800 MW Under Construction Bilaspur, Himachal Pradesh Satluj River Delhi, Haryana, Punjab, Rajasthan, Uttar Pradesh, Himachal Pradesh, J & K,

Installed Capacity Location Water Source

Beneficiary States

Chandigarh Rs. 4527.15 Crore 4X200 MW Under Construction

Approved Investment Unit Sizes Units Commissioned

Hydro Based Power Projects (Under Implementation)

NTPC has increased thrust on hydro development for a balanced portfolio for long term sustainability. The first step in this direction was taken by initiating investment in Koldam Hydro Electric Power Project located on Satluj river in Bilaspur district of Himachal Pradesh. Other hydro project under construction is Tapovan Vishnugad. On all these projects construction activities are in full swing.

APPROVED HYDRO BASED STATE CAPACITY(MW)

1. 2. 3. 4. Total

Koldam (HEPP) Tapovan Vishnugad (HEPP) Singrauli CW Discharge(Small Hydro) Lata Tapovan

Himachal Pradesh Uttarakhand Uttar Pradesh Uttrakhand

800 520 8 171 1,499

1.1 Project Background 1.2 Project Description 1.3 Scope and Details of Works 1.4 Location and Site Map
1.1 Project Background

The Himachal Pradesh Government had decided to construct a Project namely Koldam Hydroelectric Power Pr 800 MW (4x200 MW) in Bilaspur District. It is situated about 25 km from District HQ on river Satluj and 4 km upstream Dehar Power Plant. The construction of this project has to be done by NTPC Limited (formerly known as National Ther Power Corporation Limited), a Govt. of India Undertaking. In this connection an agreement was signed between H.P. G and NTPC on 26 February 2000. The Honble Prime Minister Shri Atal Bihari Bajpai laid the foundation stone on 5 June, 2000.The estimated annual generation of electricity will be 3,054 GWH (90% Dependable year).

From the Koldam Project alone, Himachal Pradesh will get 12% of the power production free of cost and anoth at bus-bar rate. The Koldam Project will not only provide suitable compensation to the property and agricultural land o but also generate employment opportunities for them. The Koldam Project, along with other such projects, shall bring prosperity in Himachal Pradesh, which in turn, shall contribute to the prosperity of the country. Main Dam construction wok was inaugurated on 14 January 2004 by the then CMD Shri C P Jain. The salient features of Koldam Hydroelectric Power Project are as follows : Main Dam - Height 167 m - Crest Level EL.+ 648 - Type Rock & gravel fill with clay core - Crest Length 474 m - Crest Width 14 m - Maximum Reservoir Level EL.+ 646 - Full Reservoir Level EL.+ 642 - Minimum Draw Down Level EL.+ 636 Diversion Tunnels - Number / Length 2 nos. (T1 900 m. & T2 920 m) - Finished Diameter 14 m ( Horseshoe shaped ) - Design Capacity 6,500 cu m/sec. Penstocks - Number / Type 4 nos. Circular Steel Lined - Size 6.45 m - Length 400 m per each Power House

- Type of Power House Surface - Type of Turbine 4 nos. Francis (Vertical) Switch Yard - Type of SW Yard Surface / Conventional Type - Transmission 400 KV Thro 400 KV Line Coming - Evacuation System Nathpa Jakhri

Land is being acquired in 68 villages for this project. For the resettlement of the oustees, resettlement with mo amenities is being developed at Kangoo in Sunder Nagar. Similar colonies will be developed for Bilaspur, Karsog, Sunni Arki. Continuous interaction between State Administration, NTPC and Oustees is being done through Village Developm Advisory Committees (VDACS). Public Information Centre (PIC) has been opened at Harnora in Bilaspur, Kyan in Mandi Sunni.

1.2 Project Description

Project Title Project Location

: Koldam Hydroelectric Power Project (4x200MW) : Kyan, P.O. Slapper, Teh. Sunder Nagar, Distt. Mandi (H.P.) 174 403, Himachal Pradesh, India. : NTPC Limited (formerly known as National Thermal Power Corporation Limited). (A Government of India Enterprise) NTPC Bhawan, SCOPE Complex, 7, Institutional Area, Lodhi Road, New Delhi 110 003.

Employer

Engineer

: The General Manager (In-charge) Koldam Hydroelectric Power Project, NTPC Limited, P Barmana, Distt. Bilaspur, Himachal Pradesh, India. : Italian-Thai Development Public Company Limited 2034/132-161 New Petchburi Road, Bangkok, 10320, Thailand. : Main Civil Works Package I : Dam, Spillway & Power Intake Package Contract CW-2A 11th February 2004

Contractor

Contract Package Contract Agreement Date :

Original Contract Value : Rs. 6,645,555,021 (Indian Rupees Six Billion, Six Hundred and Forty Five Million, Five Hundred and Fifty Five Thousand, and Twenty One only.) Project Commencement Date Original Contract Period : 12th December 2003 (as the date of Issue of LOA)

: 1,737 Days, 57 (Fifty seven) calendar months

Estimated Completion : 7th September, 2010 Date (Progress Status please refer to Item 2.2: Total Work Progress) (Rev.3 Updated No.1)

1.3 Scope and Details of Works

Italian-Thai Development Public Company Limited (ITD) is employed by NTPC Limited (formerly known as Natio Thermal Power Corporation Limited) for the Koldam Hydroelectric Power Project, Main civil works package I: Dam, Spi and Power Intake package.

Works included in this contract are mainly: Upstream diversion dyke construction. Downstream cofferdam construction. Dewatering works between the upstream diversion dyke and downstream cofferdam. Excavation, regularization, caulking, grouting, compaction and cleaning works for dam foundation surface preparatio acceptance. Upstream cofferdam construction. Dam construction. Installation of the dam monitoring equipment and dam surveillance during the construction and first impounding. Information on geological and hydro geological aspects, hydrology and climate are indicated in the other documents o contract. Power Intake construction, Approach Channel, Spillway and Plunge Pool excavation, slope protection and concrete. Power House excavation and slope protection, Switchyard excavation and filling. 1.3.1 MAIN DAM CONSTRUCTION AND UPSTREAM COFFER DAM 1.3.1.1 Main Features of Main Dam The main dimensional characteristics of the main dam shall be as follows: Type : Rock and gravel fill with impervious central clay core Crest of dam : EL.+ 648 m Max height of dam above natural ground : 153 m Max height of dam above foundation : 167 m Crest length : 474 m Crest width : 14 m

1.3.1.2 Main Features of Upstream Coffer Dam The main dimensional characteristics of the upstream cofferdam shall be as follows: Type : Rock and gravel fill with impervious central clay core Crest of dam : EL.+ 558 m Max height of dam above natural ground : 58 m Max height of dam above foundation : 73 m Crest length : 243.5 m Crest width : 14 m

1.3.2 APPROACH CHANNEL AND EXCAVATION WORKS In order to ensure the proper flow conditions of flood water to the spillway weir and, in particular, to allow the stream flow lines to be correctly orientated, major earthworks shall be carried out upstream of the spillway to create Approach Channel. The geometry of this Approach Channel is being optimized in the scale model tests and thus the vo of these earthworks are subject to revision.

1.3.3 POWER INTAKE The power intake structure is designed to connect with all head structures and units as far as the connection w 4 penstocks.

1.3.4 SPILLWAY The spillway for Koldam is a gated spillway located on the left bank of Dam. The main elements of this structur A concrete weir approximately 132m. wide, with a crest at elevation 625. 6 gate bays, each equipped with a radial gate 17.10m wide by 17m high (by H M Contractor). A concrete closure section situated on the left bank of the weir with a top surface at elevation 648 , that prevents an bypassing of the gated weir by the left bank. A reinforced-concrete chute of total length of approximately 420m, with width varying from 132m at the top to 70 m bottom, equipped at the bottom with a flip bucket that forms a jet trajectory at 30? angle to the horizontal. This structure shall respect the following operating specification; a) Discharge a flow of 11,400 cu.m./sec, which corresponds to the Standard Project Flood, with 5 gates opened and maximum water level of EL. 641.1 b) Discharge a flow of 16,500 m3/s, which corresponds to the Probable Maximum Flood, with 6 gates opened and maximum water level of El. 646 c) The spillway piers shall each have a room containing the radial gate control equipment

1.3.5 POWER HOUSE AND SWITCHYARD EXCAVATION, LEVELING AND GRADING WORKS

1.3.5.1 Power House Surface excavation of hard rock & terrace materials, for removal either to dedicated stockpiles, direct to crusher or d fill works. Slope stabilization of excavated slopes. Dewatering of excavations. Construction of temporary and permanent access roads. Landscaping works, sub-surface drainage, security fencing, gates, etc.

1.3.5.2 Switchyard Surface excavation of hard rock and terrace materials, for removal either to dedicated stockpiles, direct to crusher o to fill works. Slope stabilization of excavated slopes. Fill works to create a level platform. Temporary drainage and dewatering. Access road. Subsurface cable duct network, single sized aggregate capping.

Levelling of platform for handing-over to EM Contractor.

1.3.6 UNDERGROUND GROUTING AND DRAINAGE WORKS The work is composed of: Underground construction works for grouting and drainage galleries. All the grouting and drainage works carried out from the galleries. Installation of monitoring equipment in the galleries.

1.4 Location and Site Map

The Koldam Hydroelectric Power Project is located at Satluj River, 4.5 km upstream of Dehar Power Station of Satluj Link Project in Bilaspur District of Himachal Pradesh. The project features will inter alia include a 163 metre high Fill Dam, Spillway, Diversion Structures, Desilting Arrangement, Surface Power House with planned capacity of 800 MW (4x200 MW). The project will utilize a surface drop of 140 metres. Koldam Hydroelectric Power Project has been basica designed as a run-of-the-river scheme.

The project site is located 4.5 km from the National Highway-21(NH-21), upstream of the existing Dehar Power of BBMB in Himachal Pradesh. It is located at latitude 30? 23N and longitude 76? 52E and lies within an active Himala

Mountain range. The dam is proposed to be located in the narrow gorge of the valley downstream of Kyan village. The nearest railhead is at Kiratpur, approximately 90 km from the project site and nearest airport is Bhunter (Kullu). Anoth airport is in Chandigarh a Union Territory.

Figure 1 : Location and Site Map

Figure 2 : Koldam Construction Site (Looking from Upstream of Approach Channel as of 30 June 2008)

Figure 3 : Dam Cross Section Scheme

Tender Scheme

Construction Scheme

Top Plan View

3-D Spillway View

Figure 4 : Construction Model of Koldam Hydro Electric Power (4x200 MW) Project

Subcontractor of ITD PCL. in Koldam Project have including ;


Earthwork Subcontractors

1. MCM Services Private Ltd. (MCM) ---> http://www.mcmsindia.com/ 2. Right Tunnelling Co. Ltd. (RTL) ---> http://www.righttunnelling.com/ 3. KSR Infrastructures Private Ltd. (KSR) ---> http://sterlingstonex.com/ksr_infra.html/ 4. M/S Shiva Earth Movers (SHIVA EM) 5. Sheetla Construction Co. (SHEETLA) 6. Kuldeep Chand & Co. (KCC) 7. Ashirwad Contractor

Other Works & Labours Supply

1. K. R. Chauhan 2. Jai Singh 3. M/S Shiva Earth Movers (Drilling Works) 4. Himalaya Construction Co. 5. Kamlesh Kumar 6. Sohan Lal Thakur 7. Lalit Kumar 8. Austees Hydro Power & Construction Co. Private Ltd. 9. Jai Murari Constructions 10. Premier Service 11. Mehar Singh 12. Tilu Devi 13. Uttam Enterprises ---> http://www.uttamenterprises.com/ 14. U.R. Infrastruture Co. Private Ltd.

15. Kol Valley Contractor Co. Ltd. 16. Naresh Kumar 17. Sharma Contractor 18. Rawel Singh 19. Prem Chand & Co. 20. Birbal Ram Sehgal (J.R.D.S. Construction) Private Ltd. 21. Super Drilling Private Ltd. 22. Pavai Agro Service 23. Jayanti Sons 24. Sita Ram 25. Chint Ram Jaswal 26. Dodhuwan Berojgar Naujawan 27. VBS Power Projects Private Ltd. 28. Bumi Developers (India) Private Ltd. 29. Shubham Construction 30. Vineet Kumar

Clay Transportation

1. M/S Shiva Earth Movers (SHIVA EM) 2. Sukera Construction 3. Austees Hydro Power & Construction Co. Private Ltd. 4. M/s. Subham Thakur Construction Pvt. Ltd. Italian-Thai Development Public Company Limited (J.1479) Kyan, P.O. Slapper, Teh. Sunder Nagar, Distt. Mandi, Himachal Pradesh, India 174403 Email : admin@itd-koldam.com, Fax : +91 981-6093252