Академический Документы
Профессиональный Документы
Культура Документы
TBEA specialize in the solar PV products development and its application with national hi-tech enterprise certification. The solar factory covers an area of 51670 . There are 2035 employees, among are technical staff, accounted 40% of the regular employees.
Certified Qualification
Certified Qualification
PV Industrial Chain
Company possesses reliable & sustainable and highly-efficient PV industry chain, the company implements the construction and operation surrounding the R&D, production and system integration of the solar grade silicon wafer, solar module, and charger and inverter system, continuing provide high accuracy capability and low cost PV products.
Largest BIPV Grid-connected Solar Power Project 6.6MW BIPV Grid-connected Solar Power Station in Shanghai Hongqiao high speed railway passenger station
Largest off-grid PV station in Asia 500kw off-grid PV station in Ruoqiang county, Xinjiang Province
150KW Off-grid PV Station in Beita MT, Xinjiang Province, the earliest one in China
TBEA PV Grid-connected inverter has already applied in the BIPV project of Xinjiang Silicon Industry Co., Ltd successfully
Holland USD 15 million + China USD 10 million = Total amount of USD 25 million. Extend 80,000 sets SHS to resolve the problem of power supply for 400,000 non-electricity people. Implemented by TBEA SunOasis Co. LTD and Dutch Shell Solar Co.
TBEA Xian Electric Company and the Xi'an High-tech Zone signed to build a "Industrial Zone of New Energy in Xi'an", is expected to be completed within five years an annual output of solar cells the size 500MW, annual output of PV modules 500MW, annual output of power inverter control 1000MW, 300MW PV system integration of large-scale photovoltaic power generation equipment manufacturing high-tech enterprises.
PZ4000 Power quality 360kW Combined type analyzer 3-phase load TDS3034 Digital oscilloscope
Solar Module
TBEA SunOasis united with BP Solar Inc. to establish BP SunOasis Co., Ltd by joint venture in Xian city, which is able to provide high-quality, high-efficiency, low-cost solar module on the basis of the faithfullyadvanced, factualistic, innovative hi-tech R&D team and the internationally-advanced high-performance solar module production line.
Certification
Certification
Silicon Wafer
The Company possesses the advanced crystal controlling , casting, slicing production line and COTS, makes full use of Xinjiangs advantageous resources to promote the implementation of advantageous resources transformation strategy actively, and provides lower-cost , higher-efficiency silicon wafer for the high-powered solar power supply system through the utilization of domesticallyadvanced technology to engage in the R&D and production of big-diameter, hyper-slice solar grade mono/poly crystalline silicon wafer. Capacity of mono-crystalline wafer is 1.6million pieces, and polycrystalline wafer 450,000pcs, producing capacity of monocrystalline can reach 60MW, polycrystalline 12 MW. Now, we are under construction of new 100MW wafer produce capacity.
On Sep. 20th,2006, Comrade Hu Jintao, Secretary-General of the Central Committee of the CPC and the President of the P.R.C inspected TBEA SunOasis and concluded with sincere words: What the solar PV products bring to the farmers and herdsmen will not only be the improvement of the living problem of power supply and drinking water, the most important is that the PV products will bring the solicitude of central committee of CPC to the people of remote areas. I hope you can achieve advantage resources conversion by technical progress, to further reduce cost and make it possible that the clean and alternative solar energy can be large-scale popularized.
On Aug.19th,2007, Comrade Wen jiabao, a member of the Standing Committee of the Political Bureau of the Central Committee of CPC, the Premier of the State Council inspected TBEA SunOasis and placed high hopes: SunOasis should utilize the abundant resources in Xinjiang to vigorously boost the development of renewable energy industry and realize the advantage resources conversion, so that you can provide important support for developing of our countrys new energy resource in future.
On June 20th, 2009, Comrade Xi Jinping, a member of the Standing Committee of the Political Bureau of the Central Committee of CPC, the Secretary of the Secretariat of the Central Committee, the vice President of China, inspected SunOasis and gave highly appraisal, today I saw the new energy industry, one of the three industries of TBEA, which impressed me a lot. I saw the hope of industry development of Xinjiang, the lightspot of the structural adjustment. I hope you can achieve advantage resources conversion into alternative energy, as General Secretary said before, which will not only benefit Xinjiang, but also will make greater contribution to construction of energy and economy of our country.
On March 22nd, 2010, Comrade Li Keqiang, a member of the Standing Committee of the Political Bureau of the Central Committee of CPC, the vice Premier of the State Council inspected TBEA SunOasis and said, take advantage of the abundant resources in Xinjiang, convert it into renewable energy, then we can promote Xinjiangs great construction and development, push the opening progress rapidly forward, which will gain great support from the Development & Reform Commission.
On August 24th, 2010, Comrade Jia Qinglin, a member of the Standing Committee of the Political Bureau of the Central Committee of CPC, Chairman of the CPPCC national committee inspected TBEA and said sincerely and earnestly, The industry of transmission and transformation plays an important role in national economic construction and safety. You are requested to continuously reinforce the independent innovation ability to maintain the leading position in this field, which can not only be Chinese first-class, but the worldwide first-class, not only equip China, but the whole world. You should have the ambition of being the world first-class enterprise!
On September 13th, 2010, Comrade Li Changchun, a member of the Standing Committee of the Political Bureau of the Central Committee of CPC, inspected TBEA SunOasis. When Mr.Zhang Xin, Chairman of the board of TBEA, introduced the general development status of the three industries of TBEA, Comrade Li Changchun affectionately talked to Zhang Xin, your company developed very fast, perfect! I visited TBEA in 2004, during this short 6 years, TBEA experienced great change, fulfilled great change, also need radical change. I can see the hope of the development of TBEA new energy industry and new material industry. I hope you can seize the opportunity of Xinjiang great construction, deep exploitation and rapid development, to convert the advantage of coal power into advanced equipment manufacturing, new energy and new material, trying to be a competitive international enterprise.
On May 8th, 2010, Comrade Zhang Chunxian, the Secretary of Xinjiang Uygur Autonomous Region, inspected TBEA SunOasis and provided guidance on work.
The development of any enterprise can not do without the care and support from all the circles of society. The developed enterprises should also return the community for the benefit of the people The TBEA SunOasis will always unswervingly work for a better Environment a better life a better society a better future bringing the reliable, comfortable, green, clean and efficient energy to every corner of the world
THE END