BP-10

THERMAL AND MOISTURE PROTECTION, ROOFING

SCOPE OF WORK

DESIGNATED 50% CBE SUBCONTRACTING SET-ASIDE REQUIREMENT

DEFINITION OF PROJECT AREA:

The Scope of Work includes the roofing, waterproofing, and caulking at the Georgetown
Neighborhood Library which is located at 3260 R Street, NW, Washington, DC.

ROOFING, SHEETMETAL AND WATERPROOFING


Contractor shall be responsible for labor, material and equipment all new roofing and
waterproofing systems including but not limited to slate shingles, Hardi-Plank wall
systems, roof insulation, roof accessories and sheet metal flashings, panels and trim at the
existing building and the new addition as indicated in bid documents (100% Final
Construction Drawings and Specifications dated July 9, 2009). Available on CD. Work
includes but is not limited to the following specification sections
Division 1 – General Requirements
Division 6 – Wood and Plastics
06105 Miscellaneous Carpentry (As applicable for this work)
06160 Sheathing (As applicable for this work)
Division 7 – Thermal and Moisture Protection
07123 Cold Fluid-Applied Waterproofing
07131 Self-adhering Sheet Waterproofing
07140 Cold Fluid-Applied Waterproofing
07162 Crystalline Waterproofing
07271 Self-adhering Sheet Air Barriers
07315 Slate Shingles
07620 Sheet Metal Flashings and Trim
07920 Joint Sealants (As applicable for this work)

1. Furnish and install roof insulation and underlayment materials as


specified
2. Furnish and install rough carpentry blocking and/or sheathing as required
or as indicated in the drawings and specifications.
3. Furnish and install marine grade plywood on top of cornice. (See detail
10/A3.20)
4. Furnish and install complete roofing system at masonry HVAC out-
building and trash shed including patching of the existing slate roof.
5. Furnish and install wood parapet blocking
6. Furnish and install copper cupola wall systems, roofing, flashing, gutters,
downspouts, cornice assemblies and trim
7. Furnish and install Hardi-Plank siding systems as specified
8. Furnish and install slate shingles
9. Furnish and install all expansion joints and flashings as required for the
new additions to tie into the existing building to maintain a weather tight
enclosure.
10. Furnish and install flashing and gutter at cornice see Detail 10/A-3.20.
11. Furnish and install flashing around roof penetrations
12. Furnish and install metal coping on HVAC screenwall.
13. Furnish and install self-adhering sheet, crystalline and terrace
waterproofing systems as appropriate and as specified.
14. Furnish and install roof accessories.
15. Furnish and install caulking and sealants as specified to provide air and
water tight transitions between building enclosure materials. Interior
(painter’s) caulk shall be provided by others.
16. Hoisting as required for this work.
17. Independent Testing & Inspection Services required for this Work,
including materials testing, weld and connection testing and inspections;
18. During the period of this work, contractor agrees that all employees must
be experienced in performing the work.
19. Contractor is required to provide pre-existing surveying (photographs or
video taping).
20. Contractor shall coordinate this work with other work in progress.
21. Work to remove the existing temporary roof structure is not in this
contract.
22. The Contractor shall ensure that no elements determined to be unstable are
left unsupported. Any and all required structural bracing for structural
systems to remain shall be included in this scope of work.
23. Contractor shall remove and transport debris resulting from erection
operations and materials to site disposal area. Recyclable materials shall
be separated and stored or stockpiled without intermixing with other
surplus materials before transporting to recycling facilities in accordance
with a recycling program consistent with the Project LEED Certification
Program.
24. Contractor shall comply with all identified specification and performance
requirements to achieve LEED points toward the Silver certification goal
as indicated in the bid documents.
25. In the area where proposed protection and/or removal may conflict with
existing utilities, Contractor shall take all necessary precautions to avoid
damage to said utilities.
26. It is Contractor’s responsibility to read the Hazardous Materials Survey
Report for Georgetown Neighborhood Library, including the July 8th
2008 addendum.
27. Contractor shall submit bids detailing their proposed means and methods
for this scope of work, and shall include evidence of their experience with
similar projects as well as references who may be contacted by the Client.
28. Provide labor for incidental project clean-up
29. Miscellaneous temporary roof protection of existing conditions during
construction, to begin immediately as roof structure is installed, as
specifically specified herein and OSHA safety barricades, rails and floor
coverings, for this Work.
30. Engineering, site survey and layout for this Work.
31. Provide monthly Project construction progress documentation &
photographs, including existing building pre-construction condition
documentation.
32. Contractor shall leave the workplace in a clean and presentable condition
ready for subsequent trades and prepared for finishes as specified.
33. Submittals will be required for approval prior to execution of the work.