Sheet 1 of 18
PREPARED BY
REVIEWED BY
APPROVED BY
ISSUED TO :
ISSUED BY
(SIGN.)
BHARAT HEAVY ELECTRICALS LIMITED POWER SECTOR NORTHERN REGION TECHNICAL SERVICES Plot no 25, Sector 16A, Noida U.P. 201301
Sheet 2 of 18
Remarks:-
Signature
Sheet 3 of 18
Remarks:-
Signature
Sheet 4 of 18
Remarks:-
Signature
Sheet 5 of 18
Remarks:-
Signature
Sheet 6 of 18
14 15 16 17 18 19 20 21 22 23
Remarks:-
Signature
Sheet 7 of 18
Remarks:-
Signature
Sheet 8 of 18
31
Remarks:-
Signature
Sheet 9 of 18
8 9 10 11 12 13 14 15 16 17 18
Remarks:-
Signature
Sheet 10 of 18
Remarks:-
Signature
Sheet 11 of 18
43 44
Remarks:-
Signature
Sheet 12 of 18
Remarks:-
Signature
Sheet 13 of 18
Remarks:-
Signature
Sheet 14 of 18
Remarks:-
Signature
Sheet 15 of 18
Remarks:-
Signature
Sheet 16 of 18
9 10 11
12
13 14 15 16
Remarks:-
Signature
Sheet 17 of 18
20
21
22 23 24 25 26 27 28 29
30 31
Remarks:-
Signature
Sheet 18 of 18
Hydrostatic plug of safety valves to be removed and discs to be installed Silencers, exhaust piping of safety valves along with fixed and guide supports are erected as per drawing Proper offset of safety valve drip pan and exhaust pipe has been maintained Safety valves drain and vent arrangement have been provided as per drawing Reaction supports for Safety valves has been provided as per drawing ERV controllers have been mounted, impulse line erected, cabling and remote operation of ERVs solenoid coils has been checked Availability of calibrated local pressure gauges for drum, main steam, cold reheat and hot reheat system Steam Blowing of the particular circuit in which safety valves to be floated is over Arrangement for hand popping with pulley and rope is made. Gagging of all the safety valves in the circuit except the one being floated Availability of HPBP & LPBP system for floating of RH safety valves
5 6
9 10
11
Remarks:-
Signature