Вы находитесь на странице: 1из 25

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Code User Drafted B GBSS Engineer !ire"ess Case and Training

Product Name Product Version Date

BTS3900 V1.0 #00$%0&%#'

GS( BTS3900 )nsite Engineer )*eration Guide

Huawei Technologies Co. td. !ll rights reser"ed

GSM BTS3900 Onsite Engineer Operation Guide

Internal

+ntroduction
#. GSM BTS3900 Onsite Engineer Operation Guide is one part o$ the BTS3900 training pac%age& which is designed to support the training wor% a'road. The (ain purpose o$ this docu(ent is to $acilitate the onsite engineers to 'e (uch clear a'out the %e) points in the engineering and co((issioning wor%. *. This docu(ent can not 'e used to direct the engineering wor% in a certain pro+ect without (odi$ication to (atch the detailed pro+ect scenario ') technical director. 3. ,lease re$er to the BTS3900 -eplo)(ent Guide& Installation Guide and other docu(ents to direct the engineering and co((issioning wor%.

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Content
Chapter # BTS3900 Onsite Engineer Operation ,reparation..............................................3
#.# -ocu(ents ,reparation.................................................................................................... 3

1.1.1 GSM BTS3900 Survey Report........................................................................................3 1.1.2 GSM BTS3900 Engineering Documents.........................................................................3 1.1.3 GSM BTS3900 Insta ation Gui!e...................................................................................3 1.1." Report .....................................................................................................................................................3
#.* .ecessar) Tools and Meters............................................................................................. 3

#ar!$are Insta ation %ua ity Se &'inspection Report ( )n'site *ommissioning

Chapter * BTS3900 Onsite Engineer

Operation Guide......................................................./

*.# 0npac%ing Chec%.............................................................................................................. / *.* BTS3900 Hardware Installation......................................................................................... /

2.2.1 Insta ing t+e BTS3900 *a,inet......................................................................................." 2.2.2 Insta ing t+e E-terna .G/D *a, es o& t+e BTS3900..................................................." 2.2.3 Insta ing t+e BB03900....................................................................................................1 2.2." Insta ing t+e .M02.S0...................................................................................................3 2.2.1 Insta ing t+e .G/D ca, e o& t+e D*D0.........................................................................9 2.2.4 Insta ing 5"67 BTS3900 .o$er *a, es.......................................................................10 2.2.3 Insta ing t+e BTS3900 Transmission *a, es................................................................11 2.2.6 Insta ing t+e BTS3900 Signa *a, es...........................................................................13 2.2.9 Insta ing t+e R8 Signa *a, es......................................................................................16
*.3 Chec%ing the Installation o$ the BTS3900 Hardware.......................................................*0 *./ Co((issioning o$ BTS3900............................................................................................*#

2.".1 9oca Maintenance.........................................................................................................21 2.".2 Transmission Testing......................................................................................................22 2.".3 Data 9oa!ing .................................................................................................................22 2."." Monitoring t+e Device Status........................................................................................22

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2.".1 Measuring t+e )utput .o$er ........................................................................................22 2.".4 *a Testing.....................................................................................................................22 2.".3 Environment : arms Testing..........................................................................................23 !ttach(ent...............................................................................................................................*/

C,a*ter 1 BTS3900 )nsite Engineer )*eration Pre*aration


#.# -ocu(ents ,reparation
#.#.# GSM BTS3900 Sur"e) 1eport
O'tain the BTS3900 sur"e) report $ro( the T-. 2a(iliar with the site position& en"iron(ent and other details in the sur"e) report.

#.#.* GSM BTS3900 Engineering -ocu(ents


,a) attention to the $ollowing in$or(ation3 $ront "iew and top "iew o$ antenna4$eeder& installation position o$ the antenna s)ste(& antenna height& direction& tilt angle& etc.& in order to direct the antenna s)ste( installation and ca'le connection.

#.#.3 GSM BTS3900 Installation Guide


BTS3900 5uic% Installation Guide BTS3900 Installation Guide

#.#./ Hardware Installation 5ualit) Sel$6inspection 1eport 7 On6site Co((issioning 1eport

#.* .ecessar) Tools and Meters


SN # * 3 / 8 : Too"s-(eters SITEM!STE1 ,ower Meter Test ,hone SIM card $or testing SIM card o$ other operators with the sa(e $re9uenc) 'and Current tools o$ wireless engineering .uantit # # # # # #

GSM BTS3900 Onsite Engineer Operation Guide

Internal

C,a*ter # BTS3900 )nsite Engineer Guide


*.# 0npac%ing Chec%

)*eration

)*eration Procedures Step # Bring the printed pac%ing6lists while lea"ing $or the unpac%ing chec%ing. Step * Inspect all the ite(s on the pac%ing6list and trans$er the docu(ents to the T- a$ter getting custo(er;s signature. Step 3 2or cargo pro'le( in the unpac%ing chec%ing& please $ill in <Cargo ,ro'le( 1eport= and sol"e the pro'le( $ollowing the cargo pro'le( $eed'ac% wor% $low.

*.* BTS3900 Hardware Installation


*.*.# Installing the BTS3900 Ca'inet
,lease re$er to the chapter <Installing BTS3900 Ca'inet= in the BTS3900 5uic% Installation Guide and the BTS3900 Installation Guide.

*.*.* Installing the E>ternal ,G.- Ca'les o$ the BTS3900


)*eration Procedures Step # Based on the actual ca'ling route o$ the ,G.- ca'les& (easure the distant 'etween the ,G.- 'olt o$ the BTS3900 ca'inet and the corresponding connecting ter(inal o$ an e>ternal grounding 'ar& and o'tain ,G.- ca'les in appropriate length. Step * !ttach the te(porar) la'els at 'oth ends o$ a ca'le. The contents on the la'els can 'e consistent with the $or(al ones or 'e sel$6prepared. Step 3 Ma%e OT ter(inals at 'oth ends o$ each ,G.- ca'le. Step / 1oute the ,G.- ca'les. Step 8 Connect the OT ter(inal at one end o$ the ,G.- ca'le to the grounding point o$ the BTS3900 ca'inet& as shown in 2igure #.

*0#36##6*?

H0!@EI Con$idential

,age/& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure # Installation o$ the E>ternal ,G.- Ca'les o$ the BTS3900

Step : Connect the OT ter(inal at the other end o$ the ,G.- ca'le to the nearest grounding 'ar. Step ? 0se the ,hillips screwdri"er to tighten the screws. //End

*.*.3 Installing the BB03900


Be$ore installing the BB0& )ou should set the -I, switches on the GTM0 and 0E ,. The setting o$ S# and S* on the GTM0 is shown in Ta'le #.
Ta'le # The setting o$ the -I, switches S# and S*

Note In ?86oh( E# (ode& all 'its o$ S* are set to O22 ') de$ault A'alanced (odeB. Onl) when the $our E#s $or recei"ing lin%s 'eco(e $ault)& all 'its o$ S* are set to O. Aun'alanced (odeB to clear the lin% errors. In #*06oh( E# (ode& all 'its o$ S* %eep O22 without additional settings.
*0#36##6*? H0!@EI Con$idential ,age8& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

@hether to ena'le the !'is ')pass $unction depends on the actual re9uire(ents. The -I, switches S/ and S8 on the GTM0 are used to set whether to ena'le the !'is ')pass $unction& as shown in Ta'le *.
Ta'le * The Setting o$ -I, switches S/ and S8

)*eration Procedures Step # Hold the BB0 with 'oth hands and align the holes in each hanger with the corresponding (ounting holes in the ca'inet. Then& slowl) push the BB0 along the guide rail. Step * Thread each o$ the $our screws through the hanger and (ounting hole in the ca'inet. Then& use the cross screwdri"er to tighten the screws so that the BB0 is $astened in the ca'inet& as shown in 2igure *. Note In the case o$ a 6/CD -C ca'inet& the BB0 should 'e installed in the position 30 awa) $ro( the 2!. unit. In the case o$ a E*/D -C or **0D !C ca'inet& the BB0 should 'e installed in the position *0 awa) $ro( the 2!. unit.

*0#36##6*?

H0!@EI Con$idential

,age:& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure * Installing the BB03900

//End

*.*./ Installing the ,M04,S0


!arning Be$ore contacting the de"ice& wear a grounded ES- wrist strap or glo"es. It can pre"ent the sensiti"e co(ponents $ro( 'eing da(aged ') the static electricit) in the hu(an 'od). Note In the case o$ a **0D !C ca'inet& )ou should install the ,M0 and ,S0 A!C4-CB. The **0D !C ca'inet can 'e con$igured with a (a>i(u( o$ one ,M0 and three ,S0s. In the case o$ a E*/D -C ca'inet& )ou should install the ,S0 A-C4-CB. The E*/D -C ca'inet can 'e con$igured with a (a>i(u( o$ $our ,S0s. Prere0uisites -ip 'its # and * on the rear panel o$ the ,M0 are set to O.& and the other si> -I, 'its are set to O22& as shown in 2igure 3.

*0#36##6*?

H0!@EI Con$idential

,age?& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure 3 The setting o$ -I, switches on the ,M0

Note I$ two ,M0s are con$igured and the ports $or (onitoring the ,M0s are logicall) on the sa(e 'us& 'it 3 o$ the -I, switch on the second ,M0 should 'e set to O. and the other 'its should 'e set to O22. I$ the ports $or (onitoring the ,M0s are logicall) on di$$erent 'uses& the settings o$ the -I, switches on the two ,M0s can 'e the sa(e. )*eration Procedures Step # On the ,M04,S0 panel& loosen the two screws to un$old the handle& as shown in 2igure /.

2igure /

oosen the screws on the panel

Note 2igure / shows the screws on the ,M0 panel. The positions o$ the screws on the ,S0 panel are the sa(e as those on the ,M0 panel.

*0#36##6*?

H0!@EI Con$idential

,ageC& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Step * Slide the ,M04,S0 $orward along the guide rail until )ou $eel resisting $orce& as shown in 2igure 8.

2igure 8 Installing the ,M0

Step 3 2old the handle& and then tighten the two screws on the panel& as shown in 2igure 8. Step / Install the other ,M0 and ,S0s $ro( the le$t to the right. //End

*.*.8 Installing the ,G.- ca'le o$ the -C-0


)*eration Procedures Step # 1oute the ,G.- ca'les o$ the -C-0. Step * Connect the OT ter(inal at one end o$ the ,G.- ca'le to the corresponding G.ter(inal o$ the BTS3900 ca'inet and connect the OT ter(inal at the other end o$ the ca'le to the grounding 'ar at the lower6right o$ the -C-0& as shown in 2igure :.

*0#36##6*?

H0!@EI Con$idential

,age9& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure : Installing the ,G.- ca'le o$ the -C-0

Step 3 Tighten the screws ') using the cross screwdri"er. //End

*.*.: Installing F/CD BTS3900 ,ower Ca'les


This section descri'es onl) the installation (ethod and procedures o$ the e>ternal 6/CD input power ca'les and the power ca'les o$ the (odules in the BTS3900 ca'inet when the BTS3900 ca'inet supports 6/CD power input. ,lease re$er to the chapter <Installing the ,ower Ca'les o$ BTS3900= in the BTS3900 5uic% Installation Guide and the BTS3900 Installation Guide $or other scenarios.

Installing the E>ternal ,ower Ca'les A6/CDB


)*eration Procedures Step # Based on the actual ca'ling route o$ the e>ternal power ca'les& (easure the distance 'etween the power wiring posts on the -C-0 and the corresponding wiring posts o$ the e>ternal power input e9uip(ent. O'tain power ca'les in appropriate lengths. Step * Ma%e OT ter(inals at 'oth ends o$ each power ca'le. Step 3 1oute the e>ternal power ca'les o$ the -C-0. Step / 0nscrew the e>ternal 'olt o$ the ter(inal 'loc% ') using the cross screwdri"er& and disasse('le the protection co"er on the e>ternal ter(inal 'loc% o$ the power suppl) in the -C-0. Step 8 See the procedures $or installing the OT ter(inals. Connect the OT ter(inals o$ the power ca'les to the corresponding ter(inal. Connect the OT ter(inal o$ each 6/C D power ca'le A'lueB to the .EGA6B ter(inal& and connect the OT ter(inal o$ each G.ca'le A'lac%B to the 1T.AEB ter(inal& as shown in 2igure ?.

2igure ? Installing the e>ternal power ca'les o$ the -C-0

Step : Step ?

Tighten the screws in the ca'le hole ') using the cross screwdri"er. ,lace the protection co"er on the -C-0& and then tighten the screw on the

*0#36##6*?

H0!@EI Con$idential

,age#0& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

protection co"er ') using the cross screwdri"er. //End

Installing the ,ower Ca'les 'etween the -C-0 and the -120s
)*eration Procedures Step # Connect the 3D3 connector o$ each power ca'le to the ,@1 port on the corresponding -120& as shown in 2igure C.

2igure C Installing the power ca'le 'etween the -C-0 and the -120s

Step * Tighten the two screws on the 3D3 connector& as shown in 2igure C. Step 3 !ttach a la'el to the power ca'le. //End

*.*.? Installing the BTS3900 Trans(ission Ca'les

Installing the BB0 E#4T# Ca'le A#96Inch Ca'inetB


I$ the 0E , 'oard is con$igured& the E#4T# ca'le connects the ca'le connecting e9uip(ent to the O0TSI-E port on the 0E , 'oard. I$ the 0E , 'oard is not con$igured& the E#4T# ca'le connects the ca'le connecting e9uip(ent to the E#4T# port on the GTM0 'oard. )*eration Procedures Step # 1oute the E#4T# ca'le outside the ca'inet. Step * ead the E#4T# ca'le to the ca'inet $ro( the ca'le hole $or the signal ca'le at the right side. Step 3 Connect the E#4T# ca'le to the port on the 0E , or the GTM0.
Ta'le 3 -i$$erent wa)s o$ connection o$ E#4T# ca'les

*0#36##6*?

H0!@EI Con$idential

,age##& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

I$...

Then...

The 0E , 'oard is con$igured& The 0E , 'oard is not con$igured&

Insert the -B*: (ale connector o$ the E# ca'le into the O0TSI-E port on the 0E , and tighten the screws& as shown in 2igure 9. Then& install the E# surge protection trans$er ca'le. Insert the -B*: (ale connector o$ the E# ca'le into the E#4T# port on the GTM0 and tighten the screws& as shown in 2igure #0. In this case& installing the E# surge protection trans$er ca'le is not re9uired.

2igure 9 Connecting the E#4T# ca'le to the 0E ,

2igure #0 Connecting the E#4T# ca'le to the GTM0

Step / Step 8 //End

1oute the E#4T# ca'le 'ased on the ca'ling route at the right side o$ the #96inch ca'inet& and $i> the ca'le ') using the ca'le clips. !ttach a la'el to the E#4T# ca'le.

Installing the C,1I Signal Ca'les 'etween the BB0 and the -120s
)*eration Procedures Step # Insert the S2, connector at one end o$ each C,1I signal ca'le into the C,1I port on the panel o$ the BB0 (odule. Step * Insert the S2, connector at the other end o$ the C,1I signal ca'le into the C,1I0 port on the panel o$ the -120 (odule& as shown in 2igure ##.

*0#36##6*?

H0!@EI Con$idential

,age#*& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure ## Connections o$ the C,1I ca'le $or a single ca'inet

//End

*.*.C Installing the BTS3900 Signal Ca'les

Installing the Monitoring Signal Ca'les $or the -C-060#


Note The ,S0 $ault alar( can 'e co(pleted ') onl) one channel o$ Boolean alar( signals. The pins 3 and : o$ the (onitoring signal ca'le # $or the -C-060# are used to trans(it the alar( to the BB0. The (onitoring signal ca'le # and * $or the -C-060# need to 'e installed during the installation o$ the stac%ed ca'inets. 2igure #* shows the (onitoring signal ca'le # $or the -C-060#.

*0#36##6*?

H0!@EI Con$idential

,age#3& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure #* Monitoring signal ca'le # $or the -C-060#

Ta'le / descri'es the de$inition and color o$ the pins o$ the (onitoring signal ca'le #.
Ta'le / -e$inition and color o$ the pins o$ the (onitoring signal ca'le # ,in at the G* End ,in o$ the Connector at the G# End Color -escription

;1

2 1 4 3

B ue ;+ite )range ;+ite B ue ;+ite )range ;+ite

T$iste! pair ca, e

T$iste! pair ca, e

;2

" 1 6 3

T$iste! pair ca, e

T$iste! pair ca, e

)*eration Procedures +nsta""ing t,e monitoring signa" ca1"e 1 for t,e DCDU%01 during t,e configuration of t,e %2$V sing"e ca1inet. Connect the 1H/8 connector at one end o$ the (onitoring signal ca'le # to the EGT6 ! M0 port on the 0,E0 (odule o$ the BB0& as shown in 2igure #3.

Step #

2igure #3 Installing the (onitoring signal ca'le 'etween the BB0 and the -C-060#

Step *

Insert the pins * and # A'lue4whiteB in @# at one end o$ the (onitoring signal ca'le # into the S,- ! M port on the panel o$ the -C-060#& as shown in 2igure #/.

*0#36##6*?

H0!@EI Con$idential

,age#/& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure #/ Inserting the (onitoring signal ca'le in the -C-060#

Step 3 2i> @* on the ca'ling rac% at the right side o$ the ca'inet. Step / !ttach a la'el to the (onitoring signal ca'le. //End +nsta""ing t,e monitoring signa" ca1"es 1 and # for t,e DCDU%01 3,en t3o %2$V ca1inets are stac4ed. Connect the 1H/8 connector at one end o$ the (onitoring signal ca'le # to the EGT6 ! M0 port on the 0,E0 (odule o$ the BB0& as shown in 2igure #3. Insert the pins * and # A'lue4whiteB in @# into the S,- ! M ports on the panel o$ the -C-060#& as shown in 2igure #8. Insert the pins C and ? Aorange4whiteB in @* into the interaction ter(inals& as shown in 2igure #8. Insert the pins at one end o$ (onitoring signal ca'le * into the interconnection ter(inals& as shown in 2igure #8. Insert the pins at the other end o$ (onitoring signal ca'le * into the S,- ! M port on the panel o$ the -C-060#& as shown in 2igure #8.

Step # Step * Step 3 Step / Step 8

*0#36##6*?

H0!@EI Con$idential

,age#8& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

2igure #8 Inserting the (onitoring signal ca'le into the stac%ed ca'inet o$ the -C-060#

Step : !ttach a la'el to the (onitoring signal ca'le. Step ? 2i> the interaction ter(inals in the inside ca'ling space at the right o$ the ca'inet. //End +nsta""ing t,e monitoring signa" ca1"e 1 and # for t,e DCDU%01 3,en a 5#2V ca1inet and a %2$V ca1inets are stac4ed. Connect the 1H/8 connector at one end o$ the (onitoring signal ca'le # to the EGT6 ! M0 port on the 0,E0 (odule o$ the BB0& as shown in 2igure #3. Insert the pins * and # A'lue4whiteB in @# into the S,- ! M ports on the panel o$ the -C-060#& as shown in 2igure #:.

Step # Step *

*0#36##6*?

H0!@EI Con$idential

,age#:& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Step 3 Step / Step 8

Insert the pins C and ? Aorange4whiteB in @* into the interaction ter(inals. Insert the pins at one end o$ (onitoring signal ca'le * into the interconnection ter(inals& as shown in 2igure #:. Insert the pins at the other end o$ (onitoring signal ca'le * into the S,- ! M ports on the panel o$ the -C-060#& as shown in 2igure #:.

2igure #: Installing the (onitoring signal ca'le # and * $or the -C-060# AE*/D ca'inetB

Step : Step ? Step C Note

Cut the (onitoring signal ca'le # to e>pose the pins : and 3 Aorange4whiteB in @#. Insert the pins : and 3 Aorange4whiteB into the ! M port on the connection unit o$ the ,S0 A-C4-CB. !ttach a la'el to the (onitoring signal ca'le.

*0#36##6*?

H0!@EI Con$idential

,age#?& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

The installation o$ the (onitoring signal ca'le $or the -C-060# in the E*/ D single ca'inet is si(ilar to that o$ the stac%ed ca'inets. Iou onl) need to insert pins * and # in @# into the S,- ! M port on the panel o$ the -C-060#& and insert pins : and 3 into the ! M port on the connection unit o$ the ,S0 A-C4-CB. Step 9 2i> the interaction ter(inals in the inside ca'ling space at the right o$ the ca'inet. //End

Installing the Monitoring Signal Ca'les $or the 2!.


)*eration Procedures Step # Insert the 1H/8 connector at one end o$ the (onitoring signal ca'le into the MO.0 port on the panel o$ the 0,E0. Step * Insert the 1H/8 connector at the other end o$ the (onitoring signal ca'le into the COM I. port on the panel o$ the 2!.& as shown in 2igure #?.

2igure #? Installing the Monitoring Signal Ca'les $or the 2!.

Step 3 !ttach a la'el to the (onitoring signal ca'le o$ the 2!.. //End

Installing the Monitoring Signal Ca'le $or the EM0!


,lease re$er to the H0!@EI EM0! 0ser Guide.

*.*.9 Installing the 12 Signal Ca'les

Installing the 12 Hu(pers


)*eration Procedures Step # @hen cutting the 12 +u(per& )ou should lea"e 30c( o$ the +u(per $or ease o$ ca'ling
*0#36##6*? H0!@EI Con$idential ,age#C& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Step * Step 3

on the upper ca'inet in case that the ca'inets are stac%ed $or capacit) e>pansion. Connect one end o$ the +u(per to the +u(per connector at the $eeder side. Connect the -I. connector o$ the +u(per to the !.T port on the panel o$ the -120 (odule& as shown in 2igure #C.

2igure #C Connections o$ 12 +u(pers $or a single ca'inet

Step / Tighten the -I. connector ') using the ad+usta'le wrench. //End Note I$ a single ca'inet is installed& the 12 +u(pers are routed along the le$t and right ca'le troughs. I$ two ca'inets are stac%ed& the 12 +u(pers in the lower ca'inet are routed along the le$t and right ca'le troughs& and the 12 +u(pers in the upper ca'inet are routed in $ront o$ the -120 panels. ,lease re$er to the design $ile o$ each pro+ect to see the connection o$ the 12 signal ca'les 'etween -120s.

*0#36##6*?

H0!@EI Con$idential

,age#9& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

!ttaching Color 1ings

2igure #9 !ttaching Color 1ings

*.3 Chec%ing the Installation o$ the BTS3900 Hardware


Chec% the installation 9ualit) o$ the hardware according to the <Hardware 5ualit) Standard $or Indoor @ireless Macro Base Station product=. ,ower on the BTS3900& where the e>ternal power input "oltage is in the range o$ 63C./D -C 68?D -C. ,ower on the (odules and chec% the indicators status according to BTS3900 Co((issioning Guide.

*0#36##6*?

H0!@EI Con$idential

,age*0& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

*./ Co((issioning o$ BTS3900


,lease test the $ollowing ite(s and record the results in On6site Co((issioning 1eport.

*./.#

ocal Maintenance

Prere0uisites The I, address and the su'net (as% o$ the Site Maintenance Ter(inal ,C are set. The I, address o$ the Site Maintenance Ter(inal ,C and the I, address A#9*.#:C.0.?*4*88.*88.*88.0B o$ the BTS are on the sa(e networ% seg(ent. )*eration Procedures Step # 0se the crosso"er ca'le to connect the Site Maintenance Ter(inal ,C to the BTS. Connect one end o$ the ca'le to the ETH port on the (ain control (odule o$ the (ain ca'inet& and connect the other end o$ the ca'le to the Ethernet ca'le port on the Site Maintenance Ter(inal ,C. Step * Open the co((and window. I$ the operating s)ste( o$ the Site Maintenance Ter(inal ,C is @indows 9C& choose StartJ ,rogra( J MS6-OS ,ro(pt. The co((and window is displa)ed. I$ the operating s)ste( o$ the Site Maintenance Ter(inal ,C is @indows *0004G,& choose Start J 1un. In the 1un dialog 'o>& run the c(d co((and. The co((and window is displa)ed. Step 3 1un the ping targetKna(e co((and to "eri$) the networ% connection 'etween the ,C and the BTS. AtargetKna(e indicates the I, address o$ the BTSB. I$ the in$or(ation si(ilar to that in the $ollowing e>a(ple is returned& the MT ,C and the GB!M can co((unicate nor(all). In this e>a(ple& the I, address o$ the e>ternal networ% is #9*.#:C.0.?*. ,inging #9*.#:C.0.?* with 3* ')tes o$ data3 ,inging #9*.#:C.0.?* with 3* ')tes o$ data3 1epl) $ro( #9*.#:C.0.?*3 ')tesL3* ti(eL#(s TT L*83 1epl) $ro( #9*.#:C.0.?*3 ')tesL3* ti(eL#(s TT L*83 1epl) $ro( #9*.#:C.0.?*3 ')tesL3* ti(eL#(s TT L*83 1epl) $ro( #9*.#:C.0.?*3 ')tesL3* ti(eL#(s TT L*83 ,ing statistics $or #9*.#:C.0.?*3 ,ac%ets3 Sent L /& 1ecei"ed L /& ost L 0 A0M lossB& !ppro>i(ate round trip ti(es in (illi6seconds3 Mini(u( L #(s& Ma>i(u( L #(s& !"erage L #(s Step / Start Site Maintenance Ter(inal S)ste(. The path is <Start= 6J=!ll ,rogra(s= 6J=H0!@EI ocal Maintenance Ter(inal= 6J=BSC:000 "ersion= 6J= Site Maintenance Ter(inal S)ste(=.
*0#36##6*? H0!@EI Con$idential ,age*#& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Step 8 !$ter success$ul co((unication 'etween local (aintenance ter(inal and BTS& set the co((unication port para(eter to <.etwor% ,ort=& and set the I, address to #9*.#:C.0.?*. Step : Choose <0ser Manage(ent= 6J= og on= and input user na(e as O(c& password as o(c. Step ? -ou'le clic% <Site=& choose <Site Manage(ent 1ight=& and clic% <Get= AThe (aintenance wor% can onl) 'e per$or(ed $ro( the BTS side a$ter getting the site (anage(ent right& while onl) so(e 9uer) operations o$ the BTS can 'e per$or(ed on the BSC sideB. Step C -o the (aintenance wor% on BTS side. Step 9 1elease the local Site Manage(ent 1ight. -ou'le clic% <Site=& choose <Site Manage(ent 1ight=& and then clic% <1elease=. //End

*./.* Trans(ission Testing


Step # Con$ir( the -I, switches on the GTM0 are correctl) set. Step * Connect the !'is inter$ace trans(ission ca'les. Step 3 Trans(ission pro'le( locating and solution ') loop test.

*./.3 -ata oading


Con$ir( the hardware con$iguration and ca'les connection with BSC engineers and as% the( to load the con$iguration data.

*././ Monitoring the -e"ice Status


Step # Chec% the BTS3900 indicator status. Step * Chec% and handle the $ault) alar(s. ,lease re$er to the BTS3900 Co((issioning Guide $or other test ite(s.

*./.8 Measuring the Output ,ower


Measure the output power o$ the T1G on the !.T port o$ the -120 ') using a power (eter. ,lease re$er to the relati"e instructions o$ the certain power (eter.

*./.: Call Testing


Step # Search $or the ser"ice networ% using the test phone and (a%e sure the MS can access to the networ%. Step * CS call testing. 2orce the $re9uenc) to the $irst cell on the test phone and test the MS oriented and ter(inated calls as $ollows3 MS to MSN MS to $i>ed phoneN
*0#36##6*? H0!@EI Con$idential ,age**& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

Ms to other operators; MS. Step 3 Hando"er test $or inter6cell in the sa(e site. Step / 1epeat step# to step3 to test the other cells. Step 8 ,S call testing& including SMS4MS& we' sur$ing and downloading.

*./.? En"iron(ent !lar(s Testing


Test the en"iron(ent alar(s with the cooperation o$ the BSC engineers.

*0#36##6*?

H0!@EI Con$idential

,age*3& Total*:

GSM BTS3900 Onsite Engineer Operation Guide

Internal

6ttac,ment
1e$erence and ,ath $or -ownloading
# BTS3900 5uic% Installation Guide AD300100CK0*B * BTS3900 GSM ,roduct -escription AD300100CK03B 3 BTS3900 GSM Hardware -escription AD300100CK03B / BTS3900 GSM Co((issioning Guide AD300100CK03B Pat,7 -ocu(entation 6J @ireless ,roduct ine 6J GSM6BSS 6J GSM6BTS 6J ,roduct Manual 6J BTS3900 GSM 6J D300100C 8 GSM H0!@EI BTS3900 -eplo)(ent Guide6D#.0 Pat,7 -ocu(entation 6J @ireless ,roduct ine 6J GSM6BSS 6J GSM6BTS 6J Technical Guide 6J -eplo)(ent Guide

: H0!@EI EM0! 0ser Guide6AD#00100#K0:B Pat,7 -ocu(entation 6J @ireless ,roduct ine 6J @ireless ,u'lic 6J @ireless ,u'lic ,roducts 6J ,roduct Manual 6J EM0!

*0#36##6*?

H0!@EI Con$idential

,age*/& Total*: