COMMISSIONING TEST REPORT FOR ____KV, _____ MVA TRANSFORMER

PI/SQF/CCL/TRAF/435 Pages: 1 of 5 Date: 14.09.2007

Client : Equipment Details : Connection Symbol : Make and Sr. No. : Rating : ________MVA ____/____ KV; ONAN/ONAF/OFAN/OFAF. HV Amps : LV Amps: Outdoor/Indoor Installation Tap Changer : On Load/Off Circuit Range of Taps : +_______% to -_______% in ______ equal steps of ______% of HV % Impedance : ______/______/______ at Tap ____/____/____ Temperature Rise : _____ C/ _____ C in Winding/Oil above _____ C Details of Accessories Buchhol OSR OTI WTI MOG PRV Bushing z s Make

Description 1. Physical Inspection a. Transformer Tank b. Radiators (Check for valves) c. Bushing (Check for oil level and earthing cap) d. Explosion Vent (Check for diaphragm) e. Accessories(as mentioned above) f. HV/LV Jumpers 2. Installation / Connection a. Disposition vis-a-vis drawing b. Mounting direction of Buchholz c. Removing of Transportation Hood for condenser bushing d. Oil / Wdg. Temp indicator probes and oil pots. e. Breather mounting f. Stoppers g. Valves at radiators/B.relay h. Sampling/Filter/ Drain Valves i. Divertor Valve i. Fire Protection System 3. a.CT circuit checks

Type of Check Visual Visual / Mechanical

Checked For leakage/damage Correctness / Operation position of Valves as per Transformer Manual

Remarks

Installed correctly Checked Check for correct

Tested By
Siemens Ltd.

Witnessed By

Date

:
Dept./Ref.No.
Office

SIEMENS LTD.

PI Ref.

COMMISSIONING TEST REPORT FOR ____KV, _____ MVA TRANSFORMER


termination b. Safety Earthing of CT circuits 4. Silica Gel Visual

PI/SQF/CCL/TRAF/435 Pages: 2 of 5 Date: 14.09.2007

Circuits checked by secondary injection Colour (Should be blue) For Trapped Air

5. Air Released from Buchholz Mechanical relay, radiators, Tank, OLTC, Bushings. a. Check for oil leakage 6. Earthing Mechanical a. Body Earthing b. Neutral Earthing c. Tank Band to Band Earthing d. Transformer Core & Frame . Earthing 7. Oil dielectric strength Instrument Used : Type of Electrode: Gap Setting: Electrical

Correctness

Average Breakdown Value

8. Insulation Resistance Electrical Instrument used : Make & Sr.No. : Temperature (OTI)-_____ C Min : 1M O /KV at 75 C Rt1 = 2Rt2 t2-t1 = 10C 9. * Vector group Electrical 10. * Ratio 11. * No load magnetising current 12 * Load current (reduced .impedance voltage) 13. Bucholz relay function (by hand pump / compressed O2 / by simulation / by oil draining.) 14. MOG and PRV check by simulation 15. OTI / HV WTI / LV WTI Remote indication * AS PER SHEET 5. Electrical Electrical Electrical Mechanical

Condition of Oil/Wdg

IR HV -E LV - E HV - LV

Correctness of Terminal Marking Tap Change Connection Damage to core assembly Balanced Current Operation

Mechanical/ Electrical Visual

Proper Contact Proper installation Oil in pockets

Tested By
Siemens Ltd.

Witnessed By

Date

:
Dept./Ref.No.
Office

SIEMENS LTD.

PI Ref.

COMMISSIONING TEST REPORT FOR ____KV, _____ MVA TRANSFORMER


Description 16. Tap changer a. Off circuit b. On load c. Remote cubicle 17. Cooling a. Fan mounting & installation. b. Insulation resistance (Min 1 Meg ohms) Instrument used : Make & Sr No: c. Operation Type of Check Mechanical Mechanical/ Electrical Electrical Checked Operation Operation

PI/SQF/CCL/TRAF/435 Pages: 3 of 5 Date: 14.09.2007 Remarks

Remote manual Remote automatic Master / Follower Correctness Wdg condition Ph-E : Ph-Ph :

Visual/ Mechanical Electrical

Electrical Current measurement of fans Direction. Group Control. Manual Control. Automatic Control. Proper instn. Proper contact. Oil in pockets.

d. WTI for fans. e. Overload settings for fans f. WTI - HV settings for auto controls g. Remote annunciation check h. 415 V supply change over trial i. Space heater ON Settings on Transformer MB OTI WTI WTI (Fans)

Mechanical/ Electrical Electrical Mechanical

Alarm

Trip

(Stop)

(Start)

Tested By
Siemens Ltd.

Witnessed By

Date

:
Dept./Ref.No.
Office

SIEMENS LTD.

PI Ref.

COMMISSIONING TEST REPORT FOR ____KV, _____ MVA TRANSFORMER


A) VECTOR GROUP TEST Isolate Primary / Secondary Neutral Earth. Short 1U - 2U, Apply 3 Phase 415 V to 1U - 1V - 1W terminals. Measure following voltages : 1U-1V = ; 1V-1W = ; 1W-1U 1U-1N = ; 1V-1N = ; 1W-1N 1U-2N = ; 2N-1N = ; 2N-1V/ 1V-2V = ; 1V-2W = . 1W 1W= ; 1W-2W = . 2V Conditions : Dyn11 Dyn1 Ynyn0 B) side. Tap

PI/SQF/CCL/TRAF/435 Pages: 4 of 5 Date: 14.09.2007

= = =

. . .

1W - 2W < 1W - 2V (1U - 2N) + (2N - 1V) = 1U - 1V 1V - 2V < 1V - 2W (1U - 2N) + (2N - 1W) = 1U 1W (1U - 2N) + (2N - 1N) = 1U - 1N 1W - 2W = 1V - 2V

RATIO TEST Ratio test done by applying 415V on primary side and measuring voltage on secondary Voltage applied (In Volts) 1U-1V 1V-1W 1U-1W Measured Ratio (In Volts) 2V-2N (2V-2W)

2U-2N (2U-2V)

2W-2N (2W-2U)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Tested By
Siemens Ltd.

Witnessed By

Date

:
Dept./Ref.No.
Office

SIEMENS LTD.

PI Ref.

COMMISSIONING TEST REPORT FOR ____KV, _____ MVA TRANSFORMER


C) NO LOAD MAGNETISING / LOAD CURRENT TEST

PI/SQF/CCL/TRAF/435 Pages: 5 of 5 Date: 14.09.2007

Measurement of no load magnetising current / load current is done with Ammeters connected in primary circuit. Dotted lines indicate shorting of phases for load (reduced %ZV). Balanced secondary currents to be measured either with Ammeter or Tong Tester. CAUTION: The open circuit and short circuit test are always to be done with 3 Ph 415V supplies connected to HV terminals. No load magnetising current mA I0 U I0 V I0 W Load current primary Amps I1 U I1 V I1 W Load current secondary Amps I2 U I2 V I2 W

Tap Min. Nomin al Max.

Transformer found healthy

Yes / No

Tested By
Siemens Ltd.

Witnessed By

Date

:
Dept./Ref.No.
Office

SIEMENS LTD.