Академический Документы
Профессиональный Документы
Культура Документы
API-510, API-570 & API-653 Certified Inspector LEEA Level I Inspector Cell: Land line: Email: Career Goal:
To establish myself as a major contributor in the field of Inspection, Testing and Corrosion control and to help the organization in improving the efficiency, competitiveness and growth.
+966 535 816 112 / +92 333 3388 557 +92 213 640 6567 engr.saad07@gmail.com
Career Highlights:
An individual with distinctive leadership and planning capabilities, A result oriented person having more than 06 years of experience in the field of Inspection & Testing, Corrosion monitoring and Risk base inspection. Having experience in Inspection, planning, supervision and documentation of various inspection and maintenance activities. Familiar with international code and standards. Having sound work experience under safety environment of worlds top ranked Oil, Gas and Petrochemical Companies like BP, ENI, OMV, Chevron, Shell, OGDCL, PPL, Qaltex, Oryx GTL, Woqod, PSO, FFBL, Engro Vopak and Chemanol.
Academic Qualification:
Graduation: 2007 B.E (Metallurgy & Material Science Engg.) from DCET Recognized by PEC
Certifications:
API-510 Authorize Pressure Vessel Inspector (Cer. No 42968 Exp. Date: 31-01-2015) (Pressure vessel Inspection Code: In-Service Inspection, Rating, Repair, and Alteration) API-570 Authorize Piping Inspector (Cer. No. 44912 Exp. Date: 31-07-2015) (Piping Inspection: In-Service Inspection, Rating, Repair, and Alteration of piping system) API-653 Authorize Tank Inspector (Cer. No. 37658 Exp. Date: 31-05-2016) (Above Ground Storage Tank Inspection, Repair, alteration and Reconstruction Standard) LEEA Level I - Lifting Equipment and Engineers Association, UK for lifting equipment inspection ASNT Certification: Level II in UT, MT, PT, RT and VT Internal Auditor Certified Internal Auditor from Intertek Moody
Experience:
Abdallah I. Al Tamimi Industrial Services Est. Designation: Sr. Inspection Engineer Responsibilities: Inspection of Storage tanks, pressure vessels, boilers and pipelines. Corrosion rate, Remaining life, Next inspection interval calculation and repair recommendations as per API653, API-510 and API-570. To establish the Procedure of inspection of tank, pressure vessel and pipeline. Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings. Load testing and Repair recommendations. Drawing reviews and sketching, Calculation and Report writing as per relevant Codes and Standards. Bid preparation and technical analysis of Bid documents. Planning and Scheduling of job, Execution of Job as per scope of work, Progress monitoring, updating plans and rescheduling, Resource calculation. Kingdom of Saudi Arabia June 2011 to Present
Implementation of requirements of quality management system ISO 9001:2008, internal audit checklist preparation, planning and execution of internal and external audit.
Project Details:
Client
SWCC SWCC Obeikan CHEMANOL SWCC
Project Scope
Inspection of Tank Inspection of Overhead Cranes Inspection of Tank & Boiler Inspection of Pressure Vessel, Columns Lifting Equipment inspection Lifting Equipment inspection Holiday testing of internal lining of tanks
Location
Jeddah, Saudi Arabia Al Khobar, Saudi Arabia Riyadh, Saudi Arabia Jubail, Saudi Arabia Jeddah, Saudi Arabia
Applicable Standard
API-653 LEEA ASME API-653 API-510 LEEA ASME LEEA ASME API-653 API-653 API-570
Date
Oct. 2013 Oct. 2013 Sep. 2013 May 2013 Dec. 2012 Oct. 2012 June 2012 Aug. 2011 June 2011
Status
Inspector Engineer LEEA Inspector Inspection Engineer Static Equipment Inspector Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer
SWCC
ARAMCO
Shoaiba,
Saudi Arabia Jubail, Saudi Arabia
SWCC SWCC
Shoaiba,
Saudi Arabia
Riyadh,
Saudi Arabia
Experience: (Continued)
SGS Pakistan (Pvt.) Ltd. Islamic Republic of Pakistan March 2008 to June 2011
Designation: Sr. Inspection Engineer Responsibilities: Inspection of Storage Tanks, Pressure Vessels and Pipelines as per scope and international standards. Short Term / Long Term Corrosion rate determination, Remaining life, next inspection interval calculation and repair recommendations as per API-510, API-570 and API-653. Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings. Load testing and Repair recommendations. Report writing and reviews as per relevant international Codes and Standards, Drawing reviews and sketching. Planning and Scheduling of job, Execution of Job as per scope of work, Progress monitoring, updating plans and rescheduling, Resource calculation. Preparation and Technical analysis of Bid, Tender and Contract documents.
Leading team of Inspection Engineers at various sites, Daily progress monitoring. Implementation of requirements of quality management system ISO 9001:2008.
Temperature evaluation and Hot spot monitoring after Thermography, report preparation on Flir software. Project Details:
Client
QALTEX ORYX GTL WOQOD OGDCL Shell Caltex Chevron PSO BP OGDCL Lotte PPTA OGDCL SHELL PARCO OMV MOL SHELL FFBL
Project Scope Inspection of Tank Inspection of Tank & Pressure Vessel Inspection of Tanks Inspection of Tank Inspection of Tanks Inspection of Tanks Inspection of Tanks
Pressure Vessel Inspection Pressure Vessel Inspection Pressure Vessel Inspection Inspection of Pipeline MFL scanning of Tanks bottom MFL scanning of Tanks bottom Buried Pipe Line Coating Inspection by PCM Post Shipment Inspection
Location
Mussaid, Qatar Ras Lafan, Qatar Abu Hamour Depot, Qatar Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Pakistan Ghana, Africa Pakistan
Applicable Standard
API-653 API-510 API-653 API-653 API-653 API-653 API-653 API-653 API-510 API-510 API-510 API-570 API-653 API-653 API-5L API-653 -
Date
June 2010 April. 2010 2009-2011 2010 2009-2010 2009-2010 2009-2010 2010 2010 2010 2010 2010 2010 2009 2009 June 2009 2009
Status
API Inspector Inspection Engineer Inspection Engineer API Inspector API Inspector API Inspector API Inspector Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer Inspection Engineer Inspector Inspection Engineer Inspection Engineer
Inspection of Tank
Thermography of Ammonia
Client
Project Scope
Reforming Section & Gas Turbine for Hot spot monitoring Buried Pipe Line Coating Inspection by PCM Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings. Load testing Metallography Assessment of Pipelines Pressure Vessel Inspection Inspection of Mobile cranes, Overhead Cranes, Fork lifters, Mobile trucks, Slings, Shackles, webbing slings. Load testing RBI Data Entry Inspection of underwater pilling for Evaluation of Zn Anode
Location
Applicable Standard
Date
Status
APL
Pakistan Sui, Adhi, Mazarani, Pakistan Kunar, Pakistan Pakistan Pakistan Pakistan Pakistan
2009
Inspection Engineer
PPL
2009
Inspection Engineer
Atlas Engineering
Designation: Project Internee Responsibilities: Metallography & Chemical composition analysis of sample of Honda cylinders. Hardness testing of Honda cylinders made through Shell core casting. Shut Down / Turn around Experience:
Involved in Seven (07) shutdowns of various Oil & Gas, Petro chemical Plants. Client
OBEIKAN Chemanol ORYX GTL PPTA OGDCL PPTA ENI
Shutdown Scope
Tank, Boiler & Pipeline Inspection Inspection of Pressure Vessel, Boiler Life Assessment Remote visual inspection Inspection Pressure Vessel
Location
Riyadh Saudi Arabia Jubail Saudi Arabia Ras Lafan, Qatar Karachi Pakistan Kunnar Pakistan Pakistan Bhit Pakistan
Applicable Standard
API-653 API-570 API-510 API-653 API-510 API-510 API-570 API-653 API-510 API-510 API-653 API-510 API-653
Date
Sept. 2013 May 2013 Apr. 2010 Aug 2010 Aug 2009 Aug 2008 June 2008
Status
Inspection Engineer Static Equipment Inspector Inspector Plant Inspector API Team Leader Plant Inspector Static Equipment Inspector
Visual Inspection
Training & Courses: Involved in various in-house and client base trainings includes, Training Description
TOFD (Time of Flight Diffraction) Phase Array Infrared Thermography RVI (Remote Visual Inspection) PMI (Positive Material Identification) LRUT (Guided Wave)
Duration
One day One day One day One day One day Five Days
Details
Method of inspection, limits of techniques, applications Applications, Technique basics, Limits Operation of Flir P-65 Camera, Reporting Software RVI equipment functions and report essentials
Course Description
High Temperature Hydrogen Attack Impression Management Leading for Results General Safety & Fire Fighting
Duration
One day One day One day One day
Details
Effects on equipment, Detection techniques
Impression building, Personality development Result orientation objectives and planning Fire and Extinguishers types, Practical fire fighting
Details
Welding requirements, Tension and Bend Test, Essential Variables, Non-Essential Variables UT, MT, PT, RT Procedure and Requirements Welding and Metallurgy, WPS and PQR Review Risk base inspection Damage Mechanisms Affecting Fixed Equipment in the Refining Industry
Computer Skills:
MS Office: Internet: Auto CAD: (Word, Excel, Power Point) (Internet Browsing, E-mails) (General Overview)
Personnel Details:
Fathers Name: E-mail: Mobile No.: Date of birth: Passport No: Postal Adress: Nationality: Marital Status: Sharfuddin Ahmed engr.saad07@gmail.com +966 5358 16 112 / +92 333 3388 557 12th FEB, 1986 CK5124702 S-3/154, Shahwaliullah Nagar, Sector 11 , Orangi Town, Karachi-75800 Pakistan Pakistani Married