Introducing the new MineSight Schedule Optimizer

Outline
Integrated planning and workflow Equipment scheduling Stockpile handling Underground planning Schedule analysis tools More constraints Speed up Reporting and charting Multi-period scheduling looking ahead

Integrated Planning Tool


STP, MTP and LTP Open pit and Underground 3DBM and stratigraphic/GSM Cuts (blocks, regular cuts, bench reserves) Partial (percentage) cuts mining 64-bit CPLEX optimization engine Gantt (in dev.)

Integrated Planning Spiral


Integrate MSSO with
MSHaulage MSIP-MM MSEP MSSP MSAtlas

Save schedule to
MSPD Block model

Interoperability
MineSight 3D viewer integration
Visualization Animation Manual/interactive scheduling

Streamlined Workflow
Canvas integration
Drag and drop Material flow

Property dialog
Capacity Period availability Filled tonnage

New GUI
Dockable panels

Equipment Scheduling
Equipment scheduling options
Schedule without equipment Schedule then assign equipment Schedule with equipment

Cycle time data


Default cycle time (phase/bench/destination) Import from MineSight Haulage (cut/destination)

Truck/Shovel hour constraints, and reports

Stockpile Handling
Reclaim methods
FIFO LIFO Average Any Materials Tonnage Volume Grades

Opening balances

Underground Planning
Solids Stopes MS3D viewer Gantt

Schedule Analysis Tools


ARC Visualization Animation Gantt

More Constraints (1/2)


Multi-phase dependency Phase lead/lag Number of partial (open) benches Volume constraints Destination tonnage & volume capacity Destination availability Truck & shovel hour Haulage route availability Stockpile closing balance

More Constraints (2/2)


Partial (Percentage) cut mining
Splitting tonnage tolerance Minimum leftover tonnage Maximum partial cuts each period Must complete partial cuts from pervious periods Must fully mine preceding cuts on upper level

Speed Up
Loading cuts Updating MSPD Optimization
CPLEX optimization engine Multithread Multi-core ability 64-bit

Reporting and Charting


ARC library integration Standard and project templates Analysis report Publish report Cash flow report (in dev.) Real-time reports & charts (in dev.)

Multi-Period Scheduling
Scheduling period window Non-fallible/Infallible scheduling (in progress)

Major Enhancements
01) Haulage integration 02) Equipment planning 03) Solid scheduling 04) Stockpile reclaim (average, FIFO, LIFO) 05) Stockpile opening balance 06) Phase lead/lag constraints 07) Volume report and constraints 08) Destination capacity constraints 09) Number of partial bench constraints 10) Multiple phase dependency 11) GUI-revamp 12) 64-bit 13) Canvas implementation 14) CPLEX engine support 15) Lindo 7 support 16) ARC enhancements 17) Advanced material mapping 18) Viewer/animation 19) Partial (percentage) cut mining 20) Multi-period scheduling (in dev) 21) Gantt scheduler (in dev) 22) Cash flow report (in dev)