Академический Документы
Профессиональный Документы
Культура Документы
Draft-LolL'lL3
Projet lD
ilbiri:
Proict Type
PrpjectTitle
Project Dsqption
Magsterial District
Project Estimate
Beneft/Cost
Rato
Interchange
lonstruct grade-seParated interchange t the intersection ofthe Fairfx County Parkway nd popes Head Road, with shared jsepathsonbothsides, ProvideforfutureconnectontoshirleVGateRoadtotheesr.
5prngfield
590,15O,00(
nterchange
:onstruct a Brade-separted nterchange on Franconi-Sprntfeld Parkway, including an overpass of Neuman Street extensron leconstructHooesRoadandNeumanstreetintersection.consructnewsdewalkalongNeumanstreet. closeexistig ntersedion of Franconi-Springfield Parkway nd sprng Village Drive/Eonniemill Lane, and remove traffc signl-
Lee
ss8,0s0,00(
Interchange
leconstruct portions of the existng nterchnge at Route 28 and l-66. Remove four tmffc signls on Route 28 to enhance afety and mprove capcty. Wden and reconstfuct westbound l-66 off Emp to nofthbound Route 28. Realign Braddock toad/Wlney Road and construct overpass wth ramp connecton from northbound Route 28 to new bridge. provide new
ronnections from.Braddock Road to estbound and westbound l-66, from Braddock Road to and from southbound Route 28, nd from southbound Route 28 to eastbound l-66 (flyover).
Sully
5166,000.00(
nterchange
mprovements
construct a flyover mp to carry trffic exitint northbound l-95 to go west o ihe Fairfax county parkwy. The project would include construction of left turns at the Fairfax county parkway off-m and Loisdale Road intersecton.
Mt. Vernon
594,000,00(
1.
lnterchnge
mprovements
lonstruct Sngle-occupant vehcle (sOV) ramps from l-95 Southbound to Westbound FEnconia Springfeld parkway, and :astbound Franconia Springeld prkwayto Northbound l-95. Reconstruct bridge
Dedestrn over l_95.
Lee
S189,7so,oo(
lnterchange
lonstrud
8fde-separated intefchange t the ntersecton of Route 123 and EGddock Rod. )edestrian ad bicycle facilities-
Braddock, Springfield
s119.500.00(
lnterchnge
:onstruct a grde-separated brdge on New Braddock Rod over Route 28. The project will nclude 10' wide trail on the south ide of New Braddock Rod, and S, sidewalk on the north sde of New Braddock Road.
Sully
547,s00,00r
Interchange
lonstruct grade-separated iterchange at the intersecton of Route 50 (Lee Highway) with stringfellow RoadStrnBfellow load will bridge over Route 50. projed wll include pedestran facilties.
Sprngfield, Sully
Sso,ooo,oo(
Interchange
Mason, Providence
*Project has alte-rnatve d6igns, fnal design notyet chosen. +*Projett part ofsecond phase ofCost Benefit
Analvss. +++Project
Draft-tlt6lL3
Project lD
.Numbr
Proect TJpe
Project Ttle
Proiect Descrpton
Magisterial Districi
Projest Estmte
Benefit/Cosl
Ratio
.
10
Interchnge
:onstruct
woutd
Lee
5139,500,00r
0.i
t].
lnterchange
Construct 8rde-separated nterchange at sunrise Valley Drive nd Fairfax County Parkwy ntersection to mprove trffc flov and reduce congeston- Ths prcject would nclude intersecto; improvements such as pedestrian crosswalk5 and bicvcle fciltv
Hunter Mill
s230.900,00(
I.:
tz
Roadway Extenson
Construct
a 4-lane roadwy over the Dulles Toll Road from Sunrse Vlley Drive on the south, to Dvis Drve extension n Loudoun County on the north side. The project would include pedestrian and bicycle facililies.
Dranesvile
s218,200,00(
Rodway Extenson
lonstruct 4-lane rodway over th Dulles Toll Road from Sunrise Vallev Drve to Sunset Hills Road. The proiect would clude
)edestrian and bcycle facilites-
Hunter Mll
582,250,00(
t4
Roadway Extension
lonstruct4-lane divided roadway underthe DullesToll Road from sunrise vallev Driveto sunset Hlls Road.
Hunter Mill
5157,000,00r
Roadway Extenson
lonstrud a 4lae roadway over the Dlles Toll Road from Sunrse Vlley Drive to Sunset Hlls Road. The project would clude )edestfian and bicvcle nd transt facilities.
Hunter Mil
591,7s0,00(
Rodway xtension
:ronter Drive from Francona-Springfeld Prkway to Loisdale Road )lus Braided Raps '
:xtend Frontier Drive from Franconia-Springfeld Parkway to Losdale Road, including access to Franconia-Sprin8field Metrofart ;tation and braded ramps to and from the Parkwy. Provide on-street prking along Frontier Drive as well as pedestrin nd )icvcle faclities.
Lee
s8s,s00,00(
77
Roadway Extenson
:onstrud 4-lae divided roadway with a rased median from Walney Road over Route 28 connecting to Stonecroft Blvd. t r'e$fields Blvd. a5 well as a pedestran facilitv on the south sde of poDlarTree Rd.
Sullv
541,000,00(
18
Roadway Extension
to Farfax Countv
:xtend 4-lane divided Shirley Gate Road from 8rddock Road to the Failax county Prkwy, north of Popes Head Road, The ,roject would include a raised median and pedstrian and bicycle facilties.
Braddock, Springfelc
539,500,00(
19
Roadway Extenson
Construct 4-iane divded road between Stone Rod at Route 29 and New Braddock Road. ncludes curb and gutter, 5'concrele ;idewalk on east side, and 10' shred use path on west side of Stone Road. Construct a brdge over l-66 and another bridge over 3g Rocky Run. Re-stripe westbound New Braddock Road to provde 2 through travel lnes.
Sully
581,550,00(
20
Roadway 5pot
rmprovemenl
wevtnt
xoeo
Lee
+Project hs alternatvetesigns, final design not yet chosen. +*Project part ofsecond phase of Cost Berefit Anlysis.
Draft- LO/L643
Project lD
Numbr
Proiect Type
Prolec I rue
Proied Description
Beneft/Cost
Rato
Roadway Spot
lmorovement
lonstruct eft turn lne on nofthbound Bcklick Rod. Ths project would include sidewalk aong the west side of Bcklick oad, upgraded pedestrian signal, and drinte improvements-
Mason
52,085,00(
RoadwaySpot
lmpfovement
.onstruct one Iane roundabout. The project would nclude splitter slands and pedestrian facilities.
Dranesville
23
Rodway Spot
lmprovement
lemove the sharp curue on Burke Rod to improve sfety. Raise profle and provide new stream crossing. Modfy Hertage ;quare Drve li8nment, and provide adequate sght dstnce- Provde 5' concrete sidewak on one sid, and 10'trail on the
5prngfeld
riher.
57,000,00i
1.
24
Roadwy Spot
lmprovement
edar lne and Route 50 southbound Rght Turn Lane o Cedr Lan{
\dd left turn lane on southbound Cedar Lne t Route 50, nd shift northbond lanes for turh lane nd taper construction. The ,roject would clude 8' sphalt tril on the east side of Cedar Lne nd tfaffic siEnal modifications.
Providence
52,280,00(
Roadway Spot
lmpfovement
turn lnes
ntersection mprovements to add left turn lane; on Riverbirch Road and install a traffic sien1.
Drnesville
26
Rodway Spot
tmpfovement
qdd 250' of left turn lane on nofthbound cedar Lane t Electrc Avenue. The project would include curb and Bufter and drainage mprovements on the east sde of Cedar Lane, 5' concrete sidewalk, crosswalks, and new mast-arm sisnal-
Providence
51,605,00(
27
Roadway Spot
lmprovement
f95 to Telegraph
Road
)rovde spot improvements along Route 286 (Fairfx County Parkway) from l-95 to Telegraph Road to p.ovide additionel :apacty at intersections and reduce congestion i the throu8h lnes- The project woutd nclude lengthenng the auxliary tane ln northbound Route 286 onto northbound l-95, lengthenng turn lanes at Terminal Road, nd wdenng the Bcklck Road lridge over the Gilroad tracks.
Lee,
Mt, Vernon
519,248,00(
0.
28
Roadway Spot
lmprovement
Roadway Spot
mprovements)
\dd rmp and sEnal to sprng street/sunset Hills Road, eliminatng the traffic signal on the Farfax county parkway.
Drnesville
29
lmprovement
;traighten curue on Frfax Station Road and costruct turn lanes on FairfxSttion Road and nnisvale Drive.
Springfeld
30
Roadwy Spot
lmprovement
bnstruct left
tuh
la
nes on
both northbound and southbound Fort. Hunt Road at Collngwood Road. The project wold include sgnals. and walkways on both sides of Fort Hunt Road.
Mt- Vernon
52,220,00f
Roadway Spot
lmprovement
\dd rightturn lane on 6eorgetown Pike n estbound drection- This project would include sgnalization mprovements
rs
pedstrin faclties.
well
Dranesville
51,67s,00(
*Praet
has alternatve dsicns, fnal dessn not yFt fihasen, **Project part of second phase ofCost EenefitAnalyss. +*+Prcject requires addtional information to complete Cost Benefit Analysis.
Draft- tOlt6ll3
PrdiectiD
Nuinber.
;.Prcj9c!Type
Project Ttle
Proiect Descrption
Benefit/Cost
Ratio
Roadway Spot
rmprovement
leplace intersection wth roundabout, provide 10' shared-used path and adequate pedestran crossngs throughout the 'oundabout, and relocate overhead utilites.
515,s00,00(
33
Roadway Spol
mprovement
eintersectionsafetyndgeometrybyaddngorextendingturnlanes-
Theprojectwouldincludepedestrianfacilites.
Dranesville
34
Roadway Spot
lmprovement
:onstruct roundabouts to improve traffc flow. This project would include pedestrian crosswalks.
Dranesvile
35
Roadway Spot
lmrovement
)ld Courthouse
mprove lignment of Old Courthouse Road s-curve at Besley road- The prcject would include rising the road elevation mprove drainage and limt floodng-
to
Hunler Mil
36
Rodway Spot
mProvement
\dd a left turn lane on northbond Pleasant Valley Road nd realign Herndon Avenue. Provide traffic signal and two pedestrar
ignals and crosswalks at
intersedon. Provide 8'trail long estbound Herndon Avenue and northbound Pleasant Valley Rod.
Sully
S4,45o.oo(
Roadway Spot
lmprovement
\dd second left turn lane on northbound Rolling Road at Old Keene Mll Road, Replace existng trffc signal and improve )edestran ramps at intersedion.
Springfield
38
Roadway Spot
lmprovement
Roadway 5po't
\dd or extend existing turn lanes on all approaches, remove channelized slands, and construct ssng sidewalk segments left turn lane on estbound Silverbrook Road at Sodhrun Road- The Droect would incude sidewlk ide of Silverbrook Road.
Dranesvlle
S6,9oo,oor
39
lmprovement
Mt. Vernon
40
Roadway 5pot
Improvement
:onstruct an edditonal left turn lane from southbound Slverbrook Road onto estbound Lorton Road. The project would nclude a new trffc sgnal and replacement of sidewalk on the west sde of Silverbrook Road.
Mt. Vernon
Roadway Spot
lmprovement
leconstrct d realign intersection to improve turning radius. This project would include sgnalizton improvements
s oedestran morovemenls-
well
Dranesville
42
Roadway Spol
lProvement
\dd leftturn Iane on northbound Woodburn Road atTobn Road.The project would nclude extendingsdewalkto connedto xisting sdewalk. The existng signal will be replaced and will nclude pedestran sgnals,
Provdence
51,385,00(
43
Roadway Wdening
from Rolling
Road
to Boudinot Drve
from 2 to 4 lnes from Rollnt Road to Eoudinot Drive. The project would nclude a raised medin, additional :urn lanes, and pedeslrian nd bicycle facilites.
Viden Alban Road
Lee, Mt.
Vernon
S43,8oo,ooc
0-5
*Project has alternatveesigns, final design not yet chosen. **Prcject part ofsecond phase of Cost Benefit Analysis. ***P@ject requires addtional nformaton to comlete Cost Benefit Analysis.
Dratt- to/L6lL3
P.!:9j9ct
lp
Nuinber.
Poje.4 Type
P.rigct
Title
Projest Descrpton
Magsterial Dstri
Project Estimate
Bhefit/Cost
KAO
Roadwy Widenng
parkwv
'liden Backlck Road from 4 to 6 Ianes fro calamo street to Frncona sprin8field parkwy. lhe proiect would nclude ntersedion signaliztion improvements, nd pedestrian and brycle facilties,
529,800,00(
<'r
45
Roadwy Widening
Braddock Road from 4to 6 lanes from Burke Lake Road to Gunea Road. The protect would include ntersection ^/iden mprovements such as turn lanes nd signaliztion improvements, as well as pedestran and bicvclefailites.
Braddock
521,625,00(
46
Roadway WdeninB
Widen Braddock Road from 6 lanes to 6 lanes plus 1-Hov lane in each direction, from l-495 to Burke Lake Road. The proiecr would nclude intersection improvements such as turn Ianes and signalization improvements, s well s pedestrin and biclce
fctes.
Braddock
563,000,001
47
RoadwayWidening
rviden ceter Rod on both sides to provide two 12 foot lanes wth center striping. The prcject would iclude widening the urn bay at crdnal Brook court, and new curb and gutter nd 5'wide sidewalk5 on each side of rodway from Garden Roao ro :xising curb and gutter and sdewalks at northern end of oroiect.
Springfield
4a
Roadway Wdenng
lider Bed Rod from Allen park Road to Roling Creek Way
:onstrud improved 2 lne section on cinder Bed Road from Allen Prk Road to Rollng creek way. The prcject would inctuoe videning exsting lanes, dding turn lnes, nd pedestran and bicvcle facilities.
513,350,00r
0.:
49
Roedwy Widening
rvden Fairfax county Parkway from 4 to 6 lanes from Lee chapel Road to Rolling Roa d. project would include intersectio iignlizton improvements, nd shared-use path on the north side Frfx counw prkwv.
Sprngfeld
50
Roadway Widening
'videnFairfxcountyParkwyfrom4to6lanesfromRoutel23toLeechapelRoad.
projectwouldincludentersection
Springfield
iignalztion improvements, and shared-use path on the orth side Fairfax countv parkwv.
Roadway Widening
iden Fairfax county Parkway from 4 to 6 lnes from Route 29 to Route 123 in Firfax conty. The project would include ntersedion improvements such as turn lanes nd sgnalztion mprovements, pedestrian
s wet as
nd bicvce faclities.
Braddock, Sprngfe(
569,750.001
13.:
*Project has lternatve de'signs, final design not yet chosen. '"PrJec.pn of secnd phase of Cost Beneft Analvsis. ***Project requires additional nformation to complete Cost BeneftAnlvsis.
Draft- t0lt6l1-3
lrgna
o .Number Prcjct Type Project Title
Proiect Descrption
52
Roadway Wdening
Parkwayfrom 4 to 6 lanesfrom DullesToll Road toWestOx Road.The project would include intersecton mprovements such as turn lane and 5gnalzaton improvements, as well as edestran and bicvce facilities.
rVden Fairfax County
Hunter Mll,
Drnesville 57s,s00,00(
Roadway Widening
mprovements such
as
from 4 to 6 lnes from West Ox Road to Rugby Road- The project would nclude intecton turn lane and signalizaton improvements, as well as pedestrin and bicvcle facilities.
S116.750.00(
0.4
54
Roadway Widening
to Centreville
Rod
Wden Frying Pn Rod from 2 and 4 lans to 6 lanes from Route 28 to centerulle Road. The project would include intersecton mprovements such as a turn lnes nd signlization as well as edestrian and bicycle faciltes.
Dranesville, Hunter
Mitl
554,600,00(
5_:
55
Roadway Wdenng
Wden Hooes Road from 2 1o 4 lanes from Firfx County Parkway to Slverbrook Road. The project would include pedestrian siBnals at Newin8ton Forest Avenue, and pedestrian and bicvcle fclities.
Mt. Vernon,
SprnBfield s20,s50,00(
56
Roadwy Widening
Lee,
Mt. Vernon
s19,300,00(
57
Roadway Widening
Mden Pohick Road from 2 to 4 Lanes from Route 1 (Rchmond HBhway) to l-95. The proiect would nclude ntersedion i8nlzaton improvements, and pedestrian and bicycle fcilities.
Mt. Vernon
529,250,00C
58
Roadway Wdenng
rviden RollinB Road from 2 to 4 lanes, including with parking Ianes n each drection for some sections ofthe rodwy-'fhe )roject would include an 8' sphalt tril long the west sde and 5' concrete sidewalk along the east side of Rollng Road-
Sprngfield
s3s,200,00(
59
Roadway Wdennt
from
CSX
Railroad lJnderpass
to
/viden Roule 1 from 4 to 6 lanes from the csx Railroad Underpass to the Occoqun River brdge. Ths 'econstruction of the CsX Ralrod Underpass, and pedestran nd bicycle facilities.
Mount Vehon
60
Roadway Wdeing
Route 1 (Richmod Highway) from Mount Vernon Memorial Highway (Route 235) to Npper Road
Thsprojectwouldinctuoe
Lee,
Mount Vehon
Rodway Widening
oute 1 {Rchmond Hghwy) Wideningfrom Armstead Road to l-95 Wden Route 1 (Richmond H8hway) from 4 to 6 lanes from Armistead Road to I-95 Ramps. The project would incude a rised lamps median, intersection sgnalization mprovements, and pedestrin nd bicycle fcites.
Mt. Vernon
S84,7so,oo(
*Projed
**Prnjpct
r?rt of tecond phre of cort Bencfit ***Project requres additional informtion to complete ^nlyir. Cost Benefit Analysis
Fairfax county unfunded Transportation Roadway and Transit projects praft - 10lL6lt3
Projefr lD
',i,ir".
Prbject Type
Project Title
Project Descripton
Madsteral Distrct
Project Estmate
Benefit/Cos!
Rato
62
Roadway Widening
Route 28 (Centrevlle Road) from Old Centreville Rod to prince Willim County Lne
diden Route 28 (Centreville Rod) frofi 4 to 6 les from Old Centrevile Road to prince William County Line, ncludint ntersection improvements nd pedestrin and bcvcle fcilties.
Springfield, Sully
547,3s0,00(
10.t
Roadwy Widening
rvidenRoute28from 6toslanesfromtheDullesTollRoadtoRoute50.Theprojectwouldincludedrainageimprovements
ideningthe Route23 brdge over Hofsepen Run.
Dranesville, Sully 5s7,85o,ooi
13.
64
Rodway Widenng
/r'iden Route 28 from 6 to 8 lanes from Route 50 to l-66. The project would include signal replacements at Ellanor c- Lwrence trk and Braddock Road and walney Road as well as dringe improvements.
5uly
ss7,9s0,00(
65
Roadwy Wdenng
ruiden Route 29 from 4 to 6 lenes from Plesnt Valley Rod to o'Day Drve and provide pedestrian nd biqcle facltes ruiden Route 29 from 4 ide ofRoute 29.
5ully
544,200.00{
66
Roadway Widenng
to 6 lanes from Unon Mill Rod to Buckley's Gate Drve and provide pedestrian faclties on the north
Springfield, Sully
S32,70o,oo(
67
Rodway Widening
loute 29 (Lee Hghway) Inside Eeltway from Glows Road to Fals lhurch
y'Viden Route 29
from 4 to 6 lanes from Gallows Rod to Flls church City line, ad provde pedestrian nd bicycle facilities.
Providence
5111,900,00(
68
Roadway Widenng
loute 29 (Lee Highway) Outsde Beltwy from Gallows Road to llake Lane
Wden Rote 29 from 4 to 6 lanes from Gallows Rod improvements, and pedestrin and b/cle faclites.
to Blke
Provdence
s182,450.00(
69
Roadway WideninB
'liden Route 50 {Arlington Boulevard} nside the Eeltway from 4 to 6 lanes from cedar Hill Rod to Annande Road. The r@jed would include intersecton mprovements, nctuding signalzation improvements, and pedestrn and bcvcle facilies.
Mson
s47,500.001
70
Roadway Wdenng
Viden
Roue 50 (Arlington Blvd) outsidethe Beltway from 4 to 6 lanes from Blake Lane to William5 Drive. The project would nclude intersedion mprovements, ncludng signalzation mprovements, and pedestrn nd bcycle fciitis.
Providence
5s7,2s0,00f
71
Roadway WdennC
Telegraph Road from 2 to 4 lanes from Hayfeld Road to South Van Dorn street, includng pedestran and bc./cle ^/den 'acilties.
Lee
ss9,s00,00(
L.t
Roadway Widening
to Hayfield
Road
'Iden Telegph Road from 2 to 4 lnes from Leaf Road to Hyfield Road. The project would include intersection signalzaton mprovements and pedestrin nd birycle facilites.
s18,8s0,00(
2.(
73
RoadwayWidening
/Vest Ox Road
west ox Road to 4 lanes ftom Lawyers Road to Mclearen Road. The prorect would inctude a sed median, lo,shared ^'/iden se pth alont the south sde, and 5'sidewalk alongthe north sde ofWest Ox Rod.
s26,7s0,00(
*+Project part ofsecond phse of Cost Benefit Analysis. +**Project requir6 addtonal information to complete
Co BenefitAnalvss.
Fairfax county unfunded Transportation Roadway and Transit projects Draft- LO/761L3
P,I,o.f".tt
lP Numbr
Poject Type
P,rgiqct
Ttle
Project Descrpton
Benefit/Cost
Rato
74
Roadwy WdeninB
:onstruct improved 2 lne secton oh Woodburn Rod from Little River Turnpike to Tobn Rod and widen Woodburn Roao 'ro 2 to 4 lanes from Tobin Road to Gallows Road. The project would nclude intersecton ihprovements such s trn lanes ,nd signaization mprovements, mprovements to the rod alignment, nd pedestran and bcycle faciltes-
Mson, Providence
s49,500,00(
rnsf
lonstruct commuter parkng lot wth 500 spces djcent to Braddock Rod ner Kinss park West
existing bus seruice and mplement new bus service to support the opertion of the columbia pke streetcr.
Braddock
Slo,ooo,oo(
Transil
Mason
5135,000,00(
l7
7a
Transt
strud a minmuh 1975 additional parking spaces in a second 6arag at Herndon Metiorail Station. lonstruct a minmum 2037 space parkng grage at lnnovaton Center Metrorl Station
;tudy alternatves for high-capacity trnsil in the Rchnond Hghway corrdor between Huntington nd Foft Belvoir.
Huntef Mill
5s4.000.00(
Transit
nnovaton Center Metroral Staton Prking Gge lichmond Highway Transit {Rchmond Hghway Transit Alternatives \nelyss)
Dranesville
554,000,00r
11-{
79
Transit
Lee,
Mt- Vernon
80
Transit
)urchase buses nd mplement enhnced bus seNice between Dules Arport and Manassas va Route 2g.
Hunter Mill, SprinBfield, Sully Braddock, Hunter s47,000,00( Springfield, Sully 16.! s47,000,00(
81
Transt
lFairfax
Purchase buses and implement enhanced bus seruice between Herndon-Monroe Prk-and-Ride and Fort Belvoir via the Farfax County Parkway
a2
Transt
Drnesvlle, Hnter
;tudy alternatives for hgh-capacty trnsit n the Leesburg pke corridor between Tvsons nd Alexandra.
Mill, Mason,
Provdence
83
Transt
'urchase buses and improve 5eruice levels on bus routes 5eruing Richmond Highwy, Kingstowne, and springfield,
51o6.5oo.oo(
84
Transit
'urchase buses, add new routes, and improve 5eruce levels on existing routes that serve the V;enna Metrorail stton
Mill, Mason,
Provdence, Sorinfield- sullv Braddock,
s132,500,00(
85
lransit
Dranesville, Hunter Purchase buses and implement new ctoss-county limited-stop/express bus seruice serung Vienna and Centreville
s116.500.00(
*Project has alternative desitns, finl design not yet chosen. **Prniefi narl of se.nnrl nhese of fnrt Beneft..1nzlyrir.
Fa
irfax
Projggt
bitrtct
Estiiate
s8,000,00c
Benefit/C st.Ratio
86
Pedestran/Bicycle
\rln8ton Boulevard (Route 5O) pedestrian Bridse \rlington Boulevard (Route \rlngton Boulevard (Route
Backlick Road Walkway lacklck Road Walkway
-onsrrucr pedestrran brdge on the north sde of oute 50 over l-495 from Gallows Road to Faruew
)ark Drive-
Providence
a7 88 89 90
5O)
Walkway Walkway
Providence rovdence
Lee
SO)
:onstruct walkway on the south side from g3O1 -onsrruct watkway on west side of Backlick Road ;outh of Barta Road-onstruct walkway on east side of Backlick Road :onstrust walkway on east sde of Backlick Road lrom Industrial Drve to Hechinger Drve.
lnstall signalzed crosswalks at Highland Street. nstall signalized crosswalk at Lake Farfax Drve. Construct walkway on the north sde of Baron Road from Dead Run Park trailhead to Douglass Drve. Construct walkway on the south side of Braddock Road from Calbern Drive to Clubside Lane. _onsrruct walKway on Brawner Street in front of :rankln Sherman Elementary School from Calder oad to Julia Avenue.
Mason
9T
Pedestrian/Bicycle
Mason
S2,ooo,oo(
0.6
92
93
Pedestran/Bicycle Pedestrian/Bcycle
Lee
s300,00( s2s0,00c
Hunter Mill
N/A
Pedestrian/BcVcle
laron
Road Walkway
Dranesville
s2s0,0oc
1.1
95
Pedestrian/Bicycle
Sully
S1,2oo;oo(
1.0
96
Pedestrian/Bicycle
Dranesville
S3,soo,ooo
o.4
Pedestrian/Bicycle
-onstruct trat at Browne Academy from Edgehill lourt to Dewev Drive. -onsrrufi watKway on Burke Road from Alomado )rve to Parakeet Drve.
Ths project includes re-striping Burke Road from
Lee
s400,00( S1,ooo,oo(
1.1 0-6
98
Pedestran/Bcycle
Sprngfeld
99
Pedestrian/Bicycle
Liberty Bell Court to the entrance of the Rolling Road VRE Park-and-Ride lot. All existing lanes and on-street parkng can remain, but widths will be adjusted as needed. The project also includes bicycle signage and access mprovements n the vcinity of Liberty Bell Court to improve safety and sight distance.
Springfield
+Project has alternative designs, final design not yet chosen. **Project part ofsecond phase of Cost Beneft Analyss.
+**Prejet
Fa i rf
ax
Co u nty U
nfu
nd
Bi
Draft -
rllt3
Construct walkwav on south side of Center Road
100
Pedestrian/Bicycle
:enter
Road Wakway
Sprindeld
s800.00(
0.9
101
Pedestran/Bicycle
Providence
51s0,000
N/A
ro2
Pedestran/Bcycle
Providence
S1,8oo,ooo
103
Pedestran/Bicycle
:onslruct walkway on south side of Chai Bridge oad (Route 123) from Horse Shoe Drive (north
ntersection) to Niblick Drive.
Providence
s2,000,00c
0.9
t04
Pedestrian/Bicycle
:onstruct walkway on east side of Chan Bridge oad (Route 123) over l-66 from Whte Granite )rive to Eaton Place. lonstruct walkway on north sde of Chesterbrook oad from Kirbv Road to Golden Court. lonstruct walkwav on north side of Chesterbrook oad from Golden Court to Maddux Lane.
Construct walkway on south side of Chesterbrook
Provdence
s6,000,00(
0.6
105
Pedestran/Bicyce
Dranesvil le
S8so,oo(
0.8
106
Pedestran/Bicycle
Dranesville
s1,200,00(
0.4
L07
Pedestria n/Bicycle
to North
Dranesvil le
S1,3oo,oo(
o.4
Albemarle Street. Construct walkwav on west sde of Chichester Lne from Cherry Drive to Fairhill Elementary School {south entrance). Conslruct wlkway from Lismore Lane to Fairhill Elementarv School
Provde approximately three miles of bikeway,
108
Pedestrian/Bicycle
Providence
5300,00(
o.7
extending from Farfx County Parkway near 109 Pedestrian/Bcycle Cinderbed Road Bikeway Telegraph Road to the south sde of the FranconiaSpringfield Metroral station. The southern segment could nclude an on-road facility on Cinderbed Road.
1-10
Lee
s4,00o,ooc
o.7
Pedestrian/Bcycle
:ompton
Road Walkway
:onstruct walkway on north side of Compton Road rom east of pumping staton to Centreville Road
Route 28). Construct walkway on east side of Compton Road from Mt. Olive Road to Cub Run Stream Valley
ra1.
Sully
S1,4oo,oo(
o.7
111
Pedestran/Bicycle
lompton
Road Walkway
Sully
s3,000,00(
0.4
*Project has alternative designs, final design not yet chosen. **Project part of second phase of cost Benefit Analyss.
Fa
rfax
Cou
Tra
Mggisteial
.
Proiect
Estmate
5150,00(
Benefit/(
ost Rato N/A
District
Mason
1,12
Pedestran/Bicycle
Edsall Road
rf5
Pedestrian/Bcycle
:onstruct walkway on north side of Edsall Road from Timber Forest Drve to Edsall Gardens
qpartments. Construct walkway on north side of Edsall Road over l-395 from Cherokee Avenue to Edsall Gardens ApartmentsThe project wll include lengthening
Mason
s700,oo(
0.9
r14
Pedestran/Bicycle
Mason
s4,000,00(
o.7
the refuge
Dra
115
Pedestrian/Bicycle
area, upgrading ADA access, and installinB rectangular raid flashing beacons (RRFB) to imrove safew at this intersectior..
nesvile
s100,00(
N/A
iL6
Pedestrian/Bcvcle
:onstruct walkway on south side of Fair Lakes )arkway from Stringfellow Road to retail centernstall bicycle wayfndng signs along the Fairfax
5pringfield
s600,00(
1q
L17
Pedestran/Bcycle
57s,00(
N/A
l-18
Pedestran/Bcycle
Ltg
Pedestrian/Bicycle
:onstruct walkway on north side of Fairfax County )arkway from Huntsman Boulevard to Lee Chapel oad. :onstruct walkway on east sde of Fleet Drve from /adkin Court to existing walkway south of
:ranconia Road.
Springfield
s2,700,00(
0.9
Lee
s800,00(
r-
120
Pedestrian/Bicycle
:onstruct walkway on east side of Fort Hunt Road 'rom Belle View Boulevard to Belle View :lementary School. :onstruct wlkway on north side of Fox Mill Road 'rom Fairfax County Parkway to Reston Parkway. :onstruct pedestrian median refuge area on :ranconia Road at Westchester Street and Rose Hill
;hoDDins Center.
Mount Vernon
5400,00c
1.9
tzt
122
Pedestrian/Bicycle
Hunter Mill
S2,4oo,oo(
L.7
Pedestrian/Bicycle
Lee
s200,00c
N/A
rz3
Pedestrian/Bcycle
nstall covered bicycle parking to accommodate at east thirty bcycles. lmprovements to the access iriveway pavement and lighting and securty may rlso be Drovided.
Lee
s130,00c
N/A
xProject has altrnatve designs, fnal design not yet chosen. +tPtoject part of second phase ot Cost Benetit Analysis. +*+Project requires addtional information to complete Cost
Benefit Analysis.
Fa
Draft - tolt6.lLS
Project ,Estimate
124 Pedestrian/Bicycle
!allows Road
nstall signalized crosswalks at Arlington Boulevard Routd 50) and Gallows Road interchange.
Provdence
S2so,oo(
N/A
t25
Pedestrian/Bicycle
:onstruct walkway on north side of Georgetown )ike from Seneca Shopping Centerto Falls Bridge
_a
Dranesviile
s1,000,00(
0.6
ne.
LZO
Pedestrian/Bicycle
)onstruct walkway on north side of Glade Drive 'rom Middle Creek Lane to Glade Bank Wav.
Construct walkwav on north sde of Glade Drive from Colts Neck Road to Reston Parkwav. Construct walkwav on south side of Glen Forest Drive from retail center on Route 7 to Glen Foresl Eiementarv School.
Hunter Mill
5200,00(
z.r
727
Pedestran/Bicycle
Hunter Mill
s400,00c
!.7
128
Pedestran/Bicycle
Mason
s1,200,00c
0.9
lmplement road diets on several roadways around the Government Cenler to make the area more bicycle friendly. Government Center Parkway from
129 Pedestran/Bicycle Government Center Area Bcycle Demonstration project Random Hlls Road to the Fairfax City line will be road dieted to provide on-road buffered bike lanes. Other roadways to be evaluated include: Post Forest Drive {West Ox Road to Government Center Parkway), Legato Road (Post Forest Drve to Route 29), and Ridge Top Road (Random Hlls Road to Route 29). Construct walkway on north side of Greensboro Drive from Spring Hill Road to Rotunda entrance.
Braddock
17s.00(
N/A
130
Pedestrian/Bcycle
Providence
51,400,00(
1.1
131
Pedestran,/Bicvcle
:onstruct walkwaV on north sde ofGunston Cove oad from Cranford Street to Amsterdam Street. :onstruct walkwav on north side of Hooes Road
'rom Ox Road to Furnace Road. This project will complement the new on-road bike lanes by installing covered bicycle parking on the
Mount Vernon
Ssoo,oo(
0.7
r52
Pedestrian/Bicycle
Mount Vernon
s400,00(
133
Pedestrian/Bicycle
the vicinty of
Springfield
sso,ooo
N/A
*Project has alternative designs, final design not yet chosen. ++Project part of second phase of Cost Benefit Analyss.
Fairfax County
PIojgt Ttle
Magisteral District
Project'
Estirhate
Benefit/(
ost Ratio
0.8
134
Pedestrian/Bicycle
Springfield
s300,00(
135
Pedestran/Bicycle
Construct a new bicycle and pedestran bridge over l-495 n the vicinty of John Marshall High School. Construct walkway on east side of ldylwood Road
Frovdence
510,000,00(
0.6
136
Pedestrian/Bcycle
Dranesville
ss92,00(
r-
L37
Pedestrian/Bicycle
Dranesville
S8o7,o0(
0.8
138
Pedestrian/Bicycle
pedestrian access from the medical education campus located off Metropolitan Center Drive in Springf ield to the Franconia-springfield Metrorail Station and nearby activty centers.
Lee
s210,00c
N/A
139
Pedestran,/Bcycle
Jermantown Road
Providence
S1so,o0c
N/A
0.6
L40
Pedestrian/Blcycle
:onstruct walkway on south side of Kirby Road rom Chesterbrook Elementary School to Halsey
oad.
Drnesvlle
s400,000
r47
142
Pedestrian/Bicycle Pedestran/Bicycle
Dra
nesville
s1,s00,000
58s0,000
0.5 0.4
:onstruct walkway on north side of Kirby Road rom lW Hill Drve to Corliss Court. lonstruct walkway on north sde of Kirby Road
'rom Chesterfeld Avenue to
Dranesville
143
Pedestrian/Bicycle
lw
Hill Drve.
Dranesville
59s0,00(
0.4
744
Pedestrian/Bicycle
lonstruct walkway on the west side of Lee Chapel oad from Brtford Drive to Burke Lake Road. :onstruct walkway on south side of Lee Highway Route 29) from Circle Towers to Nutey Street. nstall signalized crosswalk at Utterback Store oad. :onstruct walkway on the south sde of Lisle venue from Grffth Road to Sportsman Drive
Springfield
s1,200,00(
0.8
145
Pedestran/Bicycle
53,000,00(
o-7
146
Pedestrian/Bcycle
Mitl
Dranesville
s1s0.00(
N/A
!47
Pedestrian/Bicycle
s600,00c
*Project has alte?native designs, final desgn not yet chosen. "'Projcr parr of scond hse of Lost Benetlt Analysts. +**Project requres additional information to complete Cost Benefit Analysis.
Fa
rfax
eroe ritte
Little River Turnpike (Route 236)
nstall signalized crosswalks at Old Columbia Pike 'Columbia Road. Construct walkway on east side of Little Rocky Run 3ircle from Rockdale Court (north ntersecton) to Braddock Road. 150 Pedestrian/Bicycle Construct walkway on south side of Magarty Road from Lusby Place to Peabody Drive near Westgate Elementary School.
151
1,48
Pedestran/Bcvcle
Mason
s2s0,00(
149
Pedestran/Bicycle
Sully
5200.00(
0.5
Dranesville
s1,000,00(
0.9
Pedestran/Bicycle
Construct walkway on east side of Medford Drive from Annandale High School to Davan Drve.
Mason
s400,00c
o.7
Pedestrian/Bicycle
:onstruct walkway on west side of Monument )rive from Government Center Parkwav lsouth ntersection) to existing bus stop.
Construct walkways on both sides of Moore Road east of Cavaler Woods Lane. This project will complete the mssing segments of the Potomac Heritage Natonal Scenic Trail from soulheast of Route 1 (Richmond Highway) in the
Braddock
5200,00c
0.6
153
Pedestrian,/Bicycle
Sully
s200,00(
0.6
154
Pedestra n/BicVcle
vicinity of the Washington's Mll Historc State Park to Grist Mll Park {southeast of Old Mill Road). This project includes a new pedestran and bicycle
bridge over Dogue Creek.
Mount Vernon
s6,s00,00c
0.6
fff
Pedestran/Bcycle
:onstruct wakway on south side of North Shore )rive from east of North Shore Court to Sycamore
,/allev Court.
Hunter Ml
51,400,00(
1..9
This project will retrofit on-road bicycle facilities on OId Dominion Drive from the central business 156 Pedestran/Bicycle
distrct of McLean west to Georgetown Pike with either bike shoulders or on-road bike lanes. Supplemental wayfinding signage is also included. Construct walkwav on north side of Old Dominion Drive from northeast corner at Sprng Hll Road to existing walkway at Duchess Drve.
Dranesvlle
s3,640,00c
2.r
L57
Pedestrian/Bcycle
Dranesville
52s0,00(
1,-4
+*Project part of second phase of Cost Benefit Analysis +++Proect requires additonal nformaton to complete Cost Benefit Analysis
Fa
irfax
Co u nty U
Draft - LOIL6|L3
ioea rype, Project 1tle Project Dscription
Ths project includes the installaton of bicycle
Magisteral Dstrict
Project
Estimte
158
Pedestrian/Bicycle
shoulders on OId Keene Mill Road from Lee Chapel Road to Sprng Street, providing connectivity for the south-central area ofthe County. Supplemental signage will be nstalled.
Springfield
159
Pedestrian/Bicycle
flney
Road Walkwav
eplace existng sidewalk on Olney Road from Vlasaritv Road to Lisle Avenue.
Dranesville
ss00,00c
L.7
160
Pedestrian/Bicycle
aof
Pedestran/Bicycle
!62
Pedestran/Bcycle
:onstruct walkway on east side of Peabody Drive 'rom Magarty Road to Lsle Avenue near Westgate :lementary school. :onstruct walkway on north side of Peace Valley -ane alons Jeb Sluart Hsh School. lonstruct walkway on east side of Pleasant Valley oad from north of Elklick Run to Dominion /irsinia Power lines. :onstruct walkway on south side of Post Forest )rve from Legto Road west to existng walkway :onstruct walkway on south sde of Post Forest )rive from Legato Road to Government Center
)arkway. Construct walkway on west side of Quander Avenue from southern West Potomac High Schbol frontage to Quander Elementary School. Complete missng links on west side of Riverside
Road
Dranesville
s400,00c
Mason
ss00,00c
L.7
Sully
53,8oo.ooo
0.6
1.63
Pedestrian/Bcycle
5pringfield
s300,00c
2.7
164
Pedestrian/Bicycle
Braddock
5600,000
2.r
155
Pedestran/BcVcle
Mount Vernon
s1,300,000
0.9
Pedestran/Bicycle
from
Elkin Street
to Pennsylvana Boulevard.
Mount Vernon
s400,000
1.6
Pedestrian/Bcycle
Construct walkway on east side of Rolling Road from Roxburv Avenue to Tuttle Road. Construct walkway on west side of Rugby Road
Braddock
s800,000
0.9
Pedestrian/Bcycle
from Misty Creek Lane to Alder Woods Drve. :onstruct walkway on Seminary Road from north rf Magnolia Lane to Colfax Avenue. Provide on-road bike lanes on Shipplett Boulevard from Burke Lake Road to OId Keene Mill Road by reducng roadway lane wdth. No roadway widening is anticioated.
Sully
s300,00(
o.6
L69
Pedestrian/Bcycle
Mason
s1,600,00(
o.9
r70
Pedestrian/Bicycle
Lanes
Springfield
S4o,oo(
N/A
+Project has altetnative designs, final design not yet chosen. **Project part of second phase of Cost Benefit Analyss.
Analyss
Fai
U nf u n d
171,
Pedestrian/Bcycle
Springfeld
s200,00(
0.9
t72
173
174
Pedestrian/Bicycle
Complete missing lnks on Sleepy Hollow Road from Columbia Pke to Route 7.
Mason
54,300,00(
0.8
Pedestrian/Bicycle
Pedestran/BcVcle Pedestran/Bcycle
;oapstone Drive Walkway ;outh Knss Hghwav ;outh Lakes Drive Walkways
:onstruct walkway on west side of Soapstone Driv( 'rom South Lakes Drve to Snakeden Branch.
nstall signalized crosswalks at The Parkwav.
Hunter Mil
Lee
51,200,00(
5
2.O
150,000
N/A
2.4
:omplete missng Iinks on South Lakes Drive from reenkeepers Court to Sunrise Valley Drve.
Construct wakway on north side of Sunrise Valley Drive from Hitchcock Drve to Colts Brook Drve. Construct walkwav on north side of Sunset Hills
Road from Old Reston Avenue
Hunter Mll
s3,6so,ooc
Pedestran/Bicycle
Hunter Mil
ss00,00(
0.9
177
Pedestrian/Bicycle
to Reston Parkwav.
Hunter Mill
5350,00(
l.-1
178
Pedestran/Bcycle
Install signalzed crosswalk at Franconia Road. Pedestrian safety mprovements at crossing south
Lee
Slso,oo(
N/A N/A
179
Pedestran/Bcycle
Lee
s200,00(
180
Pedestrian/Bicycle
:omplete missing links from Huntngton Avenue to ose Hll Drve. lonstruct walkway on south side of Twn Branches oad from Villaridge Drive to South Lakes Drive.
Lee
s2,100,00(
0.9
181
Pedestran/Bcycle
Hunter Mili
s200.00c
o.7
r82
Pedestrian/Bicycle
{ramp underpass) to the Alexandria City Line will br mproved to current geometrc standards, includin those segments under the Captal Beltway (l-95) and the railroad. Lighting and wayfinding signage will be included as part ofthis project.
Lee
5s00,000
N/A
*Project has altFrnative designs, final design not yet chosen. **Proect part of second phase of Cost Benefit Analysis. +*+Project requires additional nformaton to complete Cost Benefit Analysis.
Fa
irfax
Cou
Tra nspo
eroje to
. PJoject Type
Benefit/C
ost Ratio
Distiict
:nhnce bicycle access to the Vienna Metrorail ;taton and the adjacent Metro West Town Center,
Mth improvements at Vaden Drive Bridge, Five
183
Pedestrian/Bicycle
)aks Road from Vden Drve to Blake Lane. and /irginia Centre Boulevard. Bcycle facilities wll be rrovided through lane and road dietng techniques. -he project will also include bicycle wayfinding
;ignage and shared lane markings.
Providence
s1,000,00c
0.8
184
185
Pedestrian/Bicycle
:xtend existing on-road bike lanes from Kirby Road o the Arlington County Line (near Williamsburg loulevard). This will be done as part of VDOT's 'epaving program. Westmoreland Street is a )rorty route providing bicycle connectvity )etween Mclean, Arlington County, Metroral ;tations, and the W&OD Tail. :onstruct walkway on west side of Westmoreland ;treet from Kirbv Road to Lemon Road.
rViden east side of Westmoreland Street north of
Dranesville
540,00c
N/A
186
Pedestrian/Bicycle
Dranesville
51,800,00(
1.0
747
Pedestrian/Bicycle
Dranesville
Slso,ool
N/A
Reserue for Reston Metrorail Access Group (RMAG) phase.ll projects Reserue for Herndon Metrorail Station Access Management Group
N/A
(HMSAMS) Proiecrs
Reserue for Rchriond Highway PublicTransportaton Intiatve
N/n
N/A N/A
Sully