From the earliest times people have needed some idea of what a new building was going to cost before they started work on it. The New English Bible says Would any of you think of building a tower without first sitting down and calculating the cost, to see whether he could afford to finish it? Otherwise, if he has laid its foundations and then is not able to complete it, all the onlookers will laugh at him. There is the man they will say who started to build and could not finish. (St Luke, Ch 14.)
by
K.L.S. SAHABANDU
Additional General Manager (Designs)
ENGINEERS
GEOTECHNICAL / FOUNDATION STRUCTURAL BUILDING SERVICES
CONSULTANTS
- Electrical
- Mechanical - Water Supply & Drainage - Acoustic
CONTRACTORS
3
FUNCTIONAL REQUIREMENTS
- Building Size - Comfort - Prestige - Low running cost
BUDGETARY CONSTRAINS
5
FEASIBILITY, OUTLINE & SCHEMATIC DESIGNS DETAIL DESIGNS SPECIFICATIONS BILL OF QUANTITIES PROCUREMENT CONSTRUCTION MAINTENANCE
by K L S Sahabandu-CECB
COST INDICATORS
COST /SQUARE FOOT (METRE) COST / BED, COST / PUPIL, COST / ROOM
LIFE-CYCLE COSTING
CAPITAL COST RUNNING COST
TYPE OF BUILDING
LOCATION SUBSOIL CONDITIONS - Foundation Type MATERIALS - Architectural - Structural SYSTEMS - Ventilation - Lighting - Conveyance
7
REASONS FOR ACCEPTING LESSER CAPITAL COSTS Where the building is to be disposed of by sale, maintenance charges will fall upon the purchaser, which would be of little importance to the developer, who is responsible for the construction cost. Where the building is to be let, or used commercially, the initial cost comes out of capital, while the repairs and maintenance are deducted from the commercial receipts in calculating profit for the year.
9
Built-in Obsolescence Although a building may be perfectly sound after the passage of years it may become old-fashioned in design. The future could not really be forecasted. - Maintenance policy - Interest rates - Inflation
10
11
by K L S Sahabandu-CECB
COST
STAGE 1 - INCEPTION Appointment of a design team and defining the general approach. STAGE 2 - FEASIBILITY Testing to see whether clients requirements can be met in terms of planning, accommodation, cost, etc. STAGE 3 OUTLINE PROPOSALS General approach identified together with critical dimensions, main space locations and uses.
13 14
Traditional cost planning methods do very little to contribute to the pre-sketch design dialogue, where all the major decisions of form and quality tend to be taken. Current research suggests that there is a heavy commitment of cost prior to a sketch design being formalised. This may amount to over 70% of the final potential building cost, leaving perhaps only 30% to actual control.
16
15
DESIGN TECHNIQUES What are the Constraints? What are the priorities? How much space is required? What arrangement of space is required? What form should the building take? What is the level of specifications?
17 18
80 60 40 20 0
DESIGN TIME
by K L S Sahabandu-CECB
PHYSICAL FACTORS
RELATE TO THE SITE - Boundaries - Easements (Right of way) - Method of access - Nearness of service supplier - Visual aspects & views - Soil conditions - Adjacent Structures - Material availability
19 20
EXTERNAL BODIES & INSTITUTIONS Building Regulations Planning Requirements Local Authorities Regulations
21
22
WHAT ARE THE PRIORITIES? Definitions of the constraints is of enormous assistance in containing the design solution. They help in narrowing down the range of possible solutions, which are for practical purposes almost infinity without them. Ignorance of these issues will possibly result in abortive effort and a less than satisfactory service to the client.
23
If priorities can be ranked and given their due importance in solving the design problem then it should be possible to spend the clients money in accordance with these requirements. Examples: 1. Insulation for noise 2. Maintenance free building elements
24
by K L S Sahabandu-CECB
HOW MUCH SPACE IS REQUIRED? CLIENTS BRIEF - Usable area required - Circulation Areas not given - Multiple use of space
ARRANGEMENT OF SPACE
(Optimise the positioning of Space)
DESIGN METHOD ASSOCIATION MATRIX - Identify the relationship between spaces - Weighting system BUBBLE DIAGRAM - Identify the Spaces & Links - Strength of association
SPACE
COST
25 26
FORM OF BUILDING Translate the functional spatial arrangement of the bubble diagram into a building form that will reflect the relationships determined. Constrains - Site - Planning Requirements - Cost Limits
TRANSVERSE BEAM
OPTION 1
27
OPTION 2
OPTION 3
28
LEVEL OF SPECIFICATION
FINISHES ENVIRONMENTAL COMFORT DURABILITY MAINTENANCE OPERATIONAL COST PRESTIGE
1.
2.
29
30
by K L S Sahabandu-CECB
1. Market conditions 2. Size, number of storeys, etc. 3. Specification level 4. Inclusions and exclusions 5. Services 6. Site and foundation conditions 7. Other factors
31 32
SITE CONDITIONS
SITE CONDITIONS
ADJOINING BUILDINGS / INFRA-STRUCTURE - Location w.r.t the site / proposed building - Substructure / foundation details
EGL
SITE TOPOGRAPHY
W.T.
45
SITE BOUNDARY
PROPOSED BUILDING
33
EXISTING BUILDING
34
SITE CONDITIONS
TOPOGRAPHY / ACCESS
RETAINING WALL
ACCESS ROAD
SITE CONDITIONS
TOPOGRAPHY / ACCESS
35 36
by K L S Sahabandu-CECB
SUB-SOIL CONDITIONS
LOAD BEARING CAPACITIES DEPTHS TO THE BEARING STRATA LONG TERM SETTLEMENT OF SUB-SOIL WATER TABLE
OVERBURDEN
37
38
COST PLANNING AT SCHEMATIC STAGE Building Shape - Perimeter / Area - Circular Shape - Constructability - Square Shape - Ventilation Problems - Rectangular Shape Preferable - Height- Cost for special arrangements
HEIGHT
Tall buildings are invariably more expensive to build than low rise buildings offering the same accommodation, and taller the building the greater the comparative cost.
Additional Loads
- Weights of the upper floors - Wind and Seismic loads
40
39
Higher Standards for - Windows - Wall Panels Construction Cost for working at greater heights Additional Running Costs Single-storey buildings are economical when: - Large column or wall free area is required - Heavy loads to be supported - Low cost foundation can be adopted
FRAME / SUPER-STRUCTURE - Load Bearing Walls - Concrete/Steel Frame - Column Spacing - Beam Spacing
LOAD PATH
41
COST
42
by K L S Sahabandu-CECB
SLAB SYSTEM
SIGNIFICANT IMPACT ON THE COST IN MULTI-STOREY BUILDINGS
CONCRETE CONSTRUCTION
REINFORCED CONCRETE Precast 2. Insitu PRESTRESSED CONCRETE 1. Precast 2. Insitu
1.
44
STEEL CONSTRUCTION Preferable for - Roof Construction - Single Storey Industrial Buildings - Large Spans - Aesthetical Reasons
WHERE FIRE RESISTANCE IS NOT REQUIRED
OPTIMISATION
45 46
ROOF SYSTEMS
FLAT ROOF OPTION PITCH ROOF OPTION CLADDING SYSTEMS WATER PROOFING SYSTEMS INSULATION LIFE CYCLE COST
EXTERNAL WALLS
LOAD BEARING / NON-LOAD BEARING (GRAVITATIONAL LOADINGS) DURABILITY MAINTENANCE CONSTRUCTABILITY WEATHER RESISTIVITY SELF WEIGHT RESISTANCE TO WIND LOADINGS LIFE CYCLE COST
47 48
by K L S Sahabandu-CECB
DETAILING ASPECTS
WATER PROOFING INSULATIONS CLADDING / WINDOW DETAILS ROOF DETAILS INTERFACES JOINT FILLERS LIFE CYCLE COST
49 50
ARCHITECTS
ENGINEERS
MESSAGE
Q.SURVEYORS PROJECT MANAGER
51
52
ARCHITECTS
ENGINEERS
ARCHITECTS ENGINEERS QUANTITY SURVEYORS PROJECT MANAGER
Q.SURVEYORS
PROJECT MANAGER
53
54
by K L S Sahabandu-CECB