TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM DESCRIPTION QTY UNIT PRICE UNIT AMOUNT

I 1 a

SPADEWORK TEMPORARY WORK Board Names Project Size 1200 mm x 800 mm dipasang at the height of 3000 mm (made ofplywood5mm,withincoGrade 3 wood guns plain white paint screen printing and writing with the black / blue). Fence Location At least as high as 1800 mm (with BJLS zinc material 0.2 mm x 8 'incet blue with wood stand towelding 3). Project Office Size 4000 mm x 8000 mm (material grade wood 2 thick plywood overlaid 5 mm for wall / plafound, and tin roof BJLS 0.2 mm ka-order yu grade 2, plain cement floor). Warehouse Material Size 8000 mm x 16000 mm (material wood / board grade 2, cover BJLS 0.2 mm tin roof and floor plain cement). Water facilities work Drilled / Dig to a depth of makSimal get water unfit for use. Electrical facilities Using State Electricity or Generator with pollution inallow. Mobilization and Demobilization 1.00 Lot USD 52.00 USD 52.00

378.00

M'

USD

20.00

USD

7,560.00

1.00

Lot

USD

4,500.00

USD

4,500.00

1.00

Lot

USD

1,500.00

USD

1,500.00

1.00

Lot

USD

400.00

USD

400.00

1.00

Lot

USD

1,500.00

USD

1,500.00

1.00

Lot

USD

10,000.00 I. 1

USD USD

10,000.00 25,512.00

SUB TOTAL 2 a CLEANING JOB LOCATION Measurement / Bowplank Material wood / board grade 3 were Axis and mark each point 8 pieces permanent elevation to the guidelines and Coordinated. Demolition of Existing Buildings Dismantled and the former demolition incarrying out the work location. 300.00 M' USD

1.00

USD

300.00

1.00

Lot

USD

5,500.00

USD

5,500.00

Page 1

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM c DESCRIPTION QTY UNIT M2 USD PRICE UNIT 3.00 USD AMOUNT 18,639.00

Soil erosion and Alignment 6213.00 Maximum depth of 200 mm and the rest of the land should be thrown out dari job site.

SUB TOTAL TOTAL II 1 a WORK STRUCTURE WORK FOUNDATION Deep Pile 22000 mm deep with an added Pang 500 mm, and the rest of the land beboring should be thrown out of cash. 96.00 Ttk USD I

I. 2

USD USD

24,439.00 49,951.00

15.00

USD

1,440.00

Excavation Poer 3720.00 Size 25000 mm x 2500 mm thick 1550 mm and all the rest of the excavation inexhaust exit location. Work floor Poer Size 2000 mm x 2000 mm thick 50 mm, 125 K Concrete material Casting Pile size 500 mm x 22000 mm de500 K with concrete materials. 16.00

M3

USD

2.00

USD

7,440.00

M3

USD

60.00

USD

960.00

472.51

M3

USD

110.00

USD

51,975.79

Pile reinforcement 35.91 size 500 mm x 22000 mm deConcrete steel material threaded with SNI 400 8 mm size. Casting Poer Size 2000 mm x 2000 mm thick 700 mm, 500 K concrete material Reinforcement Poer Size 2000 mm x 2000 mm, height700 mm, Concrete steel material threaded SNI 400, 19 mm size and joint with steel wire. Formwork Poer Size 2000 mm x 2000 mm, height 700mm,22mmplywoodmaterial buffer timber class 2 and lawyernails and connective terod. Excavation Sloof Size 600 mm x 800 mm and beexcavation cash thrown out The foundation excavation Ladder Size 1800 mm x 600 mm with deep 1400 mm and former excavation in exhaust exit location. 212.80

Ton

USD

2,500.00

USD

89,776.37

M3

USD

110.00

USD

23,408.00

14.90

Ton

USD

3,200.00

USD

47,667.20

425.60

M2

USD

40.00

USD

17,024.00

401.54

M3

USD

2.00

USD

803.09

15.12

M3

USD

2.00

USD

30.24

Page 2

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM k DESCRIPTION The foundation excavation verandah Size 500 mm x 500 mm with expelled former excavation site. QTY 63.30 UNIT M3 USD PRICE UNIT 2.00 USD AMOUNT 126.60

The foundation excavation Toilet Size 500 mm x 500 mm with expelled former excavation site. Foundation breezeway & Toilet Size 250 mm / 500 mm and height 500 mm, using material BaCouple times tu 1:3 mixture. Work Floor Stairs & Lift Foundation Size 400 mm and 50mm thick deConcrete material with K 125 Casting Ladder & Lift Foundation Size 1400 mm x 400 mm and 1300 mm high, 500 K Concrete. Ladder & Lift foundation reinforcement size 1400 mm x 400 mm and 1300 mm high, with the material bethe concrete screw SNI 400 sizes 16 mm steel wire binder. Formwork Stairs & Lift Foundation Size 1400 mm x 400 mm and height 1300 mm, plywood material thick ness 22 mm, grade 2 wooden buffers and fastener nails / terod.

8.00

M3

USD

2.00

USD

16.00

53.48

M3

USD

30.00

USD

1,604.25

0.28

M3

USD

60.00

USD

16.80

7.28

M3

USD

110.00

USD

800.80

0.80

Ton

USD

2,000.00

USD

1,601.60

46.80

M2

USD

40.00

USD

1,872.00

SUB TOTAL 2 a WORK ON THE 1st FLOOR Hoarding & Floor Hallway As high as 800 mm compacted and using the material type of soil piled. Lc & working foundry floor breezeway 50 mm thick, 125 K Concrete Materials. Casting Floor & breezeway Length 120 mm, 200 K Concrete Floor reinforcement & breezeway 120 mm thick, reinforced concrete material SNI 400 thread size 16 mm area findings with the beam i the steel wire. Work floor Sloof Size of 300 mm and thickness 50 mm de Concrete with K 125. 1500.26 M3 USD

II. 1

USD

246,562.74

15.00

USD

22,503.84

93.77

M3

USD

60.00

USD

5,625.96

225.04

M3

USD

80.00

USD

18,003.07

0.47

Ton

USD

2,000.00

USD

937.66

12.55

M3

USD

60.00

USD

752.90

Page 3

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM f DESCRIPTION Casting Sloof Size 300 mm x 700 mm with Concrete material K 500. QTY 175.68 UNIT M3 PRICE UNIT USD 110.00 AMOUNT USD 19,324.31

Reinforcement Sloof 21.08 Size 300 mm x 700 mm with SNI threaded steel reinforcing material 400 size staff ran 22 mm, 25 extra and beugel 8 mm, steel wire binder. Formwork Sloof Size 300 mm x 700 mm with 22mmplywoodmaterialandin 2 grade wood guns, nail fastener. Casting Column Size 800 mm x 800 mm and height 4500 mm, 500 K Concrete material. Column Reinforcement Size 800 mm x 800 mm and height 4500 mm, material Concrete steel screw SNI 400 with 22 mm and 25 beugel mm and 8 mm, fastener with the steel wire. Column Formwork Size 800 mm x 800 mm and height 4500mm,22mmplywoodmaterial buffer timber class 2 and innspikes / terod. Casting Wall Ladder & Lift Thickness of 150 mm, height 4500 mm Concrete material K 500. Wall reinforcement Ladder & Lift Size 150 mm x 4500 mm, materialConcrete steel threaded al SNI 400 with dimention 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4500 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener. Casting Stairs Width of 1400 mm and a thickness200 mm, 500 K concrete material. Reinforcement Stairs Width of 1400 mm and a thicknesslan 200 mm, Concrete steel screw material SNI 400, the size of 16 mm on the beam size 12 to floor, floor drilldes and risers. 1171.17

Ton

USD

4,200.00

USD

88,540.45

M2

USD

40.00

USD

46,846.80

267.84

M3

USD

110.00

USD

29,462.40

25.44

Ton

USD

4,200.00

USD

106,868.16

1339.20

M2

USD

40.00

USD

53,568.00

31.73

M3

USD

110.00

USD

3,489.75

9.52

Ton

USD

1,800.00

USD

17,131.50

126.90

M2

USD

40.00

USD

5,076.00

11.76

M3

USD

110.00

USD

1,293.60

2.06

Ton

USD

1,800.00

USD

3,704.40

Page 4

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM s DESCRIPTION Formwork Stairs Width of 1400 mm and a thickness200 mm, material size plywood 22mmbuffertimberclass2 binder with spikes QTY 162.16 UNIT M2 USD PRICE UNIT 40.00 USD AMOUNT 6,486.40

SUB TOTAL 3 a WORK ON THE 2nd FLOOR Floor casting Ukuranbalok 300 mm x 700 mm and 150 mm thick floor, with material Concrete K 500. Floor reinforcement Beam size of 300 mm x 700 mm and 150 mm thick floor, iron material be concrete screw SNI 400, 22 and 25 beugel 8 mm, 12 mm Floor binder with steel wire. Flooring Formwork Beam size of 300 mm x 700 mm and 150 mm thick floor, with material22mmplywood,woodenbuffer class 2 and fastener nails. Casting Column Size 800 mm x 800 mm and height 4000 mm, 500 K Concrete material. Column Reinforcement Size 800 mm x 800 mm and height 4000 mm, material Concrete steel screw ISO 400 with 22 mm and 25 beugel mm and 8 mm, fastener with steel wire. Column Formwork Size 800 mm x 800 mm and height 4000mm,22mmplywoodmaterial buffer timber class 2 and spikes / terod. Casting Wall Ladder & Lift Thickness of 150 mm, height 4000 mm Concrete material K 500. Wall reinforcement Ladder & Lift Size 150 mm x 4000 mm, materialConcrete steel threaded al SNI 400 with 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4000 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener. 437.74 M3 USD

II. 2

USD

429,615.19

131.00

USD

57,344.01

159.96

Ton

USD

5,040.00

USD

806,188.95

3169.24

M2

USD

48.00

USD

152,123.28

238.08

M3

USD

131.00

USD

31,188.48

21.43

Ton

USD

5,040.00

USD

107,993.09

1190.40

M2

USD

48.00

USD

57,139.20

28.20

M3

USD

131.00

USD

3,694.20

8.46

Ton

USD

2,160.00

USD

18,273.60

112.80

M2

USD

48.00

USD

5,414.40

Page 5

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM j DESCRIPTION Casting Stairs Width of 1400 mm and a thickness200 mm, 500 K concrete material. Reinforcement Stairs Width of 1400 mm and a thickness200 mm, Concrete steel screw material SNI 400, 16 mm to measure the beam size 12 to floor, floor drilldes and risers. Formwork Stairs Width of 1400 mm and a thickness200 mm, material size plywood 22mmbuffertimberclass2the binder with spikes QTY 10.08 UNIT M3 PRICE UNIT USD 131.00 AMOUNT USD 1,320.48

1.76

Ton

USD

2,160.00

USD

3,810.24

140.16

M2

USD

48.00

USD

6,727.68

SUB TOTAL 4 a WORK ON THE 3rd FLOOR Floor Casting Dimention 300 mm x 700 mm and 150 mm thick floor, with material Concrete K 500. Floor reinforcement Beam size of 300 mm x 700 mm and 150 mm thick floor, iron material be concrete screw SNI 400, 22 and 25mm beugel 8 mm, 12 mm Floor thebinder with steel wire. Flooring formwork Beam size of 300 mm x 700 mm and 150 mm thick floor, with material22mmplywood,woodenbuffer class 2 and fastener nails. Casting Column Size 800 mm x 800 mm and height 4000 mm, 500 K Concrete material. Column reinforcement Size 800 mm x 800 mm and height 4000 mm, material Concrete steel screw SNI 400 with 22 mm and 25 and beugel 8 mm, fastener with steel wire. Column Formwork Size 800 mm x 800 mm and height 4000mm,22mmplywoodmaterial buffer timber class 2 and in spikes / terod. Casting Wall Ladder & Lift Thickness of 150 mm, height 4000 mm Concrete material K 500. 328.17 M3 USD

II. 3

USD

1,251,217.60

144.00

USD

47,256.05

170.46

Ton

USD

5,504.00

USD

938,195.33

2375.34

M2

USD

52.40

USD

124,467.82

238.08

M3

USD

144.00

USD

34,283.52

29.76

Ton

USD

5,504.00

USD

163,799.04

1190.40

M2

USD

52.40

USD

62,376.96

28.20

M3

USD

144.00

USD

4,060.80

Page 6

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM h DESCRIPTION Wall reinforcement Ladder & Lift Size 150 mm x 4000 mm, materialConcrete steel threaded al SNI 400 with size 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4000 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener. Casting Stairs Width of 1400 mm and a thickness200 mm, 500 K concrete material. Reinforcement Stairs Width of 1400 mm and a thickness200 mm, Concrete steel screw material SNI 400, 16 mm to measure the beam size 12 to floor, floor drilldes and risers. Formwork Stairs Width of 1400 mm and a thickness200 mm, material size plywood 22mmbuffertimberclass2the binder with spikes QTY 8.46 UNIT Ton PRICE UNIT USD 2,380.00 AMOUNT USD 20,134.80

112.80

M2

USD

52.40

USD

5,910.72

10.08

M3

USD

144.00

USD

1,451.52

1.76

Ton

USD

2,600.00

USD

4,586.40

140.16

M2

USD

52.40

USD

7,344.38

SUB TOTAL 5 a WORK ON THE 4th FLOOR Floor casting Dimention 300 mm x 700 mm and 150 mm thick floor, with material Concrete K 500. Floor reinforcement Beam size of 300 mm x 700 mm and 150 mm thick floor, iron material be concrete screw ISO 400, 22 and 25mm beugel 8 mm, 12 mm Floor debinder with steel wire. Flooring formwork Beam size of 300 mm x 700 mm and 150 mm thick floor, with material22mmplywood,woodenbuffer class 2 and fastener nails. Casting Column Size 800 mm x 800 mm and height 4000 mm, 500 K Concrete material. Column reinforcement Size 800 mm x 800 mm and height 4000 mm, material Concrete steel screw SNI 400 with 22 mm and 25 and beugel 8 mm, fastener with steel wire. 328.17 M3 USD

II. 4

USD

1,413,867.34

158.00

USD

51,850.39

170.46

Ton

USD

5,673.00

USD

967,002.56

2375.34

M2

USD

56.70

USD

134,681.78

238.08

M3

USD

172.00

USD

40,949.76

29.76

Ton

USD

5,672.00

USD

168,798.72

Page 7

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM f DESCRIPTION Column Formwork Size 800 mm x 800 mm and height 4000mm,22mmplywoodmaterial buffer timber class 2 and in spikes / terod. Casting Wall Ladder & Lift Thickness of 150 mm, height 4000 mm Concrete material K 500. Wall reinforcement Ladder & Lift Size 150 mm x 4000 mm, materialConcrete steel threaded al SNI 400 with size 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4000 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener. Casting Stairs Width of 1400 mm and a thickness200 mm, 500 K concrete material. Reinforcement Stairs Width of 1400 mm and a thickness200 mm, Concrete steel screw material SNI 400, 16 mm to measure the beam size 12 to floor, floor drilldes and risers. Formwork Stairs Width of 1400 mm and a thickness200 mm, material size plywood 22mmbuffertimberclass2the binder with spikes QTY 1190.40 UNIT M2 USD PRICE UNIT 57.65 USD AMOUNT 68,626.56

28.20

M3

USD

158.00

USD

4,455.60

8.46

Ton

USD

2,800.00

USD

23,688.00

112.80

M2

USD

57.65

USD

6,502.92

10.08

M3

USD

158.00

USD

1,592.64

1.76

Ton

USD

2,860.00

USD

5,045.04

140.16

M2

USD

57.65

USD

8,080.22

SUB TOTAL 6 a WORK ON THE 5th FLOOR Floor casting Dimention 300 mm x 700 mm and 150 mm thick floor, with material Concrete K 500. Floor reinforcement Beam size of 300 mm x 700 mm and 150 mm thick floor, iron material be concrete screw SNI 400, 22 and 25mm beugel 8 mm, 12 mm Floor the binder with steel wire. Flooring formwork Beam size of 300 mm x 700 mm and 150 mm thick floor, with material22mmplywood,woodenbuffer class 2 and fastener nails. 328.17 M3 USD

II. 5

USD

1,481,274.19

188.00

USD

61,695.40

170.46

Ton

USD

6,230.00

USD

1,061,947.11

2375.34

M2

USD

62.30

USD

147,983.68

Page 8

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM d DESCRIPTION Casting Column Size 800 mm x 800 mm and height 4000 mm, 500 K Concrete material. Column reinforcement Size 800 mm x 800 mm and height 4000 mm, material Concrete steel screw SNI 400 with 22 mm and 25 and beugel 8 mm, fastener with steel wire. Column Formwork Size 800 mm x 800 mm and height 4000mm,22mmplywoodmaterial buffer timber class 2 and in spikes / terod. Casting Wall Ladder & Lift Thickness of 150 mm, height 4000 mm Concrete material K 500. Wall reinforcement Ladder & Lift Size 150 mm x 4000 mm, materialConcrete steel threaded al SNI 400 with size 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4000 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener. Casting Stairs Width of 1400 mm and a thickness200 mm, 500 K concrete material. Reinforcement Stairs Width of 1400 mm and a thickness200 mm, Concrete steel screw material SNI 400, 16 mm to measure the beam size 12 to floor, floor drilldes and risers. Formwork Stairs Width of 1400 mm and a thickness200 mm, material size plywood 22mmbuffertimberclass2the binder with spikes QTY 238.08 UNIT M3 PRICE UNIT USD 188.00 AMOUNT USD 44,759.04

29.76

Ton

USD

6,230.00

USD

185,404.80

1190.40

M2

USD

62.30

USD

74,161.92

28.20

M3

USD

188.00

USD

5,301.60

8.46

Ton

USD

3,080.00

USD

26,056.80

112.80

M2

USD

62.30

USD

7,027.44

10.08

M3

USD

188.00

USD

1,895.04

1.76

Ton

USD

3,080.00

USD

5,433.12

140.16

M2

USD

62.30

USD

8,731.97

SUB TOTAL 7 a WORK ON THE TOP ROOF Floor casting Dimention 300 mm x 700 mm and 150 mm thick floor, with material al Concrete K 500. 396.57 M3 USD

II. 6

USD

1,630,397.92

188.00

USD

74,554.60

Page 9

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM b DESCRIPTION QTY UNIT Ton PRICE UNIT USD 6,230.00 AMOUNT USD 1,168,480.11

Floor reinforcement 187.56 Beam size of 300 mm x 700 mm and 150 mm thick floor, iron material be concrete screw ISO 400, 22 and 25 and beugel 8 mm, 12 mm Floor the binder with steel wire. Flooring formwork Beam size of 300 mm x 700 mm and 150 mm thick floor, with material22mmplywood,woodenbuffer class 2 and fastener nails. casting Column Size 800 mm x 800 mm and height 4000 mm, 500 K Concrete material. Column reinforcement Size 800 mm x 800 mm and height 4000 mm, material Concrete steel screw ISO 400 with 22 mm and 25 and beugel 8 mm, fastener with steel wire. 2867.34

M2

USD

62.30

USD

178,635.28

40.96

M3

USD

188.00

USD

7,700.48

5.12

Ton

USD

6,230.00

USD

31,897.60

Column formwork Size 800 mm x 800 mm and height 4000mm,22mmplywoodmaterial buffer timber class 2 and in spikes / terod.

204.80

M2

USD

62.30

USD

12,759.04

Casting Wall Ladder & Lift Thickness of 150 mm, height 4000 mm Concrete material K 500. Wall reinforcement Ladder & Lift Size 150 mm x 4000 mm, materialConcrete steel threaded al SNI 400 with size 12 mm, steel wire binder. Wall formwork Ladder & Lift Size 150 mm x 4000 mm, with 22mmplywoodmaterialbuffer 2 grade wood and nail fastener.

28.20

M3

USD

188.00

USD

5,301.60

8.46

Ton

USD

3,080.00

USD

26,056.80

112.80

M2

USD

62.30

USD

7,027.44

SUB TOTAL TOTAL II III 1 a FINISHING WORK WORK SPOUSE The walls 1:3 mixture of brick partner plaster mixed 1:3 in aci. wall toilets 1:2 mixture of brick partner with plaster mixed 1:2. 5880.00 M2 USD

II. 7

USD USD

1,512,412.95 7,965,347.92

40.00

USD

235,200.00

1400.00

M2

USD

55.00

USD

77,000.00

Page 10

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM c DESCRIPTION floor Granite size 600 mm x 600 mm 1:3 mixture, broadcast lock-clicking use adhesive resin. floor Toilet Ceramic size 300 mm x 300 mm 1:2 mix, broadcast on the shaft lock. floor Stairs Granite size 600 mm x 600 mm and a 1:3 mixture of step nosing ukuran 100 mm x 600 mm, the broadcast taped with resin. wall toilets Ceramic size 200 mm x 250 mm 1:2 mix, broadcast on the shaft lock. wall lift Granite size 600 mm x 600 mm 1:3 mixture, broadcast lock-clicking use adhesive resin. Partition Workspace Aluminum 4 "PC + Glass and Doors Toilet partitions Type Cubikal Cladding wall Flat Iron Frame Type and elbow QTY 6750.00 UNIT USD PRICE UNIT 45.00 USD AMOUNT 303,750.00

760.00

USD

22.50

USD

17,100.00

302.40

USD

45.00

USD

13,608.00

2072.00

USD

22.50

USD

46,620.00

200.00

USD

45.00

USD

9,000.00

542.00

USD

75.00

USD

40,650.00

480.00

USD

105.00

USD

50,400.00

2500.00

USD

200.00

USD

500,000.00

SUB TOTAL 2 a PLAFOUND & STEEL ROOF WORK Waiting Room, Lobby, Administration, Cafeteria, clinic and library Flat Type, material Agustik 600 mm x 1200 mm thickness 10 mm with profil alumuninum and hanger sets. Toilet, Warehouse, Maintenance and selasar. Flat type 12 mm Gypsum material deFuring frame with 50 mm x 50 mm and hanger wire Space Minister, Cabinet, Deputy anchovies, Director and Meeting Room. Flat type 12 mm Gypsum material with Furing frame with 50 mm x 50 mm and hanger wire Auditorium Flat type 12 mm Gypsum material deFuring frame with 50 mm x 50 mm and hanger wire 4050.00 USD

III. 1

USD

702,278.00

50.00

USD

202,500.00

1250.00

USD

25.00

USD

31,250.00

1500.00

USD

55.00

USD

82,500.00

600.00

USD

55.00

USD

33,000.00

Page 11

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM d DESCRIPTION Terras / Carport Flat type 12 mm Gypsum material with Furing frame with 50 mm x 50 mm and hanger wire Auditorium Roof WF 300 steel frame with roof spandex. QTY 75.50 UNIT USD PRICE UNIT 55.00 USD AMOUNT 4,152.50

1.00

Lot

USD

150,000.00

USD

150,000.00

SUB TOTAL TOTAL III IV 1 a MECHANICAL & ELECTRICAL WORK PLUMBING WORK Dirty Water Installation Closed system using material PVC 4 "to primary and 2" in secondary channel Water Installation Closed system using material PVC 2 "to primary and 1" in secondary channels and "in tertiary. Installing Water Fire Extinguishers Closed system using material PVC 2 ". 7500.00 M2 USD

III. 2

USD USD

503,402.50 1,205,680.50

12.50

USD

93,750.00

7500.00

M2

USD

12.50

USD

93,750.00

7500.00

M2

USD

12.50

USD

93,750.00

SUB TOTAL 2 a WORK ELECTRIKAL Electrical Installation Cropping system is open, menggunaPlastic PVC material right or Sebawrapping, cable used type of heat-resistant 3 phase. Data and Telephone Installation Closed system, using estabcord wrap and standard data. Detector and Camera Closed systems and early warning as well as the central monitor. Air-Conditioning Installation Type window for limited space and type tower for space-bersta tus general, with a capacity FITNESS customize. Grounding Installation & Anti Lightning Using a system of vertical and pitch planting, using the exposed wires types of copper. 7500.00 M2 USD

IV. 1

USD

281,250.00

7.50

USD

56,250.00

7500.00

M2

USD

7.50

USD

56,250.00

7500.00

M2

USD

7.50

USD

56,250.00

7500.00

M2

USD

20.00

USD

150,000.00

1.00

Lot USD

2,500.00

USD

2,500.00

SUB TOTAL

IV. 2 USD

321,250.00

Page 12

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM 3 a DESCRIPTION WORK GEAR Hole Dirty Water Control Size 300 mm x 300 mm x 300 mm made of adobe pair with plaster shaft with concrete cover. Septic tank and Infiltration Size 200 mm x 500 mm x 150 mm of partner concrete block and cover casted concrete K 500. Water reservoirs Primary Size 300 mm x 600 mm x 200 mm of plastered brick couples aci and coated with anti-leak's fulltop concrete K 500. Water reservoirs Secondary Fiberglass material capacity of 5000 liter, concrete buffer Rooftop. Fire hydrant Type box set to the building and tower outside the building. Power House & UPS Size 8000 mm x 12000 mm watertight voice and space for Power House UPS in part. Garden Lights As high as 1800 mm pipe supports iron 1 "dicet white and light type out door type of clear glass Control Panel Customized size, type un manufacturer tuk all needs. Toilet Accessories Ceramic Materials For Closet, Urinal and Bath, Metal material for Floor drain. Mirror frame st.steel Lift Equipment Type Passenger & Goods Kap 1 ton Generators and UPS units 1.00 Lot USD 7,500.00 USD 7,500.00 QTY UNIT PRICE UNIT AMOUNT

1.00

Lot

USD

25,000.00

USD

25,000.00

1.00

Lot

USD

25,000.00

USD

25,000.00

1.00

Lot

USD

7,500.00

USD

7,500.00

1.00

Lot

USD

55,000.00

USD

55,000.00

1.00

Lot

USD

200,000

USD

200,000.00

250.00

Lot

USD

175.00

USD

43,750.00

1.00

Lot

USD

80,000.00

USD

80,000.00

760.00

M2

USD

250.00

USD

190,000.00

4.00

Lot

USD

80,000.00

USD

320,000.00

1.00

Lot

USD

250,000.00

USD

250,000.00

SUB TOTAL TOTAL IV

IV. 3 USD USD

1,203,750.00 1,806,250.00

Page 13

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM V 1 a DESCRIPTION EXTERIOR WORK JOBS GUIDES Fence 500.00 Mate 1:3 plaster brick leveling compound decombination with trellis. Gate / Door Entry & Exit Plastered brick and cast mate and aci, trellis gate type two-way slide and portals. Keep heading Dipilar finishing arch with apemik and window glass, on the front and one on the mereng with ceramic finishing and kathe bathroom. 1.00 M' USD 150.00 USD 75,000.00 QTY UNIT PRICE UNIT AMOUNT

Lot

USD

75,000.00

USD

75,000.00

1.00

Lot

USD

30,000.00

USD

30,000.00

SUB TOTAL 2 a SIGNAGE Foundation Size 250 mm / 500 mm deep 700 mm masonry times 1:3. Frame Size 5000 mm x 3000 mm with K 300 reinforced concrete frame and couples plastered brick shaft at the back and a couple granit on the front. Writing Using print letters of material stainless steel. 1.00 Lot USD

V. 1 USD

180,000.00

1,000.00

USD

1,000.00

1.00

Lot

USD

2,500.00

USD

2,500.00

1.00

Lot

USD

500.00

USD

500.00

SUB TOTAL 3 a WORK FLAG POLE Foundation Cast concrete K 300, depth 500 mm cross section of 300 mm x 300 mm Floor K 200 cast concrete, 100 mm thick and size 2000 mm x 2000 mm. Flagpole Material iron pipe 3 "combination of with 2 "total height 7000 mm, in complete ropes and hoists and in painting oil with white. 1.00 Lot USD

V. 2 USD

4,000.00

200.00

USD

200.00

1.00

Lot

USD

700.00

USD

700.00

1.00

Lot

USD

2,500.00

USD

2,500.00

SUB TOTAL

V. 3 USD

3,400.00

Page 14

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM 4 a DESCRIPTION MULTI SPACE AREA Foundation Fitted with a 1:3 mixture of stone size 250 mm / 400 mm and height 400 mm. Floor Size 40000 mm x 30000 mm and 100 mm thick, the concrete material quality K 300, plastered aci. 1.00 Lot USD 11,000.00 USD 11,000.00 QTY UNIT PRICE UNIT AMOUNT

1.00

Lot

USD

25,000.00

USD

25,000.00

Line Arena Paint primrose oil for land area basket ball and red colour at volley ball area and green colour for tennis courts. Equipment Permanent basketball wicket and clicking use iron pipe, for a net pole volleyball and tennis knock down system.

1.00

Lot

USD

1,500.00

USD

1,500.00

1.00

Lot

USD

75,000.00

USD

75,000.00

SUB TOTAL 5 a ROAD WORK Asphalting Material thickness of 70 mm with Hot mix asphalt Cansteen Cansteen made of cast concrete Quality K 300 size 400 mm and 200 mm height 300 mm embedded deep100 mm, were black and adjacent white Directions Square shape sizes 300 mm x 400 mm blue base color and a pointer white color, thick steel plate material 3 mm steel pipe propped 2 "settinggi 2000 mm and is embedded in the poundconcrete ties as deep as 500 mm. Parking lines yellow color with oil paint and many standard 3000.00 M2 USD

V. 4 USD

112,500.00

90.00

USD

270,000.00

1.00

Lot

USD

11,000.00

USD

11,000.00

120.00

Bh

USD

100.00

USD

12,000.00

1.00

Lot

USD

2,500.00

USD

2,500.00

SUB TOTAL

V. 5 USD

295,500.00

6 a

GARDEN WORK Humus accumulation 150 mm thick, with ground humus. 1200.00 M2 USD 11.00 USD 13,200.00

Page 15

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

BILL OF QUANTITIES THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste NUM b DESCRIPTION Trees and Grass The kind that can save water and light and shade treatments and unfruitful. QTY 1200.00 UNIT M2 USD PRICE UNIT 75.00 USD AMOUNT 90,000.00

SUB TOTAL TOTAL VI 1 WORK FURNITURE TABLE AND CHAIR Multi work station system knock down Filing cabinet Multi work station system knock down

V. 6 USD ( V ) USD

103,200.00 698,600.00

7310.00

M2

USD

100.00

USD

731,000.00

7310.00

M2

USD TOTAL TOTAL

30.00

USD

219,300.00 950,300.00 12,676,129.42

( V ) USD USD

Dili, Juli 25 - 2013 Tabaki Construction Unipessoal, Lda Director

DELTA RAMALHINO ALVES

Page 16

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 17

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 18

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 19

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 20

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 21

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 22

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 23

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 24

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 25

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 26

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 27

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 28

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 29

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 30

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 31

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 32

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 33

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 34

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 35

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 36

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 37

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 38

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 39

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 40

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 41

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 42

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 43

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 44

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 45

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 46

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 47

TABAKI CONSTRUCTION UNIPESSOAL, Lda

BILL OF QUANTITIES

Page 48

AMOUNT ESTIMATE THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE REPUBLIC DEMOCRATIC OF TIMOR LESTE
Rau Vila Verde, Dili - Timor Leste

SPADEWORK

USD

49,951.00

II

WORK STRUCTURE

USD

7,965,347.92

III

FINISHING WORK

USD

1,205,680.50

IV

MECHANICAL & ELECTRICAL WORK

USD

1,806,250.00

EXTERIOR WORK

USD

698,600.00

VI

WORK FURNITURE

USD

950,300.00

TOTAL

USD

12,676,129.42

Dili, 25 Juli 2013 Tabaki Construction Unipessoal, Lda Director

DELTA RAMALHINO ALVES

COST ESTIMATE
REPUBILC DEMOCRATIC OF TIMOR LESTE THE NEW FACILITIES FOR THE MINISTRY OF EDUCATION OFFICE
Rau Vila Verde, Dili - Timor Leste