The GE-120S level meter is specially designed to measure the interface for sludge, it could be continual and online to monitor the sludge interface leve in the sewage wastewater treatment field. This Sludge Level Meter could measure the position and height of sludge by the principle of ultrasonic echo, it will be real-time to monitor the thickness and depth of sludge, and to control the progress online. Then it could avoid the water quality deterioration and sludge denitrification & digestion. This Sludge Interface Level Meter have perfect function to measure the depth, and control, data tranmit, communication, with depth data output via an RS485 serial port, or 4~20mA output. It is widely used in the sewage sedimentation tank, primary settling tank, secondary sedimentation tank, sludge thickening tank, very useful in the building of waterworks, ore washery, sewage treatment. Technology Specification: * Level Range: 1m ~ 5m ~ 10m (5m is standard, more than 10m need custom-made) * Accuracy: 1.0% * Blind Spot: <500mm * Draft Depth: 500mm * Detection Method: 1HZ/s (0.1~100HZ/s is available) * Wave Beam angle: 102 degree * Work Frequence: 100KHz~300KHz (Different transducer will be different) * Output: 4~20mA (Standard, 1~5V and RS485 is available) * Power Supply: 220 VAC 50HZ/60HZ (24VDC is available) * Protect Grade: IP65
http://www.ayite.net
http://www.ayite1973.com
Email: sales@ayite.net
A.YITE
TECHNOLOGY
GROUP
Data for Transducer: * Work Medium: Sewage * Work Temperature: 0~40C (higher temperature need custom-made) * Cable Length: 10m
Data For Tester Terminal: * Power Supply: 220 VAC 50HZ/60HZ (24VDC is available) * Display: LCD Screen * Resolution: d=1mm or 1cm(setting by user) * Keyboard: three slight touch key * Work Temperature: 0C ~ 50C * Storage Temperature: -20C ~ 70C * Work Humidity: <80% RH * Storge Humidity: 70% RH
http://www.ayite.net
http://www.ayite1973.com
Email: sales@ayite.net
A.YITE
TECHNOLOGY
GROUP
Installation: When install the transducer, please consider the protection for transducer. Put the cable through the pipe at first, then connect the pipe with the transducer, avoid the force to the cable, then avoid the rending for the cable. if rupture the cable, the transducer will be destroyed. To avoid the impact of water wave of the water surface, it will be better to install the transducer 0.5m below the water surface
* The Keyboard
Add NumberWhen set the parameter, press this key, the flash number will add 1; and it could confirm the point too. When need negative, pres this key, it will out minus, or change minus to plus; when working, press it 5 seconds, the display will close, then saving power; when working, press the key, it could cheage the display about output analog with temperature.
Page Turnwhen the meter is morking, press this key, it will display the page P1; then press Move Key, it will entry the parameter in P1; Press one time for Page Ture, it will go to next page one time. Move KeyWhen set the parameter, press this key, move the changeable number. When finish set each number, press this key to each number again, then all number will flash, it means the parameter is setted. When the display is close, press thiskey, the display will appear; when working, press ths key 5 second, the backlightwill close, press 5 second again, it will be open
http://www.ayite.net
http://www.ayite1973.com
Email: sales@ayite.net
A.YITE
TECHNOLOGY
GROUP
L1
L2 L3 L4
bo P
C CA Out the P1
* Notice:
1. When measure, must power on 15 minutes before measure. 2. When measure the sea water, input the salinity value in P1, N 3. Avoid Noise and Electro Magnetic Interference 4. Avoid high temperature and low temperature
http://www.ayite.net http://www.ayite1973.com Email: sales@ayite.net
A.YITE
TECHNOLOGY
GROUP
5. The meter have blind area, if the range is less than blind area, the meter will not be correct
* P2 Page
the P2 page is used for engineer, if need change the value, just connect with the producer. We advise, dont change the P2 page
* Troubles
Matter Press the key for Power On, no display; the sensor dont have sound The sensor have sound, but the meter dont display Meter display, but the value will not change when sensor move, the sensor dont have sound Meter display, sensor sound, but the value change quickly, or the value will not change,
http://www.ayite.net
Reason 1. No power supply; 2. The power is not suitable 1. The meter is energy saving now; 2. Connect with high voltage, the meter is damage
Deal With
1. depth meter installed too skewed, reflecting not good; 2. Transmitting Power is very big 3.used in the air environment;
http://www.ayite1973.com
1. adjusted the sensor surface perpendicular to the axis 2.if less than 20m, power P is about 10,; more than 30m 10 to 15; 3. put
Email: sales@ayite.net
A.YITE
TECHNOLOGY
GROUP
4. electromagnetic interference; 1. The measure range is more than the rating range; 2. The water have so much solid, the sound could not back; 3. Transmitting Power P value is. small 1. large obstacle affect reflected wave; 2. Near shore, the wave back earlier; 3.Check the Salinity Value N; 4. Check the temperature display 1. P2 page is changed by user 2. Power is not stability 1. baud rate is not same with PC or Master Meter; 2. slave meter have a wrong address; 3. the cable is too thin; 4. PC have a bad adapter for 232-485
1. Measure suitable depth, less than rating; 2. Measure suitable water; 3. set suitable Transmitting Power P
1. Change location; 2. change location. 3.set suitable salinity value;4. if big difference about the temperature, it means the sensor is destroyed 1. contact with supplier. 2. charge the power
1. adjust the baud rate; 2. check the Ar value of PC or Mater Meter; 3. the cable should be 2m ; 4. New adapter tech@ayite.net