PT.

BHAKTI ENERGI PERSADA

MineScape Training

Minescape Reserving and Scheduling Manual


1. Minescape Open Cut Coal
1.1. 1.2. 1.3. 1.4. Minescape blocking Projection solid with batter slope for reserves calculation Projection solid Reserves calculation

2.

Excel or CSV Database


2.1. 2.2. 2.3. Create reserves database in Excel or CSV file Create polygon database in Excel or CSV file Scheduling

Page 1 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Minescape Open Cut Coal


1.1. Minescape blocking
1. Buatlah poligon pit shell (batas-batas pit). Open write design file blocks.

Click

Click Create layer untuk rancangan pit baru: Pit00

Klik kanan

Click

Click

Page 2 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click Attach design file subcrop lapisan batubara: subcrp_floor_update, layer SEAM1.

Click

Click

Page 3 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Untuk latihan, buatlah poligon pit shell pada daerah subcrop seam 1 dengan ukuran kira-kira 32 km.

Page 4 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA Tekan Ctrl+G untuk memunculkan grid.

MineScape Training

Grid akan berguna sebagai alat bantu dalam menentukan ukuran pit shell.

Click

Page 5 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

3 km

2 km

2.

Berikan tag design segment pada pit shell dengan memilih menu Strip Design>Tag Design Segments

Click

3.

Buat side definition dengan mengklik kanan bagian Side Definition lalu pilih Create,,,.

Klik kanan

Click

Page 6 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Contoh beberapa Side Definition: Side Definitions: HW63 Angles If (label == coal) then 70 else 63 endif Offset If range(level, totroof+3, topo-1) then if range(level,-29.5,-30.5) then 5 elseif range(level,-9.5,-10.5) then 10 elseif range(level, 10.5,9.5) then 5 elseif range(level,30.5,29.5) then 10 elseif range(level,50.5,49.5) then 5 elseif range(level,70.5,69.5) then 10 else 0 endif else 0 endif ILLEG_HW Angles 70 Offset 0 VERTICAL Angles 90 Offset 0

Page 7 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click Kemudian double click pit shell.

Click

Page 8 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 4. (BB_Intersect) dan solid (BB_Solid).

MineScape Training

Buatlah tiga layer baru, yaitu untuk batter block (BB), batter block intersection

Klik kanan

Click

Click

Click Click Lalu buat start line dan end line-nya.

Page 9 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 5. Buka menu Strip Design>Generate Strips End line

MineScape Training

Pit shell

Start line (garis dekat subcrop)

Click

Page 10 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

6.

Buat batter strip dengan cara yang sama tetapi dengan start line parallel terhadap highwall dan dengan interior strips = vertikal. End line Pit shell

Start line

Page 11 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 12 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 7. Design>Strip Intersection

MineScape Training

Buatlah perpotongan antar strip dengan block strip dengan memilih menu Strip

Click Sembunyikan semua layer kecuali layer BB_intersect.

Click

Page 13 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Click

Click

Page 14 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 8. dekatnya. Buka Minescape Explorer, User Commands bbmerge.

MineScape Training

Gabungkan batter block yang berukuran kecil dengan batter block lain yang berada di

Double click

Pilih batter block yang pertama.

Double click

Page 15 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA Pilih batter block yang ke-dua.

MineScape Training

Double click

Masukkan nama batter block yang telah dimerger (pilih nama batter block pertama).

Click

Page 16 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA Hapus batter block ke-dua.

MineScape Training

Click + [delete]

Page 17 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

1.2.

Projection Solid with Batter Slope for Reserves Calculation

1. Buka menu Strip Design>Project Solids 2. Masukkan nama batter block dalam kolom Block Names. 3. Masukkan nama layer BB_Solid.

4. Buatlah atau sunting pit projection rules dengan meng-klik kanan bagian Pit Projection Rules. Projection rule harus dibuat sesuai hasil kajian kestabilan lereng.

Page 18 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 19 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 20 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

1.4.

Reserves calculation
1. Pilih menu Reserves>Sample>Solids

Page 21 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 22 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 2. Pilih menu Reserves>Evaluate Samples>Mining Reserves

MineScape Training

Click

Click

Page 23 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 3. Pilih menu Reserves>Accumulate Samples

MineScape Training

Click

Click 4. Pilih menu Reserves>Reformat Samples>Block

Click

Page 24 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Page 25 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 26 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Excel or CSV Database


2.1. Create reserves database in Excel or CSV file
1. Ekspor file tab_ressol4 ke dalam format Excel.

2-Click

1-Click

Page 27 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Page 28 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

2.2. Create polygon database in Excel or CSV file


1. Buka file xls_ressol4.

2.

Buat dua kolom baru, yaitu kolom OB dan COAL.

OB = TOTALVOLUME GROUP1_VOLUME

COAL = TOTALRRMASS

Page 29 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA 3. Buat pivot table dari semua data tersebut. Pilih semua cell (tekan Ctrl+A)

MineScape Training

Pilih menu Insert>PivotTabel.

Click

Page 30 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Drag

Drag

Page 31 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Drag

Drag Values

Page 32 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA M10, M20, dst.).

MineScape Training

Urutkan kolom A mulai dari level yang paling tinggi (misal: P90, P80, P70, , P00,

5.

Untuk mempermudah penyuntingan, pivot table harus di-copy ke sheet lain Pilih semua cell (tekan Ctrl+A)

Page 33 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Copy semua cell (tekan Ctrl+C).

Pindah ke sheet baru, lalu pilih Paste>Paste Values.

Page 34 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Click

Hapus baris-baris yang kosong yang menjadi pemisah antar level (misal antara P90 dengan P80) Lakukan formatting seperlunya (lihat gambar berikut).

Page 35 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA

MineScape Training

Permukaan topografi (hijau)

Lantai batubara (hitam)

Page 36 of 37 Created by Fajar Herdian Akhzan

PT. BHAKTI ENERGI PERSADA Nama tiap solid menunjukkan lokasi blok penambangan.

MineScape Training

Blok SOL002_xxx

Blok SOL003_xxx

Dan seterusnya

2.3. Scheduling

Page 37 of 37 Created by Fajar Herdian Akhzan