lb/ft - S-135 Drill Collars: (21) Joints 6 x 4- NC46 Drill Collars: (6) Joints 8 x 6- Reg. Spiral Heviwate: (30) Joints 5 x NC46 - Slick As required for all Drill Pipe & Drill Collars As per Contract As required by Oil Company

Handling Tools: Fork Lift: Well Site Office:

CIL- 1000
CIL 1000 Triple 2000 HP AC
Rig Type: Rig Make/Brand: AC Diesel Electric Cantilever Triple CARE Industries CIL - 1000

Drawworks:
Mast:

TSM 2000 HP AC w/ Eaton 336 WCSB Brake


CIL - Cantilever Triple Mast 156 ft. x 1,000,000 lbs. Static Hook Load Capacity w/ 12 Lines CARE Industries Swing up Style (30) Floor Rotary Capacity: 750,000 lbs. Setback Capacity: 600,000 lbs.

Sub Structure:

Traveling Equipment: National Model: 650G500 - 500 ton Unitized Block/Hook

Swivel:
Top Drive: Rotary Table:

National Model: P-500 w/ 500 ton Static Load Capacity


Canrig Model: 8050 Electric w/ 500 ton Load Capacity 37 Model: RT-375 - 500 ton

CIL- 1000
CIL 1000 Triple 2000 HP AC
Mud Pumps (3): Three (3) Gardner Denver Model: PZ-11 Triplex Pump Mud Pump Power: 1600 HP AC Drive Motor for each mud pump Mud System: Five (5) - Tank System with twelve compartments Active Capacity Estimated at 2,000 bbls Three (3) Brandt King Cobra Linear Motion Shale One Brandt Mud Cleaner One (1) Desander - 2 x 12 Cones One (1) Desilter - 10 x 4 Cones

Solids Control:

Centrifugal Pumps: Four (4) Mission Magnum 5 x 6 c/w 60 HP Electric Motors Two (2) for Desander /Desilter and two (2) for Mixing BOP Equipment: One (1) 13 x 10 000 psi Hydril (GL) Annular One (1) 13 x 10,000 psi Shaffer Double Gate One (1) 13 x 10,000 psi Shaffer Single Gate 4 x 10,000 psi Gut Line with Two (2) 3 manual chokes

Choke Manifold:

BOP Closing Unit: 7 Station, 240 Gallon Accumulator

CIL- 1000
CIL 1000 Triple 2000 HP AC
Power Generation: Four (4) Caterpillar Model: 3512-C Engines (1,225 KW) Power Distribution: CARE Industries VFD Instrumentation: CARE Industries command control center Water Tank: Fuel Tank: 500 bbls - Independent water tank 500 bbls- Independent fuel tank

Tubular Handling: Hydraulic Catwalk and 3 Sets of Pipe Racks Seven (7) hydraulically operated Pipe Tubs
Drill String: Drill Pipe: 18,000 ft of 5 x 19.5lb/ft - S-135 Drill Collars (21) Joints 6 x 4- NC46 Drill Collars (6) Joints 8 x 6- Reg. Spiral Heviwate: (30) Joints 5 x NC46 - Slick As required for all Drill Pipe & Drill Collars As per Contract As required by Oil Company

Handling Tools: Fork Lift: Well Site Office:

CIL- 1000
CIL 1000 Triple 2000 HP AC

7762-47th Avenue Close, Red Deer, Alberta PH: 403.374.7337 FAX: 403.347.7755 www.careindustries.ca

CIL-550 HT
CIL - 550 HELI-PORTABLE
Configuration: Rig: Mast: Substructure: Rotary Table: Carrier: Block/Hook: Swivel: Mud Pump: Pump Power: Heli-Portable 550 HP Drilling Rig CARE Industries Series 300 Drilling Rig 112 ft. x 300,000 Telescoping Double Telescoping 16 ft. Substructure with 250,000 setback 17 Hacker Rotary Table Series 300 Double Drum, Powered By 60 Series Detroit Diesel 160 Ton Shorty Block / Hook combination 150 Ton 3 Each TT-560 Triplex 60 Series Detroit Diesel

Mud System:

600 Barrel system c/w 5 each 7 HP agitators 30 Barrel Trip tank 50 Barrel Pill tank 2 Each 6 x 5 Magnum mixing pumps
2 Each Mini Cobra Shale Shakers and King Cobra Mud Cleaner

Mud Cleaning:

CIL-550 HT
CIL-550 HELI-PORTABLE
BOPs: 11 x 5000, Annular 2 Each 11 x 5000 Single Gate 2 x 5000 HCR Valve 2 x 5000 Kill line Valves 4-Station, 120 Gallon 2 x 5000 c/w Hydraulic Choke and Control Panel

Accumulator: Manifold:

Drill String:

8,000 ft. of 4 1/2 Drill Pipe 25 each 4 1/2 HWDP 20 each 6 Drill Collars 37 ft. Kelly
Catwalk with Hydraulic Skate and 3 sets of Pipe Racks

Catwalk/Pipe:

Generator House: 2 Generator Houses (stores electrical panels and air compressor) Gen. Set: Fuel Tanks: 3 Each John Deere 250 KW Generators
3 Each 100 Barrel c/w pump and filtering system

CIL-550 HT
CIL-550 HELI-PORTABLE
Water Tanks: Mechanic/ Electrician: 3 Each 100 Barrel c/w 2 each 3 x 2 transfer pumps Workshop complete with work bench and tools

Portable Welder: Two units complete with 75 ft. cable Doghouse: Suit Cases: Doghouse complete with lifting system 12 Units complete with Water, Air, and Electric and Hydraulic links 17 baskets and bottle rack

Fly Baskets:

All track Vehicles: Track driven vehicles with 12,000 lb. mounted cranes for rig up and rig out 2 units

Note: All rig equipment fabricated to move in 6,000 lb. loads or under.

CIL-550 HT

CIL-650 HT
CIL - 650 HELI-PORTABLE
Configuration: Rig: Mast: Substructure: Rotary Table: Carrier: Heli-Portable 650 HP Drilling Rig CARE Industries Series 400 Drilling Rig 116 ft. x 400,000 Telescoping Double Telescoping 16 ft. Substructure with 350,000 setback 17 Hacker Rotary Table Series 400 Double Drum, Powered By 60 Series Detroit Diesel 250 Ton McKissick Block / Hook combination 250 Ton TSM 3 American Block 800 HP triplex pumps 60 Series Detroit Diesel 600 Barrel system c/w 5 each 7 HP agitators 30 Barrel Trip tank 50 Barrel Pill tank 2 Each 6 x 5 Magnum mixing pumps 2 Each Mini Cobra Shale Shakers and King Cobra Mud Cleaner

Block/Hook: Swivel: Mud Pump: Pump Power: Mud System:

Mud Cleaning:

CIL-650 HT
CIL - 650 HELI-PORTABLE
BOPs: 11 x 5000, Annular 2 Each 11 x 5000 Single Gate 2 x 5000 HCR Valve 2 x 5000 Kill line Valves 4-Station, 120 Gallon

Accumulator:

Manifold:
Drill String:

2 x 5000 c/w Hydraulic Choke and Control Panel


8,000 ft. of 4 1/2 Drill Pipe 25 each 4 1/2 HWDP 20 each 6 Drill Collars 37 ft. Kelly Catwalk with Hydraulic Skate and 3 sets of Pipe Racks 2 Generator Houses (stores electrical panels and air compressor) 3 Each John Deere 250 KW Generators

Catwalk/Pipe:

Generator House:

Gen. Set:

Fuel Tanks:
Water Tanks: Mechanic/ Electrician:

3 each 100 Barrel c/w pump and filtering system


3 each 100 Barrel c/w 2 each 3 x 2 transfer pumps Workshop complete with work bench and tools

CIL-650 HT
CIL - 650 HELI-PORTABLE
Portable Welder: Doghouse: Suit Cases: Two units complete with 75 ft. cable Doghouse complete with lifting system 12 Units complete with Water, Air, and Electric and Hydraulic links 17 baskets and bottle rack Track driven vehicles with 12,000 lb. mounted cranes for rig up and rig out 2 units

Fly Baskets: All track Vehicles:

Note: All rig equipment fabricated to move in 6,000 lb. loads or under.

Workover Rig Packages


The Industry Benchmark for Quality, Durability, and Functionality

7762-47th Avenue Close, Red Deer, Alberta PH: 403.374.7337 FAX: 403.347.7755 www.careindustries.ca

CIL-350
CIL - 350-Single Workover
Rig Type: Rig Make: Rig Power: Transmission: Drawworks: Mast: Work Platform: Travelling Block: Elevator links: Pump Truck: Carrier Mounted Single Workover Rig CARE Industries Caterpillar C-11 engine 385 HP @ 2100 rpm Allison 4700 OFS Transmission with Namco Dropbox Alco /Skytop Double drum rated @ 450 HP CARE Industries single mast 72 feet Static Hook load Capacity 150,000 lbs. Adjustable work platform TSM 75 Ton Split Block for 1 line 100 Ton set of elevator links SD114 Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tri-drive configuration Install 30,000 lbs. hydraulic Tulsa winch SJ 300 Triplex pump with Spicer transfer case 2 x 5,000 seven valve manifold Skid mounted 215 barrel tank with horizontal degasser

Mud Pump: Mud Tank:

CIL-350
CIL - 350-Single Workover
Equipment Truck: SD114 Freightliner with DD-13 engine rated @ 450 HP Single steer /Tandem drive configuration 20 foot deck with 24 side walls
7 1/16 x 5,000 Townsend Annular 7 1/16 X 5,000 Townsend Double Gate BOP Pintle hitch trailer 36 long x 9 6 wide 40 gallon, 3 station Accumulator installed in Dog house / tool room Isuzu 60 hp generator installed in Dog house trailer

BOP Equipment:

Dog House Trailer: BOP Closing Unit:

Power Generation:

Power Distribution: Install distribution panel, lights and plugs


Change room: Install fridge, microwave, bench seating, change lockers and bathroom 50 Gallon tank As required on a project to project basis Clipper style weight indicator As required by Operator

Fuel Tank: Handling Tools: Instrumentation: Trailers:

CIL-350
CIL - 350-Single Workover

CIL-350
CIL - 350 Single Slant Workover
Rig Type: Rig Make: Carrier Power: Transmission: Drawworks: Mast: Carrier Mount Single Slant Workover Rig CARE Industries Detroit Diesel Series 60 (365 HP) Allison 4700 OFS Transmission with Namco Dropbox Hulkster Single Drum CARE Industries Single Slant Mast 70 feet Working Degree 42 Degree to 90 Degree Capacity 125,000 lbs. 12 foot adjustable work floor 75 Ton split block for 7/8 line SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tri-drive configuration Install 30,000 lbs. hydraulic Tulsa winch SJ 300 Triplex pump with Spicer transfer case 2 x 5,000 psi seven valve manifold Skid mounted 215 barrel tank with horizontal degasser SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tandem drive configuration 20 foot deck with 24 side walls

Work Floor: Travelling Block: Pump Truck:

Pump: Mud Tank: Equipment Truck:

CIL-350
CIL-350 Single Slant Workover
BOP Equipment: 7 1/16 x 5,000 psi Townsend annular 7 1/16 x 5,000 psi Townsend Double Gate

Dog House Trailer: Pintle hitch trailer 36 long x 9 6 wide BOP Closing Unit: 40 Gallon, 3 station Accumulator installed in Tool room

Power Generations: Isuzu 60 hp generator in Dog house trailer Power Distribution: Install distribution panel lights and plugs Change Room: Install fridge, microwave, bench seating, lockers and bathroom 50 Gallon As required on a project to project basis Clipper style weight indicator As required by Operator

Fuel Tank: Handling Tools: Instrumentation: Trailers:

CIL-350
CIL - 350 Single Slant Workover

7762-47th Avenue Close, Red Deer, Alberta PH: 403.374.7337 FAX: 403.347.7755 www.careindustries.ca

CIL-450 IG
TELE-Double Workover
CIL-450-IG-105, 200,000 Double Drum
Rig Type: Rig Make: Carrier Mounted Tele-Double Workover Rig CARE Industries

Carrier Power:
Transmission: Drawworks:

Detroit Diesel engine 450 HP @ 2100 RPM


Allison 4700 OFS Transmission with Namco Dropbox Alco / Skytop Double Drum rated @ 450 HP Main drum barrel 18 x 36 Lebus grooving for 1 line Sandline barrel 13 x 39 Care Industries Tele-Double Mast 105 feet Capacity 200,000 lbs. Fabricate and install outriggers and aluminium turn buckles. Fabricate and install three piece aluminium beams Install brackets to store and secure above components 12 foot adjustable work floor 100 Ton 3 x 24 sheaves for 1 line

Mast:

Internally Guyed:

Work Floor: Travelling Block:

CIL-450 IG
TELE-Double Workover
CIL-450-IG-105, 200,000 Double Drum
Pump Truck: SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tri-drive configuration Install 30,000 lbs hydraulic Tulsa winch SJ 300 Triplex pump with Spicer transfer case 2 x 5,000 psi seven valve manifold Skid mounted 215 barrel tank with horizontal degasser SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tandem drive configuration 20 foot deck with 24 side walls 7 1/16 x 5,000 psi Townsend annular 7 1/16 x 5,000 psi Townsend Double Gate

Pump:

Mud Tank:

Equipment Truck:

BOP Equipment:

Dog House Trailer:


BOP Closing Unit:

Pintle hitch trailer 36 long x 9 6 wide


40 Gallon, 3 station Accumulator installed in Tool room

Power Generations: Isuzu 60 hp generator in Dog house trailer Power Distribution: Install distribution panel lights and plugs

CIL-450 IG
TELE-Double Workover
CIL-450-IG-105, 200,000 Double Drum
Change Room: Install fridge, microwave, bench seating, lockers and bathroom 50 Gallon As required on a project to project basis Clipper style weight indicator

Fuel Tank: Handling Tools: Instrumentation:

Trailers:

As required by Operator

CIL-450 IG
TELE-Double Workover
CIL-450-IG-105, 200,000 Double Drum

CIL-550
CIL - 550 Mobile Drilling/Heavy Workover
Rig Type: Rig make: Drawworks: Drawworks Power: Mast: Substructure: Travelling Block: Swivel: Rotary Table: Mud Pump: Mud Pump Power: Transmission: Mud System: Carrier Mounted Telescopic Drilling / Heavy Workover Double CARE Industries ALCO 700DD (500 HP) 42 x 10 and 38 x 8 Drum Sizes 1 Detroit Diesel Series 60 (550 Hp) CARE Industries Telescopic Double 112 feet Static Hookload Capacity 300,000 pounds CARE Industries 16 floor Height Set back Capacity 300,000 Lbs. Mckissick 150 Ton 150 Ton Hacker 17 300 Ton One (1) Gardner Denver PZ-7 1 Detroit Diesel 60 Series 630 HP 1 Allison 5860 1 Tank System Tank #1 315 BBLS 1 mixing hopper One (1) 2 panel shaker

Solids Control:

CIL-550
CIL- 550 Mobile Drilling/Heavy Workover
Centrifugal Pumps: BOP Equipment: One (1) 5 x 6 c/w 60 HP Motor One (1) 11 x 5,000 psi Hydril (GK) Annular One (1) 11 x 5,000 psi Shaffer (LWS) Double Gate One (1) HCR 3 1/16 x 5,000 psi Choke Manifold One (1) Hydraulic Super Choke OCO 5 station, 3000 PSI, 120 Gallon 10 Bottles (12 gallon bottles) Two (2) Detroit Diesel 375 KW MD Totco Digital Instrumentation 100 BBLs 50 BBLs 8000 ft 3 S 135 Drill Pipe 15 Each 3 HWDP 12 Each 4 Drill Collars As required on a project by project basis Available upon request

Choke Manifold: BOP Closing Unit: Power Generation: Instrumentation: Water Tank: Fuel Tank: Drill String:

Handling Tools: Well Site Offices:

CIL-550
CIL - 550 Mobile Drilling/Heavy Workover

CIL-550 IG
TELE-Double Workover
CIL-550-IG-105, 250,000 Double Drum
Rig Type: Rig Make: Carrier Mounted Tele-Double Workover Rig CARE Industries

Carrier Power: Caterpillar C-15 engine 540 HP @ 2100 RPM Transmission: Allison 4700 OFS Transmission with Namco Dropbox Drawworks: Alco / Skytop Double Drum rated @ 550 HP Main drum barrel 18 x 36 Lebus grooving for 1 line Sandline barrel 13 x 39 CARE Industries Tele-Double Mast 105 feet Capacity 250,000 lbs

Mast:

Internally Guyed: Fabricate and install outriggers and aluminium turn buckles. Fabricate and install three piece aluminium beams Install brackets to store and secure above components Work Floor: 12 foot adjustable work floor

Travelling Block: 150 Ton 3 x 24 sheaves for 1 line Pump Truck: SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tri-drive configuration Install 30,000 lbs. hydraulic Tulsa winch

CIL-550 IG
TELE-Double Workover
CIL-550-IG-105, 250,000 Double Drum
Pump: Mud Tank: Equipment Truck: SJ 300 Triplex pump with Spicer transfer case 2 x 5,000 psi seven valve manifold Skid mounted 215 barrel tank with horizontal degasser SD Freightliner with DD-13 engine rated @ 450 HP Single Steer / Tandem drive configuration 20 foot deck with 24 side walls 7 1/16 x 5,000 psi Townsend annular 7 1/16 x 5,000 psi Townsend Double Gate Pintle hitch trailer 36 long x 9 6 wide 40 Gallon, 3 station Accumulator installed in Tool room

BOP Equipment: Dog House Trailer: BOP Closing Unit:

Power Generations: Isuzu 60 HP generator in Dog house trailer Power Distribution: Install distribution panel lights and plugs Change Room: Fuel Tank: Handling Tools: Instrumentation: Trailers: Install fridge, microwave, bench seating, lockers and bathroom 50 Gallon As required on a project to project basis Clipper style weight indicator As required by Operator

CIL-550 IG
TELE-Double Workover
CIL-550-IG-105, 250,000 Double Drum

CIL-650
CIL 650 Mobile Drilling/Heavy Workover
Rig Type: Rig make: Drawworks: Drawworks Power: Mast: Substructure: Travelling Block: Swivel: Rotary Table: Mud Pump: Mud Pump Power: Transmission: Carrier Mounted Telescopic Drilling / Heavy Workover Double CARE Industries ALCO 700DD (630 HP) 42 x 10 and 38 x 8 Drum Sizes 1 Detroit Diesel Series 60 (630 Hp) CARE Industries Telescopic Double 116 feet Static Hook load Capacity 400,000 pounds CARE Industries 16 floor Height Set back Capacity 350,000 Lbs Web Wilson 250 Ton 250 Ton Hacker 17 300 Ton One (1) Gardner Denver PZ-7 1 Detroit Diesel 60 Series 630 HP 1 Allison 5860

Mud System:

1 Tank System Tank #1 315 BBLS 1 mixing hopper

CIL-650
CIL 650 Mobile Drilling/Heavy Workover
Solids Control: Centrifugal Pumps: BOP Equipment: One (1) 2 panel shaker One (1) 5 x 6 c/w 60 HP Motor One (1) 11 x 5,000 psi Hydril (GK) Annular One (1) 11 x 5,000 psi Shaffer (LWS) Double Gate One (1) HCR 3 1/16 x 5,000 psi Choke Manifold One (1) Hydraulic Super Choke OCO 5 station, 3000 PSI, 120 Gallon 10 Bottles (12 gallon bottles)

Choke Manifold: BOP Closing Unit:

Power Generation:
Instrumentation: Water Tank: Fuel Tank: Drill String:

Two (2) Detroit Diesel 375 KW


MD Totco Digital Instrumentation 100 BBLs 50 BBLs 8000 ft 3 S 135 Drill Pipe 15 Each 3 HWDP 12 Each 6 Drill Collars Warrior 250 Ton Hydraulic Top Drive As required on a project by project basis One (1) 10 x 40 Dedicated Rig Manager One (1) 10 x 40 Dedicated to Company Man

Optional: Handling Tools: Well Site Offices:

CIL-650
CIL 650 Mobile Drilling/Heavy Workover

CIL-1000
CIL - 1000 Double Workover Mobile Tele-Double
Rig Type: Carrier Mounted Telescoping Drilling / Heavy Workover - Double CARE Industries CIL 1000 Double Drum (1000 HP) Two Caterpillar C-15 engines rated 540 HP @ 2100 RPM

Rig Make: Drawworks: Drawworks Power:

Auxiliary Brake:
Transmission:

Eaton 324 WCB Disc Brake


Two Allison 6010 Transmissions c/w air shift cylinders CARE Industries Telescoping Double 116 feet Static Hook load Capacity 400,000 pounds CARE Industries Telescoping Substructure 16 floor height Rotary Capacity 425,000 lbs. Setback Capacity- 300,000 lbs. 200 Ton Travelling Block

Mast:

Sub Structure:

Travelling Block:

Swivel:

200 Ton Swivel

CIL-1000
CIL - 1000 Double Workover Mobile Tele-Double
Top Drive: Rotary Table: Mud Pump 1: Mast will accept 250 Ton hydraulic Top drive 27 Rotary Table Gardner Denver PZ-9 (1000 hp) Mud Pump

Mud Pump Power # 1: Caterpillar C-32 engine with XDR Pacific Rim Gearbox Mud Pump 2: Gardner Denver PZ-9 (1000 hp) Mud Pump

Mud Pump Power # 2: Caterpillar C-32 engine with XDR Pacific Rim Gearbox Mud System: Solids Control: Two tank 1000 barrel mud system Two Brandt King Cobra Shale Shakers

Centrifugal Pumps: Four 5 x 6 x 14 Badger Centrifugal pumps BOP Equipment: One (1) 11 x 5,000 psi Hydril (GK) Annular One (1) 11 x 5,000 psi Shaffer (LWS) Double Gate 3 1/8 x 5,000 psi Choke Manifold One (1) Hydraulic Super Choke

Choke Manifold:

CIL-1000
CIL - 1000 Double Workover Mobile Tele-Double
BOP Closing Unit: Control Tech 5 Station 120 Gallon Accumulator 10 Bottles (12 gallon bottles).

Power Generations: Two Caterpillar C-15 Generators Water Tank: 400 barrel water tank with 2 each 2 x 3 water pumps 350 barrel fuel tank skid As required on a project to project basis As per Operator requirements

Fuel Tank: Tubular Handling: Drill String:

CIL-1000
CIL - 1000 Double Workover Mobile Tele-Double

On Time & On Budget

www.careindustries.ca 403.347.7337 403.347.7755


7762-47th Avenue, Close Red Deer, Alberta

Вам также может понравиться