1 SMPN Weekly Report | 12.30.12

Engineering Design & Development

Table of Contents
1. General Information 1.1. Photos 1.2. Basic Information 1.3. Tenants information 1.4. Upcoming/Latest events Technical reports and updates 2.1. Utilities Interruption 2.2. Utilities Consumptions 2.2.1. Daily power consumption monitoring 2.2.2. Daily Non-Potable Water Consumption Monitoring 2.3. Equipment updates 2.3.1. Genset 2.3.2. AHUs 2.3.3. Cooling tower 2.3.4. Chillers 2.3.5. Elevators/Escalators repair 2.3.6. Busted Lights summary 2.3.7. (any other equipment utilities that undergoing major maintenance/repair)
Engineering Design & Development

2.

2 SMPN Weekly Report | 12.30.12

Table of Contents
2.4 Lightings 2.4.1 Mall Lightings 2.4.2 Logos 2.5 Rest rooms 2.6 Water leaks 3. Materials Withdrawals Monitoring 3.1. Materials requested within the week 3.2. Materials withdrawn within the week 4. Issues and needs list

3 SMPN Weekly Report | 12.30.12

Engineering Design & Development

1. General Information

4 SMPN Weekly Report | 12.30.12

Engineering Design & Development

1.1. Photo and Basic Information

5 SMPN Weekly Report | 12.30.12

Engineering Design & Development

1.2. Basic Information

Leasable area Common area Percentage of leasable from common area

6 SMPN Weekly Report | 12.30.12

Engineering Design & Development

1.3. Tenants information


Total Number of Tenants - 53 Vacant leasable areas Constructing Tenant

-5 -1

Schedule of opening

Print Cafe January 3, 2013

7 SMPN Weekly Report | 12.30.12

Engineering Design & Development

1.4. Upcoming Event


What: NONE Date: N/A

8 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2. Technical Report and Updates

9 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.1. Utilities interruptions


Utilities Power Water Gas supply Equipment breakdowns Numbers of AAR Status No interruption No interruption No interruption Freight Elevator 1 (September 25, 2012 Hyundai pullout the control Inverter for checking) 0

10 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.2. Utilities Consumptions


Utilities Power Water Gas Diesel Consumptions 122500 kWh 682 cu.m. Potable water for General use 7 cu.m. Potable cooling tower use No delivery this week 0

11 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.2.1. Daily power Consumption monitoring


Dec. 24 Dec. 25 Dec. 26 Dec. 27 Dec. 28 Dec. 29 Dec. 30

10 kWh

10 kWh

10 kWh

11 kWh

8 kWh

11 kWh

10 kWh

12 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.2.2. Daily Non-Potable Water Consumption Monitoring


Dec. 24 Dec. 25 Dec. 26 Dec. 27 Dec. 28 Dec. 29 Dec. 30

Cooling Tower TTP

155 cu. m

128 cu. m

120 cu. m 110cu.m

115.2 cu. m 90 cu. m

139 cu. m 95 cu. m

150 cu. m 109cu.m

77 cu. m

92cu. m 104cu.m

112cu.m

Mall

62cu. m 40 cu. m 26 cu. m 28 cu. m

45 cu. m

58cu. m 58 cu. m

13 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3. Equipment Updates


2.3.1. Genset

Running Hours

G1-101 G2-56.47

PM (Change Oil) January 23, 2012

14 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3.1. Genset

IR Scanning (No IR Scanning Held this week)

15 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3.2. AHUs

Cleaning- December 28,2012

During cleaning

After cleaning

Before cleaning

16 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3.3. Cooling Tower

Cleaning of Cooling Tower-December 30, 2013

Before

After

17 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3.4. Chillers

PM of Chillers December 14

18 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.3.5. Elevator/Escalator

Replacement of Drive Wheel

19 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.4. Lightings
2.4.1. Mall Lightings
Brand # of Busted Average life Total # of installed lamp (with the same brand) Connection (Horizontal/ Vertical)

Sylvania Karo Osram GE Philips

0 0 0 0 0

n/a n/a n/a n/a n/a

20 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.4.2. Logos
Total Number of Logos Total number repaired/replaced lights 0 Location Entrance Two Type LED # busted lamp replaced N/A

1 Details SM Logo

21 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.5. Restrooms
Total number of fixture repaired during the week
Total # of Fixture Total Number repaired for the week 0 0 0 0 0 0 Total number of fixture that is not repaired yet 0 0 0 0 0 0

Water Closet Urinal Sink Floor Drain Faucet Wash Tub


NOTE:

28 17 18 42 18 5

22 SMPN Weekly Report | 12.30.12

Engineering Design & Development

2.6. Water leaks


8. WATER LEAKS UPDATE
24 DEC 25 DEC 26 DEC 27 DEC 28 DEC 29DEC 30 DEC

Weather Condition Weather Chart

Sunny

Rainy

Sunny

Sunny

Sunny

Sunny

Sunny

NOTE: I am asking for a brief summary of the work done but please prepare the details in case you will be asked

23 SMPN Weekly Report | 12.30.12

Engineering Design & Development

3. Materials Monitoring
3.1 Material Requested within the week
MSRS # Material requested QTY Amount Purpose

none none none

24 SMPN Weekly Report | 12.30.12 24

Engineering Design & Development

3.2. Material Withdrawn within the week


MSRS # Material requested QTY Amount Purpose

none none none

25 SMPN Weekly Report | 12.30.12 25

Engineering Design & Development

4. Issues and Needs List


Description Installation of wind cone Status Design already approved the location, for mobilization Veered to 2013 project For Mobilization of ISOTECH Target Date January 10, 2012

Pylon tower rewiring Placing of Epoxy to KEF 5

January 15, 2012 January 7, 2013

26 SMPN Weekly Report | 12.30.12 26

Engineering Design & Development

Thank you

27 SMPN Weekly Report | 12.30.12