Академический Документы
Профессиональный Документы
Культура Документы
(1)
1- (1 + 0.075/12)-240
(0.075/12)
= RM 179,665.12
(2)
(1)
Model J
4
5
RM 40
Available
RM 240
100 hours
(4)
Z = 30K +40J
30(0) + 40(20) = 800
30(40) + 40(0) = 1200
30(36.5) + 40(5.5) = 1315
30(0) + 40(0) = 0
The company should produce 36.5 units of model K and 5.5 units of model J tables.
(c) The maximum profit is RM 1 312.
(1)
(1)
(1)
(2)
5.Maximise
P - 10x - 12y - 8z = 0
Subject to :
2x + 2y + s1 =5
5x + 3y + 4z + s2 = 15
x, y, z ,s1 ,s2 0
(1)
Basic
p
x
y
z
s1
p
1
-10
-12
-8
0
s1
0
2
2
0
1
s2
0
5
3
4
0
s2
0
0
1
Basic
p
y
s2
p
1
0
0
x
2
1
2
y
0
1
0
z
-8
0
4
s1
6
0.5
-1.5
s2
0
0
1
Solution
30
2.5
7.5
Basic
p
y
z
p
1
0
0
x
6
1
0.5
y
0
1
0
z
0
0
1
s1
3
0.5
--0.375
s2
2
0
0.25
Solution
45
2.5
1.875
P = 45,
x= 0
(b)
When x= 0
, y = 2.5
, z = 1.875
(2)
, y = 2.5
, z = 1.875
2x + 2y 5
2(0) + 2(2.5 ) = 5
5x + 3y + 4z 15
5(0) + 3(2.5) + 4(1.875) =
The solution is feasible.
15
(1)
Ratio test
1.875
(1)
6.
A plays 1
A plays 2
B plays 1
4
-5
B plays 2
-2
3
Row minimum
-2
-5
B should play column 1 with probability of 5/14 and column 2 with probability of
9/14
The value of the game is - 1/7
(2)
7. D = 500 units
C o = Rm 3.75
C= RM 3
Ch = Rm 0.30 per unit
Leed time = 2 days
Number of working days per year = 250
EOQ
(a) Q*
2(500) (3.75)
0.3
= 111.8 units
(2)
(b) Average inventory = Q/2 = 111.8 /2
= 55.9
Q *
Annual holding cost = Ch =RM 16.77
2
D
(c) Annual ordering cost = Co = RM 16.77
Q *
(1)
(2)
(2)
D
(d)Minimum Total annual inventory cost = C* = Co +
Q *
= RM 16.77 + RM 16.77
= RM 33.54
(2)
Reorder point
d= 500/250
=2
r = dl
=2x2
= 4 units
(2)
(f) Time between orders = 250 (111.8/500)
= 55.9 days
(3)
Q *
Ch
2
8.
(5)
(b) There are two critical paths :
A- C - G - I- M
AND A - C - H - K
The critical activities are A , C, G, H, I ,K
(c) Total float on D is 21 - 5 - 14 = 2
Total float on F is 42 - 20 - 14 = 8
(d)
(2)
(2)
(4)
(2)