IQ-01
Assure that all main and auxiliary components of the Purified Water System are as per manufacturer/vendor specifications (Manuals, Spec sheets, P & IDs, etc.)
Procedure: a. Per equipment, collect and document the required information thru physical inspection (tag, engrave, plate, sticker, etc) b. Evaluate findings against specifications References Required: x Note: Vendor/Manufacturer documentation (Manuals, Spec sheets, P & IDs, etc.) does not count as Actual Result reference
Acceptance Criteria: x Actual results match expected results as per manufacturer written specifications
IQ-01
PERFORMED BY/DATE
1A
Conformance to the acceptance criteria was evaluated and the final determination is as follows: Acceptance Criteria met? (YES/NO) __________ Reviewed by: If NO, refer to Deviation # __________ Date:
IQ-01
PERFORMED BY/DATE
2A
Conformance to the acceptance criteria was evaluated and the final determination is as follows: Acceptance Criteria met? (YES/NO) __________ Reviewed by: If NO, refer to Deviation # __________ Date:
IQ-01
PERFORMED BY/DATE
3A
Conformance to the acceptance criteria was evaluated and the final determination is as follows: Acceptance Criteria met? (YES/NO) __________ Reviewed by: If NO, refer to Deviation # __________ Date:
IQ-01
PERFORMED BY/DATE
4A
Conformance to the acceptance criteria was evaluated and the final determination is as follows: Acceptance Criteria met? (YES/NO) __________ Reviewed by: If NO, refer to Deviation # __________ Date:
IQ-01
PERFORMED BY/DATE
5A
Conformance to the acceptance criteria was evaluated and the final determination is as follows: Acceptance Criteria met? (YES/NO) __________ Reviewed by: If NO, refer to Deviation # __________ Date: