Code No. 2.1 Description Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches removing the roots and stacking of serviceable material and disposal of unserviceable material. Beyond 30 cm girth upto and including 60 cm girth Beyond 60 cm girth upto and including 120 cm girth Beyond 120 cm girth upto and including 240 cm girth Above 240 cm girth Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto 1.5 m. -All kinds of soil 2.5 Ploughing the existing ground to a depth of 15 cm to 25 cm and watering the same. -All kinds of soil 2.6 Excavating holes upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil; as directed within a lead of 50 m and lift upto 1.5 m. -All kinds of soil

SH:02/EARTH WORK

Unit

Rate

sqm

R 2.90

2.2 2.3

sqm

R 1.70

2.3.1 2.3.2 2.3.3 2.3.4 2.4

Each Each Each Each

R 159.30 R 433.80 R 1859.70 R 3769.70

sqm

R 5.70

sqm

R 10.00

Each

R 73.50

EXCAVATION
2.7 Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth upto 50 m and lift upto 1.5 m, disposed soil to be levelled and neatly dressed: -All kinds of soil 2.7.1 By manual means 100 sqm 100 sqm R 2102.60

2.7.2

By mechanical means

R 1280.70

\\vboxsrv\conversion_tmp\scratch_3\192312865.xls.ms_office/Schedule

SH:02-Page:2

SH:02/EARTH WORK Code No. 2.8 Description Earth work in rough excavation [by manual means], banking excavated earth in layers not exceeding 20 cm in depth, breaking clods watering, rolling each layer with tonne roller or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up in embankments for roads, flood banks, marginal banks and guide banks or filling up ground depressions, lead upto 50 m and lift upto 1.5 m : Unit Rate

-All kinds of soil Note: In case the measurement of actual filling is taken to calculate the quantity involved under this item, the entire quantity of filling thus calculated, should not be considered straightway for payment under this item, but the net quantity after deduction 10% quantity for not consolidating the filling under optimum moisture content only should be considered for payment, under this rate, i.e., if the calculated quantity of filling is 10 cum the payment should be made only for 9 cum under this item. (Refer CPWD specification clause 2.10.5)

cum

R 185.80

2.9

Banking excavated earth in layers not exceeding 20 cm. in depth, breaking clods, watering, rolling each layer with tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m.

-All kinds of soil Note:(Refer CPWD specification clause 2.10.5) If the banking or filling is not consolidated to optimim moisture content the quantity of filling work out after actual measurement should be deducted by 10% to arrive at the net payable quantity. The measurement of excavation as prescribed in this item especially for consolidation, is not for consolidation with optimum moisture content. Hence the deduction of 10% quantity from the actual measured and calculated quantity to arrive a correct quantity for payment is mandatory. 2.10 Deduct for not rolling with power roller of minimum 8 tonnes for banking excavated earth in layers not exceeding 20 cm in depth.

cum

R 114.70

cum

R 3.50

2.11

Deduct for not watering the excavated earth for banking

cum

R 34.60

\\vboxsrv\conversion_tmp\scratch_3\192312865.xls.ms_office/Schedule

SH:02-Page:3

SH:02/EARTH WORK Code No. 2.12 Description Earth work in excavation over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. -All kinds of soil By manual means By mechanical means Earth work in excavation in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. -All kinds of soil 2.13.1 2.13.2 2.14 2.14.1 By manual means By mechanical means Extra rates for quantities of works, executed: In or under water and/ or liquid mud, including pumping out water Metreas required. depth In or under foul position, including pumping out water as required. Metredepth 20% cum cum R 113.40 R 106.30 cum cum R 95.60 R 90.30 Unit Rate

2.12.1 2.12.2 2.13

2.14.2

25%

Note for item no. 2.14:- The extra percentage rate is applicable in respect of each item but limited to quantities of work executed in these difficult conditions. The unit, namely, metre depth, to be considered for payment, shall be the depth measured from the sub soil water level up to the centre of gravity of the quantity executed in difficult condition. The depth shall be reckoned correct to 0.10m, 0.05m or more shall be taken as 0.10m and less than 0.05m ignore.

2.15 2.16

Deduct for disposed soil not levelled and neatly dressed. Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. -All kinds of soil

cum

R 16.50

cum

R 48.80

2.17

Extra for additional lift of 1.5m or part thereof -All kinds of soil cum R 13.60

\\vboxsrv\conversion_tmp\scratch_3\192312865.xls.ms_office/Schedule

SH:02-Page:4

SH:02/EARTH WORK Code No. 2.18 Description Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. Unit Rate

cum

R 424.40

ANTI TERMITE TREATMENT


2.19 2.19.1 2.20 Supplying chemical emulsion in sealed containers including delivery as specified. Chlorpyriphos/Lindane emulsifiable concentrate of 20% Diluting and injecting chemical emulsion for PRECONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) and continuous chemical barrier under and alround the column pits, wall trenches, basement excavation, top surface of plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth of which apron is to be laid, surroundings of pipes and conduits etc. complete as per specification. The work should be carried out as per IS: 6313 (Part II)- Latest revision [Plinth area of the building at ground floor only shall be measured for payment] : Litre R 228.70

2.20.1 2.21

With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. Diluting and injecting chemical emulsion for POSTCONSTRUCTIONAL anti-termite treatment as per IS: 6313 (Part III)- Latest revision (excluding the cost of chemical emulsion):

sqm

R 80.10

2.21.1

Along external wall where the apron is not provided using chemical emulsion @ 7.5 litres/sqm of the vertical surface of the substructure to a depth of 300 mm including excavation channel along the wall & rodding etc. complete: m R 17.80

2.21.1.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration.

2.21.2

Along the external wall below concrete or masonry apron using chemical emulsion @ 2.25 litres per linear metre including drilling and plugging holes etc. m R 13.60

2.21.2.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. 2.21.3 Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 fine sand) to match the existing floor:

sqm

R 45.90

2.21.3.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration.

\\vboxsrv\conversion_tmp\scratch_3\192312865.xls.ms_office/Schedule

SH:02-Page:5

SH:02/EARTH WORK Code No. 2.21.4 Description Treatment of existing masonry using chemical emulsion @ one litre per hole at 300 mm interval including drilling holes at 45 and plugging them with cement mortar 1:2 (1 cement: 2 fine sand) to the full depth of the hole: m R 14.00 Unit Rate

2.21.4.1 With Chlorpyriphos/Lindane E.C. 20% with 1% concentration. 2.22.5 Treatment at points of contact of wood work by chemical emulsion Chlorpyriphos/ Lindane (in oil or kerosene based solution) @ 0.5 litres per hole by drilling 6 mm dia holes at downward angle of 45 at 150 mm centre to centre and sealing the same. Note: For Item No. 2.20 & 2.21. The work will be carried out as per IS: 6313 [Latest Revision]. Under the Insecticides Rule 1971: 10(3A) any person who desires to undertake pest control operations will be a Licence holder. The agency must complying with all safety health and welfare regulations, appertaining to staff and work people employed on the site. Keeping the site free from debris arising from the works during the work and leave the site free from debris on completion of work to the satisfaction of the Owner. The agency shall give a 10-year service guarntee in writing supplemented by a seperate and unilateral guarantee from the specialised agency for the job to keep the building free of termites for the specified period at no extra cost of the Owner.

R 86.80

\\vboxsrv\conversion_tmp\scratch_3\192312865.xls.ms_office/Schedule

SH:02-Page:6