Вы находитесь на странице: 1из 336

GE Healthcare

MINItrace
Installation Manual
Class A

Direction 2232994-100 Revision 5

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

REVISION HISTORY
REV 4/27/01 0 0A DATE June, 2000 April 30, 2001 July 5, 2002 REASON FOR CHANGE Initial Draft - written during Denver (GammaPlus) installation First release, prior to M4 TOC - TOC updated Ch 1 - Updated Cross-References, Table 1-1 Updated Ch 2 - New pictures on new rigging crate, RF-cable, magnet and lifting bolts, update crate content, packing lists and content rigging crate, update text and cross-references Ch 3 - New pictures on shields, raceways, hinges and wrench, update text and cross-references, updated structure in section 3-4 Ch 4 - New pictures shielding, RF-cable connection and stainless steel runs. Drilling in hand picture taken away, new information about the cables, update text and cross-references. Ch 5 - New pictures shielding, target side of cyclotron, diffusion pump, water pump, filling cosmetic gaps, warning lights and door sensors, raceway covers, labelling and update text. New text about filling the cosmetic gaps on the shielding doors. Ch 6 - New information about Emergency Power Off, Emergency Power Off check added. Ch 7 - Updated drawings, updated information about checking the rotation direction on water pump and rotary pump, new pictures on valves, rotary pump, diffusion pump. Appendix A - Updated information about Cable Crate and Box Locations, Updated figure, Updated wrong cable positions in tables Appendix B - New pictures on Swagelok Tube Fitting, updated information about mounting the Swagelok Tube Fitting. R1 February 28 2003 Ch 4 - New sections about the ventilation of the cyclotron room and the outlet valve panel included. Ch 5 - New pictures and structure in section 5-2.6 Ch 6 - New section Functional Test added. R2 July 1, 2004 Incorporate changes from Ed Mastrangli and Scott Moser into Revision 1 document; resolve CQAs

Revision History

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

REV R3

DATE July 26 2006

REASON FOR CHANGE New front page Ch 3 - Section 3-4.1 added Ch 5 - Section 5-2.1 updated Ch 7 - Section 7-4.3 updated

R4

8/18/2006

New document layout Ch 4 - Figure 4-14 updated Appendix D updated Appendix G updated with Caution about terminal screws

R5

June 8 2007

Revision History

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

TABLE OF CONTENTS
CHAPTER 1 INSTALLATION STEERING GUIDE........................................................................... 9
1-1 1-2 Introduction.............................................................................................................................................. 9 Installation Overview......................................................................................................................... 10

CHAPTER 2 UNPACK THE SYSTEM ............................................................................................15


2-1 2-1-1 2-1-2 2-1-3 2-2 2-3 2-4 2-4-1 2-4-2 2-4-3 2-5 2-6 2-6-1 2-6-2 2-6-3 2-6-4 2-7 2-7-1 2-7-2 Recommended Handling Procedures ....................................................................................... 15 Riggers Responsibilities.......................................................................................................................... 15 Site Representatives Responsibilities ............................................................................................... 16 Installation Tool Box (Gang box).......................................................................................................... 18 Required Installation Tools ............................................................................................................. 19 Check for Transit Damage.............................................................................................................. 20 Unpacking Instructions .................................................................................................................... 21 Rigging Crate (Part # 2298267) ........................................................................................................... 23 Unpack the Magnet Shipping Container ......................................................................................... 25 Unpack the Shields.................................................................................................................................... 29 Check Crate Contents and Packing Lists ................................................................................. 33 Return Procedures for Packages................................................................................................. 35 DOA (Dead On Arrival) Parts Return................................................................................................... 35 Return the Lifting Yoke and Pressure Valve ................................................................................... 35 Return the Rigging Crate ........................................................................................................................ 35 Return the Installation Gang Box........................................................................................................ 35 Pack the Rigging Crate..................................................................................................................... 36 All Service Poles (GEMSE, GEMSA, GEMSAM).................................................................................. 36 GEMSE Service Pole .................................................................................................................................. 36

CHAPTER 3 POSITION THE SUBSYSTEMS.................................................................................39


3-1 3-2 3-2-1 3-3 3-3-1 3-3-2 3-3-3 3-3-4 3-3-5 3-4 3-4-1 3-4-2 3-5 3-5-1 3-5-2 3-5-3 3-5-4 Introduction........................................................................................................................................... 39 Move the MINItrace Magnet into the Room ........................................................................... 39 Introduction.................................................................................................................................................. 39 Move the Rear (Fixed) Shields into Position ............................................................................ 47 Attach the Hi-jacker Assembly to the Shield Component ........................................................ 47 Prepare for the Weight of the Shields............................................................................................... 50 Move the First Rear (Fixed) Shield into Position ............................................................................ 51 Caulk and Paint the Magnet Niche .................................................................................................... 58 Install the First Three Inner Plastic Shields ..................................................................................... 59 Move the Magnet into the Shield................................................................................................. 61 Install the inner Shield Wedges ........................................................................................................... 62 Square the Magnet.................................................................................................................................... 65 Attach Right and Left Shield Doors............................................................................................. 67 Attach Hi-jacker Assemblies ................................................................................................................. 67 Assemble Fixed Shield Hinges.............................................................................................................. 68 Move the Shield Doors into Position.................................................................................................. 71 Align the Shield Doors to the Fixed Shield Hinges....................................................................... 74
Table of Contents 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100


3-5-5

GE HEALTHCARE REV 5

Pin and Adjust the Shield Doors .......................................................................................................... 75 3-6 Support Cabinets and Panels ........................................................................................................ 80 3-7 Position the Electronics Cabinets ................................................................................................ 84 3-8 Assemble the Shielded Raceway................................................................................................. 88 3-9 Clean up the Cyclotron room......................................................................................................... 91 3-10 Unpack and Position the MASTER ............................................................................................... 92 3-10-1 MASTER Transceiver................................................................................................................................ 92 3-10-2 Unpack and Position the MASTER Terminal................................................................................... 92

CHAPTER 4 INSTALL THE CABLES, HOSES AND PIPES .......................................................... 93


4-1 4-1-1 4-1-2 4-1-3 4-2 4-3 4-3-1 4-3-2 4-3-3 4-3-4 4-3-5 4-3-6 4-3-7 4-4 Run the Power and Signal Cables ............................................................................................... 94 MINItrace Cabling Information ............................................................................................................ 94 Install the Magnet Power Cables ........................................................................................................ 98 Install the RF Cable.................................................................................................................................... 99 Hose and Pipe Information.......................................................................................................... 104 Attach the Hoses .............................................................................................................................. 107 Attach the Cyclotron Supply Panel Hoses.....................................................................................108 Attach the MINItrace Cooling Hoses................................................................................................112 Attach the Electronics Cabinet Cooling Hoses ............................................................................113 Polyurethane Connections...................................................................................................................114 Pull the Product Lines to the Hot Lab..............................................................................................117 Outlet Selection Panel ............................................................................................................................119 1/8" Stainless Steel Pipes .....................................................................................................................120 Cyclotron Room Ventilation......................................................................................................... 124

CHAPTER 5 ASSEMBLE THE CYCLOTRON.............................................................................. 127


5-1 5-2 5-2-1 5-2-2 5-2-3 5-2-4 5-2-5 5-2-6 5-2-7 5-2-8 5-3 5-3-1 5-4 5-4-1 5-4-2 5-4-3 5-4-4 5-4-5 5-4-6 5-4-7 5-4-8
6 Table of Contents

Introduction ........................................................................................................................................ 127 Assemble the Target Side of the Cyclotron.......................................................................... 129 Install Inner Shield 5 ...............................................................................................................................129 Install the Targets ....................................................................................................................................132 Target Support Cabinet (TSC)..............................................................................................................134 Install the Helium Compressor(s) ......................................................................................................135 Attach the Helium Compressor Hoses............................................................................................137 Install the Valve Panel and Target Cooling Manifold................................................................140 Paint the Inner Doors .............................................................................................................................146 Attach Outer Shield Assemblies to Left Door...............................................................................146 Assemble the Vacuum Side of the Cyclotron...................................................................... 149 Attach the Diffusion Pump to the Accelerator.............................................................................149 Finish the Cyclotron Installation................................................................................................ 155 Final Door Adjustments.........................................................................................................................155 Install Right and Left Cosmetic Covers...........................................................................................156 Fill the Cosmetic Cover Gaps and Door Picking Point..............................................................157 Final Cleanup and Repair of Damage.............................................................................................160 Final Touch-up of Outer Shield Surfaces .......................................................................................160 Install Warning Lights and Door Sensors......................................................................................160 Install the Right and Left Door Motors............................................................................................162 Touch-up Scratches - Paint Electronics Cabinet Surfaces .....................................................163

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100


5-4-9 Attach the Shield Door Handles ........................................................................................................163 5-4-10 Attach System Labels.............................................................................................................................164

CHAPTER 6 SYSTEM PHASE AND POWER CHECKS...............................................................167


6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 Input Power .........................................................................................................................................167 MASTER Power Checks ...................................................................................................................167 Mains Distribution Panel (MDP) Power Checks....................................................................168 CCAB Power Checks ........................................................................................................................169 PSMC Power Checks ........................................................................................................................171 RFPG Power Checks.........................................................................................................................172 Emergency Power Off Checks.....................................................................................................173 Start up Conditions Checklist ......................................................................................................174

CHAPTER 7 START-UP AND CALIBRATION SEQUENCE .......................................................177


7-1 Start-up Sequence ...........................................................................................................................177 7-2 Control System...................................................................................................................................178 7-3 Water Cooling System ....................................................................................................................181 7-3-1 Fill the Secondary Water Cooling System with Water.............................................................181 7-3-2 Start up the Secondary Water Cooling System ..........................................................................186 7-3-3 Check the Cooling Water Temperature Sensor ..........................................................................190 7-3-4 Check the Shunt Valve Temperature Control Adjustment .....................................................193 7-4 Vacuum Chamber Checks ............................................................................................................195 7-4-1 Clean the Cyclotron Room and Accelerator Surfaces..............................................................195 7-4-2 Inspect the Vacuum Chamber............................................................................................................195 7-4-3 Install the last four Shield Wedges...................................................................................................196 7-4-4 Check the Extraction System ..............................................................................................................197 7-4-5 Calibrate the Extraction Motor...........................................................................................................198 7-4-6 Check the Diagnostic System .............................................................................................................201 7-4-7 Inspect the Center Region and Ion Source. ..................................................................................202 7-5 Vacuum System.................................................................................................................................204 7-6 Magnet System ..................................................................................................................................212 7-7 RF System .............................................................................................................................................216 7-8 Helium Cooling, LTF, and Target Support System Checks.............................................225 7-8-1 Introduction................................................................................................................................................225 7-8-2 F18- Option: Single and Dual Extraction systems .....................................................................226 7-8-3 Check the F18- Target Water and Product Line Connections ..............................................228 7-8-4 Check the 13N Option Connections.................................................................................................230 7-9 Beam Tuning.......................................................................................................................................232 7-9-1 Condition the System .............................................................................................................................232 7-9-2 Tune the Beam..........................................................................................................................................233 7-10 Target System Start-up..................................................................................................................235 7-10-1 Resize the Collimator Opening...........................................................................................................239 7-10-2 Install the Collimator and Resize the Opening............................................................................241 7-11 Functional Test...................................................................................................................................244 7-11-1 Required Equipment...............................................................................................................................244 7-11-2 Radiation License.....................................................................................................................................244 7-11-3 Inspection....................................................................................................................................................244
Table of Contents 7

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-11-4 Operator Report........................................................................................................................................244 7-11-5 Test Procedure ..........................................................................................................................................245

7-12 FDG Micro Lab ................................................................................................................................... 254

APPENDIX A CABLES ................................................................................................................ 255 APPENDIX B CONNECTORS ..................................................................................................... 267 APPENDIX C GCS CONFIGURATION VALUES ........................................................................ 289 APPENDIX D MINITRACE GAS PURITY AND PRESSURE SETTINGS ..................................... 293 APPENDIX E DAILY RECORDS LOG ......................................................................................... 297 APPENDIX F POWER ON/OFF SEQUENCES ........................................................................... 305 APPENDIX G RFPG TRANSFORMER TAPS .............................................................................. 309 APPENDIX H START-UP CERTIFICATE .................................................................................... 329

Table of Contents

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 1 INSTALLATION STEERING GUIDE


This manual describes the PET MINItrace Production System installation process, up to, but not including, the Performance Demonstration and customer acceptance.

1-1

Introduction
Use this chapter as a general guide to the installation. The Installation Steering Guide provides a brief description of each phase of the installation, and the location of the detailed instructions elsewhere in the manual. The instructions include boxes to check when you complete each subsection or step. The final six chapters are laid out in a logical sequence, so that each chapter covers a phase of the installation: Chapter 2 - page 15 Chapter 3 - page 39 Chapter 4 - page 93 Chapter 5 - page 127 Chapter 6 - page 167 Chapter 7 - page 177

This manual also contains several appendices that contain tables to record start-up values or other information used by one or more chapters. Note: Some sites are literally built around the cyclotron, so several weeks may elapse between the system delivery and the actual start of the installation. The customer must provide secure storage for the rest of the system, and arrange for the riggers to come back to move the heavy components into place. During a MINItrace system installation, you have to: Unpack and rig the major system components. Assemble the fixed shields, position the magnet and attach the shield doors. Position the components and attach the support cabinets to the shield. Run the power and signal cables. Run the hoses, compressed air, gas and product pipes or tubes. Attach the Target cooling panel, diffusion pump and vacuum rotary pump to the magnet. Make the connections to the MINItrace components. Start-up the system. Run the initial beam tests, and check the system function. Run the Performance Demonstration for customer acceptance.
Chapter 1 Installation Steering Guide 9

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

This manual contains instructions for everything except performance demonstration.

1-2

Installation Overview
Use Table 1-1 to track the system installation. Within the chapters, each section, subsection or step contains a checkbox to mark when you complete the corresponding instruction. When you finish one of the major tasks listed in Table 1-1 , make a check mark in the corresponding box. That way, a new person can quickly determine how far the installation has proceeded, and what tasks remain unfinished. If this is the your first MINItrace installation, follow the procedures in the order they appear in this manual. If you have previous MINItrace installation experience, you may vary the installation sequence. If you have a team of installers on site, you may assign tasks, and work independently. For instance, one person could assemble the target side of the magnet while another person (or team) attaches the diffusion pump. Note: Refer to Illustration 1-1. All "right" and "left" shield and support cabinet locations are referenced from the front of the MINItrace.

ILLUSTRATION 1-1 MINITRACE SHIELD AND CABINET LOCATIONS


Target Support Cabinet 150Kg

Left rear (fixed) shield 12,500Kg Right rear (fixed) shield 11,000Kg Shielded raceway

Door motor Left shield door 8,300Kg

Cyclotron Support Cabinet 300Kg

Right shield door 7,900Kg

10

Chapter 1 Installation Steering Guide

GE HEALTHCARE REV 5 TABLE 1-1 MINITRACE INSTALLATION STEERING GUIDE Installation Phase Chapter 2 Unpack the System Starts on 15 Tasks

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

The crated equipment typically arrives on site packed in three 20-ft shipping containers. (In Europe, the crates arrive on three trucks.) The riggers unload the equipment from the containers and transport the components to their positions in the cyclotron facility or storage area. GE representatives supervise the unloading and rigging, inventory the crate contents, and check for damage. System unloaded Refer to the Site Drawings, and position the major components: Prepare the delivery route from the staging area to the Cyclotron room. Move Cyclotron Magnet into temporary position. Move rear (fixed) shields into position. If possible, clean and paint the rear shields at this time. (See page 58) Attach the first three plastic shields to the left fixed shield. Move Cyclotron Magnet into final position. Assemble hinges and attach shield doors. Start to adjust the shield doors. Attach the Cyclotron Support Cabinet (CSC) to the right rear shield. Attach the Target Support Cabinet (TSC) to the left rear shield. Position the Electronics Cabinets: - RF Power Generator Cabinet (RFPG) - Control Cabinet (CCAB) Assemble the raceway between the cyclotron and electronics cabinets. Clean up the Cyclotron room and sweep the floors. Unpack and position the MASTER transceiver and terminal. Refer to the Site Drawings, MIS map and Cable lists, and Chapter 5: Pull the magnet power cables. Install and attach the RF cable. Install the rest of the MINItrace system power and signal cables. Install cooling water lines. Install compressed air and gas lines.

Chapter 3 Position the Subsystems Starts on 39

Chapter 4 Install the Cables, Hoses and Pipes Starts on 93

Chapter 1 Installation Steering Guide

11

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Installation Phase Chapter 5 Assemble the Cyclotron Starts on 127

Tasks Verify all cables and hoses have been pulled. Repair shipment damage. Paint the inner and outer shield surfaces (Continue to periodically paint and touch up the surfaces until satisfied with the finish.) Install last three left inner shields. Install the Helium compressor(s) Install the Valve panel and Target Cooling Unit. Install targets. (and cover the left side to protect from dirt.) Paint inner doors. Attach outer shield assemblies to left door. Install diffusion pump. Install roughing vacuum pump. Optional: Fill the cooling system with water and bleed the lines. Final door adjustments. Install right and left cosmetic covers. Fill in the gaps between the side shields and support cabinets. Final cleanup and repair of damage. Install warning lights and door sensors. (and connect cables at CSC) Install door motors. Final touch-up and paint of outer shield surfaces. Attach the shield door handles. Touch-up scratches and/or paint Electronics Cabinet surfaces. Attach system labels.

Chapter 6 System Phase and Power Checks Starts on 167

Check incoming power and phasing (to MDP) Check power from the MDP to the major system components. MASTER Power Checks CCAB Power Checks RFPG Power Checks Support Cabinet Power Checks Follow these tasks to sequentially start-up and test the MINItrace system, to prepare for the performance demonstration phase of the installation. Dont start-up the system until site construction is complete and all gases are present. Start up the system in the following order: 1. Control System 2. Secondary Cooling Water System 3. Magnet Chamber Checks 4. Vacuum System 5. Magnet System 6. RF System 7. Helium Cooling System, LTF System and Target Checks 8. Beam Tuning

Chapter 7 Start-up and Calibration Sequence Starts on 177

12

Chapter 1 Installation Steering Guide

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Installation Phase

Tasks 9. Target System 10. Beam Performance and Functional Testing 11. Radiochemistry System

Performance Demonstration Phase

Upon successful completion of the system Start-up and Functional Test sections, the equipment enters the Performance Demonstration phase. This manual does NOT describe this phase of the installation. Currently, a qualified chemist or technologist arrives on site to run these tests; eventually, the test instructions will be recorded in a direction, and run by a trained FE.

Chapter 1 Installation Steering Guide

13

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

14

Chapter 1 Installation Steering Guide

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 2 UNPACK THE SYSTEM


Hire experienced riggers, a crane, and operator to: Unpack the MINItrace system. Move the large components into position. Assemble the rear shields. Move the magnet into its niche. Help attach the shield doors.

The MINItrace Electronics cabinets (RFPG and CCAB) and Support Cabinets arrive completely assembled, and packed in crates. Additional crates contain specialized rigging equipment, installation tools, cables and cyclotron subsystems, to be assembled on site. You dont have to unpack all the crates during the rigging process, but you need a crane and riggers to move these crates to the Cyclotron room, or another secure location.

2-1
2-1-1

Recommended Handling Procedures


Riggers Responsibilities
Unpack the magnet and shields. Move the magnet into a temporary location in the Cyclotron room. Unpack the shields. Assemble the rear (fixed) shields and move the magnet into place. Help attach the shield doors to the rear shields. Uncrate the CSC and TSC support cabinets and move them into the room. Uncrate and move the RFPG and CCAB into the room. Recommended: Rent an appliance dolly to move the CCAB (no wheels). Move the rest of the crates and boxes into a secure area in or near the PET suite. Recommended: It you cant store the crates in a secure area, rent a 40-ft shipping container for use as a staging area and temporary storage. Remove all the shipping materials from the containers and reattach the tops. Remove the packing materials and empty crates from the site.

Chapter 2 Unpack the System

15

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

2-1-2

Site Representatives Responsibilities


The FE or Installation representative has the following responsibilities: Oversee the unpacking and positioning of the major components. Inventory the crate contents and check for excessive damage. The system should arrive with a packing list attached to the cyclotron magnet.

Inventory the cables. The cables are currently bundled and packaged by MIS group number. Each box in Crate 7 and 8 contains a separate MIS run. Appendix A contains a MIS Map, tables of cable information, the cable list, and a list of system designators (acronyms) and definitions.

Note: Expect the shields to look a little rough when they come out of the containers. (Illustration 2-1) The system arrives with paint and supplies to repair chips and cracks in the shield. ILLUSTRATION 2-1 SHIPMENT DAMAGE

16

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Study the room in Illustration 2-2. This room is ready for Cyclotron delivery.

ILLUSTRATION 2-2 FINISHED FLOOR


Ceiling access for shielded raceway

Walls finished, except for final coat(s) of paint

Removable section for clearance

Direct access to unpacking/staging area. Minimum travel distance. Crane can fly each piece directly to the doorway. Floor cured for one week

Raw concrete - no damage to a finished floor from the rigging hardware and anchors Surfaces swept clean (everything else out of the room)

Chapter 2 Unpack the System

17

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

2-1-3

Installation Tool Box (Gang box)


Arrange for the secure storage of the wooden MINItrace installation gang box. (Part number 2230305) Refer to Illustration 2-3. The gang box is considered a Regional tool. It contains the tools and hardware youll need to install the MINItrace system. The box contains an assortment of spare hardware and wall anchors to accommodate a variety of wall finishes. Inventory the contents at the beginning and end of the installation. Restock the items you used during the installation BEFORE you return the gang box. The gang box should arrive with a complete inventory list. Make sure the box contains enough hardware and drill bits to complete the installation. A consumables kit is sent separately.

ILLUSTRATION 2-3 INSTALLATION TOOL BOX (GANG BOX) - 3/4 AND SIDE VIEWS

The gang box contains power tools and tool boxes filled with metric hand tools. In theory, it contains everything you need to install the system. REMEMBER to return the hand tools to the individual tool boxes each night, and lock the box each time you leave the site.

18

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2-2

Required Installation Tools


In addition to the usual service tool kit, youll need the following items to install the MINItrace system: The MINItrace Installation Gang Box, part number 2230305 (Refer to Illustration 2-3) Rigging box (part number 2298267), see section 2-4-1 (Ships with the system as Crate #16, or arrives separately from GEMSA or GEMSAM) Hand-truck, or pallet-jack with narrow forks (Refer to Illustration 2-4) The forks must be 65cm wide, or less, to accommodate a European pallet. Appliance dolly to position the CCAB (Refer to Illustration 2-4) Rent one with solid rubber tires and built-in load binding straps. Aluminum platform ladder

ILLUSTRATION 2-4 HYDRAULIC PALLET-JACK WITH NARROW FORKS AND APPLIANCE DOLLY

65cm or less

Chapter 2 Unpack the System

19

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

2-3

Check for Transit Damage


Check the shipping containers for physical damage when they arrive on site. In Illustration 2-5, the shield shifted about 5cm during transit, enough to damage the container doors and break the dimensional lumber used to secure it during shipment. Also check the crate exteriors for damage as the riggers unload them from the shipping container. Inspect the containers when they are delivered. Immediately report any damage to the driver/freight handler and your local installation specialist.

ILLUSTRATION 2-5 DAMAGED SHIPPING CONTAINER

20

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2-4

Unpacking Instructions
You have two objectives during this phase of the installation: Remove the system components from their trucks or shipping containers. Position (stage) the components in the unloading area for efficient access and transfer into the Cyclotron room or to more secure storage.

Use a heavy mobile crane to unload the MINItrace system and crates from the truck or shipping container. Position the crane as close as possible to the facility entrance or access hole. Choose the most direct delivery route from the entrance to the Cyclotron room, as corners can be difficult to negotiate. For best results: Reserve a 5000 sq-ft area near the facility entrance to unload and stage the system components for delivery to the cyclotron room. This area includes space for the crane, truck and its shipping container or trailer. ILLUSTRATION 2-6 RESERVE A 5000 SQ-FT UNLOADING AREA

In Europe, the MINItrace system arrives crated, on three trucks. Elsewhere, the MINItrace system arrives in three 20-ft shipping containers with removable tops. To remove the MINItrace crates and components from the shipping container: Open the doors and use a forklift or skid loader with at least a 50 ton capacity to remove the crates and components from the shipping container. Recommended: Remove the tarp from the top of the container, and use a 60-80 ton crane to remove the magnet and shields (vertically) from the shipping container.

Chapter 2 Unpack the System

21

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-7 REMOVE THE TARP FROM THE TOP OF THE CONTAINER

GE HEALTHCARE REV 5

ILLUSTRATION 2-8 DISASSEMBLE AND SALVAGE THE PACKING MATERIALS

The magnet and shields are held in place with straps and lumber bracing. Disassemble the packing materials and use the lumber as dunnage. Refer to Illustration 2-9.

22

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-9 REUSE THE PACKING MATERIALS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2-4-1

Rigging Crate (Part # 2298267)


Refer to Illustration 2-10, Illustration 2-11 and Illustration 2-12. The rigging crate will either ship as Crate 16 with the MINItrace system (GEMSE), or ship separately (GEMSA, GEMSAM as part number 2298267). It contains the skates, hi-jacker assemblies and accessories used to unload and move the MINItrace shield components into place. A toolbox holds the hardware you need to attach the hi-jacker assemblies. A vacuum cleaner, a ladder and dolly are also included. The rigging crate is currently packed in the same container (or truck) as the MINItrace magnet. Recommended: Locate and unload Container 1 with Crate 16 first. Use the riggers tools and straps to unload the crates. Do NOT destroy the Rigging Crate! When you finish the mechanical installation, repack the crate and return it to the corresponding service pole. Section 2-7 contains an inventory list and instructions to pack the rigging crate for return.

Chapter 2 Unpack the System

23

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-10 RIGGING CRATE

GE HEALTHCARE REV 5

ILLUSTRATION 2-11 THE HI-JACKERS IN THE RIGGING CRATE

24

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-12 HI-JACKERS, SKATES AND CAPS (USED WITH HI-JACKERS)
Hi-jackers

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Skates

Caps

2-4-2

Unpack the Magnet Shipping Container


The RF cable is packed in crate 12. Note: Store the RF cable in a safe location before you rig the magnet.

ILLUSTRATION 2-13 THE RF CABLE (FACTORY PHOTO)

The Magnet arrives in a container along with the electronics cabinets, cables, support cabinets and rigging tools.

Chapter 2 Unpack the System

25

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-14 THE MAGNET (FACTORY PHOTO)

GE HEALTHCARE REV 5

ILLUSTRATION 2-15 REMOVE SUPPORT CABINETS FROM MAGNET CONTAINER

Use lifting straps to remove the crates from the container. Refer to Illustration 2-16. The magnet arrives with the Lifting Yoke attached.

26

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-16 MINITRACE MAGNET

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Lifting Yoke

Remember to remove the lifting yoke from the magnet before you move it indoors. For best results, unbolt the lifting yoke, and let the crane operator remove it from the magnet and set it on the ground. When you finish, follow the instructions on <Text: Hypertext>35 to return the lifting yoke to the factory or service pole. ILLUSTRATION 2-17 LIFTING YOKE AND HARDWARE

Chapter 2 Unpack the System

27

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-18 MAGNET, LIFTING YOKE AND STRAPS (FACTORY PHOTO)

GE HEALTHCARE REV 5

Tools and hardware to install Diffusion pump

RF Cable hardware

Unload or move the Crates to the designated staging area. The site in the photographs had adequate space and security to store the crates outside. The installers and on-site construction workers disassembled and disposed of the crates as they were emptied. Once opened, the contents of the crates were inventoried and moved to secure storage inside the building. Recommended: If you cannot store the crates/contents inside the building during system installation, rent a 40-ft shipping container for use as a temporary staging and storage facility. Most companies will provide delivery and pickup services with the rental agreement.

28

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-19 MOVE THE CRATES TO THE DESIGNATED STAGING AREA

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Rigging Crate

Electronics Cabinet(s)

Support Cabinets and Cable Bundles

2-4-3

Unpack the Shields


The major MINItrace Shield components arrive on two Trucks/Containers. Each container holds one rear (fixed) shield and one shield door. For best results: Remove the container tops and use a crane to unload the shields. Disassemble the shipping braces and save the lumber for later use. Tell the crane operator the order in which you plan to move the shields into the building, so he or she can stage the shields to keep crane picks to a minimum. Refer to Illustration 2-20.Locate the Lifting Bolts in Crate 5 The crate is packed together with the MINItrace Shield components.

ILLUSTRATION 2-20 LIFTING BOLTS IN CRATE 5

Chapter 2 Unpack the System

29

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

The tops of the MINItrace shield components each have two or three built in picking points. Fasten the Lifting Bolts onto the hardware in the holes on the shield components, and use them to lift the items from the containers.

30

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-21 USE LIFTING BOLTS TO UNLOAD THE SHIELD COMPONENTS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Lifting Bolts from the Rigging Crate Two picking points on shield doors

(Riggers supply shackles and chokers.)

ILLUSTRATION 2-22 FIXED SHIELDS HAVE 3 PICKING POINTS

Three picking points

Chapter 2 Unpack the System

31

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-23 MOVE THE SHIELD COMPONENTS TO THE DESIGNATED STAGING AREA

GE HEALTHCARE REV 5

32

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2-5

Check Crate Contents and Packing Lists


Table 2-1 and Table 2-2 contain the general list of crates, their dimensions, weights and major contents. The European systems arrive on three trucks, usually in 18 meter trailers. Systems are shipped overseas in three 20 foot containers. The magnet and crates 6 through 17 are packed into one truck/container and the shields are packed into the remaining two trucks/containers. The system cables are packed with the Control Cabinet, in crate 9. Note: Even though the Magnet and Shields have crate number assignments, they arent enclosed. They are loaded and secured directly to the shipping container or truck. Each system arrives with a detailed packing list attached to the magnet.

TABLE 2-1 SHIELD CRATE LIST Crate # 1 2 3 4 5 Content Radiation shield, left back Radiation shield, left door Radiation shield, right back Radiation shield, right door Cable Ducts Dimensions (cm) 180 140 210 180 74 210 180 140 210 180 74 210 230 90 60 Weight (kg) 12 500 8 300 11 000 7 900 200 Truck/ Container# 1 1 2 2 2

Chapter 2 Unpack the System

33

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 TABLE 2-2 MAGNET CRATE LIST Crate # 6 7 8 9 10 11 12 13 14 15 16 17 Content Magnet/Cyclotron Cyclotron and Target Support Cabinet Cables and hoses Control Cabinet RFPG Cabinet Vacuum system & cyclotron parts RF Cable MT Pre-Installation kit FDG MeI Rigging tools Tool Box 100 150 90 180 80 100 750 375 Dimensions (cm) 113 110 203 230 130 76 230 130 76 97 78 190 135 94 208 115 180 140 180 180 30 80 120 160 80 60 150 140 Weight (kg) 9 600 620 390 600 850 1100 100

GE HEALTHCARE REV 5

Truck/ Container# 1 1 1 1 1 1 1 1 1 1 1 1

Note: The GEMSAM and GEMSA Rigging Tools will ship with the Installation Gang box from the corresponding service pole. Open each crate and check the contents for damage. If you notice any physical damage, write down the crate number and make a note on the packing list. Pay special attention to the contents of any crate with external damage.

Note: The system cables should be bundled and separated into MIS runs. Each bundle is packed into a separate box with the Control Cabinet, in Crate 9. Appendix A contains a copy of the current cable list, MIS map and system identifiers (Acronyms).

34

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2-6
2-6-1

Return Procedures for Packages


DOA (Dead On Arrival) Parts Return
GEMSE: Follow the procedure in the Field Engineer Guidelines (2127810-100) to return DOA components. GEMSAM: Call the OnLine Center. GEMSA: Follow the local guidelines to report DOA components.

2-6-2

Return the Lifting Yoke and Pressure Valve


GEMSE: Pack the lifting yoke and pressure valve in the rigging box. GEMSAM: Contact the local installation specialist for instructions. GEMSA: Contact your local office for instructions.

2-6-3

Return the Rigging Crate


GEMSE: Ship the Rigging Box to the following address: GEMS PET Systems %Wilson & Co. AB Cargo City Cityvargen Stockholm-Arlanda SE-190 Sweden GEMSAM: Contact the local installation specialist for instructions. GEMSA: Contact your local office for instructions.

2-6-4

Return the Installation Gang Box


GEMSE: Ship to the same Stockholm-Arlanda address as the rigging crate (2-6-3). GEMSAM: Contact the local installation specialist for instructions. GEMSA: Contact your local office for instructions.

Chapter 2 Unpack the System

35

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

2-7

Pack the Rigging Crate


When you finish the mechanical installation, pack the contents of the Rigging Crate for return to the corresponding service pole. (See <Text: Hypertext>page 35.) Refer to the illustrations in this section, and check off the corresponding items as you pack them into the crate.

2-7-1

All Service Poles (GEMSE, GEMSA, GEMSAM)


Note: The Rigging Crate may also contain a stepladder. 1. 2. 3. 4. 5. 6. 7. 8. 9. Four Hi-jacker assemblies Two collapsible jack handles Four heavy duty skates (A skate consists of a roller body and top piece.) Four skate steering handles Four caps (that fit over the top of the skate and under the hi-jacker) Hi-jacker spacer for the right rear shield (1) 2 Hi-jacker spacers to clear the magnet yoke. Toolbox containing hi-jacker hardware Hardened steel plates (6)

10. Transport Dolly (4) 11. Dolly 12. Vacuum cleaner with accessories

2-7-2

GEMSE Service Pole


Note: If you are working in the GEMSA or GEMSAM Service pole, contact your local office for return or disposal of the following items. 1. 2. 3. Pressure Valve (from cyclotron magnet) Magnet Transport Shield and hardware Lifting Yoke

36

Chapter 2 Unpack the System

GE HEALTHCARE REV 5 ILLUSTRATION 2-24 PACK THE RIGGING CRATE


Skate steering handles

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Steel plates

Stepladder accessories

Magnet Spacers Steel plates behind the Magnet Spacers

Transport Dolly

Skates

Jack handles

Door Transport frame

ILLUSTRATION 2-25 PACK THE CAPS

Pack the caps in the Hi-jackers

Chapter 2 Unpack the System

37

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 2-26 PACK THE VACUUM CLEANER, DOLLY, STEPLADDER AND TOOL BOX

GE HEALTHCARE REV 5

38

Chapter 2 Unpack the System

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 3 POSITION THE SUBSYSTEMS


Follow the instructions in this chapter to position or mount the MINItrace components in the cyclotron room, and attach the support cabinets and cable raceway to the shield.

3-1

Introduction
Note: At this point in time, every facility design is unique. The document writers dont know where the architect placed the floor or wall penetrations for the product, ductwork, or power lines in your facility. We dont know what already exists in the ceiling and wall spaces or what was added. Obtain a detailed set of site drawings, and use them in conjunction with this manual. ALWAYS defer to the site drawings. If it makes more sense to mount a panel or position subsystem in a different order than this manual suggests, by all means do so. Just remember to check each section as you complete it. Use this manual to track your progress.

3-2
3-2-1

Move the MINItrace Magnet into the Room


Introduction
Move the MINItrace magnet indoors as quickly as possible to prevent damage from exposure to the elements. For best results, consult the site drawings, and if possible, rig the magnet into the Cyclotron room to a spot directly perpendicular to its final position. Otherwise, move the magnet to a temporary indoor location, until you rig the rear shields into place. If necessary, build up the floor to the level of the epoxy area before you push the magnet aside.

ILLUSTRATION 3-1 MOVE THE MAGNET TO A TEMPORARY LOCATION

Final Location

Wedge Skates to prevent unintended movement.

Temporary Position (out of the way)

Chapter 3 Position the Subsystems

Temporary Location

39

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-2-1-1

Prepare the Delivery Route


The illustrations in this section show the optimal facility plan. The double doors to the cyclotron room open directly onto the temporary unloading and staging area. Most of you will not be so lucky. If you followed the MINItrace Pre-Installation manual Site Preparation checklist, you should have a planned delivery route to your facilitys cyclotron room. The riggers should have walked the route to determine anchor locations for the rigging equipment, and floor protection requirements. All doorways should have been measured for minimum clearance, and doors removed, if required. The delivery route should be free from obstructions. The following MINItrace components could damage unprotected floor surfaces: MINItrace magnet: 11,000Kg Rear shields: Left shield - 12,500Kg, Right shield - 11,00Kg Door shields: Left door - 8,300Kg, Right door - 7,900Kg RFPG Cabinet: 750Kg CCAB: 300Kg

Refer to Illustration 3-2. Build up surfaces to even out differences in floor levels. Use a minimum 1/4" thickness steel plate to protect the floor from damage by the heaviest components. ILLUSTRATION 3-2 PROTECT THE FLOOR FROM DAMAGE

Use the crane to move the MINItrace components as close to the facility entrance as possible. Set the magnet down on a set of rigger supplied skates, or use the hi-jacker assemblies and magnet spacers from the Rigging Crate. (See section 3-3-1 to attach hijackers).

40

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-3 USE THE CRANE TO MOVE THE MAGNET INTO POSITION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Rigger supplied skates

ILLUSTRATION 3-4 MAGNET SPACERS FROM THE RIGGING CRATE (FACTORY PHOTO)
This end down: The lip fits under the edge of the cyclotron.

Use the magnet spacers to prevent damage to the cyclotron magnet coils. Orient the spacers so the lip fits in the space beneath the cyclotron. Insert the long hi-jacker hardware through the hi-jacker assembly and spacer, and fasten everything to the cyclotron. Attach one spacer and hi-jacker assembly on each side of the yoke, Attach the third hi-jacker directly to the magnet chamber door.

Chapter 3 Position the Subsystems

41

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

CAUTION

Refer to Illustration 3-5. Always wedge components on skates, to prevent unintended motion.

ILLUSTRATION 3-5 USE WEDGES TO PREVENT ROLL BACK

The riggers have the responsibility to unpack and deliver the MINItrace components to their final position in the Cyclotron room. They determine how to move each piece along the route and into position. Refer to the illustrations in this section for examples and ideas. Refer to Illustration 3-6 and Illustration 3-7. During the illustrated installation, the riggers anchored the rigging equipment to various locations on the unfinished concrete floor. They also pushed off the anchored angle iron with a house jack (Illustration 3-27). For best results ask the riggers to install the anchors and set up the rigging equipment before the system arrives on site. ILLUSTRATION 3-6 ANCHOR THE RIGGING EQUIPMENT TO THE FLOOR

42

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-7 ANCHOR THE RIGGING EQUIPMENT TO THE FLOOR

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Rigger supplied equipment

The riggers may use an electric winch, mule or manual device (come-along) to pull or push the magnet along the delivery route and into the Cyclotron room. The delivery route length and complexity determines the number of times the riggers will have to insert new anchors and reposition the rigging tools. The riggers have the responsibility to supply the additional rigging equipment they need to complete the job, in addition to the contents of the Rigging Crate. ILLUSTRATION 3-8 THE RIGGER PULLS THE MAGNET INTO THE CYCLOTRON ROOM

Use straps to pull the components into position, to minimize damage to the finish.

Chapter 3 Position the Subsystems

43

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

CAUTION

The iron impregnated concrete shields are fairly brittle. When you wrap the rigging straps around the shields, take care to position the metal coupling devices as far away from the corners of the shields as possible. Try to position the straps so no metal comes in contact with the shield surfaces. Refer to Illustration 3-49. Use wood to protect stationary pieces from damage by the straps and cables used to pull other pieces into place.

ILLUSTRATION 3-9 THE MAGNET ENTERS THE CYCLOTRON ROOM

Rigging strap Cable from the rigger supplied equipment

Refer to Illustration 3-1 and Illustration 3-10. Consult the site drawings, and pull the magnet into a position perpendicular to its final installed location. Lay a set of steel plates to the temporary position.

44

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-10 STEEL PLATES AT 90 DEGREES TO TEMPORARY MAGNET POSITION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Skate Steering Handle Installed Position

Temporary Position

Delivery Route

Wedged to prevent roll back

Attach the steering handles to the skates to pull the magnet onto the new set of plates and rotate the skates 90 degrees. If necessary, use a jack to help shift the magnet onto the new set of plates, or take the weight off the skates to rotate them.

CAUTION

To prevent damage to the MINItrace, do NOT lift the magnet by its coils. Do NOT lift the magnet by the vacuum chamber hinge.

ILLUSTRATION 3-11 USE A JACK TO HELP SHIFT THE MAGNET

Do NOT lift the magnet by its coils!

Attach the steering handles to the skates, and use them to manually re-center the skates on the steel plate as the magnet is pulled or pushed into position.

Chapter 3 Position the Subsystems

45

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-12 PUSH MAGNET INTO TEMPORARY POSITION

GE HEALTHCARE REV 5

Steering handle to reposition skates.

If necessary, build up the Cyclotron room floor to the level of the epoxy area, and push the Magnet partially off of the epoxy floor until the rear shields are in place. Wedge all four skates to prevent unintended movement. ILLUSTRATION 3-13 MAGNET IN TEMPORARY LOCATION

Wedge (all four) skates to prevent unintended movement

When Complete

Cyclotron Magnet moved into Temporary Position

46

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-3

Move the Rear (Fixed) Shields into Position


Note: If necessary, move the Electronics cabinets into position first. (See section 3-7)

3-3-1

Attach the Hi-jacker Assembly to the Shield Component


Refer to Illustration 3-14.The MINItrace shield components are pre-drilled and tapped to accept three of the hi-jacker, cap and skate assemblies that ship in the Rigging Crate.

ILLUSTRATION 3-14 EACH SHIELD COMPONENT HAS PRE-DRILLED AND TAPPED HOLES

Mounting holes Hinge Race

Hi-jacker

Skate

Cap

Use the shield spacer from the Rigging crate to attach the hi-jacker to the interior of the right fixed shields.

Chapter 3 Position the Subsystems

47

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Refer to Illustration 3-15 and Illustration 3-16. The hi-jacker has a lip that fits beneath the shield component, and carries the weight. The hydraulic jack sits on a sliding block. The bottom of the block fits into the cap, which in turn fits over the skate. ILLUSTRATION 3-15 ATTACH HI-JACKER TO SHIELD

ILLUSTRATION 3-16 HI-JACKER ASSEMBLY

Fits into Cap

Mounting holes

Lip slips beneath shield

Release Valve

1.

Attach three hi-jacker assemblies to the first shield you plan to move into position. Attach the fourth hi-jacker assembly to the second fixed shield.

Note: Use the shield spacer to attach the hi-jacker to the interior of the right fixed shield. 2. 3. 4.
48

Slip the lip under the shield, and loosely fasten the hi-jacker to the shield. Place a cap over the skate. Lift the sliding block, move the skate into place, and lower the block into the cap.

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 5. 6. 7. 8.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Center the hydraulic jack on the sliding block, and adjust it to fit the hi-jacker. Tighten the hi-jacker mounting bolts. Refer to Illustration 3-19. Position a set of steel plates beneath each skate. Close the release valve on each jack, attach the jack handle and raise the jacks to transfer the weight of the shield to the hi-jacker assembly. 9. Use the jack handle to open and close the release valve.

Attach the steering handles to the skates, so you can center the assembly over the steel plate as the shield is pulled along.

ILLUSTRATION 3-17 STEERING HANDLE

Chapter 3 Position the Subsystems

49

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-3-2

Prepare for the Weight of the Shields


If necessary, prepare the delivery route to accommodate the weight of the rear shields. Use the lumber salvaged from the shipping containers. After the right rear shield destroyed it, the sidewalk extension in the illustration was upgraded from plywood to lumber salvaged from the shipping container.

ILLUSTRATION 3-18 PREPARE FOR THE WEIGHT OF THE SHIELDS

Heavy shields will delaminate plywood and emboss 1/8" steel plate.

50

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-3-3

Move the First Rear (Fixed) Shield into Position


Move the rear shield that is physically the farthest from the doorway into position first. Use the floor anchors, rigging tools and riggers to move the shield into position.

ILLUSTRATION 3-19 PULL THE FIRST REAR SHIELD INTO THE CYCLOTRON ROOM

One steel plate for each hi-jacker assembly

Consult the site drawings, and move the first shield into its exact position before removing the hi-jacker assemblies. Maintain adequate clearances. ILLUSTRATION 3-20 MAINTAIN ADEQUATE CLEARANCES

Chapter 3 Position the Subsystems

51

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-21 MOVE THE SHIELD INTO ITS FINAL POSITION

GE HEALTHCARE REV 5

Remove two of the hi-jacker assemblies, and transfer them to the second shield. Leave the third hi-jacker in place, until you are sure the first shield is in its exact location. ILLUSTRATION 3-22 REMOVE TWO OF THE HI-JACKER ASSEMBLIES

Spacer for interior of the right fixed shield

52

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-3-3-1

Move the Second Rear Shield into Position


Move the second rear shield to the facility entrance.

ILLUSTRATION 3-23 MOVE THE SECOND REAR SHIELD

Attach the remaining hi-jacker assemblies. ILLUSTRATION 3-24 ATTACH HI-JACKER ASSEMBLIES TO SECOND REAR SHIELD

Chapter 3 Position the Subsystems

53

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Move the shield into position next to the first rear shield. ILLUSTRATION 3-25 USE THE STEERING HANDLES TO ADJUST THE SKATES

GE HEALTHCARE REV 5

ILLUSTRATION 3-26 MOVE THE SECOND SHIELD INTO THE CYCLOTRON ROOM

If necessary, use a house jack and dimensional lumber to push the shield into position.

54

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-27 PUSH THE SHIELD INTO POSITION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Extra weight to keep lumber in place.

Reuse rigging anchors to fasten angle iron to floor. Brace jack and push off against angle iron.

Bring the two rear shields together. ILLUSTRATION 3-28 MOVE THE SECOND SHIELD INTO POSITION

Make any fine adjustments to align the rear shields. You have two adjustment methods; you may push or pull the shields into place. Illustration 3-27 illustrates one method to push. Illustration 3-29 illustrates a method to pull.

Chapter 3 Position the Subsystems

55

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-29 ALIGN THE REAR SHIELDS

GE HEALTHCARE REV 5

Refer to Illustration 3-30 and Illustration 3-31. Loosely bolt the shields together. The shields have two openings for 24mm throughbolts on the shield tops, and one opening on the front surface of the magnet niche. ILLUSTRATION 3-30 BOLT THE TWO SHIELDS TOGETHER

Use the jack handles to open the release valves and drop the jacks.

56

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Make sure the two shields are still aligned, then remove all the hi-jacker assemblies and tighten the through-bolts.

ILLUSTRATION 3-31 CHECK ALIGNMENT AND TIGHTEN BOLTS

Two additional throughbolt openings on top of the shields

Opening for through-bolt

When Complete

Left Rear Shield in Place Right Rear Shield in Place

Chapter 3 Position the Subsystems

57

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-3-4

Caulk and Paint the Magnet Niche


If possible, finish positioning the rear shields at the end of the day, or near a scheduled break, so you can caulk and paint the inner niche before moving the magnet into the final position.

CAUTION

Do NOT apply caulk to the penetrations and cable/hose raceway openings!


The system or installation gang box ships with a caulk gun and tubes of caulk. Before painting, apply a bead of silicon caulk to the gaps between the fixed shields and the floor. You may paint immediately after caulking.

The system or installation gang box ships with three 2.5 liter buckets of white paint, enough to apply two or three coats to the exposed areas of the magnet and shields. The paint is water-based, and dries to the touch in about 30 minutes. For best results, wait at least 12 hours between coats. To prevent injury, pad the Hinges until ready to attach the shield doors.

ILLUSTRATION 3-32 PAINT THE SHIELD INTERIOR BEFORE MOVING THE MAGNET INTO POSITION

Magnet Niche

Apply a bead of caulk between the fixed shield and the floor Do NOT caulk hose/cable raceway openings!

58

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-3-5

Install the First Three Inner Plastic Shields


Note: You will install the remaining plastic shields when you finish assembling the target side of the magnet, in Chapter 5. 1. Locate and remove the three inner plastic shields from Crate 7. 2. The three shields are labeled, Inner Shield 4, and are identical and interchangeable. These are the only plastic shields with eight holes.

Refer to Illustration 3-33, and fasten the right and left support brackets to the shield. a. b. c. d. Locate and remove Shield Block Support 1, P/N 906274, and Shield Block Support 2, P/N 906275, from the installation kit. Fasten Shield Block Support 1 to the right side of the target niche with two sets of P/N 904632 screws, and P/N 903998 washers. Fasten Shield Block Support 2 to the left side of the target niche with two sets of P/N 702691 screws, and P/N 703438 washers. Measure the distance from the floor, and adjust the supports, as needed, until the tops of the brackets are 472mm from the floor surface, then tighten into place.

3.

Rest the three plastic shield, in any order, on the Shield Block Supports, and attach them to the left fixed shield with the M8 hardware: Each shield has three holes drilled near the upper and lower edges. The two middle holes are counter-sunk. Insert a 140mm M8 screw through the two middle (counter-sunk) holes in all three plastic shields and fasten them to the fixed shield.

4.

Remove the right bracket, Illustration 3-33, to make room for one hi-jacker. You will reattach the bracket when you assemble the target side of the cyclotron, in Chapter 5.

Chapter 3 Position the Subsystems

59

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-33 INSTALL THE FIRST THREE PLASTIC SHIELDS

GE HEALTHCARE REV 5

Center holes are counter-sunk

Shield Block Support 2, P/N 906275 (Left Bracket)

Shield Block Support 1, P/N 906274 (Right Bracket)

Note: After you attach the first three shields, remove the right bracket to accommodate the hi-jacker.

60

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-4

Move the Magnet into the Shield


Follow the procedures in this section to remove the magnet transport shield and move the magnet into position within the fixed shields. OPTIONAL: Pull and terminate the Magnet power cables before pushing the magnet into place. Chapter 4, Section 4-1-2 contains the instructions to install the magnet power cables. Refer to Illustration 3-34 and Illustration 3-36. Attach three hi-jacker assemblies to the magnet, and insert a steel plate under each skate. Use a magnet spacer with each of the side hi-jackers, to protect the magnet yoke. Attach the third hi-jacker directly to the magnet chamber door. Attach the steering handles to the skates, and use them to center the magnet within the shield. Tolerances are very tight, so take care to align the magnet before you push it into the niche. (See Illustration 3-34.)

ILLUSTRATION 3-34 : USE THE STEERING HANDLE TO MOVE MAGNET INTO PLACE

Steering handles

Refer to Illustration 3-35. Remove the magnet transport shield. Remove the four M12 bolts that fasten the transport shield into place. GEMSE: Send the magnet transport shield back to Sweden with the rigging crate. GEMSAM and GEMSA: Contact your local office for return instructions.

CAUTION

The extraction motor assembly on the magnet is fragile. Take care NOT to damage the extraction motor while removing the transport shield and moving the magnet.

Chapter 3 Position the Subsystems

61

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-35 MAGNET TRANSPORT SHIELD
The transport shield protects the extraction motor from damage during shipment.

GE HEALTHCARE REV 5

Systems with the Dual Extraction option have two more motors mounted here.

3-4-1

Install the inner Shield Wedges


The 13 shield wedges were removed during system disassembly, and the magnet transport shield was attached to the cyclotron by the holes tapped into the assembly to hold the wedges in place. The nine inner shield wedges have to be installed at this time. 1. Refer to Illustration 5-1: Inner shield Assembly. 2. 3. The shield wedges should be labeled with the parts list call-out number.

Locate the 13 shield wedges that were packed with the plastic shields in Crate 11. Attach the following nine shield wedges to the vacuum chamber with a washer and the M12 bolt that measures 381mm from end-to-end (NOT thread length): Shield Wedge 4 (rests against the chamber wall) Shield Wedge 9 Shield Wedge 9 Shield Wedge 10 Shield Wedge 10 Shield Wedge 10 Shield Wedge 10 Shield Wedge 10 Shield Wedge 12

4.

The four remaining wedges will be installed later when the cyclotron can be opened.

62

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-36 HI-JACKER ASSEMBLY LOCATIONS ON MAGNET

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Magnet spacer

Hi-jacker with skate Steel plate

Push the magnet all the way against the rear shield. The magnet should square itself against the shield. The vacuum chamber door opening will align with the shield surface. Use the house jack and dimensional lumber to push the magnet into the niche. ILLUSTRATION 3-37 CHECK THE POSITION OF THE MAGNET

Watch tolerances; concrete fairly brittle

Vacuum Chamber door flush with rear shield

Chapter 3 Position the Subsystems

63

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-38 : PUSH THE MAGNET INTO PLACE

GE HEALTHCARE REV 5

Remove the hi-jacker assemblies and steel plate, and prepare to move the first shield door into position. (See section 3-5 on page <Text: Hypertext>page 67.) ILLUSTRATION 3-39 MAGNET IN POSITION

64

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-4-2

Square the Magnet


If the magnet doesnt sit squarely against the rear shield, the doors wont close properly. If you discover this after somebody removed the rigging anchors, use salvaged shipping materials, 12mm all-thread from the rigging tool box, and the jack from the installation tool box to shift the magnet by a few millimeters. Refer to Illustration 3-40 and Illustration 3-41. To square the magnet, use pieces of allthread and nuts from the rigging tool box to fasten one of the MINItrace shipping straps to the hi-jacker mounting holes in the rear shield. Position a piece of dimensional lumber against the front hi-jacker assembly, and tighten the strap.

ILLUSTRATION 3-40 SQUARE THE MAGNET IN ITS NICHE

Tighten the strap

Hi-jacker mounting holes

Shipping Strap

ILLUSTRATION 3-41 CLOSE UP OF SHIPPING STRAP FASTENER

Chapter 3 Position the Subsystems

65

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Insert the remote jacker between the block on the hi-jacker assembly and the lumber, and pump the jack to shift the magnet. The magnet should square itself against the shield. Monitor the all-thread connections as you shift the magnet. If they show any signs of stress, stop immediately and remove tension from the strap. ILLUSTRATION 3-42 USE THE JACK FROM THE INSTALLATION TOOL BOX

66

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-5
3-5-1

Attach Right and Left Shield Doors


Attach Hi-jacker Assemblies
The shield doors are more narrow, and more easily tipped than the rear shields. The Rigging Crate contains a Door Transport Frame that connects two hi-jackers into an assembly to stabilize the door. The rigging tool box contains the hardware to attach the transport frame to the hi-jacker assemblies, and the completed Door Transport Assembly to the door shield. Refer to Illustration 3-43. Remove the Door Transport Frame and two hi-jackers from the Rigging Crate. Attach each hi-jacker to the transport frame with four sets of M12 hardware. Roll the Door Transport Assembly over to the side of shield door opposite the hinge race. (The prototype shown in the illustration does not have its wheels.) Center the holes in the frame under the anchors in the shield. Tip the assembly on its side, and attach it to the shield with four M12 bolts and two M16 bolts. Attach the third hi-jacker directly to the hinge side of the shield.

ILLUSTRATION 3-43 ATTACH DOOR TRANSPORT ASSEMBLY TO SIDE OPPOSITE THE HINGE
M16 hardware

Wheel location (future) M12 bolts and washers

Attach Hi-jackers with 4 sets of M12 hardware

Chapter 3 Position the Subsystems

67

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-5-2

Assemble Fixed Shield Hinges


Each shield door hinge race holds a bearing assembly covered by a washer/gasket. The bottom of the door is pinned with a threaded steel pin that also adjusts the door height. The top of the door is pinned with a brass and steel eccentric that also adjusts the door location, relative to the fixed shield. Before they disassemble the system, the mechanics mark and scribe all four bearing assemblies and hinge races, and scribe marks on the eccentric pins and upper hinges. The hinge race and the hinge bearing cases are marked with UL (upper left), UR (upper right), LL (lower left) and LR (lower right). When you reassemble the hinges, use the marks and scribes as a starting point.

ILLUSTRATION 3-44 MARKS ON THE UPPER LEFT HINGE BEARING CASE


.

Upper Left (UL) marks on bearing case

1. 2.

Refer to drawing CAC210-31011-xx-2 (bottom hinge), CAC210-31010-xx-2 (top hinge), Illustration 3-44 and Illustration 3-47. Insert the corresponding bearing assembly into each fixed shield hinge race. Make sure the marks on the hinge bearing case match the marks on the hinge race. Align the scribe marks.

68

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-45 ALIGN THE SCRIBE MARKS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

UL UL

Line up the scribe marks on the bearing assembly and hinge race.

Adjusting threads with nut are pullers. Threads screw into the bearing assembly.

Adjusting threads without nuts are pushers. Threads screw into tapped holes on hinge race.

3.

Refer to the drawings and screw all the adjusting threads (set screws) into the corresponding tapped holes in the hinge race or bearing assembly. The long threads with the nuts screw directly into the bearing assembly and pull the assembly away from the fixed shields. Screw these threads all the way into the bearing assembly, and tighten. Slide a washer onto each thread and attach the nut, but do NOT tighten it. Leave a gap between the nut and the hinge race. The short adjusting threads without the nuts press against the bearing assembly and push the assembly toward the fixed shields. Screw the threads into the tapped holes in the hinge race, but do NOT tighten them against the bearing assembly. Leave a gap between the thread and the bearing assembly.

4.

Apply a layer of molycoat to each bearing assembly.

Chapter 3 Position the Subsystems

69

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-46 BOTTOM HINGE RACE WITH BEARING ASSEMBLY

GE HEALTHCARE REV 5

5.

Cover each bearing assembly with a washer/gasket, placed gasket side down.

ILLUSTRATION 3-47 BOTTOM HINGE WITH WASHER IN PLACE

Washer, placed gasket side down

Leave this hardware loose on both the top and bottom hinges.

70

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-5-3

Move the Shield Doors into Position


Move the shield door that is physically the farthest from the doorway into the cyclotron room first. Orient the shield for most efficient delivery. Once in the room, the fixed shield and door hinges should meet without having to reorient the shield.

ILLUSTRATION 3-48 ORIENT THE SHIELD FOR DELIVERY

The first shield enters hinge first

Lay steel plate beneath each skate, and pull the shield door into the cyclotron room. Use scrap lumber to prevent damage when you pull the shield into place.

Chapter 3 Position the Subsystems

71

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-49 PROTECT MINITRACE SURFACES DURING RIGGING

GE HEALTHCARE REV 5

Use scrap lumber to protect the magnet.

Three skates; three plates

Pay attention to clearances when you pull the door past the fixed shields and magnet. Use the steering handles to adjust the skates and reposition the door. ILLUSTRATION 3-50 WATCH CLEARANCES

Use steering handles to reposition door

Watch clearances

Relocate the rigging equipment, as needed, to bring the door into position.

72

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-51 BRING DOOR HINGES INTO POSITION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

(Photo taken through lead glass observation window)

Try to position the door hinges as close as possible to the fixed hinges. If necessary, adjust the jacks to reposition the door hinges. ILLUSTRATION 3-52 BRING HINGES CLOSE TOGETHER

Use a level to make sure the door is absolutely plumb before you try to insert the hinge pin. Refer to Illustration 3-53. Adjust the jacks to level the door. If necessary, insert pieces of steel or wood behind the hi-jacker assembly to fill in any gaps between the door and the back of the hi-jacker. (This prevents any abnormal strain on the steel plate imbedded in the shield door, which could cause it to break free of the door.)

Chapter 3 Position the Subsystems

73

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-53 BRING DOOR INTO PLUMB

GE HEALTHCARE REV 5

Pieces of steel fill gaps behind hi-jacker assembly,

3-5-4

Align the Shield Doors to the Fixed Shield Hinges


Adjust the door to bring its hinge assemblies into perpendicular alignment with the fixed hinges. Move the door toward the fixed shield to align the centers of the door hinges with the centers of the fixed hinge bearing assemblies. Expect to take at least an hour to pin a shield door the very first time.

ILLUSTRATION 3-54 ALIGN DOOR HINGES TO FIXED HINGES

Align Hinges

74

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Remember to check the door for plumb every time you adjust the jacks. Maneuver the door into position. Examine the threads on the bottom pins and the corresponding hinges for damage. Apply a light coat of molycoat to the lower portion of the threaded bottom pin, the interior of the brass eccentric and to the lower exterior of the steel eccentric hinge pins.

ILLUSTRATION 3-55 PAINT THE PINS WITH MOLYCOAT

3-5-5

Pin and Adjust the Shield Doors


Follow the procedure in this section to pin the doors and complete the preliminary door adjustments. Chapter 5 contains the final door adjustment procedure. Allow the door to settle for a few days before you make the final door adjustments. Pin the bottom hinge first. (The bottom pins are identical and interchangeable.) The bottom pins bear the weight of the door, and are also used to adjust the door for floor clearance. 1. 2. Tighten the pin until it enters the bearing assembly. Fasten the locking ring onto the hinge pin, so it isnt lost, but dont tighten it yet.

Chapter 3 Position the Subsystems

75

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-56 PIN THE BOTTOM HINGE

GE HEALTHCARE REV 5

Locking ring

After you pin the lower hinge, you can adjust the height of the hi-jackers as needed to fit the eccentric pin into the upper hinge and bearing assembly. 1. Assemble the upper hinge pins. One pin set has single scribe marks and the other has double scribe marks. a. b. c. Slide the steel eccentric into the brass casing. Align the scribe marks on the brass and steel. Tighten the set screw to create a single pin assembly. (See Illustration 3-57.)

Note: The eccentric pins are NOT interchangeable. One upper door hinge has a single scribe mark and the other door hinge has double scribe marks. Make sure the marks match. 2. Insert the assembled eccentric pin through the top hinge and make sure it enters the upper bearing assembly. Dont try to align the scribe marks on the pin to the mark(s) on the upper hinge until you lower the door. The object at this time is to insert the pin into the bearing assembly. Refer to Illustration 3-57. If necessary, use the wrench, included in the Installation tool box, to turn the entire pin assembly until it slides into the bearing assembly. You can also raise or lower one or more jacks to help the pin drop into the bearing.

76

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-57 TOP HINGE PIN

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Set screw for eccentric

The wrench ships in the installation tool box

3.

After the eccentric enters the bearing assembly, drop the jacks and align the scribe marks on the eccentric with the scribe marks on the upper hinge. Lower the jacks all the way, then raise the jack on the end opposite the hinges just enough to take the weight off of the hinges, so you can move the eccentric.

4.

Refer to Illustration 3-58. The upper hinge has a set screw that fits into the groove that is machined around the middle of the outer brass casing. When the shoulder on the brass casing is flush with the top of the upper hinge, the set screw is centered in the groove.

CAUTION

To prevent damage to the hinge assembly, carefully align the groove in the eccentric casing to the middle of the upper hinge before you tighten the set screw. For best results, do NOT insert the set screw into its tapped hole until the shoulder on the brass casing is flush with the top of the upper hinge.
5. 6. Tighten the set screw in the upper hinge to fasten the eccentric into place. If necessary, readjust the threads on the hinge races to align all the scribe marks. Recommended: Use the modified diffusion pump wrench from the hardware bag attached to the cyclotron to adjust the threads nearest the hinge. (See Illustration 5-28 on <Text: Hypertext>page 151)

7.

Tighten all the nuts against the hinge races.

Chapter 3 Position the Subsystems

77

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 8. Tighten all the pusher threads against the bearing assemblies.

GE HEALTHCARE REV 5

Each pusher thread should rest against its bearing assembly.

Note: During disassembly at the factory, the mechanics scribed marks on the tops of the door and fixed shield. When all the scribe marks on the hinges and pins are properly aligned, the scribe marks on the doors and shields should also line up. ILLUSTRATION 3-58 UPPER HINGE SET SCREW
Eccentric pin set screw When this shoulder is flush with the top of the upper hinge, you can tighten the hinge set screw.

When the brass casing is centered in the upper door hinge, the hinge set screw is aligned with this groove machined into the brass casing.

Eccentric pin set screw

When the shoulder is flush with the top of the upper hinge, you can tighten the hinge set screw.

9.

If necessary, raise the jacks to take the weight off of the bottom hinge.

10. Adjust the bottom hinge pin to raise the bottom of the shield door 3-4mm off the floor. 11. Remove the hi-jackers and move them to the second shield door. 12. Return to Section 3-5-3 and install the second shield door.

CAUTION

To prevent injury or damage to the system, wedge the shield doors until the door motors have been installed.

78

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

When Complete

Left Shield Door pinned and wedged Right Shield Door pinned and wedged

Chapter 3 Position the Subsystems

79

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-6

Support Cabinets and Panels


The Target Support Cabinet (TSC) mounts to the left fixed shield; the Cyclotron Support Cabinet (CSC) mounts to the right shield. The TSC houses the helium compressor(s) and target support panels, such as the Liquid Target Filler (LTF). The Cyclotron Support Cabinet houses the Secondary Water Cooling Unit (SWCU), and the power distribution, control and status panels for the SWCU, the vacuum system, and the shield doors, as well as a port for the service pc (MSS). The Cyclotron Supply Panel (CSP) mounts on the wall near the Cyclotron Support Cabinet (CSC). The Valve Panel mounts on a wall near the TSC and gas bottles. Attach the Support Cabinets to the Fixed Shield The CSC arrives in Crate 7. The CSC arrives completely assembled, and weighs about twice as much as the TSC. The TSC ships in Crate 7 with the target panel(s) in place. The rest of the TSC components arrive in Crate 11. Crate 7 also contains several additional boxes of components and cables. Move these other boxes into a secure temporary storage area.

ILLUSTRATION 3-59 SUPPORT CABINET CRATES AND CSC UNPACKED

1. 2. 3. 4.

Unpack the support cabinets from their crates. Move all additional boxes into secure storage. Open the cabinet doors, and locate the mounting hardware and keys. The rear shields are pre-drilled and tapped for the cabinet mounting hardware.

80

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-60 MOUNTING HOLES FOR CYCLOTRON SUPPORT CABINET

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Pre-drilled and tapped mounting hole

5. 6.

Use a 6 mm allen wrench to fasten each cabinet to the corresponding shield with four bolts and washers. Check that the side of each cabinet is offset about 10mm from the edge of the rear shield, to provide adequate clearance when opening the cabinet door.

ILLUSTRATION 3-61 CYCLOTRON SUPPORT CABINET INSTALLED

Chapter 3 Position the Subsystems

81

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Mount the Panels on the Wall

GE HEALTHCARE REV 5

Note: Continue to check the plumbing to the cooling unit for directional flow inconsistencies while the contractors connect the water pipes. The MINItrace system has two wall mounted panels. The Cyclotron Supply Panel (CSP) acts as the interface between the customer supplied air and water lines, and the MINItrace system. The Gas Valve panel acts as the interface between the customer supplied gases and the MINItrace Target system. ILLUSTRATION 3-62 WALL MOUNTED MINITRACE PANELS

Gas Valve Panel

Cyclotron Supply Panel

1. 2.

Consult the site drawings for the exact mounting location. Unpack the panels The CSP is in Crate 11, box P. The Gas Valve panel is in Crate 11, with the Target options.

3.

Use the panel as a template, to mark the holes. Check your marks with a level before drilling the holes.

4. 5. 6. 7. 8.

Use the 8mm expanding anchor bolts shipped with the panels, or if necessary, select other suitable anchors from the gang box. Drill the upper holes. Fasten the panel to the wall by the two upper anchors. Mark the location of the two bottom holes on the wall. Drill the holes and insert the bottom anchors.

82

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 9.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Check the panel tops with a level before you tighten the hardware into place.

When Complete

Cyclotron Supply Panel on wall Gas Valve Panel on wall

Chapter 3 Position the Subsystems

83

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-7

Position the Electronics Cabinets


The MINItrace system has two Power Supply/Electronics cabinets: Radio Frequency Power Generator (RFPG) - Crate 10 Accelerator Control System (CCAB) - Crate 9

ILLUSTRATION 3-63 UNPACK THE ELECTRONICS CABINETS AND MOVE THEM INTO POSITION

1. Notice

Refer to Illustration 3-63. Move the RFPG and CCAB crates into position and unpack them.

Consult the site specific drawings to determine the exact cabinet locations. The drawings should take the minimum cabinet service clearances into consideration. Otherwise, position the cabinets to provide a minimum service clearance of 800mm behind the cabinets, and 700mm in front of the cabinets. Once you fix the cabinets into place and install the shielded raceway, do not move the cabinets again. 2. Move the cabinets into the room, and take them off the shipping pallets. The RFPG cabinet has wheels. Refer to Illustration 3-64. Build a ramp for the cabinet. Unfasten the cabinet from the shipping pallet and roll it into place. The CCAB does NOT have wheels. Refer to Illustration 3-65. Disassemble the shipping pallet and push the cabinet onto the floor. Refer to Illustration 3-66. Rent an appliance dolly to move the CCAB into position.

84

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 ILLUSTRATION 3-64 BUILD A RAMP FOR THE RFPG CABINET

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Bracket salvaged from shipping brace

Cabinet fastened to shipping pallet (total 4 locations)

3.

Push the cabinets into place and lower the RFPG cabinet leveling feet. Follow the site drawings to position the cabinets. Leave at least 600mm (about 2 feet) minimum distance between the rear of the cabinets and the wall, for service access. Adjust the RFPG leveling feet until the two cabinets are even.

Chapter 3 Position the Subsystems

85

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-65 DISASSEMBLE THE CCAB PALLET

GE HEALTHCARE REV 5

Use the Pallet Jack to take the weight off the pallet, then disassemble it, and push the CCAB to the floor.

ILLUSTRATION 3-66 RENT AN APPLIANCE DOLLY TO POSITION THE CCAB

4.

Check to make sure the cabinets are vertically level, and horizontally even.

86

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

When Complete

RFPG in position and level CCAB in position and level

Chapter 3 Position the Subsystems

87

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-8

Assemble the Shielded Raceway


The shielded raceway runs between the electronics cabinets and the cyclotron, and continues along the top of the cyclotron shield, to connect the TSC and CSC. In most sites, the cyclotron room will have a suspended ceiling. If possible, run the electronics cabinet to cyclotron raceway above the suspended ceiling. The raceway pieces are customized to the facility and a drawing should arrive with the system. The figures below shows examples from a site. The shielded raceway arrives in Crate 5:F. Drawing CAC210-31002-xx-1 shows the final raceway configuration. 1. Assemble and attach the raceway to the electronics cabinets. Make sure all the hardware is tightly fastened, to prevent damage to the cables.

ILLUSTRATION 3-67 ASSEMBLE THE ELECTRONICS CABINET RACEWAY

2.

Assemble and attach the raceway to the top of the shield.

ILLUSTRATION 3-68 ASSEMBLE SHIELD RACEWAY ON TOP OF SHIELD

88

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5 3.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Assemble the raceway between the cyclotron and the electronics cabinets. The system ships with hangers to suspend the raceway from the ceiling.

ILLUSTRATION 3-69 USE THE HANGERS TO SUSPEND THE RACEWAY FROM THE CEILING

Use the hangers to suspend the raceway from the ceiling. 4. Tighten all the raceway hardware before you run the cables.

Chapter 3 Position the Subsystems

89

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 3-70 ELECTRONICS CABINETS READY TO CABLE

GE HEALTHCARE REV 5

When Complete

Shielded Raceway in place

90

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3-9

Clean up the Cyclotron room


1. 2. Sweep up all debris from the installation. Refer to Illustration 3-71. Remove the floor anchors, to prevent trip hazards.

ILLUSTRATION 3-71 REMOVE TRIP HAZARDS

3. 4. 5. 6.

If you havent done so already, arrange to have all empty shipping crates and packing materials removed from the site. Vacuum up the dust from drilling and mounting the panels. Wet mop the floor. Clean up the site at the end of each workday.

ILLUSTRATION 3-72 CYCLOTRON ROOM - BEFORE AND AFTER

When Complete

Cyclotron room cleaned

Chapter 3 Position the Subsystems

91

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

3-10

Unpack and Position the MASTER


CAUTION For best results, do NOT unpack the MASTER until all construction is complete, the room is clean and the floors have been mopped. If you must set up the MASTER before everything is ready, always cover the MASTER with a drop cloth or plastic to protect it from dust and construction debris, when not in use.
Note: The customer provides the table for the MASTER workstation and printer.

3-10-1

MASTER Transceiver
The MASTER transceiver provides the communications link between the MASTER and the MINItrace Tracer Production system. You can mount it on the wall or ty-wrap it to the workstation table. If you mount it on the wall, choose a location near the MASTER. Refer to the Transceiver documentation for additional information. Set the Transceiver switches to the following positions: Top Switch: W/S Power Switch: ON

3-10-2

Unpack and Position the MASTER Terminal


Remove the MASTER components from the shipping boxes. Arrange the components on the table provided for the MASTER. Follow the manufacturers instructions to cable the components. Refer to the MINItrace Service Manual - Master System (Dir# 2232999-100) and to the Master System Administration Manual (Dir#2232997-100) for detailed hardware and software installation and configuration. When not in use, cover the MASTER with a drop cloth or plastic to protect it from dust and construction debris.

When Complete

Master Terminal in Position

92

Chapter 3 Position the Subsystems

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 4 INSTALL THE CABLES, HOSES AND PIPES


Follow the instructions in this chapter and the designated appendices to begin the installation of the MINItrace power, signal, cooling water, gas and product lines. The shield contains many of the raceways between the cyclotron and the system support and electronics cabinets. To accommodate this integrated design, you need to pull cables, hoses and lines in a specific order. You must also reassemble and interconnect the cyclotron in stages. For best results, take the time to check for the presence of ALL connections to a cyclotron subsystem before you start to assemble it. Note: Follow all the instructions in Chapter 4 before proceeding to Chapter 5. One person may install the cables (Section 4-1) while another person installs the hoses and pipes (Section 4-2), but each person should follow the corresponding sections from beginning to end. After you complete the tasks in Chapter 4, and proceed to Chapter 5, you may assemble the target and vacuum systems simultaneously. When the system is disassembled for packing, the lines that run between the LTF and valve panel or Target Cooling Manifold are left attached to the LTF and the lines that run between the Target Cooling Manifold and target(s) are left attached to the TCM. Chapter 5 contains the instructions to reattach these lines to their respective units. Your system documentation includes a customized MINItrace Pipe Work Drawing and a Cable Block Diagram. Locate and use these drawings to install the system. Pipe Work Drawing CAC600-17000-00-1 Cable Block Diagram, CAC000-51003-00-3

CAUTION

Read ALL the information in this chapter before you attempt to run the cables or connect the hoses, pipes and tubes. Some cables may NEVER be cut to length, while others may be cut ONLY to lengths determined by a mathematical formula. Each section also contains specific instructions, important information, and references to additional information in the Appendices.

Chapter 4 Install the Cables, Hoses and Pipes

93

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-1
4-1-1

Run the Power and Signal Cables


MINItrace Cabling Information
1. Loose cables are bundled by MIS run, packed into separate boxes, and shipped in Crate 7 and 8. contains the MIS map, cable list and matrix, and the definition list of acronyms (component designators) used in the MINItrace documentation. The cable destinations are clearly marked on each cable. A basic system has 10 MIS runs, plus the RF cable. A system with all available options could have up to 25 MIS runs. Illustration 4-2 contains an example of the Cable Block Diagram, CAC00051003-00-3. Direction 2233001 contains a larger (A3/11.5x17") drawing of the Cable Block Diagram

2.

Pull the MIS run 3 Magnet Power Cables first. See Section 4-1-2. You may pull the remaining cable runs in any order.

3.

Pull the MIS run 1a cables to the target side of the cyclotron. You will terminate MIS 1a cables during Chapter 5.

4.

The MIS run 1b cables go to the vacuum side of the cyclotron and are already mounted in the CSC in crate 7. Attach the Magnet Coil Temp switch connectors to the switches shown in Illustration 4-3. (The switches are in series.) You will terminate the rest of the MIS run 1b cables during Chapter 5.

5.

Wait until you finish the outer surfaces of the shield to install the warning lights, door sensors and door motors which comprise MIS run 2. (See Sections 5-4-6 and 5-4-7.) Pull the MIS run 4 cables through the raceway on top of the shield, from the CSC to TSC. IF the RF Cable has both connectors attached, you can install this cable when you pull MIS run 5. IF the cable arrives with one or both connectors missing, follow the instructions in Appendix B, Section B-3 to determine the cable length and attach the connector. Refer to section 4-1-3 for detailed RF cable installation instructions.

6. 7.

8.

NEVER shorten the MIS Run 5 cable, SKA, that runs between the RFPG and the cyclotron vacuum chamber; this cable must ALWAYS be 40m long. You may coil and store the excess cable in the race without causing signal interference.

9.

MIS run 9 cables are already mounted on the magnet in crate 6.

94

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 10. Start the run from the Electronics or Support cabinet end first, and terminate the cables at the cyclotron last. 11. Keep power cables away from the signal cables in the raceways. The raceways are wide enough to provide space for separated power cables, signal cables, hoses, pipes and air lines. Keep runs neat and use plenty of ty-wraps. You may coil, ty-wrap and store the excess lengths of cable in the raceway.

12. PAY ATTENTION to the labels on the cables. Most signal cables have a male and female end. Make sure you orient the cables correctly when you run them. The cable label describes the termination point. (ex: The end labeled CCAB GCU P3 terminates at connector P3 of the General Control Unit in the CCAB.)

13. For best results, check off each cable in the cable list as you install it. When you finish a bundle, color the corresponding run on the MIS Map, Cable Block Diagram and/or Site plans.

14. The Cyclotron Support Cabinet (CSC) arrives with the cables already attached to the components in the Vacuum Cooling and Control panel. Remove the loose cable ends from the CSC and run them into the raceway. Use the Basic Cable Block Diagram (CAC000-51003-00-3) to locate the destinations when you run these cables.

15. The cyclotron has conduits and raceways integrated into and beneath the shield. These penetrations accommodate all the cables, hoses, pipes and tubes. The cyclotron cooling hoses exit the bottom of the CSC and run beneath the fixed shield, and into the cavity with the magnet. (See Illustration 4-15.) The power and signal cables exit the shielded raceway through the hole in the top of the fixed shield, pass through an integrated conduit, and into a raceway attached to the inner niche wall of the right fixed shield. (See Illustration 4-1 and Illustration 4-4.)

Chapter 4 Install the Cables, Hoses and Pipes

95

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-1 CABLE RACEWAY AND PENETRATIONS IN RIGHT FIXED SHIELD

GE HEALTHCARE REV 5

Vacuum Side of the Cyclotron Through-bolt connection RF Cable penetration

Shield penetration for cables

Cable raceway (Covers snap into place)

Contact plate for magnet power cables in this raceway

Support line raceway for hoses

96

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

ILLUSTRATION 4-2 CABLE BLOCK DIAGRAM (A3 [11.5X17"] SIZE AVAILABLE IN MANUAL 2233001)

Chapter 4 Install the Cables, Hoses and Pipes

97

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-1-2

Install the Magnet Power Cables


Refer to Appendix A. The magnet power cables in MIS run number 3 run from the CCAB to the cyclotron magnet. Run these five cables first. 1. Refer to Illustration 4-3. Check the cable connections for tightness and damage to the insulation during shipment. Make sure the insulation covers all metal contact surfaces.

ILLUSTRATION 4-3 CHECK MAGNET POWER CONNECTIONS FOR SHIPMENT DAMAGE

Magnet Coil Temp Switches

2. 3. 4. 5. 6. 7.

Refer to Illustration 4-4. Locate the contact plate in the surface mounted shield raceway. Lift the outer edge of each contact cover to flip it open. Attach both + power cables from the magnet to the top left terminal and both cables to the bottom left terminal. Attach both + power cables from the CCAB to the top right terminal and both cables from the CCAB to the bottom right terminal. Refer to Illustration 4-4. Attach both ground cables to the cyclotron ground stud. After you attach the cables, check for a very tight connection. Make sure the cables will not touch any hot surfaces on the diffusion pump or interfere with the diffusion pump installation. Chapter 5 contains the diffusion pump assembly instructions.

98

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-4 MAGNET POWER CONTACT PLATE IN THE SHIELD RACEWAY

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Magnet cable contact plate Ground stud

4-1-3

Install the RF Cable


The RF cable arrives in a coil, usually with a connector attached to at least one end.

ILLUSTRATION 4-5 COILED CABLE

Sharper bends than this become permanent.

Notice

IF you must attach one or both connectors, follow the instructions in Appendix B.

If you have to attach a connector to one end of the cable, first measure and cut the cable to length, then push the raw cable end through the corrugated conduit in the shield before attaching the connector. Dont fasten the other end to the RFPG cabinet until after you attach the connector, so you can pull enough cable through the conduit to work comfortably. Attach the connector to the cable, push the excess cable back through the shield conduit, then fasten the ends of the cable to the magnet and RFPG cabinet.

Chapter 4 Install the Cables, Hoses and Pipes

99

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 1.

GE HEALTHCARE REV 5

IF the cable arrives with both connectors attached, one end should have about 50mm of the outer insulation removed near one of the connectors, exposing the outer copper conductor. Orient the cable with the exposed conductor at the RFPG cabinet. If necessary, refer to the instructions on page 285 in Appendix B to cut away the insulation to expose the copper conductor.

2.

Run the RF Cable outside the shielded raceway. Consult with the contractor before supporting the cable or fastening it in place. Local building codes may prohibit fastening cable supports to existing components in the ceiling space. If necessary, ask the contractor to shoot some wires into the ceiling, and use them to support the cable over the suspended ceiling.

3.

You may not make a single bend in the cable with a radius of less than 180mm or multiple bends with less than 550mm radii. Refer to Illustration 4-5. If you make any bends with a smaller radius than these loops, the bend becomes permanent. Plan every bend carefully. If you must negotiate a very tight bend, and no alternative routes exist, contact the Uppsala factory for additional connector hardware and instructions.

4.

Refer to Illustration 4-6. Remove the outer connector retaining ring and C-rings from the cyclotron end of the RF cable. The connector retaining ring is held in place by internal C-rings. Use a small hammer to tap the retaining ring downward, until it slides down the body of the RF cable connector. Remove both C-rings from the connector. Remove the retaining ring from the connector. Wrap a piece of plastic or bubble wrap around the end of the cable before you insert it into the shield conduit.

5.

Start at the RFPG cabinet, and feed the cable above any suspended ceiling, toward the cyclotron. If you have to attach a connector to the cable, push the raw end through the conduit in the shield first. (See the note at the beginning of this procedure.)

100

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-6 REMOVE THE CONNECTOR RING TO INSTALL THE RF CABLE

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

1. Gently tap retaining ring until it slides down the connector. RF connector retaining ring

2. Remove both C-rings.

3. Slide the retaining ring off the connector.

6.

Refer to Illustration 4-7. Locate the RF Cable penetration to the cyclotron, near the raceway on top of the right rear shield.

Chapter 4 Install the Cables, Hoses and Pipes

101

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-7 RF CABLE PENETRATION

GE HEALTHCARE REV 5

Ventilation (vacuum side)

RF Cable Penetration

7.

Push the RF cable in through the top of the shield. Expect a tight fit and a lot of pushing. Currently, the shield uses a corrugated RF Cable conduit. You will feel some resistance as the connector rubs along the corrugated inner surface.

8.

Refer to Illustration 4-8. The cable exits the conduit next to the magnet RF connector. Use the attached hardware to connect the RF cable to the magnet.

102

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-8 RF CABLE ENTERS THE CYCLOTRON THROUGH INTEGRATED CONDUIT

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Integrated Conduit

9.

Refer to Illustration 4-9. a. b. Insert the RFPG end of the RF Cable through the top of the cabinet and fasten it to the connector just inside the cabinet. Fasten the grounding collar around the exposed copper conductor and fasten into place with eight sets of M6 bolts, hex nuts, and flat washers.

10. Fasten a hose clamp around the grounding collar and tighten it into place. ILLUSTRATION 4-9 RF CABLE ENTERS THE TOP OF THE RFPG CABINET

RF Cable

RF Cable Connection to RFPG Cabinet

Fasten a hose clamp around the collar. RF Cable with grounding collar

Chapter 4 Install the Cables, Hoses and Pipes

103

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-2

Hose and Pipe Information


Every system has a unique Pipe Work Drawing, similar to Illustration 4-10. The labels on the drawing match the labels on the finished hoses. Labels for the lines you cut to length also come with the system, and should be attached after you install the tube. (Some penetrations are too small to accommodate the tubes with their labels.) The Pipe Work drawing also contains a key that describes the types and sizes of tube to use for each run. Lines run between the Cyclotron room and the Radiochemistry lab. The remainder run between the support cabinets and cyclotron subsystems. Appendix B contains instructions to make the Swagelok and RF Cable connections.

For best results: 1. 2. Hang a copy of your sites Pipe Work Drawing in the Cyclotron room. Choose a line to run. Pay attention to the number of lines listed for each run on the Pipe Work drawing. You should run eight spares for every tefzel product delivery line. When you run the spares, remember to use permanent markers to mark both ends of each line with the same unique identifier, so the person changing lines over the coming years can make the correct connections on the first try.

3. 4.

Refer to the key, and choose the correct hose, pipe or tube material. The following tables list the connections by destination, or size and type. Cyclotron Supply Panel: Table 4-1 on page 109 3/8" Rubber Hose (RH): Table 4-2 on page 112 Rubber hoses from CSC to Electronics Cabinets: Table 4-3 on page 113 4mm Polyurethane (Pu): Table 4-4 on page 116 1/16" Tefzel: Table 4-5 on page 117 1/8" Stainless Steel (SS):Table 4-6 on page 121 3/8" Polyurethane (Pu): Table 5-2 on page 138 3.18mm Polyurethane (Pu): Section 5-2-6 on page 140 1/16" PEEK : Table 5-3 on page 148

5.

Crimp the end of the metal pipe shut, or tape the end of the polyurethane or tefzel tubing, to prevent any debris from entering it while you push/pull it to its destination. Feed the pipe/tube through the penetration, to its destination.

6.

104

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Note: At least one penetration between the cyclotron room and radiochemistry lab should have a piece of PVC conduit with shallow bends installed in it, to accommodate the tefzel lines that deliver the product to the lab. These lines must be replaced on a regular basis, and the conduit helps ease the way. Run all active and spare tefzel lines through the conduit. Remember to mark the spares. 7. 8. 9. Remove the tape or cut off the crimp, restore the roundness of the open end, and attach it to the corresponding tube fitting. Attach the label to the pipe or tube with two ty-wraps. Cut the pipe to length, fasten the other end to its fitting, and attach the label.

10. Color the corresponding line on the Pipe Work drawing. In theory, when you run out of labels, the gas/product pipe work is finished. However, compressed air lines currently do NOT have labels.

Chapter 4 Install the Cables, Hoses and Pipes

105

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-10 EXAMPLE OF PIPE WORK DRAWING

GE HEALTHCARE REV 5

106

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

4-3

Attach the Hoses


The hoses that run between the CSC and the cyclotron have been cut to length, fitted and labeled. The hoses that run from the CSP to the CSC, and on to the RFPG and CCAB may have to be trimmed to length. The fittings are already attached to the support panels, cabinets and magnet. The hose clamps are attached to the corresponding panels, along with the mounting hardware. (The installation gang box should also have spares.) The fitted hoses use Swagelok connectors. Use a wrench to attach the fitted hoses to the system connectors. Appendix B contains information about Swagelok connectors. If you have to manufacture or refit one of the hoses, first read the information in Section B-1. The following tables contain piping connections for a dual extraction MINItrace system. If your system has additional options, you will have additional tubes and pipes to install. Every installation has its own Pipe Work drawing, which shows the system connections. Use this drawing to ensure all connections have been made on your system. For best results, color or highlight each line on the drawing as you install it.

Chapter 4 Install the Cables, Hoses and Pipes

107

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-11 THE CSP LINKS CUSTOMER SUPPLIED LINES TO THE MINITRACE SYSTEM
Customer provides Water and Air connections into the CSP Valve OFF

GE HEALTHCARE REV 5

Valve ON

Hose Fitting

2 hose clamps on Water In and Water Out hoses

Air IN Make up water

Water IN (Pressure)

Water OUT (Return)

GE supplies the hoses from the CSP to the MINItrace

4-3-1

Attach the Cyclotron Supply Panel Hoses


On most sites, plumbers and fitters install the water and air lines and make the connections between the air compressor, the chiller and the CSP. The installation team makes the connections between the Cyclotron Supply Panel and Cyclotron Support Cabinet, and from there to the MINItrace subsystems. To attach an unfitted hose: 1. The hoses that run between the wall-mounted Cyclotron Supply Panel and the Cyclotron Support Cabinet (CSC) need to be cut to length from the raw hose sent with the system. a. b. Cut the end of the hose evenly, so it butts snugly against the top of the fitting. Slide a hose clamp onto the hose, then slide the hose onto the fitting.

108

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 c. d. e. 2.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Refer to Illustration 4-11. Slide two hose clamps onto the Water IN and Water OUT hoses, at both the CSC and CSP connections. Illustration 4-12 shows the CSC destinations for each of the lines. Slide the clamp to within 1/2 inch of the end of the hose, and tighten it down with a flat blade screwdriver.

Table 4-1 lists the Cyclotron Supply Panel connections. Check off each hose as you connect it.

CAUTION

Keep water hoses well away from the electronic cables. Moisture may condense on the hoses. Bundle the electronic cables, and dress them away from the hoses.

TABLE 4-1 CYCLOTRON SUPPLY PANEL CONNECTIONS

When Installed

From Cyclotron Supply Panel Air In

To CSC

Hose Diameter 3/8"

Notes

Air Manifold Assembly (V30) Water Manifold (V50)

Runs along top of cabinet, down the hinge side of the shield and enters cabinet along lower left side, to V30 Runs along top of cabinet, down the hinge side of the shield and enters cabinet along lower left side, to V50 Enters cabinet on top, left connector Refer to Illustration 4-12. Two Hose Clamps - both ends Enters cabinet on top, right connector Refer to Illustration 4-12. Two Hose Clamps - both ends

Make Up Water

3/8"

Water In

Water Manifold (V1)

1"

Water Out

Water Manifold

1"

Refer to Illustration 4-12, Air and Make Up water lines cross the top of the cabinet, run along the side, and enter the bottom half of the CSC, near the connection destinations.

Chapter 4 Install the Cables, Hoses and Pipes

109

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-12 CYCLOTRON SUPPORT CABINET - COOLING WATER SYSTEM
Water In

GE HEALTHCARE REV 5

Water Out

Connection destinations

Make Up Water (V50) Air In (V30)

Lines enter/exit the CSC here

ILLUSTRATION 4-13 WATER HOSE TO THE CSC

Water OUT Line Two hose clamps for extra security

110

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-14 COOLING WATER CONNECTIONS (CAC212-31010)

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Chapter 4 Install the Cables, Hoses and Pipes

111

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-3-2

Attach the MINItrace Cooling Hoses


Note: Refer to Illustration 4-14. Run all the 3/8" rubber hoses in the exact order they appear in Table 4-2 . Do NOT cross or stack hoses, or they will not fit. All 3/8" hoses are cut to length, fitted with connectors and labeled at both ends. Run all the hoses at this time, and make as many connections as possible. Chapter 5 contains instructions to make the remaining connections to the Diffusion Pump and Target Cooling Manifold.

TABLE 4-2 3/8" RUBBER HOSE CONNECTIONS.

When Installed

Hose Label

From the Water Manifold (CSC)/To Target Cooling Manifold Target Cooling Manifold Target Cooling Manifold Magnet (DEE 2) Magnet (DEE 2) Magnet Coil Magnet Coil Magnet (DEE 1) Magnet (DEE 2) Magnet Ion Source Magnet Ion Source Diffusion Pump (bottom) Diffusion Pump (top)

Max Length 400cm 360cm 410cm 380cm 360cm 270cm 370cm 390cm 350cm 310cm 280cm 270cm 320cm

Notes

Target Dual Return Target Single Return Target Pressure RF 2 Pressure RF 2 Return Magnet Pressure Magnet Return RF1 Pressure RF1 Return Ion Source Pressure Ion Source Return Vacuum Return Vacuum Pressure

Run to Target side of magnet Run to Target side of magnet Run to Target side of magnet

Connected in Chapter 5 Connected in Chapter 5

112

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-15 RUN HOSES BENEATH THE MAGNET AND SHIELD

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Support line races cast into bottom of shield and magnet Hoses must lie flat, like a ribbon cable, or they will cause interference.

Fitted hoses cut to length and labeled

Target Side of the Magnet

4-3-3

Attach the Electronics Cabinet Cooling Hoses

TABLE 4-3 RUBBER HOSE (RH) CONNECTIONS TO ELECTRONICS CABINET

When Installed

From the Water Manifold (CSC) RFPG Pressure RFPG Return

To

Hose Diameter 3/4" 3/4"

Notes

RFPG cabinet Water In RFPG cabinet Water Out CCAB PSMC (connector on the left) CCAB PSMC (right connector)

Pull in through the top of the cabinet. Attach to the WATER IN connector. Pull in through the top of the cabinet. Attach to the top of the WATER OUT flow meter. Pull in through the top of the cabinet. Connector should be labeled IN. Pull in through the top of the cabinet. Attach to the OUT connector.

PSMC Pressure PSMC Return

3/8" 3/8"

Chapter 4 Install the Cables, Hoses and Pipes

113

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-16 RFPG WATER IN AND WATER OUT

GE HEALTHCARE REV 5

Water OUT (Return)

Water OUT flow meter

Water IN (Pressure)

4-3-4 4-3-4-1

Polyurethane Connections 4mm Compressed Air Lines


The 4mm polyurethane tubes carry compressed air from the CSC to the: Air Valve Panel and LTF(s), mounted in the Target Support Cabinet (TSC). Backing and Roughing Valves, mounted on the diffusion pump.

The 4mm (or smaller) compressed air tubes use the fittings shown in Illustration 4-17. 1. 2. 3. 4. Trim the end of the tube to produce an even edge. Slide the end of the tube into the (blue) opening of the connector, until it butts against the shoulder on the inside. Pull the shoulder away from the connector to lock the tube into place. Press the blue shoulder against the connector to release the tube.

114

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-17 COMPRESSED AIR TUBE CONNECTIONS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Blue shoulder

Note: The LTF panels use similar compressed air fittings, but these should arrive intact. ILLUSTRATION 4-18 LTF PANEL

TSC cable raceway

The compressed air hose attaches to the bottom of the LTF

Compressed air hose from CSC

You may run the hose from the CSC to TSC at any time, but you must run the hose to the diffusion pump before you start to move the pump into place. Refer to Illustration 4-12 on page 110. The CSP compressed air line enters the CSC on the left side of the cabinet, about half way down.

Chapter 4 Install the Cables, Hoses and Pipes

115

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-19 COMPRESSED AIR VALVES IN CSC

GE HEALTHCARE REV 5

C1 tank

To magnet niche

To Target Support Cabinet

Slide collar to open and close valve (Pull away from block to open valve; push toward block to close valve.)

Push hose into this connector

TABLE 4-4 4MM POLYURETHANE (PU) CONNECTIONS

When Installed

From

To

Notes

CSC Air Valve labeled LTF

TSC

Run line through the shielded raceway to the top of the TSC, and into the integrated TSC raceway. Attach compressed air line to the bottom of the LTF panel. The compressed air line follows the same path as the cooling hoses. Run the hose through the opening at the bottom of the CSC, beneath the right fixed shield and into the magnet niche. Installed during Chapter 5 Installed during Chapter 5 Installed during Chapter 5

CSC Air Valve labeled VAC SYS

Right side of the magnet niche (Run the line now. You will attach it to the Diffusion Pump during Chapter 5)

Target Cooling Manifold Target Cooling Manifold Target Cooling Manifold

18F- Target (single extraction) 13N Target option 18F- Target (dual extraction)

116

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

4-3-5

Pull the Product Lines to the Hot Lab


Refer to the system Pipe Work drawing, site plans and Table 4-5 . The tefzel lines that deliver the product to the hot labs have a finite life span, and must be periodically changed. During installation, run a set of 8 uniquely marked spares with every active product line. Depending upon the production schedule, these spares can last up to five years. The lines run through a plastic conduit with shallow bends, to facilitate the future replacement of spares. Note: Remember to mark the ends of each line before you pull the lines. 1. 2. 3. Fish a line through the conduits between the Cyclotron room and the Hot Lab. Pull all the lines and spares between the rooms. Decide which line(s) to youll use when you assemble the cyclotron, and label both ends with a piece of masking tape.

TABLE 4-5 PRODUCT LINES

When Installed

From

To

Material

Notes

Hot Lab Conduit

Hot Lab

1/16" Tefzel

Refer to the system Pipe Work Drawing. Run 8 spares, for a total of 9 lines for each Target on the system.

ILLUSTRATION 4-20 WASTE GAS MANIFOLD


Waste gas enters shield here and vents from the top.

Shield penetrations to TSC

Conduit for product lines let into floor. Shown with fish line to pull tefzel lines to hot lab.

Chapter 4 Install the Cables, Hoses and Pipes

117

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-21 : F-TARGET OPTION ASSEMBLY

GE HEALTHCARE REV 5

118

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

4-3-6

Outlet Selection Panel


The outlet selection panel is used to divert incoming Target water (O16 or O18) to the synthesizer input, or to a waste vial. Refer to Illustration 4-21. The panel consists of a selector valve, an air actuator and a valve holder, and is installed in the hot cell. 1. 2. 3. 4. 5. Mount the outlet valve panel close to the FDG box in the Hot cell. Connect the product line from the target to the input of the selector valve. Connect the input of the FDG box to the first outlet (OUT 1) of the selector valve. Connect the second outlet (OUT 2) of the selector valve to a 250ml waste bottle. Connect two air hoses between the pneumatic actuator and the pneumatic air valve assembly on the LTF panel on the cyclotron.

CAUTION

Do NOT ty-wrap the compressed air lines to the product delivery lines.

ILLUSTRATION 4-22 OUTLET SELECTION PANEL


Out 1

In

Out 2

Compressed Air Inputs to Pneumatic Actuator

Chapter 4 Install the Cables, Hoses and Pipes

119

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-3-7

1/8" Stainless Steel Pipes


The gases travel from the Cyclotron Gas Panel to the MINItrace through stainless steel tubing you cut to length during installation. The system target options determine the number of pipes to install. Refer to the facility Pipe Work drawing and Table 4-6 for additional installation information. A length of stainless steel tubing ships with the system. Choose a run between the Cyclotron Gas Panel and the MINItrace with the fewest bends and maximum support from walls and shield surfaces. Refer to Illustration 4-24. Use the cutting tool from the Installation Tool Box to cut the tubing to length.

ILLUSTRATION 4-23 CYCLOTRON GAS PANEL

H2 TO I.S. MANIF

He TO LTF 1.5bar

He TO LTF 30bar

N2O2 TO LTF

He TO He COOL 5bar CH4 TO LTF

ILLUSTRATION 4-24 CUTTING TOOL

120

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 TABLE 4-6 1/8" STAINLESS STEEL (SS) CONNECTIONS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

When Installed

Cyclotron Gas Supply Panel Label H2 to I.S. MANIF

To

Notes

Ion Source Manifold Panel in CSC

Pull through raceway to Ion Source panel in CSC. (Drill a hole in the raceway, near the access hole on top of the CSC) Attach to the top of the IS panel (Illustration 4-28) (Continuation of run from H2 to I.S. MANIF) Start from the bottom of the IS panel and pull to the magnet. Remove P1, P2, P3 to install lines to LTF. Line enters the top of the TSC and attaches to the LTF at ID1 V1 Changes to PEEK in cable raceway Remove P1, P2, P3 to install lines to LTF. Line enters the top of the TSC and attaches to the LTF at He 5BAR IN. Remove P1, P2, P3 to install lines to LTF. Line enters the top of the TSC and attaches to the LTF at He 30BAR IN.

Ion Source Manifold

Ion Source, magnet

CH4 TO LFT (13N option) He TO He COOL 1.5bar He TO LTF 5bar

Liquid Target Filler

Target Cooling Manifold Liquid Target Filler

He TO LTF 30bar

Liquid Target Filler

N2O2 TO LTF (Future option) 1. 2.

Liquid Target Filler

Determine the total number of pipes to run. Measure the exact run between the Cyclotron Support Panel and MINItrace, including bends, and cut the tubing to length. Refer to Illustration 4-25. a. b. c. d. Loosen the knob on the cutting tool. Slip the tubing next to the cutting wheels and tighten the knob. Spin the cutting tool around the tubing. Continue to tighten the knob and spin the cutting tool around the tubing until it snaps. The tool makes a clean, burr-free cut, but the cutting process reduces the inner diameter of the tubing. (See Step 3.)

Chapter 4 Install the Cables, Hoses and Pipes

121

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 4-25 CUT THE TUBING TO LENGTH

GE HEALTHCARE REV 5

3.

Use a 3mm drill bit to carefully restore the inner diameter of the steel tubing. IF POSSIBLE, hold the stainless steel piping upside down while you restore the inner diameter, to prevent any debris (swarf) from entering the tube. When you finish, tap the end of the tubing against a solid surface to knock out any debris that may have entered its interior.

4.

Refer to Illustration 4-26. Take the time to make neat runs. Use the walls and shield to support the pipes as much as possible. To prevent accidents, keep runs to the MINItrace close to the ceiling.

ILLUSTRATION 4-26 KEEP RUNS NEAT, SIMPLE AND FAR FROM THE FLOOR

5. 6.

Run the stainless tubing through the cable duct in the top of the TSC cabinet. The pipes attach to the target panels with Swagelok connectors.

122

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 ILLUSTRATION 4-27 TARGET PANEL CONNECTION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Panel Connection

7.

Refer to Table 4-6 and Illustration 4-28. The Helium cooling line to the Target Cooling Manifold changes to a PEEK connection in the shielded raceway. Chapter 5 contains the instructions to connect the PEEK tubes that run to the TCM.

ILLUSTRATION 4-28 STAINLESS STEEL PIPES IN SHIELDED RACEWAY


To I.S. Manifold in CSC Steel piping transitions to PEEK tubing in raceway.

Access hole for pipe to I.S. Manifold

Chapter 4 Install the Cables, Hoses and Pipes

123

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

4-4

Cyclotron Room Ventilation


Check that the ventilation from the vacuum side, and the waste gas outlet from the target side are connected to the ventilation stack. Illustration 4-29 shows the ventilation and the waste gas outlet. Notice Check that the Cyclotron room pressure is 15-20 pascal lower than the static pressure in the surrounding areas. The air flow in the ventilation pipe, from the vacuum side, should range between 100 to 150 liter/minute.

ILLUSTRATION 4-29 VENTILATION AND WASTE GAS OUTLET

Waste gas outlet

Ventilation (vacuum side)

124

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5 Notes and Comments:

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Chapter 4 Install the Cables, Hoses and Pipes

125

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

126

Chapter 4 Install the Cables, Hoses and Pipes

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 5 ASSEMBLE THE CYCLOTRON


Follow the instructions in this chapter to complete the assembly and installation of the MINItrace cyclotron and support systems. This chapter also contains the instructions to repair and finish the shields. When you complete all the Chapter 5 procedures, the system is ready for power checks and start-up. Note: Follow all the instructions in Chapter 4 before proceeding to Chapter 5 . After you complete the Chapter 4 tasks and prep the interior shield, two people may assemble the target and vacuum sides of the cyclotron simultaneously.

5-1

Introduction
The MINItrace shields house the cyclotron and part of the target and vacuum support systems. The cabinets attached to the right and left fixed shields house additional cyclotron and target support systems. Any component that has the potential to become radioactive, either during normal use or catastrophic failure, is housed inside the shields. Before you start to reassemble the cyclotron: Verify all cables and hoses from the CSC have been pulled into the interior niche. (Wait until you install the Target Cooling Manifold and Valve panel to pull the lines from the Liquid Target Filler and Helium Compressor in the TSC.) Repair any shipment damage to the interior surfaces. (Follow the application directions on the can of plastic filler.) Paint the inner and outer shield surfaces (Continue to periodically paint and touch up the surfaces until satisfied with the finish.)

Notice

Any time you paint the shields, cover any exposed components, cables or hoses with plastic. Wipe up or smooth out any drips as soon as you discover them. When you make the final door adjustments, the tolerances are so small that a dried paint drip can prevent the doors from closing. When you repair the damaged areas, sand the surfaces completely smooth before you paint them. Too much plastic filler (bond-o) will also cause problems during the final door adjustments.

Chapter 5 Assemble the Cyclotron

127

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-1 INNER SHIELD ASSEMBLY

GE HEALTHCARE REV 5

128

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

5-2
5-2-1

Assemble the Target Side of the Cyclotron


Install Inner Shield 5
The cyclotron ships with the magnet chamber filled with nitrogen gas. Release the gas, remove the valve, and cover the port with a blind flange before installing the last five inner plastic shields.

CAUTION

The extraction motor assembly is fragile. Take care NOT to damage the extraction motor while installing the plastic inner shields.
1. Release the nitrogen gas and remove the pressure valve from the magnet port. 2. 3. 4. GEMSE: Send the pressure valve back to Sweden with the rigging crate. GEMSAM and GEMSA: Contact your local office for return instructions.

Locate the blind flange in the hardware attached to the magnet. Reuse the 6mm hardware to fasten the flange cover over the open port. Fasten the right shield support bracket back into place. You removed this bracket during Section 3-3-5, to attach the hi-jacker.

5.

Refer to Illustration 5-1 on page 128 while installing the plastic inner shield 5 marked 21 on page 128. The top of each shield was numbered during disassembly.

6.

CAREFULLY place Shield 21 on the metal brackets and slide it into place, making sure the cutout completely clears the extraction motor (single extraction system) or motors (dual extraction system) and the attached cables. Refer to Illustration 5-2. Shield 21 has wire raceways routed into the surface. a. b. c. Locate the black filter board cable at the top of the coil (CAC 205-3101 01-3-3.2m) Press the black cable into the top wire raceway, and down to the floor. Press the single (Upper) extraction motor cable into the lower wire raceway. * Refer to Illustration 5-2. Use a ty-wrap to position the cable in the niche.

7.

Chapter 5 Assemble the Cyclotron

129

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-2 SHIELD 21 AND UPPER (SINGLE) EXTRACTION MOTOR

GE HEALTHCARE REV 5

Filter Board cable

Single Extraction motor (U)

Ty-wrap cable

8.

Refer to Illustration 5-2. IF the system has the Dual Extraction option: a. b. Position the DU and DL cables at the entrance to the raceway, and ty-wrap the two cables together. Press the cables into the raceway.

ILLUSTRATION 5-3 SHIELD 21 WITH DUAL EXTRACTION FOIL AND BALANCE MOTORS

Dual Extraction Foil Motor (DU)

Balance Motor (DL)

130

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 TABLE 5-1 FILTER BOARD AND EXTRACTION MOTOR CABLES To Cyclotron Connection board on TCM (Target Cooling Manifold) P7 P4 P6 P5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

When Installed

From Filter board Single Extraction Motor (Upper Motor) Foil Motor (DU) Balance Motor (DL)

Notes All MINItrace systems All MINItrace systems Dual Extraction systems only Dual Extraction systems only

CAUTION

Take care NOT to pinch the cables between the shields. Recommended: Tape strips of masking tape across the routed raceways to keep the cables in place while you install the remaining shields.
9. Slide the rest of the shields into place, in the following order: a. b. c. d. Shield 7 Shield 5 Shield 6 Shield 22

10. Fasten the plastic shields to the fixed shield with 4 M8 (340mm) bolts. ILLUSTRATION 5-4 ALL INNER PLASTIC SHIELDS IN PLACE

Shield Race and Ports (detail)

Chapter 5 Assemble the Cyclotron

131

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

5-2-2

Install the Targets


Follow the procedure in this section to attach the targets to the ports on the cyclotron. The actual number of targets, and port locations vary from system to system, depending upon the Target options that were purchased. Consult the packing list; the target options ship in Crate 11. Your MINItrace system pipe work drawing (Basic Drawing, CAC600-17000-00-1) shows the target locations for your system. The MINItrace system uses the following default port assignments, listed from top to bottom: 1. Port 1: 18F- Single and Dual Extraction systems Port 2: 11C Port 3: 15O Port 4: 13N Port 5: Proton (Dummy) Target - all MINItrace systems Port 6: 18F- Dual Extraction systems Remove the blind flange from the target mounting area(s).

ILLUSTRATION 5-5 MINITRACE TARGET PORTS WITH BAYONET MOUNT IN PLACE

2.

Refer to Illustration 5-6. Each product target is surrounded by a nylon shield. The dummy (proton) target does NOT have a nylon shield.

3.

Slide target into shield and fasten cover with the captive nylon screw. The shield should spin freely around the target body.

132

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-6 MINITRACE TARGET SHIELD

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

4.

Refer to Illustration 5-7. Orient the shield with the nylon screw facing upward, and GENTLY insert the end of the target into the mounting plate. The targets mount onto the port with the media inlets on the top side of the target and the outlets on the bottom side of the target (nearest the floor).

ILLUSTRATION 5-7 INSERT THE MINITRACE TARGET INTO THE PORT

Target Inlets

Nylon screw

Target Outlets

5.

Mount the dummy target into the fifth target position. The dummy target has connections for cooling water lines and the current sensing cable. The dummy target does NOT have helium cooling lines or PEEK connections.

6.

Refer to Illustration 5-8. Fasten the filler blocks into the unused target openings. The blocks are labeled with the corresponding target port number. The target hoses are attached to the targets later, during section 5-2-6 on page 140.
Chapter 5 Assemble the Cyclotron 133

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-8 FILLER BLOCKS IN UNUSED PORTS

GE HEALTHCARE REV 5

Filler Blocks Labeled with Target Port #

5-2-3

Target Support Cabinet (TSC)


The Target Support Cabinet (TSC) houses the helium compressor(s) used by the helium cooling system, and the Liquid Target Filler(s) used by the 18F- and 13N Target systems. The TSC also contains space to house future Target system product panels, such as 15O and 11C. The Liquid Target Filler (LTF) panel should arrive already attached to the TSC. During system disassembly for shipment, the lines that run from the LTF were pulled back into the TSC, but left attached to the LTF panel.

134

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

5-2-4

Install the Helium Compressor(s)


The MINItrace currently uses a single compressor on a single extraction system, and two compressors if the system has the Dual Extraction option. 1. Refer to Illustration 5-9. Each compressor sits on a shelf attached to a bracket that fastens directly to the shield. The bracket hardware passes through openings in the back of the TSC and fastens to anchors imbedded in the shield.

ILLUSTRATION 5-9 HELIUM COMPRESSOR SHELVES (DUAL EXTRACTION SYSTEM)

TSC Cable Raceway Penetrations for the compressor hoses

Ground stud (in raceway)

Bracket for shelves

2. 3.

Fasten the bracket to the shield with four M6 bolts and flat washers. Refer to Illustration 5-10. Install the mounting plate (shelf) with the studs facing upward. Temporarily fasten the mounting hardware to align the shelf to the bracket. a. b. Insert the mounting hardware from the bottom, making sure it slides into the slot in the shelf bracket. Insert the spacer and loosely fasten into place with the black knurled knob.

Chapter 5 Assemble the Cyclotron

135

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-10 INSTALL THE MOUNTING PLATE
Spacer

GE HEALTHCARE REV 5

Lower set of penetrations Install mounting plate with studs facing upward

Fasten hardware from below

4.

The compressor power cable originates in the CSC, and arrives still connected to its terminal in that cabinet. a. Locate the power cable in the raceway on the CSC side of the shield. (You should have placed all the cables into the raceway when you attached the CSC and raceway to the shield.) Run the power cable along the race, through the penetration at the TSC side of the shield, and down the plastic raceway inside the TSC. Refer to Illustration 5-9. Locate the ground stud at the bottom of the TSC raceway. The compressor ground wires should already be fastened to the stud. Pull the ground wires from the raceway.

b. c. d. 5.

The compressors are shipped in Crate 11 (Single Extraction in box C and Dual Extraction option in box D) and should already have the 3/8" PU hoses attached. a. Refer to Illustration 5-11. Attach a ground wire to each pump case.

ILLUSTRATION 5-11 ATTACH THE GROUND WIRE TO THE COMPRESSOR CASE

b.

Orient the compressor so the ground wire faces the front or rear of the TSC.

136

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 6.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 The pumps have rubber vibration absorbing feet, with metal mounting tabs. a. b. c. Refer to Illustration 5-12. Remove the black knobs and mounting hardware. Slip the back tabs over the exposed studs and align the front tabs over the holes and slots at the front of the shelf. Insert the screw through the shelf and mounting tab, slide the spacer onto the screw and fasten everything into place with the black knob.

ILLUSTRATION 5-12 FRONT FOOT AND MOUNTING TAB

5-2-5

Attach the Helium Compressor Hoses


After you install the helium compressors and the Target Cooling Manifold (section 5-2-6), attach the hoses listed in Table 5-2 . The compressors ship with their hoses attached. Refer to Illustration 5-9. Run the pressure hose (arrow points away from compressor) through the bottom penetration. Run the return hose (arrow points toward compressor) through the top penetration. The hoses use Swagelok connectors. Appendix B contains information about Swagelok connectors. If you have to manufacture or refit one of the hoses, first read the information in section B-1.

Chapter 5 Assemble the Cyclotron

137

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-13 DUAL COMPRESSOR CONFIGURATION

GE HEALTHCARE REV 5

TABLE 5-2 3/8" POLYURETHANE (PU) CONNECTIONS

When Installed

From

To

Notes

Helium Compressor#1 Helium Compressor#2 Target Cooling Manifold

Target Cooling Manifold He Compressor #1 He Compressor Return

Single and dual beam systems Dual Extraction system only. Drawing CAC 208-31004-03-1 has an inset showing the dual compressor configuration.

138

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-14 PIPE WORK MINITRACE BASIC DRAWING

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Chapter 5 Assemble the Cyclotron

139

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

5-2-6

Install the Valve Panel and Target Cooling Manifold


The Target Cooling Manifold provides cooling media to the targets. It also contains the Cyclotron Connection board and Relay panel. The Valve Panel contains the valves to move the media into the target for bombardment, pressurize the target, then flush and dry it.The Valve Panel and Target Cooling Manifold ship in Crate 11.The Valve Panel ships in box N; the TCM sits next to the Diffusion Pump. Illustration 4-14 on page 111 shows the cooling water connection locations and labels.

ILLUSTRATION 5-15 THE VALVE PANEL AND THE TARGET COOLING MANIFOLD

Leave enough slack to move the manifold for service access. Valve Panel (New Style)

Target Cooling Manifold

Notice

For best results, DO NOT push all the tubes/lines through at once. Push and connect one tube/line at a time to prevent confusion. Leave about 0.5 to 1 meter length of slack tube/ line inside the magnet chamber, to provide service access.

ILLUSTRATION 5-16 TSC AND SHIELD PENETRATIONS BELOW THE LTF PANEL

TSC/Shield penetrations Push and connect one tube/line at a time.

140

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 1.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Make the tube connections between the LTF panel and the valve panel.All destination valve connectors on the Valve Panel are clearly marked with the same label names as the source connectors on the LTF, but the tubes are not labeled. a. b. c. 2. Choose an LTF source connection and push its tube through the TSC/shield penetration. Cut a 5-10 mm piece from the end of the tube, to remove any dirt that may have entered it when you pushed the tube through the shielding. Connect the tube to the destination connector.

Refer to Illustration 5-14 on page 139. Make the tefzel line(s) between the LTF panel and the corresponding valve panel connector. a. b. c. Choose an LTF source connection and push its tube through the TSC/shield penetration. Cut a 5-10 mm piece from the end of the tube, to remove any dirt that may have entered it when you pushed the tube through the shielding. Connect the tube to the destination connector.

CAUTION

DO NOT bend the PEEK lines, or they may crack. The PEEK lines between the target and the LTF are supposed to be 2 meters long. DO NOT cut these lines.
Information about PEEK Connections The 18F- and 13N Target systems use PEEK tubes between the Liquid Target Filler and the Target. The LTF also has additional PEEK tubing and connections. Usually, the 1/16" PEEK tube uses the same Swagelok connectors as the 1/16" Tefzel tubes (See Appendix B), but the PEEK tubes also use connections like the one shown in Illustration 5-17, to provide a quick method to disconnect the Target lines from the LTF. The LTF vials also use needles with a similar fitting.

Chapter 5 Assemble the Cyclotron

141

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-17 INSTALL PEEK CONNECTIONS

GE HEALTHCARE REV 5

Insert the tube into the connector, until it passes the shoulder inside the tip, and extends beyond the outer tip of the connector by a millimeter or two.

Insert the tube here

Tube extends 1 or 2mm past tip

Screw the threaded end of the connector into the coupling or threaded LTF component and tighten it with your fingers.

Screw threaded tips into coupling

3.

Make the PEEK line connections between the LTF and the valve panel. Refer to Illustration 5-14 on 139, and read the information about Peek Connections below. a. b. c. Choose an LTF source connection and push its tube through the TSC/shield penetration. Cut a 5-10 mm piece from the end of the tube, to remove any dirt that may have entered it when you pushed the tube through the shielding. Connect the tube to the destination connector.

4.

Make the PEEK line connections between the valve panel and the target(s). a. Press the PEEK tubes into the routed races, behind the beveled screws. Refer to Illustration 5-18. When tightened into place, the screws act as retainers.

ILLUSTRATION 5-18 SCREWS ACT AS RETAINERS

Screws act as retainers

142

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 5.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Refer to Illustration 5-19. Fasten the valve panel to the side of the fixed shield with the two black knurled knobs.

ILLUSTRATION 5-19 SINGLE EXTRACTION VALVE PANEL AND TARGET COOLING MANIFOLD
Shield penetration between LTF (in TSC) and Valve Panel

3/8" hoses from helium compressor

Valve Panel

6.

The Target Cooling Manifold (TCM) sits directly on the floor. Leave enough slack on the tubes and cables to service the TCM.

7.

Refer to Drawing CAC208-31004-03-1 (Direction 2233001). a. b. c. d. e. f. Make the cooling water hose connections. (Refer to Table 4-2 on page 112.) Make the Helium compressor connections. (Refer to Table 5-2 on page 138.) Make the Single Extraction motor (U) cable connection. (Table 5-1 on page 131.) Make the filter board connection. (Table 5-1 on page 131.) IF the MINItrace has the Dual Extraction Option: Make the Foil motor (DU) and Balance motor (DL) cable connections. (Table 5-1 on page 131.) Attach the cables from the CSC Connector and Relay board to TCM P1, P2 and P3. * Refer to Cable Block Diagram CAC000-51003-00-3 g. Attach the magnet door interlock cable from the cyclotron to PC4. * Insert the blue wire into terminal 9. * Insert the black wire into terminal 10. h. i. Refer to Illustration 5-20. Attach the Waste Gas Manifold inlet tube to the WASTE OUT connection on the Target Cooling Manifold. Run the PEEK tube attached to the TCM He IN connector to the Stainless Steel pipe in the raceway. (See Illustration 4-27 on page 123.) Refer to Appendix B to fit the Swagelok connector to the pipe.

Chapter 5 Assemble the Cyclotron

143

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-20 WASTE GAS MANIFOLD

GE HEALTHCARE REV 5

Waste gas inlet

8.

The Target Cooling tubing and current sensor lines for each of the MINItrace Targets are attached to the Target Cooling Manifold. The current sensor lines arrive attached to PC5 on the TCM connection board. Compare the position of the targets on the cyclotron with the tubing configuration on the TCM. The two should match. The TCM in Illustration 5-21 is configured for a Dual Extraction system. (This picture taken before port five became the permanent default Proton [Dummy] Target position.)

ILLUSTRATION 5-21 TARGET COOLING MANIFOLD BEFORE INSTALLATION


Target current sensing lines Target Cooling tubing

Target 6 144 Chapter 5 Assemble the Cyclotron

Target 1

GE HEALTHCARE REV 5 9.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Refer to Illustration 5-22. Press the Target media lines into their routed raceway.

10. Attach the media lines to the corresponding target connector. 11. Route each Target Current Sensor wire behind the retaining screws. Wait until you install the PEEK lines to tighten the screws. If necessary, use strips of masking tape to hold the lines in place.

ILLUSTRATION 5-22 ROUTE THE TARGET LINES IN THE SHIELD RACEWAYS

Current Sensor line

Retaining screws keep the lines in place.

Chapter 5 Assemble the Cyclotron

145

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

5-2-7

Paint the Inner Doors

ILLUSTRATION 5-23 PAINT THE DOOR

Paint the door before you install the outer plastic shields.

5-2-8

Attach Outer Shield Assemblies to Left Door


Attach the outer plastic shields to the left door. All the inner and outer plastic shields ship in Crate 11. 1. Refer to Illustration 5-24. Tighten the following lengths of M12 all-thread all the way into the holes tapped into the lead shielding on the left door. a. b. Fasten the longer piece (240mm) into the top hole. Faster the shorter piece (226mm) into the bottom hole.

146

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-24 FASTEN THE M12 ALL-THREAD TO THE SHIELD DOOR

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

240 mm

226 mm

2.

Each outer plastic shield is slightly smaller than the previous one, to form a stepped surface. The top of each shield is numbered with its call-out on CAC210-31005-05-2. Slide the shields onto the all-thread in the following order: a. b. c. d. e. Shield 20 Shield 19 Shield 18 Shield 17 Shield 16

3.

4. 5.

Slide a washer onto each thread, and fasten the outer shields to the door with M12 nuts. Refer to Illustration 5-25. Make sure the ends of the thread and nuts are flush with the outer surface of the last plastic shield. If the hardware sticks out, the door will NOT close. If the hardware extends past the shield surface, make sure you didnt fasten the longer thread to the bottom hole by mistake.

Chapter 5 Assemble the Cyclotron

147

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-25 MOUNTING HARDWARE SHOULD BE FLUSH

GE HEALTHCARE REV 5

6. 7. TABLE 5-3 LIST OF PEEK CONNECTIONS

Make the PEEK line connections between the valve panel and the targets Refer to system drawing CAC 285-31010-xx-1

When Installed

From

To

Notes

LTF LTF

18F- Target(s) 13N Target

Two lines for each 18F- Target on system Two lines

148

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

5-3
5-3-1

Assemble the Vacuum Side of the Cyclotron


Attach the Diffusion Pump to the Accelerator
Follow the instructions in this section to attach the Diffusion and Rotary pumps to the accelerator. Make sure all hoses and cables have been pulled through the shield penetrations and races. Ty-wrap the signal and power cables into bundles in the race way, and install the race covers before moving the diffusion pump into the cavity. 1. Refer to Illustration 5-26. The diffusion pump ships fully assembled and ready to install. When you pull it out of Crate 11, inspect the bottom of the crate and the diffusion pump pallet for signs of an oil leak. If you see any oil, call support. Service Manual 2233000 contains instructions to disassemble and fill the diffusion pump with SANTOVAC 5 diffusion pump oil.

ILLUSTRATION 5-26 DIFFUSION PUMP

2. 3.

Locate the square metal roller plate (dolly) in the installation gang box. Remove the diffusion pump from its shipping pallet and transfer it to the roller plate. Use the roller plate to transport the diffusion pump to the cyclotron room and position it for attachment to the vacuum chamber.

4.

Refer to Illustration 5-27. Use an 8mm allen wrench to remove the six M10 hex cap head screws that fasten the blind flange to the cyclotron magnet chamber. Remove the blind flange, and set aside.

Chapter 5 Assemble the Cyclotron

149

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Note: If necessary, loosen the power cables and hoses and push them out of the way while you install the diffusion pump. REMEMBER to reposition and fasten them when you finish. ILLUSTRATION 5-27 CYCLOTRON WITH BLIND FLANGE
If necessary, loosen the cooling hoses and move them out of the way during the diffusion pump installation Insert guide pins

Blind Flange

The system ships a bag of installation hardware taped to the bottom of the flange.

CAUTION

Do not do ANYTHING to damage the o-ring area. A single nick, scratch or hair across the area will cause vacuum to fail. PAY attention to everything you do, it could take days to find the source of the vacuum leak, and hours of wet sanding with 1000-1200 grit sandpaper to resolve.
5. Refer to Illustration 5-28. a. b. Remove the guide pins from the bag of hardware attached to the bottom of the flange. Replace the hardware you removed from the upper right and left hole with the guide pins.

150

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-28 DIFFUSION PUMP INSTALLATION KIT

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

6.

Refer to Illustration 5-29. Remove the protective cover from the diffusion pump chamber. a. b. c. Apply a thin layer of vacuum grease to the o-ring. Run your finger over the o-ring to seat it in its groove. Run your finger lightly over the copper spring to seat it in its groove.

ILLUSTRATION 5-29 DIFFUSION PUMP O-RING

Make sure the rubber o-ring and copper spring are seated in their grooves. Make sure the ends of the copper spring are firmly seated.

7. 8. 9.

Move the diffusion pump into the niche, and shift it onto the guide pins. Insert cap head screws into the four remaining holes and fasten them into place. Remove the two guide pins and replace them with cap head screws

10. Refer to Illustration 5-28. Use the modified allen wrench (packed with the guide pins and diffusion pump hardware) to fasten the upper right cap head screws. Snug down all six screws as tightly as possible.

Chapter 5 Assemble the Cyclotron

151

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 11. Attach the cooling water hoses to the diffusion pump. a. b. Attach the inlet (pressure) hose to the top of the pump. Attach the outlet (return) hose to the bottom of the pump.

GE HEALTHCARE REV 5

12. Refer to Illustration 5-30. Attach the compressed air lines from the C1 block in the CSC. a. b. Run the line from HVV on the C1 block to the connector on the back of the High Vacuum Valve (HVV). Run the line from VAC S. on the C1 block to the T-connector on the front of the Backing Valve (BV).

Note: If you loosened and moved the power cables and hoses, move them into place and fasten into position before you move to the next step. Check all vacuum chamber connections. 13. Refer to the Cable List in Appendix A and Illustration 5-30. Fasten the 10 cables from MIS run 1b to the Diffusion Pump components. (The 11th cable attaches to the rotary pump, and the 12th cable in the group attaches to the Magnet Coil Temperature switches.) All signal cables are clearly marked; make the connections and ty-wrap into place, so the cables do not touch the hot surfaces of the diffusion pump.

ILLUSTRATION 5-30 DIFFUSION PUMP AND ROUGHING VACUUM PUMP


Magnet Coil Temp Switches

Penning Cell Pirani Cell 2 Vacuum Valve (VV) (attached to end of vacuum chamber) High Vacuum Valve Switch (HVV SW) High Vacuum Valve (HVV)

Pirani Cell 1 Backing Valve (BV) DP 4 pin plug (side of box nearest shield) Roughing Valve (RV) DP Temp Sensor Rotary pump (RP)

14. Refer to the Cable List in Appendix A, Illustration 5-30 and Illustration 5-31. a. The DP Temp Switch cable ends in a temperature sensor.

152

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 b. c. d. e. ILLUSTRATION 5-31 DP TEMP SWITCH

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Use a 3mm allen wrench to remove the DP Temp Switch cap from the bottom of the Diffusion pump. Insert the cable through the hole in the cap. Apply a coat of thermal coupling compound to the stud and the tab end of the temperature sensor. Insert the temperature sensor over the stud in the cap. Fasten the cap back into place.

Temperature Sensor

15. Refer to Illustration 5-32. Check the oil level in the rotary pump, It should fall between the two markings on the site glass. ILLUSTRATION 5-32 ROTARY PUMP SITE GLASS Service Manual 2233000 contains instructions to fill the pump with oil.

Switch to 0 for normal operation

Site glass

16. The diffusion pump ships with a flexible hose and clamping collar attached to the top of the Roughing Valve (RV) assembly.
Chapter 5 Assemble the Cyclotron 153

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Apply a light coating of vacuum grease to the o-ring.

GE HEALTHCARE REV 5

Refer to Illustration 5-33. Use the clamping collar to clamp the flexible hose to the elbow on the inlet.

17. Plug the rotary pump power cord into its MIS 1b cable and lock. 18. Refer to Illustration 5-32. Set the circulating pump switch to the 0 position. 19. Slide the rotary pump into place in the inner shield cavity. (Illustration 5-30.) ILLUSTRATION 5-33 ROTARY PUMP READY TO INSTALL
Exhaust flange Vacuum flange

Clamping collars

154

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

5-4
5-4-1

Finish the Cyclotron Installation


Final Door Adjustments
If you followed the directions in section 3-5-5 of Chapter 3, the doors should be fairly well adjusted, and should have had time to settle while you installed the cables and hoses. 1. 2. Remove the wedges from the doors. Push and pull on each door and watch its motion. 3. Ideally, the door should stop when you stop applying pressure. If the door tends to drift, it should drift TOWARD the fixed shield, NOT away from the fixed shield. If the door drifts, it should NOT gain momentum as it moves; it should NOT slam into the fixed shield. The door should NOT make contact with the cyclotron. The door should rest against the fixed shield without striking it, leaving a 1 or 2mm gap between the inner surface of the door and the fixed shield.

If the door fails to meet the Step 2 criteria, adjust the bearing assembly. Recommended: Use the modified diffusion pump wrench to adjust the threads nearest the hinge. (See Illustration 5-28 on page 151.)

4. ILLUSTRATION 5-34 LIFT PLATE AND REMOTE JACK

Refer to Illustration 5-34. Attach the Lift Plate to the end of the door opposite the hinges, and use the remote jack to take the weight off the hinges.

If necessary, use pieces of steel plate to raise the remote jack into position.

To pull the door away from the fixed shields: Loosen the nuts and adjust the threads To push the door toward the shield: Adjust the threads without the nuts,.

Note: If you become "lost or confused" adjust the pusher and puller threads to align the scribe marks on the top and bottom hinge and bearing assemblies, and start again.
Chapter 5 Assemble the Cyclotron 155

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 5. 6. Release the remote jack and try the door again.

GE HEALTHCARE REV 5

When satisfied with the door motion, adjust the eccentric to fit the door to the shield. Take the weight off the hinges, and align the scribe marks on the eccentric to the mark(s) on the hinge race If necessary, continue to adjust the eccentric until the door fits evenly against the shield, leaving about a 1 or 2mm gap between the two surfaces.

7.

After you fine tune both doors, try closing them together. Make sure the two doors DO NOT collide. When closed, the door surfaces should be flush, with a 1 or 2mm gap between them.

Right and Left Shield Doors adjusted.

5-4-2

Install Right and Left Cosmetic Covers


The Cosmetic covers consist of two metal brackets and a vinyl cover. The brackets fasten to the shield and support cabinets to cover the hinge. Note: Remove the CSC door to install the right cosmetic cover. Remove the three cotter pins that fasten the CSC door to its hinges. 1. 2. 3. The right and left cosmetic covers and hardware ship in Crate 7. Tightly fasten the M8 all-thread (guide pin) to the tapped holes in the shield doors. Fasten the cosmetic cover to the shield door with M8 hardware. (flat washer and nut) If the cover doesnt fit, build up the guide pins with one or two washers.

ILLUSTRATION 5-35 ALL-THREAD ACTS AS GUIDE PIN

Guide pin

156

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 4. 5. 6. 7.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Stretch the cover across the gap between the door and support cabinet. From the interior of the cabinet, fasten the cover into place with the rest of the M8 hardware. Close the doors to make sure the cover isnt too tight. Reattach the Cyclotron Support Cabinet (CSC) door.

ILLUSTRATION 5-36 MAKE SURE THE COVER ISNT TOO TIGHT

5-4-3

Fill the Cosmetic Cover Gaps and Door Picking Point


You may have to apply multiple coats of filler over a period of days. Use the grinder from the gang box to smooth the filler between coats. Sand the surfaces smooth before you paint them. Notice Do NOT fill the gaps between the cosmetic covers and shield surfaces until you are SURE the door hinges are correctly adjusted. Refer to Illustration 5-37. Use caulk and/or plastic filler ("bond-o) to fill the gaps between the cosmetic covers and the shields. You may have to apply multiple coats over a period of days.

Chapter 5 Assemble the Cyclotron

157

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-37 FILL THE GAPS BETWEEN THE SHIELDS AND THE COSMETIC COVERS

GE HEALTHCARE REV 5

Refer to Illustration 5-38. Fill the front holes used as picking points for the doors during the rigging process. You dont have to fill the hole directly on top of the door, because it is more difficult to see from a standing position in front of the door. Refer to Illustration 5-38. Locate the four styrofoam filler pieces and insert them into the front holes on the doors. Apply a layer of plastic filler over the styrofoam pieces, to fill any remaining gaps between the picking point hole and the filler piece.

158

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-38 FILL THE HOLES TOWARD THE FRONT OF EACH DOOR.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Door Sensor Block Fill this hole

You DO NOT have to fill this less visible hole

Fill the most visible picking point hole on each door with cardboard or styrofoam and layers of plastic filler.

Picking Point holes filled. Cosmetic Cover Gaps filled.

Chapter 5 Assemble the Cyclotron

159

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

5-4-4

Final Cleanup and Repair of Damage


The shields will suffer damage during shipment in the containers. Purchase cleaning supplies locally. The system ships with a box of damage repair and paint supplies. Also check the gang box for additional tools and supplies. 1. 2. Clean all surface dirt and debris from the interior and exterior shield and cyclotron. Follow the instructions on the can of "Plastic Padding" ("bond-o") to mix the twopart compound and fill in any scrapes, divots and chips. 3. If the damage is deep, you may have to apply multiple coats over a period of days.

After the plastic filler dries, sand it smooth.

5-4-5

Final Touch-up of Outer Shield Surfaces


Sand any rough spots or dried paint drips. Check all surfaces and fill any remaining nicks or scratches. Apply the final coat of paint to the inner and outer shield surfaces. 1. The system or gang box ships with three 2.5 liter buckets of white paint, enough to apply two or three coats to the exposed areas of the magnet and shields. The paint is water-based, and dries to the touch in about 30 minutes. For best results prop the doors open, and wait at least 12 hours between coats. Apply the final coat at least a day before you attach the labels.

2. 3.

After the final coat dries, open and close the shield doors to make sure they still fit correctly, and dont make contact with the cyclotron when you close them. Check the gap between the doors. The door surfaces should remain flush.

5-4-6

Install Warning Lights and Door Sensors


The warning light and door sensors are attached to a single mounting plate and ship with the cables in Crate 7, with the cables already attached. The metal blocks that mount on the shield doors ship with the warning light assembly. 1. 2. Use the attached hardware to fasten the Warning Light assembly to the shield. Refer to Illustration 5-39. Run the cables through the raceway to the CSC.

160

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-39 WARNING LIGHT AND DOOR SENSOR LOCATION

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3. 4.

Refer to the Drawing CAC200-52004-00-2 and the Cable list in Appendix A to fasten the cable to the CSC Accelerator Support Connector board. Refer to Illustration 5-38 and Illustration 5-40. a. b. Fasten the metal blocks to the tapped holes in each door. Close the door and push the block forward until it makes the microswitch, then tighten the hardware into place.

ILLUSTRATION 5-40 WARNING LIGHT AND DOOR SENSOR MICROSWITCHES (FRONT AND SIDE VIEW)

A sensor block mounts on each door. Close the door and adjust the block to make the microswitch.

Chapter 5 Assemble the Cyclotron

161

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

5-4-7

Install the Right and Left Door Motors


The right and left shield doors have motors to assist them to open and close. The door controls reside on a pendant that attaches to a panel in the CSC. 1. Drop each shield door motor into the holes in the top of the shield and the door.

ILLUSTRATION 5-41 DOOR MOTOR IN PLACE

2.

The shielded raceway has holes drilled into it for the cables. Make sure the holes have rubber grommets in place to protect the cable.

3. 4.

Run the cables through the shielded raceway to the CSC. Refer to the Drawing CAC200-52004-00-2 and the Cable list in Appendix A to fasten the cables to the CSC Accelerator Support Connector board.

ILLUSTRATION 5-42 DOOR MOTOR CABLE AND RACEWAY

Protect the cables from damage by inserting a rubber grommet or strain relief into the access hole in the raceway.

5. 6.

Locate the Door Control Pendant and plug it into its connector on the CSC panel. Refer to Illustration 5-43. Install all raceway covers.

162

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-43 INSTALL ALL RACEWAY COVERS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

5-4-8

Touch-up Scratches - Paint Electronics Cabinet Surfaces


Use the shield paint to touch up any scratches to the CCAB and RFPG. If necessary, mask off the labels and/or remove hardware and paint the cabinet surfaces.

5-4-9

Attach the Shield Door Handles


The shield door handles consist of two pieces of 182cm conduit, with four holes drilled through each piece. The handles are anchored to the shield surface through standoffs. The shield door hardware ships with the handles. (Also refer to Illustration 5-45.) Remember to place a flat washer against the shield surface before anchoring the standoff and handle to the door.

Chapter 5 Assemble the Cyclotron

163

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 5-44 SHIELD DOOR HANDLES
Standoff Flat Washer

GE HEALTHCARE REV 5

Door anchors pass through standoffs

5-4-10

Attach System Labels


1. 2. 3. Clean off the system components; remove any dirt or marks. Repair any paint scratches, and let dry. Locate the packet of system labels that shipped in Crate 11. If present, use the drawing packed with the labels as a guide. Otherwise, refer to Drawing CAC000-31010-03-2, and parts list CAC00036010, located in Direction 2233001. (The parts lists are located at the back of the manual.)

164

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5 ILLUSTRATION 5-45 MINITRACE DOOR LABEL LOCATIONS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Chapter 5 Assemble the Cyclotron

165

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

166

Chapter 5 Assemble the Cyclotron

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 6 SYSTEM PHASE AND POWER CHECKS


Follow the instructions in this chapter to check the phase of the power into and out of the Mains Distribution Panel and PDU, as well as the phasing and power inputs to the subsystems.

CAUTION

The MINItrace subsystem has two phase sensitive components, the Rotary pump and the SWCU pump. If you apply power and run the pump and motor with the phases swapped, you will damage or destroy them. NEVER apply power to a MINItrace subsystem until you are sure the input power and phasing has been verified. If necessary, ohm out the wiring to the subsystem in question, and correct any cabling errors before you apply power to the component.

6-1

Input Power
The RFPG and CCAB can accept input voltages of 208VAC, 400VAC or 480VAC. The MINItrace Service Manual has a Generic Mains Distribution Drawing, CAA209-56001-xx-2, which currently applies to all three input voltages. Measure the power into the Mains Distribution Panel (MDP) to determine which voltage this site uses. In addition to the MDP circuit breakers, the customer provides one standard power outlet for the MASTER and one for the optional FDG mini lab, if present.

6-2

MASTER Power Checks


Standard power outlet for MASTER present? Check the outlet voltage. Does it match the value on the drawing?

Chapter 6 System Phase and Power Checks

167

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

6-3

Mains Distribution Panel (MDP) Power Checks


Check that the power rating for the RFPG and CCAB circuit breakers are at least 20kVA. 1. 2. 3. Turn OFF all circuit breakers in the back of the CCAB and in the CSC. Open the lower front cover on the RFPG and turn off SW1. Use an oscilloscope or phase sequence analyzer to check the L1, L2,L3 voltage and the phase relationships of the incoming power to the MDP. 4. If necessary, correct any cabling errors at the source.

Record the voltages in Table 6-1 . The MDP has 4 circuit breakers for the standard MINItrace system.

TABLE 6-1 MAINS POWER INPUTS Circuit Breaker# MAIN CB CONT 1 CB1 CB2 CB5 RFPG CCAB Emergency Off The customer supplies the MDP, so its design will vary from site to site. Illustration 6-1 shows an example of an interior view from a site. Recommended: To prevent confusion, label the front and back of each Circuit Breaker. ILLUSTRATION 6-1 MAINS DISTRIBUTION PANEL (AN EXAMPLE OF AN INTERIOR VIEW FROM A SITE) Power to L1/L2 L1/L3 L2/L3 L1/N L2/N L3/N

To prevent confusion, label MDP circuit breakers

168

Chapter 6 System Phase and Power Checks

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

6-4

CCAB Power Checks


The MDP supplies power to the CCAB. The CCAB supplies 400VAC (three phase) and 230VAC (single phase) to the Cyclotron Support Cabinet (CSC) and subsystems within the CCAB and RFPG cabinets. The CSC supplies power to the Cyclotron support subsystems, such as the diffusion pump and Vacuum Control Unit (VCU) 1. 2. Turn off the CCAB main power switch on the MDP. Check that the CCAB transformer is configured to the facility MDP input power: a. b. c. Refer to Illustration 6-3. Open the front and rear CCAB doors. Remove the interior front protective panel to expose the transformer inputs. Refer to Illustration 6-4. Make sure the taps are configured for the on site voltage. (The site electrician should make incoming power connections from the MDP.)

3. 4. 5.

Check the connections between MDP CB1 and CCAB L1, L2, L3 and ground. Turn on MDP CB1 to apply power to the CCAB. Measure the voltage to the transformer. Make sure the L1, L2, L3 power equals the tapped value between phases.

6.

Measure the transformer output voltage. Verify the transformer output measures 400VAC between phases.

7.

Check the incoming voltage to each circuit breaker in the back of the CCAB. Verify the input to each circuit breaker except the PSARC equals 400VAC. Verify the input to the PSARC measures 208VAC.

8. ILLUSTRATION 6-2 CCAB CIRCUIT BREAKERS

Use an oscilloscope or phase sequence analyzer to check the L1, L2, L3 phase relationships. If necessary, correct any cabling errors at the source.

208VAC input

400VAC input

Chapter 6 System Phase and Power Checks

169

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 6-3 CCAB TRANSFORMER

GE HEALTHCARE REV 5

ILLUSTRATION 6-4 CCAB TRANSFORMER TAP CONFIGURATIONS


480VAC from MDP
480 480 480 400 400 400 208 208 208 L3 L2 L1 N PE 208 208 208 400 400 400 N PE 480 480 480 400 400 400 208 208 208 L3 L2 L1 N PE

400VAC from MDP


208 208 208 400 400 400 N PE 480 480 480 400 400 400 208 208 208 L3 L2 L1 N PE

208VAC from MDP


208 208 208 400 400 400 N PE

From MDP

From MDP

From MDP

170

Chapter 6 System Phase and Power Checks

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

6-5

PSMC Power Checks


The CCAB circuit breaker provides power to the PSMC. 1. 2. 3. Refer to Illustration 6-5. Check the power cable connections between the CCAB circuit breakers and the PSMC. Turn off the PSMC main power switch on the back of the CCAB. Measure the power to the PSMC circuit breaker in the CCAB. 4. Check the box if the input power matches the value in Table 6-1 .

Use an oscilloscope or phase sequence analyzer to check the L1, L2, L3 phase relationships. If necessary, correct any cabling errors at the source.

ILLUSTRATION 6-5 CCAB CIRCUIT BREAKERS

Chapter 6 System Phase and Power Checks

171

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

6-6

RFPG Power Checks


CAUTION The RFPG has two different power sources. The MDP panel provides the power connection for the High Voltage circuitry. The CCAB provides the 230VAC to the rest of the components. Whenever you work on the RFPG, remember to turn off the MDP circuit breaker AND the circuit breaker in the back of the CCAB.
1. 2. 3. 4. 5. Remove the front lower panel from the RFPG. Check power cable connections between MDP CB2 and RFPG L1, L2, L3 and ground. Turn off the RFPG main power switch, located in the center of the lower front panel. Turn on MDP CB2 to apply power to RFPG. Measure the L1, L2, L3 power into the RFPG. 6. 7. 8. 9. Check the box if the input power matches the value in Table 6-1 .

Remove the lower back cover to the RFPG. Refer to Appendix G. Compare the tapping configuration on the transformer with the configuration in Appendix G. Use an oscilloscope or phase sequence analyzer to check the L1, L2, L3 phase relationships. If necessary, correct any cabling errors at the source. Turn ON the RFPG main power switch.

10. Replace the front and rear covers.

172

Chapter 6 System Phase and Power Checks

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

6-7

Emergency Power Off Checks


CAUTION Although the Master System is normally NOT powered by a phase passing the Emergency Power Off Circuit Breaker, always shut down the entire Cyclotron system, (RFPG, Vacuum system, Cooling system, GCU and MASTER) before testing the EPO buttons. An abrupt power interrupt may cause severe damage to the Cyclotron subsystems.
1. 2. Press the Emergency Power Off (EPO) button. Use a meter to measure the voltage between L1 and L2 on the EPO circuit breaker. 3. The meter should equal 0 volts.

Use a meter to measure the voltage between L2 and L3 on the EPO circuit breaker. The meter should equal 0 volts.

4.

The customer is responsible for the Mains Distribution EPO Arrangement, but some guidance is given in MINItrace Drawing CAC 209-56001 (See Direction 2233001-100 MINItrace Service Manual Drawings and Parts Lists.)

Chapter 6 System Phase and Power Checks

173

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

6-8

Start up Conditions Checklist


All items in this section must be completed and checked YES before the team arrives to start up the system. Check if Yes Have all power connections been made? Are voltages correct? Has the correct 50/60Hz frequency been selected? Have the compressed air connections been made? Does the air quality meet specifications? Does the compressed air pressure meet specifications? Have the primary cooling water connections been made? Does the cooling capacity meet specifications? Does the system have the correct regulators? Have the He and H2 gas connections been made? Does the gas quality meet specifications? Have the correct gas pressure regulators been installed? Are the gas cylinders on site and correctly connected to the gas panel? Does the system have the N13 target option? If Yes: Have the CH4 gas connections been made? Does the gas quality meet specifications? Has the correct gas pressure regulator been installed? Is the gas cylinder on site and connected to the gas panel? Do the temperature and humidity readings fall within specified limits? Is the air exhaust system installed and working to specification? Is the Master computer connected (via the serial net) to the Accelerator? Is the Service computer included with the system? If Yes: Is the Service PC connected to the system? If No: Is the floppy with the service software on site? Has the service software been loaded on the designated PC?

174

Chapter 6 System Phase and Power Checks

GE HEALTHCARE REV 5 Are the delivery lines connected to the Targets? Is the hot lab ready to receive product?

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Are the Safety Facilities ready for the System Start-up? Are the delivery lines adequately shielded? Is the hot cell installation complete? Is the external safety system ready? Has permission to run the beam been granted?

Chapter 6 System Phase and Power Checks

175

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

176

Chapter 6 System Phase and Power Checks

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CHAPTER 7 START-UP AND CALIBRATION SEQUENCE


This chapter contains the MINItrace subsystem start-up, calibration and functional test procedures. Upon completion of the physical installation, follow this sequence to start up and calibrate the MINItrace system.

DANGER

IF YOU HAVE NOT RECEIVED TRAINING IN RADIATION SAFETY AND MINITRACE SYSTEM SERVICE, DO NOT PROCEED! THIS CHAPTER ASSUMES YOU HAVE RECEIVED PROPER TRAINING, AND ARE AWARE OF THE DANGERS INHERENT IN THE SERVICE, CALIBRATION AND OPERATION OF RADIOCHEMISTRY PRODUCTION SYSTEMS.
Note: At the end of each work day, display one of the MSS system pages, (for example, the Vacuum System or Magnet System page) and select the SYSTEM OFF button to shut down the system in an orderly manner.

7-1

Start-up Sequence
When you complete the corresponding subsystem start-up section. 1. 2. 3. 4. 5. 6. 7. 8. 9. Control System: Starts on page 178 Secondary Cooling Water System: Starts on page 181 Vacuum Chamber Checks: Starts on page 195 Vacuum System: Starts on page 204 Magnet System: Starts on page 212 RF System: Starts on page 216 Helium Cooling System, LTF System and Target Checks: Starts on page 225 Beam Tuning: Starts on page 232 Target System: Starts on page 235

10. Functional Test: Starts on page 244 11. FDG Micro Lab: Starts on page 254

Chapter 7 Start-up and Calibration Sequence

177

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-2

Control System
Use this section to check the system configuration against the actual system, and load the operating software into the GCU. Refer to the MINItrace Service Manual (Direction 2233000) and Master System manual (Direction 2232999) for more detailed information. 1. Locate the plastic folder of system staging information that shipped with the system. 2. This folder also holds the floppy diskette of configuration values, and was probably packed with the rest of the system software.

Switch on the MASTER. If necessary, consult the OEM documentation for power switch locations.

3.

When the MASTER has booted up, switch on power to the GCU. The GCU automatically accesses the MASTER and downloads the necessary software when you turn on power.

4.

Locate and check the MASTER and GCU transceiver boxes. As you turn on the corresponding component, the PWR and SQE LEDs, if present on its transceiver, should light. Not all transceiver boxes have PWR and SQE LEDs. The components cannot communicate until the LEDs on all the transceivers light.

Note: Do NOT login at this time! 5. Press RESET on the GCU to reload the software. 6. Check the transceivers again, and make sure the RCV/XMIT LEDs light or flash. After 2 to 3 minutes, the software is loaded to the CPU on the GCU. The LEDs on the top of the GCU start to light.

Connect your Service PC (MSS) to the MSS connector on the CSC and use the following procedure to check the communication with the CPU. a. b. c. Turn on the Service PC (MSS). After Windows starts, click on the MSS icon. The MSS screen updates to display the MSS and GCU software versions.

7. 8.

Record the software versions on the start-up certificate, located in Appendix H, Table H-8 . Check all the configuration values stored in the GEM_CONF.DAT file on the configuration floppy, sent with the system.

Note: Remember to save any changes you make to the system operating parameters (configuration values) to floppy. The service manual contains the instructions to back-up configuration data.
178 Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 9.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Compare the system Target configuration information with the installed options. Make sure the actual installed Target Types, Target Positions and Tracers Used match the configuration information.

10. If necessary, Log off the MSS (laptop) at this time. 11. Login to the MASTER as MANAGER and enter the default password: Login: manager Password: manag000

12. Open a Unix terminal window and check the current system configuration: Type: tracer-config Check the current configuration, and if necessary, configure your system to reflect the actual installed Target Types, Target Positions and Tracers Used. Close the tracer-config window.

13. Open a Unix terminal window and check the current parameter configuration: Type: param-config Set the Pressure Units, Radiation Units and Flow Units to the customers preferences Add the list of Operators provided by the customer to the system. Close the param-config window.

14. Open a Unix terminal window and check the report handling parameters: Type: handle-reports Type/enter the MASTER, MSS and GCS software versions into the terminal window. Type/enter the Customerss address, telephone number(s), fax number, e-mail address and contact persons name into the corresponding data fields. Type/enter the local GE reps name, office address, telephone number(s), fax number and e-mail address into the corresponding data fields. Close the handle-reports window.

15. Log out from the manager program. a. Login as root: * * b. c. Login: root Password: gemsrot

Open a Unix terminal window, and type/enter: /usr/sbin/shutdown -i5 -y -g0 When the screen prompts you to switch off power, you can safely turn off the workstation.
Chapter 7 Start-up and Calibration Sequence 179

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

16. If construction work is still going on, unplug the workstation and cover it, the keyboard and printer with a dropcloth or a sheet of plastic to keep out the dust. (Or turn the workstation boxes into covers.) Control system Start-up successfully completed.

180

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-3

Water Cooling System


Follow this procedure to bleed all the air from the water lines, and check for leaky connections. Keep a bucket and mop and/or sponge nearby! Chapter 8 of the MINItrace Service Manual (Dir# 2233000) contains more detailed information about the Secondary Water Cooling System. Note: You may fill and bleed the lines as soon as you finish making all the cooling water connections, before applying power to the system. If the compressed air is not yet available, you may be able to fill the and bleed the lines just using the incoming water pressure. When you bleed the target system, things will change, so its your option to wait until the targets are in place, then fill and bleed all eight circuits in one session.

7-3-1

Fill the Secondary Water Cooling System with Water


Note: The system specifications call for the installation of two bleeder valves at the highest point in the chiller lines. The valves should be auto bleeders. Check with the contractor for the actual location(s) and types of valves used on at the facility. If you experience problems with the incoming water, you may have to check these valves. Repeat the following procedure on each cooling water circuit. Do NOT fill the Target cooling circuit until the Targets have been installed. Start with the RFPG circuit and work your way from left to right, skipping the target circuit, if necessary. 1. Check and tighten ALL the hose connections before you fill the circuit with water. 2. Tighten ALL the hose connections on the pressure side of the manifold. (upper tier)

Refer to Illustration 7-1. Check the view port on each flow meter in the lower tier (return side) to make sure you have a clear view of the interior. Sometimes the inner sleeve shifts during shipment. If this happens: a. b. c. Loosen the four hex cap set screws at the top of the meter and remove the cap. Insert your finger into the meter and turn the inner sleeve until you can see the indicator cone, the black rod and the back of the meter. Replace the cap and tighten the set screws.

Chapter 7 Start-up and Calibration Sequence

181

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-1 GOOD AND BAD FLOW METER INTERIORS

GE HEALTHCARE REV 5

Black plastic rod and indicator (cone) should be visible

during shipment, obscuring interior

Good

Bad

182

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-2 CSC VALVE LOCATIONS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

V71 Closed

PR3 Open

PR2 Open V53 Closed C1 all air valves Closed

V80 Closed

V50 Closed

V51 Open V52 Closed

V70 Closed

V2 Open

V30 Closed Bleeder for water pump

V52 Closed

Chapter 7 Start-up and Calibration Sequence

183

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 3. 4. TABLE 7-1 INITIAL VALVE CONDITIONS Valve V53 (Compressed air to expansion vessel) V71 (Bleeder) V80 (Drain) V51 V50 (Water Inlet) V52 (to Filter) V2 V3 V52 (Drain) V30 (Air Inlet) V70 (Bleeder) PR2 PR3 C1 5. Condition Closed Closed Closed Open Closed Open Open Open Closed Closed Closed Open Open

GE HEALTHCARE REV 5

Turn all the pressure and return valves fully counterclockwise to close them. (OFF) Refer to Illustration 7-2. Locate and set all the valves to the condition listed in Table 7-1 .

All air valves closed Remove the hose from the return side of the valve. (Start with RFPG.)

Note: Refer to the illustrations in this procedure for general component locations. Drawing CAC 212-31001-04-1 shows the entire Cooling System Assembly and all the labels (Direction 2233001). 6. 7. Hold a bucket against valve 71 to catch the spray. Refer to Illustration 7-3. Open V71 (bleeder valve). a. b. 8. As the air (and water mist) bleeds out, the lines fill with water. Fill the system until BP1 reads about 0.75 bar.

Open the corresponding valve on the pressure side. (RFPG valve the first time)

184

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-3 TOP PORTION OF THE COOLING SYSTEM ASSEMBLY
BP1

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Watch Tube

V71 (bleeder valve)

V53

C1 tank

V80

Pressure valves

9. ILLUSTRATION 7-4 ADJUST V50

Continue to monitor BP1 (dont peg the needle) and adjust V50 until the BP1 needle steadies somewhere between 0.5 and 0.75bar.

C1 block

Return valves Flow meters

V30 V50

10. As soon as all water and no air comes out of the return side hose, close the valve on the pressure side of that circuit.

Chapter 7 Start-up and Calibration Sequence

185

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 11. Repeat the process on the next circuit, working from left to right.

GE HEALTHCARE REV 5

REMEMBER to skip the target circuit unless the targets are in place.

Note: The targets have one supply line and two return lines. The upper valve labeled, Target, controls the supply to ALL the targets. RFPG cooling circuit filled. (Leave the cover off the TAU until you pressurize the SWCU circuits. See Illustration 7-23 on page 217.) MAGNET cooling circuit filled. RF1 cooling circuit filled. RF2 cooling circuit filled. TARGET cooling circuits filled. VACUUM cooling circuit filled. I-S cooling circuit filled.

7-3-2

Start up the Secondary Water Cooling System


Follow the instructions in this section to start pumping water through the secondary water cooling system. Note: The MINItrace is staged with a 50Hz water pump. If the system goes to a facility with 60Hz power frequency, the pump is changed during the disassembly and packing process. IF your site has 60Hz power, it is very important to make sure the 60Hz pump is present and rotating in the proper direction when you apply power. 1. Check that the primary cooling water temperature falls between 10 and 13oC. 2. If the water temperature falls at the low end of the range, check the hoses for condensation and make sure the pipes to the shunt are well insulated. If the water temperature falls at the high end of the range, you may have to increase the water flow through the system to provide adequate cooling.

Check the secondary cooling water temperature on the panel beneath the VCU. The water temperature should remain steady at 20oC +/- 2 degrees.

3.

Refer to Illustration 7-5. Locate the water pump beneath the return valves in the CSC. Make sure the round frequency sticker on the side cover of the pump matches the on-site power frequency. If a mismatch exists, DO NOT apply power until you replace the cooling pump.

186

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-5 SECONDARY COOLING WATER PUMP


Rotation Direction Indicator F10

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Frequency label location

CAUTION

Do NOT start the water pump until you bleed out any air that may be inside. Failure to bleed the pump before starting it could damage the pump vanes.
4. Bleed the water pump before you start it: a. b. c. d. 5. If necessary, adjust V50 until the water pressure at BP1 falls between 0.5 and 0.75bar. Refer to Illustration 7-2. Place a bucket against the water pump bleeder, to catch any water. Refer to Illustration 7-2. Open the bleeder on the water pump, and let the pressure in the system drive out the air. Close the bleeder valve when only water escapes.

Check the pump phasing. a. b. c. d. Locate the yellow rotational direction sticker on top of the pump. Locate the CP circuit breaker (CB2) and contactor (CON2) in the narrow CSC. Turn on CB2. Briefly turn on and off the VCU Cooling ON button on the control panel as you check the direction of the fan blades. Look through the ventilation-grating on the top of the water pump. Use a flashlight for a better view. If the direction is wrong; turn off the pump and CB2. Locate the source of the phase swap.

e.

Chapter 7 Start-up and Calibration Sequence

187

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6. If the phasing is correct, start the water pump and bleed it a. b. c. d. e. f. g. h. i. j. 7.

GE HEALTHCARE REV 5

Press the VCU Cooling ON button, on the control panel, to start the pump. Run the pump for three seconds. Refer to Illustration 7-2. Stop the pump, open the bleeder, and bleed out the air. Run the pump for six seconds. Refer to Illustration 7-2. Stop the pump, open the bleeder, and bleed out the air. Run the pump for 12 seconds. Refer to Illustration 7-2. Stop the pump, open the bleeder, and bleed out the air. Continue to start the pump for 12 seconds, stop it, and open the bleeder, until NO air escapes. When only water escapes from the bleeder, turn on the pump for two minutes, then stop the pump and bleed it. When NO air escapes after running for two minutes, you have successfully evacuated all the air from the cooling system.

After you finish bleeding the air from the system, leave the pump on, and start to open the cooling circuits. a. b. Check the water wheel, F10, above the pump for motion. Adjust V51 until you can see the blades rotate. (If the wheel looks like a blur, the flow is too fast.) Check the internal CSC components and hoses for water leaks under pressure.

8.

Open one set of pressure and return valves and check the corresponding hose connections for leaks. Continue to open each (completed) circuit in turn, while monitoring all active circuits. Periodically check the hose connections on the active circuits every day, for leaks.

9.

When you open a cooling circuit, turn the return (lower) valve fully clockwise.

10. Refer to Table 7-2 . Adjust the water flow meters in the individual circuits with the corresponding pressure valves. If the water flow falls below an acceptable level, the MSS will display an alarm.

188

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 TABLE 7-2 FLOW METER SETTINGS Pressure Valve Label RFPG MAGNET RF1 RF2 TARGET TARGET PSMC VACUUM I-S Return Valve/Meter Label RFPG MAGNET RF1 RF2 TARGET S TARGET D PSMC VACUUM I-S

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Minimum (l/min) 4 8 8 2 2 3 0.7

Average (l/min) >15 5-6 10-12 10-12 3 3 4-8 4 1

11. During normal system operation, the watch tube should remain about half filled and BP1 should read about 0.5bar. Refer to Illustration 7-3, Illustration 7-4, and Illustration 7-6. a. 1. 2. Adjust BP1 to 0.5mbar by changing the pressure in the C1 tank. Locate the EXP (expansion) valve on the C1 block. If the BP1 pressure is too high: Push the blue sleeve against the C1 block to release the pressure on the hose. Open V53 to release pressure in the C1 tank until BP1 drops to 0.5mbar. If the BP1 pressure is too low: Pull the blue sleeve away from the C1 block to pressurize the hose. Open V53 to increase pressure in the C1 tank. Adjust the watch tube level with V50 and V80. If the watch tube level is too low: Adjust V50 until the water rises about halfway up the watch tube. If the watch tube level is too high: Locate the open end of the hose attached to V80 and place it in a bucket. Adjust V80 to drain the excess water from the watch tube.

3. b. 1. 2.

12. Continue to monitor the secondary cooling water temperature on the panel beneath the VCU. It should remain steady at 20oC +/- 2 degrees, with no condensation on the lines. Tip: Refer to Illustration 7-6. If you need compressed air, attach the hose to one of the unused valves on the back of the C1 block. Slide the blue sleeve away from the C1 block to turn on the compressed air.

Chapter 7 Start-up and Calibration Sequence

189

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-6 COMPRESSED AIR LINE

GE HEALTHCARE REV 5

C1 Tank

Check C1 for condensation during the first few days of operation.

C1 Block

7-3-3

Check the Cooling Water Temperature Sensor


The MINItrace system ships with the cooling water temperature sensor pre-programmed to trigger an alarm when the water temperature rises above 25 degrees centigrade. Follow the procedure in this section to make sure the programming survived shipment. IF the temperature sensor lost its presets, follow the procedure in Section 7-3-3-1 to reprogram it. 1. 2. 3. Refer to Illustration 7-7. Press and hold the SEL button about 2 seconds, until the temperature display starts to flash. Press the arrow buttons to change the display value to 25. Press the SEL button to accept the displayed value. The alarm level is now set to 25oC

190

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-7 WATER TEMPERATURE SENSOR


PRG/Mute button

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

SEL button

UP and Down arrows

4.

IF you cannot set the alarm level, the sensor has lost its programming. Proceed to Section 7-3-3-1, to program the cooling water temperature sensor.

7-3-3-1

Program the Cooling Water Temperature Sensor


IF the water temperature sensor lost its presets, follow the procedure in this section to program the sensor. Notice You may leave the setup program at any time, without saving the new values, by pressing and holding any button for 60 seconds. 1. 2. 3. Refer to Illustration 7-7. Press and hold both the PRG MUTE and SEL buttons for at least 5 seconds, to display the configuration menu. Press the UP arrow to display the value, 22. Press SEL.

4. 5. 6. 7. 8. 9.

The display changes to

= /C

Press the UP arrow until the display changes to rd. Press the SEL button to display the rd value. Use the UP/DOWN arrow buttons to change the display to 0.1. Press the SEL button to confirm the new value. Press the DOWN arrow button until the display changes to A0. Press the SEL button to display the A0 value

10. Use the UP/DOWN arrow buttons to change the display to 0.1.
Chapter 7 Start-up and Calibration Sequence 191

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 11. Press the SEL button to confirm the new value. 12. Press the DOWN arrow button until the display changes to AL . 13. Press the SEL button to display the AL value. 14. Use the UP/DOWN arrow buttons to change the display to 00. 15. Press the SEL button to confirm the new value. 16. Press the DOWN arrow button until the display changes to AH. 17. Press the SEL button to display the AH value. 18. Use the UP/DOWN arrow buttons to change the display to 05. 19. Press the SEL button to confirm the new value. 20. Press the DOWN arrow button until the display changes to Ad. 21. Press the SEL button to display the Ad value. 22. Use the UP/DOWN arrow buttons to change the display to 00. 23. Press the SEL button to confirm the new value. 24. Press the DOWN arrow button until the display changes to H1. 25. Press the SEL button to display the H1 value. 26. Use the UP/DOWN arrow buttons to change the display to 01. 27. Press the SEL button to confirm the new value. 28. Press the DOWN arrow button until the display changes to H2. 29. Press the SEL button to display the H2 value. 30. Use the UP/DOWN arrow buttons to change the display to 03. 31. Press the SEL button to confirm the new value. 32. Press the PRG button to confirm all the program values.

GE HEALTHCARE REV 5

33. Return to Section 7-3-3, to set the water temperature sensor alarm value.

192

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-3-4

Check the Shunt Valve Temperature Control Adjustment


This section contains the instructions to set and test the shunt valve temperature control. Illustration 7-8 shows the control unit with labels that correspond to steps in this procedure. 1. Ramp up the magnet to put a heat load on the system, to check the three-way valve operation. If necessary, refer to 7-6 for detailed instructions. Start the magnet at a low value of between 30 to 50 amps, to create a small heat load of 5 to 10kW.

ILLUSTRATION 7-8 TIDUR SHUNT VALVE TEMPERATURE CONTROL


Step 11 Step 9 Steps 8, 9 and 12 Steps 7 and 10 Step 4

Step 3

2. 3. 4. 5. 6. 7. 8.

Refer to Illustration 7-8. Locate the TIDUR shunt valve, in the Cyclotron Support Cabinet. If necessary, disable the timer by setting the TIDUR switch to the 0 position. Turn the right-most knob (labeled with ) to 0. Refer to Illustration 7-7. Record the value currently displayed on the water temperature sensor: __________. Subtract 20 from the value recorded in Step 5: ___________. Set the middle knob (with the sun icon) to the value you recorded in Step 6. Remove the black cover from the hole next to the left-most knob (with the moon icon).

Chapter 7 Start-up and Calibration Sequence

193

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 9.

GE HEALTHCARE REV 5

Insert a screwdriver into the hole, and adjust the potentiometer until the center LED (labeled 0) turns green.

10. Set the middle knob (with the sun icon) back to the 0 position. 11. Adjust the white potentiometer (upper left side of the device) to provide a 10 to 20 second pause between shunt motor operations. Make sure the shunt motor does NOT oscillate.

12. Replace the black cover over the potentiometer access hole.

194

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-4

Vacuum Chamber Checks


CAUTION Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize conditioning time, and prevent the possible contamination of the vacuum chamber.
Clean the cyclotron room, then open the vacuum chamber and follow the instructions in this section to: Inspect the vacuum chamber and remove any packing material. Install the shield wedges that were removed during system disassembly to accommodate the magnet transport shield. Check the calibration and function of the extraction system. Inspect the foils for damage. Check the function of the flip-in probe. Inspect the center region and Ion Source.

Note: The MINItrace Service Manual (Dir# 2233000) contains more detailed Vacuum, Diagnostic and Extraction System information.

7-4-1

Clean the Cyclotron Room and Accelerator Surfaces


Prepare to open the vacuum chamber: Remove any debris from the Cyclotron vault. Vacuum any dust or dirt from the floor, cable raceways and/or shields. Arrange to have the floor damp mopped to remove any traces of dust or dirt. Clean the exterior surfaces of the magnet and all accessible shield surfaces.

7-4-2

Inspect the Vacuum Chamber CAUTION Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior surfaces of the chamber. Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize conditioning time, and prevent the possible contamination of the vacuum chamber.

Chapter 7 Start-up and Calibration Sequence

195

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 1.

GE HEALTHCARE REV 5

The system ships with a ratcheting socket wrench to open the vacuum chamber door. Locate the wrench and open the vacuum chamber door.

2. 3. 4. 5. ILLUSTRATION 7-9 BLIND FLANGES

Inspect the interior for obvious damage. Remove any packing materials and brush out any large particles from the interior. Make sure a blind flange covers every unused or unoccupied port. (Illustration 7-9) Close the vacuum chamber, or proceed to the next subsection.

7-4-3

Install the last four Shield Wedges


The 13 shield wedges were removed during system disassembly, and the magnet transport shield was attached to the cyclotron by the holes tapped into the assembly to hold the wedges in place. You have to open the vacuum chamber door to attach the remaining four wedges.

CAUTION

Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior chamber surfaces. Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize

196

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

conditioning time, and prevent the possible contamination of the vacuum chamber.
1. Refer to Illustration 5-1: Inner shield Assembly on page 128. 2. 3. 4. The shield wedges should be labeled with the parts list call-out number.

Locate the last four shield wedges that were packed with the plastic shields in Crate 11. Open the vacuum chamber door. Attach the following four shield wedges to the vacuum chamber door with the washer and the M12 bolt that measures 202mm from end-to-end (NOT thread length): Shield Wedge 15 (rests against the door) Shield Wedge 9 Shield Wedge 14 Shield Wedge 13

7-4-4

Check the Extraction System


Follow the instructions in this section to inspect and test the extraction system operation.

CAUTION

Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior chamber surfaces. Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize conditioning time, and prevent the possible contamination of the vacuum chamber.
1. 2. Open the vacuum chamber. Refer to Illustration 7-11. Compare your system to the illustration, to determine whether the MINItrace has a single extraction system, with one motor, or a dual extraction system with two extraction motors and a balance motor.

CAUTION

The foils are fragile!


3. 4. 5. Check the foils. If you see any damage, wait until you complete the extraction and diagnostic checks to replace it/them. (Spares were shipped with the system.) Check the mechanical assembly for loose or damaged parts. Make sure the wires are centered over the pulleys, and appear taut.

Chapter 7 Start-up and Calibration Sequence

197

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6.

GE HEALTHCARE REV 5

Connect the Service PC (MSS) to the MSS port on the CSC panel and login as MSS. Move the MSS close to the vacuum chamber, so you can watch the extraction system move when you give the commands. During the following tests, listen and watch for signs of binding or damage.

Notice

NEVER touch the interior of the vacuum chamber with your bare hands. The oil residue from your skin will outgas and cause sparking when you apply RF.

7-4-5

Calibrate the Extraction Motor.


1. 2. Check that the extraction system operates smoothly. Use a current source (resistance tester or multimeter set to measure ) to induce a current in the flip-in probe, extraction foils, collimators and target, and compare the actual values to the values on the MSS DIAGNOSTIC SYSTEM page. a. b. Attach the ground lead to some part of the vacuum chamber. Read the resistance on the meter, and the current on the MSS DIAGNOSTIC SYSTEM page, while you touch the (+) probe to the each of the following components: > > > > Flip-in probe: 10/20k Collimators: 10/20k Targets: 10/20k Extraction foil holders: 5 (1/2 the current)/20k

CAUTION

If you notice any jerky motion, or slack in the cables when you change foil holder positions, immediately stop and consult the Service Maintenance Manual (2233000).
ILLUSTRATION 7-10Open the MSS DIAGNOSTIC SYSTEM page, and set the Foil Holder position 1 to the halfway point (50%). a. Watch for smooth operation in the counterclockwise direction. b. c. d. Move the Foil Holder position 1 to 80%. IF the foil holder appears to move smoothly, continue to change the position by 5% steps until it reaches the 100% position and flips to the second foil. Make sure the holder doesnt drive into the physical limit at the 100% position, and that the foil holder turns over completely. (Check the position with your finger.)

198

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-11 SINGLE AND DUAL EXTRACTION SYSTEMS


Single Extraction System

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Dual Extraction System

Chapter 7 Start-up and Calibration Sequence

199

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 3.

GE HEALTHCARE REV 5

Refer to Illustration 7-11. IF the MINItrace has the Dual Extraction option: a. b. c. d. e. f. Repeat Illustration 7-10 for Foil Holder position 2. (Foil holder 2 only has one foil.) Set the Balance to 80%. Make sure the assembly drives toward the center of the chamber. Set the Balance to 50% to drive the assembly away from the center. Set the Balance to 100% and watch the assembly move toward the center. Make sure the wires remain under tension (no slack) during the entire process, and that the foil holder doesnt drive into the physical limit. (After it reaches the 100% position and flips to the second foil, the foil holder is about 1mm away from the physical limit.)

4. 5. 6. 7.

Display the MSS MAIN MENU. Click the MOTOR CALIBRATION icon to display the MOTOR CALIBRATION page. Click on FOIL #1 to select Foil Holder position 1. Click on CALIBRATE to drive the Foil Holder to the 100% position. Check for smooth operation of the foil system as it moves to the 100% position. Watch the current value on the MSS change as the assembly moves. Make sure it ramps up smoothly.

8.

IF the MINItrace has the Dual Extraction option: a. b. c. d. Click on FOIL #2 to select Foil Holder position 2. Click on CALIBRATE to drive the Foil Holder to the 100% position. Check for smooth operation of the foil system as it moves to the 100% position. Watch the current value on the MSS change as the assembly moves. Make sure it ramps up smoothly.

9.

IF the MINItrace has the Dual Extraction option: a. b. c. d. Click on BALANCE. Click on CALIBRATE. Check for smooth operation of the foil system. Watch the current value on the MSS change as the assembly moves. Make sure it ramps up smoothly.

200

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 10. You may repeat the calibration process as many times as you like. When finished: a. b. c. d. e. Return to the MSS DIAGNOSTIC SYSTEM page. Set the Foil Holder position 1 to 20%. Manually flip the foil holder back to the first position. Dual extraction systems: Set the Balance to 5.0. Dual extraction systems: Set the Foil Holder position 2 to 50%.

Extraction System Checks successfully completed.

7-4-6

Check the Diagnostic System


Follow the procedure in this section to check the motion of the flip-in probe and the diameter of the collimator ports

CAUTION

Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior surfaces of the chamber. Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize conditioning time, and prevent the possible contamination of the vacuum chamber.

7-4-6-1

Check the Flip-In Probe Motion


Measure the coil voltage while activating the Flip-in probe. 1. 2. Open the vacuum chamber. Connect the Service PC (MSS) to the MSS port on the CSC panel and login as MSS. 3. Move the MSS close to the vacuum chamber.

Check the mechanical motion of the Flip-in probe: Move the Flip-in probe coil back and forth with your (gloved) finger. Make sure the coil moves freely, without binding; move it all the way in and release. Make sure the coil moves back out, without sticking.

4. 5.

Display the BEAM CONTROL page on the MSS. Click on PROBE IN. The probe will not move with the vacuum chamber door open.

Chapter 7 Start-up and Calibration Sequence

201

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6.

GE HEALTHCARE REV 5

Refer to Illustration 7-12. Measure the coil voltage at the coil connectors. The voltage should read 12 to 15VDC.

ILLUSTRATION 7-12 MEASURE THE FLIP-IN PROBE VOLTAGE

Coil connections

7-4-7

Inspect the Center Region and Ion Source. CAUTION Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior surfaces of the chamber. Remove any tools and test equipment from the interior, and close the door to the vacuum chamber any time you leave the system for more than 15 minutes. Keep the MINItrace Cyclotron room as clean as possible, to minimize conditioning time, and prevent the possible contamination of the vacuum chamber.
1. 2. Open the vacuum chamber. Inspect the Ion Source and Dee assemblies for signs of physical damage. 3. Do not check the Ion Source and Dee adjustments at this time.

Check the physical diameter of the collimator openings with calipers. Each collimator port diameter should equal 6mm +/-1mm.

4. 5.

Inspect the foils for damage. If you notice any damage, replace the foil(s) at this time. Follow the procedure in Direction 2233000 to replace a damaged foil.

202

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

CAUTION

Carefully inspect the interior of vacuum chamber before you close the door. REMEMBER to remove all your tools and test equipment from the interior. Wipe all the chamber surfaces that make contact with the o-ring with a lintfree cloth and alcohol. Do NOT clean the O-ring with alcohol! Remove any dust from the surfaces and inspect for marks. Apply a light coat of Apiezon-M vacuum grease to the o-ring. This is the last time the vacuum chamber will be open before you bring up the vacuum and apply RF.
6. Close the vacuum chamber, and fasten the door. REMOVE any tools and test equipment from the interior. Inspect the interior surfaces and remove any dust or marks with a lint-free cloth, moistened with alcohol. (From the installation gang box) Wipe all chamber surfaces that make contact with the gasket seal (O-ring), with a lint-free cloth, moistened with alcohol. Do NOT wipe the O-ring with alcohol! Apply a light coat of Apiezon-M vacuum grease to the o-ring. (The tube of vacuum grease is in the installation gang box.)

Diagnostic system checks successfully completed.

Chapter 7 Start-up and Calibration Sequence

203

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-5

Vacuum System
Follow the instructions in this section to bring up vacuum in the cyclotron. Chapter 9 of the MINItrace Service Manual (Direction 2233000) contains more detailed information. 1. Refer to Illustration 7-13. Check the oil level in the rotary pump site glass, it should fall between the two markings. If the site glass appears low, top off the with BALZERS P3 oil.

Note: The following steps require 2 people, one person at the rotary pump and one person to turn the rotary pump on and off from the VCU Cooling panel. ILLUSTRATION 7-13 ROTARY PUMP COMPARTMENT

Operating fluid filler and drain screw

Rotary pump site glass

Rotary pump inlet

2.

Check the rotary pump rotation direction. Refer to Illustration 7-13. a. b. Unfasten the wing nut and disconnect the flexible metal hose from the rotary pump inlet. Remove the O-ring from the coupling.

204

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 Notice

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 If the pump rotates in the wrong direction, oil will come out of the rotary pump inlet, so only turn on the pump for brief periods of time. c. d. e. f. g. Turn on RP CB1 in the narrow CSC. Press the MANUAL button on the VCU Vacuum System. Place a plastic lid or similar object against the rotary pump inlet, while the other person presses the RP button on the VCU to start the rotary pump. You should feel a definite suction when the rotational direction is correct. If you feel air blowing out, the phasing is incorrect. If this is the case, check the phase of the incoming power and correct the problem at its source. Then, repeat Step 2 to make sure the pump rotates in the correct direction.

3. 4.

Wipe any dust or oil residue from the open ends of the flexible metal hose and rotary pump inlet. Apply a light coat of vacuum grease to the O-ring, and reconnect the rotary pump inlet hose to the diffusion pump. The tube of vacuum grease is in the installation gang box.

5.

Check that the cooling water hoses are correctly and securely connected to the diffusion pump. Cold water enters the top of the diffusion pump, and the heated water exits from the bottom of the pump. Open the VACUUM PUMP pressure and return valves in the SWCU in the CSC. Refer to Illustration 7-14. Check the 6mm blue compressed air line connections to the Backing Valve, Roughing Valve and High Vacuum Valve.

6. 7.

Note: The customer usually supplies the compressed air, either by a dedicated unit, or as a feed from the in-house system. If necessary, contact the facility maintenance/ engineer to turn on the compressed air supply. Notice IF the compressed air pressure falls below the limit set on the compressed air interlock on the C1 block (Illustration 7-15) the interlock trips and you cannot operate the system in automatic mode, but it will work in manual mode. If you encounter this problem, call for support.

Chapter 7 Start-up and Calibration Sequence

205

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-14 CHECK DIFFUSION PUMP CONNECTIONS

GE HEALTHCARE REV 5

Penning Gauge Pirani 2 to Diffusion Pump baffle High Vacuum Valve Switch (HVV SW) High Vacuum Valve (HVV)

Backing Valve (BV)

Pirani 1 Roughing Valve (RV)

DP Temp Switch Rotary Pump

8.

Refer to Illustration 7-15. Switch on the compressed air supply. a. b. c. Locate the C1 block in the CSC, next to the SWCU. Slide the blue sleeve labeled, VAC. S., away from the block to turn on the air. Slide the blue sleeve labeled, HVV, away from the block to turn on the air.

206

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-15 C1 COMPRESSED AIR BLOCK


Compressed air interlock If this trips, the Vacuum system will NOT work in automatic mode.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

VAC. S.

HVV

9.

Make sure the cooling system is running. If necessary, press the VCU Cooling panel ON button to start the system.

10. The MINItrace VCU and TPG 300 panels are located in the narrow Cyclotron Support Cabinet, above the door pendant control plug. Press the VCU MANUAL button.

Note: The following steps require two people, one to press the buttons and watch the status LEDs on the VCU panel change from red to green (to red), and one next to the diffusion pump to watch and listen for valve activity. Close the vacuum chamber door to satisfy the roughing valve interlock, but leave the shield doors open. ILLUSTRATION 7-16 OLD AND NEW VALVE BODY STYLES

Indicator turns green

Chapter 7 Start-up and Calibration Sequence

207

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 11. Test the function of the valves from the VCU panel: a.

GE HEALTHCARE REV 5

Press the BV button to enable the Backing Valve and turn the BV LED to green. * The indicator turns green or the piston extends from the back of the Backing Valve.

b. c.

Press the BV button a second time to disable the Backing Valve and turn the corresponding LED on the VCU from green to red. Press the RV button to enable the Roughing Valve and turn the RV LED to green. * The indicator turns green or the piston extends from the back of the Roughing Valve.

d.

Press the RV button a second time to disable the Roughing Valve and turn the corresponding LED on the VCU from green to red.

WARNING

THE HVV VALVE OPENS SLOWLY AND CLOSES QUICKLY. KEEP YOUR FINGERS AWAY FROM THE HVV VALVE AREA DURING THIS OPERATION.
e. Press the HVV button to enable the High Vacuum Valve and turn the HVV LED from red to green. * The HVV valve starts to move. f. g. h. Press the HVV button a second time to disable the High Vacuum Valve, and turn the corresponding LED from green to red. Press the VV button to enable the Vent Valve and turn the VV LED to green. Press the VV button again to disable the valve and turn the VV LED red. * The other person should hear the vent disable. 12. Press the MANUAL button to toggle the VCU to automatic mode 13. Adjust the Pirani 1 ATM pressure: a. b. c. d. 1. 2. Disconnect the Pirani at the cyclotron, nearest the backing valve, and read the A1 sensor the TPG 300 panel, located above the VCU in the CSC. If necessary, press the TPG 300 SENSOR button to display the A1 reading. A1 should read 1.0 x 10+3mbar (atmospheric pressure at sea level). Refer to Illustration 7-17. To adjust the Pirani ATM: Loosen the four screws on the front panel of the TPG 300 and carefully pull the unit out of the rack to access the PI 300 modules. Looking from behind, the left-most TPG 300 board has two sets of trim pots, one set per Pirani. (The top pot in each set is labeled ATM and the bottom pot is labeled High Vac.)

208

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 3.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Adjust the topmost ATM pot, until the A1 sensor on the TPG 300 panel displays 1.0 x 10+3mbar. e. Reconnect the Pirani.

ILLUSTRATION 7-17 PIRANI ADJUSTMENT POTENTIOMETERS

Pirani 1 adjustment pots

Pirani 2 adjustment pots

14. Adjust the Pirani 2 ATM pressure: a. b. Press the TPG 300 SENSOR button to display the A2 reading. Disconnect the Pirani attached to the vacuum chamber, and read the A2 display. A2 should read 1.0 x 10+3mbar (atmospheric pressure at sea level). Refer to Illustration 7-17. To adjust the Pirani 2 ATM: If necessary, follow the instructions in the previous step to access the PI 300 module and trim pots. Adjust the ATM pot from the bottom set of pots, until the A2 sensor on the TPG 300 panel displays 1.0 x 10+3mbar. e. Reconnect the Pirani to the vacuum chamber.

c. d. 1. 2.

15. Make sure the SWCU pump is running, the VACUUM PUMP pressure and return valves are open and the flow meter adjusted. (Table 7-2 on page 189). 16. Turn ON the DP CB3 circuit breaker. Make sure the DIFF.PUMP contactor (CON 3) energizes.

Chapter 7 Start-up and Calibration Sequence

209

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 17. Press the STAND BY button to start the roughing down process. The RP indicator on the VCU changes from red to green.

GE HEALTHCARE REV 5

After a few seconds, the BV indicator on the VCU changes from red to green.

18. Read the A1 pressure on the TPG 300 panel. Press the SENSOR button until the A1 value appears on the display. When the pressure reaches 2.0 x 10-1mbar, the power switches ON to the diffusion pump and the DP indicator on the VCU changes from red, to flashing green, and continues to flash while the rotary pump pumps down the diffusion pump.

19. After 30 +/- 5 minutes, the diffusion pump LED on the VCU front panel turns green. 20. If the Diffusion Pump is OK, press the PUMP button to start the vacuum sequence. The BV indicator turns red and the RV indicator on the VCU changes from red to green. When A2 pressure reaches 7.0 x 10-2, the roughing sequence ends. The HVV opens and the Diffusion pump takes over.

Note: If the DP LED flashes for 40 minutes or longer, the DP temperature switch may be bad.

CAUTION

The diffusion pump becomes hot enough to instantly blister the skin.
21. When the A2 pressure reaches 1.0 x 10-3mbar, the penning gauge switches on and the TPG 300 panel display automatically changes to the B1 reading. IF the TPG 300 display does not switch from the A2 to the B1 display within 5 minutes, adjust the Pirani 2 High Vac trim pot. Refer to Step 13 for instructions to access the PI 300 module. Slowly turn the bottom-most pot (High Vac) until the display changes to the B1 reading. (You will fine tune this adjustment later.)

22. Twenty to thirty minutes later, check the B1 sensor display at the TPG 300 panel. The pressure should read 4.0 x 10-5mbar or less* (*standard operating pressure is <6.0 x 10-7mbar, but it takes 2 or 3 days to reach this level.) 23. If you adjusted the Pirani 2 during, Step 21, fine tune the adjustment at this time: At the Pirani 2 PI 300 module, slowly turn the bottom (High Vac) pot until the display reads ur x 10-4mbar (ur = under range). Gently tweak the pot back and forth between the 1.0 x 10-4mbar and ur x 104

mbar readings until the display just changes to the ur x 10-4mbar reading.

210

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 24. Record the following parameters in the start-up certificate. (Appendix H) Heating time (START to Diffusion pump OK) Pump down time (Diffusion pump OK to vacuum OK) Backing pressure (A1) Tank pressure (B1) Cooling water temperature (panel above the Door Pendant Control plug in CSC)

Vacuum system Start-up successfully completed.

Chapter 7 Start-up and Calibration Sequence

211

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-6

Magnet System
Follow the procedures in this section to apply current to the magnet and check the magnet interlocks. Chapter 11 in Direction 2233000 contains more detailed instructions. 1. Verify that all hoses, power, water interlock and signal cables have been installed between the PSMC, CSC and Magnet.

CAUTION

Make sure the high current cables are securely fastened, and insulation protects all metal contact surfaces to prevent shorts.
2. Connect the MSS to the port beneath the Door Pendant Control plug in the CSC.

ILLUSTRATION 7-18 MSS PORT IN THE CYCLOTRON SUPPORT CABINET

MSS connection on CSC

3.

Check the MSS MAGNET SYSTEM page for magnet system error messages. Reset if necessary. If the error continues, check the interlock chain.

4.

Check the vacuum chamber door switch function. Press the VENT button on the VCU panel to vent the vacuum chamber. Use the Door Pendant Control to open the shield doors. Open the door to the vacuum chamber, and check for a response on the MSS MAGNET SYSTEM screen. Close the vacuum chamber door.

5.

Check the Water Flow interlock function by slowly closing off the pressure valve in the Cyclotron Support Cabinet (CSC). Check the water flow status on the MSS MAGNET SYSTEM page for alarms. Open the valve until the water flow meter pressure returns to the previous level.

212

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 6.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Refer to Illustration 7-19. Check the magnet coil (cyclotron) temperature switch function. Unplug the cable to one of the temperature switches on the magnet. Check that the interlock alarm displays on the PSMC.

ILLUSTRATION 7-19 MAGNET POWER, COOLING AND COIL TEMPERATURE SWITCH CONNECTIONS

Cooling Hoses

Temperature Switch Location Cooling Hoses Magnet Power connections (to Contact plate in raceway attached to inner shield cavity)

7.

Refer to Illustration 7-19 and Illustration 7-20. Attach a multimeter (voltage and frequency meter) to the magnet high current connections at the cyclotron or PSMC.

Chapter 7 Start-up and Calibration Sequence

213

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-20 MAGNET POWER CABLE CONNECTIONS TO THE PSMC

GE HEALTHCARE REV 5

Attach DC Clamp-on Ammeter here (Clamp around both + wires)

8. 9.

Switch on the water-cooling system from the VCU panel on the CSC. Use the MSS software to reset all the interlocks. a. b. c. Display the MAGNET SYSTEM page, and verify all the interlocks are green. Click the magnet ON. Click on the UP arrow key to increment the current up to 10A.

10. Refer to Illustration 7-20. Use the DC clamp-on ammeter to read the current, and the voltmeter to read the voltage at the magnet. Record the current, the DC voltage and ripple in the start up appendix. (Appendix H)

11. Monitor the MSS screen and VCU panel for heat faults and alarms. Continue to check all the cooling lines for water leaks and condensation.

12. Display the MAGNET SYSTEM page and click OFF. Verify the magnet ramps down to 1A before the PSMC turns off.

13. Display the MAGNET SYSTEM page and click ON. a. b. Type 130 into the Set Current field to set the Magnet to 130A. The current should ramp up to 150A, stay there for one minute, then ramp down to 130A.

214

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 14. Monitor the MSS screen and VCU panel for heat faults and alarms. Continue to check all cooling lines for water leaks and condensation.

15. Check the voltage and current at the magnet. Record the current, the DC voltage and ripple in the start up certificate.

16. Type 150 into the MAGNET SYSTEM page Set Current field, to increase the current to 100%. The current should ramp up 150A, then stop.

17. Check the voltage and current at the magnet. Record the current, the DC voltage and ripple in the start up certificate.

18. Compare the current and voltage values you read at the magnet to the ones displayed on the Service PC (MSS). 19. Check the water temperature at the cooling water panel, beneath the VCU panel. The temperature should not increase more than 4oC. (If it does, something is wrong with the temperature regulation circuit and shunt valve.)

20. Use the MSS MAGNET SYSTEM page software to turn OFF the PSMC. Verify the magnet ramps down to 1A before the PSMC turns off.

21. Display the MAGNET SYSTEM page and click ON. Type 130 into the Set Magnet Current window, to set the current to 130A.

22. Monitor the following sequence" The current ramps up to a maximum of 150A, with a ramp speed of 1A/second. The current remains at 100% for 60 seconds, then ramps down to the set current.

23. Display the MAGNET SYSTEM page and click OFF. 24. Check that the current ramps down at a rate of 1A/second, to zero, before the PSMC finally switches off. 25. Disconnect the multimeter and DC clamp-on ammeter. 26. Restore all panels and close all covers. Magnet Start up successfully completed.

Chapter 7 Start-up and Calibration Sequence

215

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-7

RF System
DANGER DISCHARGE CAPACITORS WITH THE GROUNDING HOOK ANY TIME YOU OPEN THE LOWER PART OF THE RFPG.
Follow the procedure in this section to: Check the TAU for water leaks. Check the TPSU power setting. Apply power to the RFPG cabinet. Apply RF to the Dees.

For more detailed instructions, refer to Chapter 11 in Direction 2233000. 1. 2. Turn OFF the RFPG Circuit Breaker on the Mains Distribution Panel. Open the rear door of the CCAB. 3. Turn OFF the RFPG circuit breaker.

Refer to Illustration 7-21. Remove the TPSU front and rear covers. Turn OFF the TPSU Main Power Switch.

ILLUSTRATION 7-21 TPSU MAIN POWER SWITCH

4.

Inspect the TPSU for damage or loose parts. Check all the fast-on terminals for loose connections or broken wires.

5. 6.
216

Refer to Illustration 7-22. Remove the upper RFPG front and rear covers. Remove the front TAU cover.

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-22 TAU (FRONT VIEW)

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7. 8. ILLUSTRATION 7-23 TAU SHORTING MECHANISM

Check the TAU for damaged or loose parts. Refer to Illustration 7-23. Check the shorting mechanism for free movement.

Press here

Chapter 7 Start-up and Calibration Sequence

217

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 9. Check the flow meter at the back of the RFPG cabinet. Make sure the flow rate is higher than 16 liter/minute.

GE HEALTHCARE REV 5

10. Replace the front TAU cover. 11. Replace the front and rear RFPG covers. 12. Flip the TPSU Main Power Switch to the ON position. 13. Flip the RFPG control power switch in the CCAB to the ON position. 14. Refer to Table 7-3 . Compare the LED Matrix to the lights on the SCU in the CCAB. 15. The LEDs in the SCU measuring display should also light. All measurement indicators should display values near zero, EXCEPT the Dee volts reference, which should display a value of about 8.0.

16. Flip the RFPG circuit breaker in the MDP to the ON position. 17. Display the RFPG page on the MSS. Select STANDBY mode.

18. Verify the following values appear on the SCU measuring unit display: Heater voltage about 7.5 to 7.7v

Wait one minute, then check the for the following values: Grid voltage = -250v Screen voltage = 750v Anode voltage = 7.3 to 8.0kv Grid current = -114mA Screen current = 22mA Anode current about 0.07A

19. Refer to Table 7-4 . Compare the LED Matrix to the lights on the SCU in the CCAB. 20. Check the vacuum level on the SCU measuring display. If the value falls below 10-6 mbar, click NORMAL to start RF.

21. Set the Dee Voltage to 17kV. 22. After the voltage stabilizes, and remains stable for 2 minutes, increase the D- voltage by 1kV steps to 25kV. Increase by 1kV, allow to stabilize for 2 minutes, then step up 1kV.

218

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 23. When the voltage stabilizes at 25kV, check the SCU display for the following values (+/-10%): RF forward power: 4.3kW Reflected power: 0.05kW DPA Forward power: 8.8 = 88W DPA Reflected power: 0.15 = 15W Grid current: -114mA Screen current: 27mA Anode current: 1.5A

24. Increase the D- voltage by 1kV steps to 35kV.

Chapter 7 Start-up and Calibration Sequence

219

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 TABLE 7-3 RFPG LED MATRIX - OFF STATUS Load Phase Detector (Position 4 TE) Signal and Status System Controller (Position 12 TE) Signal and Status Tube Controller (Position 36 TE) Signal and Status Interface 1 (Position 44 TE) Signal and Status 1 2 3 4 1 2 3 4 1 2 RVL (INT) 1 +15V 2 -15V 3 +5V 4 +24V l l l l 3 DVR CLOSE 4 DVR OK 5 DET LIMIT 6 RF ENABLE 7 INT LOOP SELECT 8 -15V OK (SCU) l 5 6 7 8 9 10 11 12 13 14 15 TC READY TUBE ON TUBE READY DOOR ALARM EARTH ALARM WATER ALARM AIR FLOW ALAR HEATER ALARM GRID ALARM SCREEN ALARM EHT ALARM FAN ON HEATER ON GRID ON SCREEN ON l l l l l l l l l l 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 PULSE MODE FIXED MODE RESET NORMAL MODE STANDBY SPARK ERROR GRID NORMAL SCREEN NORM. EHT NORMAL HEATER NORM. ------WATER FLOW AIR FLOW DOOR INTLOCK l l l l l 9 10 11 12 13 14 15 16 17 18 19 HTL +24 RF INHIBIT l

GE HEALTHCARE REV 5

Interface 2 (Position 52 TE) Signal and Status

-------------

-------

ACL

220

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Load Phase Detector (Position 4 TE) Signal and Status

System Controller (Position 12 TE) Signal and Status

Tube Controller (Position 36 TE) Signal and Status 16 EHT CON ON l

Interface 1 (Position 44 TE) Signal and Status 20 21 22 23 24 RVL CONT FAULT GEN. FAULT EARTH STICK

Interface 2 (Position 52 TE) Signal and Status 20 21 22 23 24 STANDBY READY STANDBY ERROR START MODE TUNING MODE DEE VOLTS OK l l l l

TABLE 7-4 RFPG LED MATRIX - STANDBY STATUS Load Phase Detector (Position 4 TE) Signal and Status System Controller (Position 12 TE) Signal and Status Tube Controller (Position 36 TE) Signal and Status Interface 1 (Position 44 TE) Signal and Status 1 2 3 4 1 2 3 4 1 2 RVL (INT) 5 6 TC READY TUBE ON TUBE READY DOOR ALARM EARTH ALARM WATER ALARM l l l l 5 6 7 8 9 10 PULSE MODE FIXED MODE RESET NORMAL MODE STANDBY SPARK ERROR 9 10 ------l l l l HTL +24 RF INHIBIT l Interface 2 (Position 52 TE) Signal and Status

Chapter 7 Start-up and Calibration Sequence

221

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Load Phase Detector (Position 4 TE) Signal and Status 1 +15V 2 -15V 3 +5V 4 +24V l l l l

System Controller (Position 12 TE) Signal and Status 3 DVR CLOSE 4 DVR OK 5 DET LIMIT 6 RF ENABLE 7 INT LOOP SELECT 8 -15V OK (SCU) l

Tube Controller (Position 36 TE) Signal and Status 7 8 9 10 11 12 13 14 15 16 AIR FLOW ALAR HEATER ALARM GRID ALARM SCREEN ALARM EHT ALARM FAN ON HEATER ON GRID ON SCREEN ON EHT CON ON l l l l l

Interface 1 (Position 44 TE) Signal and Status 11 12 13 14 15 16 17 18 19 20 21 22 23 24 RVL CONT FAULT GEN. FAULT GRID NORMAL SCREEN NORM. EHT NORMAL HEATER NORM. ------WATER FLOW AIR FLOW DOOR INTLOCK EARTH STICK

Interface 2 (Position 52 TE) Signal and Status 11 12 13 14 15 16 17 18 19 20 21 22 23 24 ACL STANDBY READY STANDBY ERROR START MODE TUNING MODE DEE VOLTS OK l l l -------------

222

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 TABLE 7-5 RFPG LED MATRIX - NORMAL MODE STATUS Load Phase Detector (Position 4 TE) Signal and Status System Controller (Position 12 TE) Signal and Status Tube Controller (Position 36 TE) Signal and Status

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Interface 1 (Position 44 TE) Signal and Status 1 2 3 4 PULSE MODE FIXED MODE RESET NORMAL MODE STANDBY SPARK ERROR GRID NORMAL SCREEN NORM. EHT NORMAL HEATER NORM. ------WATER FLOW AIR FLOW DOOR INTLOCK l l l HTL +24 RF INHIBIT l

Interface 2 (Position 52 TE) Signal and Status

1 2 3 4 1 2 RVL (INT) 1 +15V 2 -15V 3 +5V 4 +24V l l l l 3 DVR CLOSE 4 DVR OK 5 DET LIMIT 6 RF ENABLE 7 INT LOOP SELECT 8 -15V OK (SCU) l l l l 5 6 7 8 9 10 11 12 13 14 15

TC READY TUBE ON TUBE READY DOOR ALARM EARTH ALARM WATER ALARM AIR FLOW ALAR HEATER ALARM GRID ALARM SCREEN ALARM EHT ALARM FAN ON HEATER ON GRID ON SCREEN ON

5 6 7

l l l l l l l l

8 9 10 11 12 13 14 15 16 17 18 19

9 10 11 12 13 14 15 16 17 18 19

-------------

-------

ACL

Chapter 7 Start-up and Calibration Sequence

223

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Load Phase Detector (Position 4 TE) Signal and Status

System Controller (Position 12 TE) Signal and Status

Tube Controller (Position 36 TE) Signal and Status 16 EHT CON ON

Interface 1 (Position 44 TE) Signal and Status 20 21 22 23 24 EARTH STICK DVL RVL CONT FAULT GEN. FAULT

Interface 2 (Position 52 TE) Signal and Status 20 21 22 23 24 STANDBY READY STANDBY ERROR START MODE TUNING MODE DEE VOLTS OK l l

224

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-8
7-8-1

Helium Cooling, LTF, and Target Support System Checks


Introduction
Most of the target support lines from the LTF and Target Cooling Manifold (TCM) are currently unmarked. Follow the procedures in this section to make sure the Targets and corresponding support systems are correctly installed and leak free. This manual assumes the target options are connected to the following ports: Target 1: 18F- Option; Single and Dual Extraction (page 226) Target 2: 11C Option (Refer to the MINItrace Maintenance Manual for detailed installation instructions.) Target 3: 15O Option (Refer to the MINItrace Maintenance Manual for detailed installation instructions.) Target 4: 13N Option (page 230) Target 5: Dummy (Proton) Target [All Systems] Target 6: 18F- Option; Dual Extraction only (page 226)

Your system may differ from this configuration. If so, select the target position that corresponds to the location of the target on your system. If unsure of the target configuration on your system, check the configuration files on the system MASTER. 7-2 contains the instructions to check the configuration files. Notice If the MASTER and MSS have different configuration file contents, the system wont start. If you change the physical target port location, remember to update the MASTER configuration files by saving the MSS configuration to the GSU.

When you complete the corresponding step. 1. 2. Make sure all the targets have been installed in the correct ports, and that all current sensing, cooling and product lines are securely attached. Check all the physical connections. Make sure all the hoses, pipes and tubes have been correctly installed and securely fastened. Make sure the helium and water lines to the targets are correctly oriented. The brown gas line has a green stripe, and always attaches to the upper connector. The brown water line has an orange stripe, and always attaches to the bottom connector. Both lines have the same outside diameter (1/16") but different interior diameters.

3. 4. 5.

If you didnt fill and bleed the target cooling lines when you started the Secondary Water Cooling Unit, return to 7-3 and fill the target cooling circuit. Press the VCU Cooling panel ON button to start the SWCU pump. Make sure all the gas bottles are in place and connected.

Chapter 7 Start-up and Calibration Sequence

225

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6. If necessary, turn on the gases and adjust the regulators.

GE HEALTHCARE REV 5

Appendix D contains the list of purity and pressures settings for the system gases.

7-8-2

F18- Option: Single

and Dual Extraction systems

CAUTION

If you are color blind in the red/green spectrum, carefully check the connections, then mark or label the lines to prevent future problems. Recommended: Use a permanent marker to make series of rings around the gas line(s).

7-8-2-1

Check the Helium Cooling System


Display the Target handling screen on the MSS. a. b. 7. 8. Display the MAIN MENU. Click on the first target icon to open the 18F- Target menu page.

Click CONNECT TARGET. Click SELECT TARGET to open the water valve (7) and start the Helium cooling compressor(s). The water flow indicator in the water cooling window changes from yellow to green. (If not, the entire process shuts down with error messages.) The He-cooling indicator turns ON. The He-cooling valves open and close as the He cooling system empties and fills. The Pressure increases to 18psi and the compressor continues to run.

9.

Once the Pressure reaches 18psi, continue to monitor the system for 5 minutes. Make sure the system maintains pressure for five minutes without any error messages, alarms, or additional messages that it is filling the system with He. If the system cannot maintain pressure, or refills the system every minute or two, start looking for leaks.

10. After five minutes, click UNSELECT TARGET. The compressor should stop running.

Note: If you plan to operate the He compressor manually, click EMPTY before you click ON. You must empty the system before you can start it.

226

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-8-2-2

Check the Gas Connections to the

18- Target

Make sure the gas line is brown with a green stripe, and is attached to the upper connector. The water line is brown with an orange stripe, and always attaches to the bottom connector. Both lines have the same outside diameter (1/16") but different interior diameters. 1. 2. 3. 4. 5. 6. 7. 8. 9. Physically disconnect the gas line from the upper connector on the target. Click on the 1a valve to open the low pressure helium line to the target. Place your finger over the end of the tube and check for the flow of gas. Click on the 1a valve to close it. Check that the gas stops flowing from the tube. Click on the 1b valve to open the high pressure helium line to the target. Place your finger over the end of the tube and check that the flow of gas is much stronger than before. Click on the 1b valve to close it and stop the flow of gas from the line. Reattach the brown and green line to the upper connector.

10. Click on the 1b valve to open the high pressure line to the target, and check that it takes less than one minute for the pressure to reach 300 to 320psi. IF the pressure exceeds 320psi, or it takes longer than one minute to reach pressure, adjust the regulator on the customer side of the gas manifold. IF you cannot reach pressure by adjusting the customer regulator, the line could be blocked. Locate the needle valve directly behind the P1 connector to the LTF. Back off one turn on the knurled silver knob for a few seconds, then retighten the knob one turn.

11. Click on the 2b outlet valve to release the target pressure. 12. Repressurize the target. 13. When the target pressure reaches 300 to 320psi, click on the 1b valve to close it. 14. Monitor the level for at least two minutes to make sure it doesnt drop. IF the target pressure falls below 300psi during the two minute time period, tighten all the high pressure PEEK connections, and try again. If necessary, fill a spray bottle with soapy water, set it to the "mist" position and use it to check the system for leaks. You may also use SNOOP (available from plumbing supply stores) or the helium detector that ships with the MINItrace, to find any leaks.

15. Dual Extraction systems: Select Target 6 and repeat Step 1 through Step 14. 16. Check the product line connections to the hot lab: a. b. Click on the 1a valve to open the low pressure helium line to the target. Click on the 2a and 2b outlet valves to open the line to the hot lab.
Chapter 7 Start-up and Calibration Sequence 227

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 c. d.

GE HEALTHCARE REV 5 Check the outlet line in the hot lab to make sure gas is flowing from the tube. Repeat the process on each active outlet line.

7-8-3

Check the F18- Target Water and Product Line Connections


The water line is brown with an orange stripe, and always attaches to the bottom connector. A single line supplies both the 16O and 18O water to the 18F- target. Notice Make sure you use the sterile, deionized 16O water during these tests. Do NOT use the extremely expensive 18O water until specifically told to do so during the functional testing phase of the start-up process. Use only 16O water to test the timing and connections of both LTF syringes. 1. 2. 3. 4. Fill the 16O vial on the LTF with water, and insert a needle into the vial. Move the MSS near the TSC. Leave the valves in their current state, so the water doesnt leave the LTF. Click on the syringe icon on the MSS and watch the syringe fill in the LTF. 5. The syringe should take about 10 seconds to fill.

Click on the syringe icon on the MSS and watch the syringe empty in the LTF. The syringe should take about 4 seconds to empty.

6.

Continue to click on the syringe icon to fill and empty the LTF syringe while you check the timing. Too fast: The increased pressure could pop the needle out of the water vial. Too slow: The pump may not fill correctly; insufficient water to the target.

Note: The fill and empty times were set at the factory, and should be fine. If you need to adjust the fill or empty times, locate the screws at the top and bottom of the syringe body. Adjust the bottom screw to change the syringe speed and fill time. Adjust the upper screw to change the time to empty the syringe. 7. 8. 9. Remove the bottom (brown/orange) line from the target connector, and put it in a bottle, to catch the water. Click on the syringe icon to fill the LTF syringe. Click on valve 3 to open it. (Click on valve 4 when you test the 18O connections.)

10. Click on the syringe icon to empty the syringe. Check that a steady stream of water flows from the tube.

11. Reattach the water line to the bottom connector on the target.

228

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 12. Fill the target with sterile water. -or Click on FILL WITH H216O.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Click on FILL WITH H218O when you test the 18O connections.

13. Make sure the pressure reading on the MSS rises as the target fills with water. 14. Check the target connections for leaks. 15. Locate the bundle of tefzel lines (active line and spares) in the hot lab. 16. Place the active tefzel line(s) into a vial or bottle, to catch the water. 17. Click on EMPTY TO OUTLET 1. Make sure the water exits the correct line. Measure the water and compare the amount to the one recorded in the data sheets that arrived with the system. The two amounts should be the same.

18. Refill the target with sterile water. -or Click on FILL WITH H218O when you test the 18O connections. Click on FILL WITH H216O.

19. Make sure the pressure reading on the MSS rises as the target fills with water. 20. Click EMPTY TO OUTLET 2. Make sure the water exits the correct line. Measure the water and compare the amount to the one recorded in the data sheets that arrived with the system. The two amounts should be the same.

21. Move the vial of 16O to the 18O syringe and repeat Step 3 through Step 20 to test the 18O connections. 22. Dual Extraction Systems: a. b. Move the vial back to the 16O syringe. Select Target 6 and complete Step 7 through Step 21.

18F- Target Connections tests successfully completed.

Chapter 7 Start-up and Calibration Sequence

229

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-8-4

Check the 13N Option Connections DANGER METHANE GAS (CH4) IS HEAVIER THAN AIR, FLAMMABLE AND EXPLOSIVE. EXTINGUISH ALL OPEN FLAMES BEFORE CONNECTING THE GAS LINES.
1. Display the Target handling screen on the MSS. a. b. 2. 3. 4. 5. Display the MAIN MENU. Click on the fourth target icon to open the 13N- Target menu page.

Click CONNECT TARGET. Click SELECT TARGET to open the cooling water valve and start the Helium cooling compressor(s). Refer to Illustration 7-24. Make sure the PEEK line from the LTF to the target has a coil of 5 to 7m just before it enters the target. Make sure the target has a filling volume of 2.5ml. a. b. c. d. e. Fill the 16O vial on the LTF with water, and insert a needle into the vial. Click on the syringe to fill it with water. Replace the 16O vial on the LTF with an empty vial. Click on the syringe to empty the contents back into the vial. Measure the contents.

ILLUSTRATION 7-24 PEEK LINE COIL ON 13N TARGET

6.

Check the CH4 line connections, and open the gas valve. a. b. c. d. Adjust the valve for 5bar pressure. Click on the 1 valve to open the gas line to pressurize the target. Check for a pressure reading of about 70psi. Click on the 1 valve to close it.

230

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 e. f. 7.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Monitor the pressure for 2 minutes to make sure it doesnt drop. Click on the 2 valve to release the target pressure.

Click on FILL TARGET . Check that the pressure reading rises above 70psi. Check the LTF and target connections for leaks.

8. 9.

In the hot lab, place the active product outlet line into a vial. Click on EMPTY TARGET .

10. Measure the contents of the vial in the hot lab. The vial should contain 2.5ml of water.

13N Target Connection test successfully completed.

Chapter 7 Start-up and Calibration Sequence

231

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-9

Beam Tuning
Follow the procedures in this section to condition the system and tune the beam, to prepare the system for functional testing. This section assumes the Secondary Cooling Water, Vacuum, Magnet, and RF System start up procedures were successfully completed.

7-9-1

Condition the System


Note: Return to this section any time you open the chamber. If you make a physical adjustment to the Ion Source or do anything to the interior of the vacuum chamber that exposes new metal, expect a significant increase in conditioning time. 1. If necessary: a. b. 2. 3. 4. 5. Press the VCU Cooling panel ON button to start the cooling water pump. Press PUMP at the VCU to pump down the chamber to the standby state.

Connect the Service PC (MSS) to the port on in the narrow CSC. Display the BEAM CONTROL page. Click GAS ON to clear the pipe to the Ion Source (IS). The Vacuum chamber pressure will increase from the -7 range, to 1.5 to 2.5 x 10-5 when you turn on the gas. Let the chamber pump down with the gas on for at least 30 minutes.

6. 7. 8. 9.

After 30 minutes, click GAS OFF so you can change MSS pages. Display the MAGNET SYSTEM page. Click the magnet ON button. Set the magnet current to the value listed on the factory data sheets.

10. Display the RF SYSTEM page. 11. Type/enter a Set Frequency value of 80%. 12. Click SAVE FREQUENCY to set the upper range limit for the frequency sweep. 13. Type/enter a Dee Voltage value of 25kV, which equals 50% of full power. 14. Click STANDBY. The system should take about one minute to transition from the STANDBY to the READY state.

15. When the STANDBY indicator changes to READY, click NORMAL. During the conditioning process, the Dee Voltage status changes from START MODE, to SPARKS and TUNING MODE as the system sets up the scanning frequency and Dee voltage.

232

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 16. When the Dee Voltage status changes to a steady DEE VOLTS OK for 3 minutes, click on the UP arrow to increase the Dee Voltage. IF you dont see a DEE VOLTS OK after 5 minutes, drop the Dee Voltage to 15kV, and restart the conditioning process.

17. Continue to increase the Dee Voltage, until the system reaches a steady DEE VOLTS OK for 5 minutes at 35kV (normal operating voltage). 18. During the Beam Tuning process, return to this section anytime you introduce a new variable that causes the system to spark. Drop the Dee Voltage to 25kV until the status changes to a steady DEE VOLTS OK, then increase the Dee Voltage back to 35kV. If the system doesnt reach DEE VOLTS OK at 25kV, drop down to 15kV, and start from there.

7-9-2

Tune the Beam


Once the Dee Voltage status reaches a steady DEE VOLTS OK at the 35kV setting, you can start to tune the beam. Whenever the system starts to spark, return to the conditioning process. Dual Extraction systems tend to be more non linear than Single Extraction systems until the IS current reaches 200mA. 1. 2. Display the BEAM CONTROL page. Click RF NORMAL to set the Dee Voltage to the value in the configuration file. 3. The RF SYSTEM values displayed on this page are more of a mean, and not as "realtime" as the values on the RF SYSTEM page.

When the status changes to a steady DEE VOLTS OK, click GAS ON. The system will start to spark and retune the frequency. Allow the system to remain in this condition until it starts to stabilize.

4.

When the status changes to a steady DEE VOLTS OK, click PROBE IN. The Flip-in Probe protects the target from the beam.

5. 6.

Click IS ON. Type/enter a Current Set value of 10mA. Even though the field may display a value when you click IS ON, its probably the last typed value, which the system ignores, so you have to type in a new value. IF the system starts to spark when you enter the 10mA value, change the Current Set value to 0mA, and return to the conditioning process in section 7-9-1.

Note: When you set a new IS current, the IS Voltage should increase to about 900v, then slowly decrease as the actual IS Current value increases to the Set value. IF the ION SOURCE voltage goes above 1kV, check the cable connection to the Ion Source. (Especially if you have taken the IS assembly out of the vacuum chamber.) The coax cable has an extra long sleeve, which can deceive you into thinking its connected when it really isnt.
Chapter 7 Start-up and Calibration Sequence 233

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 7.

GE HEALTHCARE REV 5

If the Dee Voltage is OK, and the current reading on the Flip-In Probe equals 1A, wait one to two minutes, then increase the ION SOURCE Current Set value to the each of the following values for at least two minutes.

Note: If the system starts to spark, enter a value of 0mA, and return to the conditioning process. When changing from a lower to higher current, or lowering the current to a non zero value, the system ramps up/down. When you set the current to zero, it goes immediately to zero. 20mA should produce a Flip-In Probe current of 2A 20% 30mA should produce a Flip-In Probe current of 3A 20% 40mA should produce a Flip-In Probe current of 4A 20% 50mA should produce a Flip-In Probe current of 5A 20% 100mA should produce a Flip-In Probe current of 10A 20% 200mA should produce a Flip-In Probe current of 20A 15% 300mA should produce a Flip-In Probe current of 30A 15% 500mA should produce a Flip-In Probe current of 50A 15% 1000mA should produce a Flip-In Probe current of 100A 15%

Note: IF you dont see a Probe current of 100A 15% on the probe at 1000mA IS current, then its time to check the Dee adjustments and the position of the Ion Source slit. Follow the maintenance and service instructions in Direction 2233000.

234

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-10

Target System Start-up


Follow the procedure in this section to check and adjust the collimators to center the beam on the corresponding target. If you added a target option during the installation, and had to install the target collimator, follow the procedure in Section 7-10-2, page 241, before you start this section.

WARNING

RADIATION! ALWAYS MEASURE THE ACTIVITY WHEN YOU OPEN THE VACUUM CHAMBER DOOR, SO YOU KNOW HOW LONG YOU CAN STAY IN THE CHAMBER AREA. REMEMBER: DOSAGE LEVEL LIMITS VARY FROM COUNTRY TO COUNTRY. Always wear clean cotton or non-powdered examination gloves when working in the vacuum chamber. Take care NOT to scratch the interior surfaces of the chamber.
1. 2. 3. 4. Vent the chamber. Shut off the System. (if on) Open the shield doors. Locate the Ion Source Tool Box. (Often stored in the empty TSC cabinet.) Remove the Paper Burner target and collimator adjustment tool from the Tool kit.

CAUTION

ILLUSTRATION 7-25 PAPER BURNER TARGET

5.

Remove the first target from the target mount, and replace it with the Paper Burner target. Leave the cooling lines attached to the original target. Attach the targets current sensing line to the Paper Burner target. Make sure the Paper Burner is firmly seated in the bayonet mount.

WARNING

RADIATION! YOU CAN ONLY LEAVE THE ORIGINAL TARGET IN PLACE IN THE SHIELD AREA IF YOU HAVE NOT BOMBARDED IT YET. IF YOU HAVE ALREADY BOMBARDED THE TARGET, YOU MUST REMOVE IT AND STORE IT INSIDE LEAD SHIELDING.

Chapter 7 Start-up and Calibration Sequence

235

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6. 7. 8. 9.

GE HEALTHCARE REV 5

Close the shield doors and press PUMP to start the vacuum system. Attach the service pc to MSS port on the CSC panel. Display the MAGNET SYSTEM page. Click ON to turn on the magnet.

10. Set the current to 132 Amps. (Type in a value, dont use the arrows.) 11. Display the BEAM CONTROL page. Password: scxscx

12. Click on RF STANDBY. 13. Click on PROBE IN. 14. Set the Foil holder 1 position to the value displayed for the corresponding target position in the Configuration Parameters window. 15. When the RF SYSTEM standby goes to the Ready state, click on RF NORMAL. Wait for Dee volts OK to stabilize. (no sparking allowed during this test) If necessary, return to section 7-9-1 and condition the system.

16. Click on Ion Source GAS ON. Make sure the RF SYSTEM window still displays dee volt, ok.

17. Select ION SOURCE (IS ON). 18. Set the Ion source to 100 mAmp, and wait for Dee volts to stabilize. 19. Adjust ion source current to produce about 4microamps on the probe, because the paper burner does NOT have cooling water lines. 20. Make paper targets out of business cards while waiting for the Dee volts to stabilize: a. b. c. d. e. Cut a business card in half, width-wise. Measure from the lower right corner of the card. Draw a horizontal line 19.5mm above the bottom edge of the card. Draw a vertical line 19.5mm from the right edge of the card. Make about 6 cards per system target, including the dummy port.

236

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-26 PAPER CROSSHAIR DIMENSIONS

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

19.5mm

19.5mm

WARNING

RADIATION! WEAR GLOVES AND PROTECTIVE EYE WEAR, AND USE FORCEPS TO INSTALL THE TARGET PAPERS. USE TOOLS TO SHIFT THE PAPER BURNER TARGET TO A NEW PORT, AND TO ADJUST THE COLLIMATOR BLADES. DO NOT TOUCH THE COLLIMATOR BLADES OR BOMBARDED PAPER BURNER TARGET WITH YOUR (GLOVED) HANDS.
21. Click on PROBE OUT. 22. Tune the magnet to produce the highest Foil 1 reading. Click on the MAGNET UP and DOWN arrow keys to optimize the foil 1 current reading.

23. Adjust the foil holder positions by small steps (10 to 20%) while watching the waveform on the BEAM CONTROL page. a. b. c. d. e. Click on the Foil holder 1 pos UP arrow to shift all current to the upper collimator. Record the upper Foil 1 position value displayed in the Foil 1 number: field. Click on the Foil holder 1 pos DOWN arrow shift all current to the lower collimator. Record the lower Foil 1 position value displayed in the Foil 1 number: field. Type the first value into the Foil 1 number: field.

24. Click on PROBE IN. 25. Click on IS OFF. 26. Click on RF STANDBY.

CAUTION

Take Care! The Magnet is still ON. Remove all credit cards and mechanical watches. Use forceps to insert and remove the paper targets.
27. Write the target number, burn trial number and date along the top of the card. 28. Open the left shield door.
Chapter 7 Start-up and Calibration Sequence 237

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

29. Insert the paper target into the bottom of the burner with the cross facing the beam. 30. Close the left shield door. 31. Click on RF NORMAL . 32. Click on GAS ON. 33. Click on IS ON. Use the same IS current as before.

34. Click on PROBE IN. Read the probe current; make sure RF Frequency is the same as before. Wait for the Dee volts to stabilize.

35. Click on PROBE OUT. You should see all the beam current on the upper collimator.

36. Type/enter the Foil 1 position value you recorded for the lower collimator value into the Foil 1 number: field, to switch the current to the lower collimator. 37. Type the upper collimator value, then type the lower collimator value into the field 3 or 4 times for each value, to sweep the beam back and forth between the collimators. Note: You may need to experiment with the number of times you enter the values. The number of times needed to sweep the beam across the collimator blades will increase as the paper thickness increases. Try not to over burn (blacken) the paper. It is better to under burn than over burn the paper target. 38. Click on PROBE IN. 39. Click on IS OFF.

WARNING

RADIATION! WEAR GLOVES AND PROTECTIVE EYEWEAR WHEN YOU OPEN THE TARGET SHIELD DOOR AND REMOVE THE PAPER. ALWAYS MEASURE THE ACTIVITY WHEN YOU OPEN THE SHIELD DOOR.
40. Use forceps to remove the paper from the Paper Burner Target. 41. Refer to Illustration 7-27. Examine the burn mark. The burn mark on a liquid target should be centered horizontally, but slightly lower than center on the vertical axis. The burn mark on a gas target should be centered directly over the crosshair.

WARNING

RADIATION! THE PAPER IS RADIOACTIVE (CARBON ISOTOPE). DO NOT TOUCH THE PAPER WITH BARE HANDS. STORE THE PAPERS IN A LEAD CONTAINER FOR AT LEAST 2 HOURS. IF POSSIBLE LEAVE THE PAPER IN THE CONTAINER OVER NIGHT.

238

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-27 PAPER TARGET FOR LIQUID TARGET Top

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

42. Repeat the test two or three more times at the current target location, to check for consistency, before moving on to the next target port. IF the beam is too far above or below the horizontal line, proceed to section 7-10-2. IF the beam position changes each time you repeat the test, call support.

43. Test each occupied target port on the system, including position five (proton target). Use a tool to shift the Paper Burner from one position to the next.

WARNING

RADIATION! REMEMBER, THE PAPER BURNER TARGET BECOMES INCREASINGLY RADIOACTIVE THE LONGER YOU USE IT. ALWAYS USE A TOOL TO MOVE THE PAPER BURNER FROM ONE TARGET PORT TO ANOTHER. WHEN YOU FINISH THE TEST, STORE THE PAPER BURNER IN A LEAD CONTAINER.

7-10-1

Resize the Collimator Opening


Follow the procedure in this section to reposition the collimator, to raise or lower the point where the beam strikes the target, without changing the collimator diameter. Liquid targets are pressurized with helium to increase the boiling point of the target liquid. The gas forms a bubble at the top of the target chamber. The collimator is positioned to direct the beam below the center point of the target, to avoid this bubble. On gas targets, the collimator is positioned to direct the beam to the center of the target. 1. Measure the collimator opening with calipers to determine the factory setting. The standard collimator diameter is about 6mm, but could be as large as 8mm.

Chapter 7 Start-up and Calibration Sequence

239

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 2. Look at the burn mark on the paper target. 3.

GE HEALTHCARE REV 5

IF the top of the liquid target burn mark -or- the center of the gas target burn mark falls below the horizontal line, raise the entire collimator. IF the bottom of the burn mark -or- the center of the gas target burn mark falls above the horizontal line, lower the entire collimator.

Determine the distance to move the beam. a. b. Measure the distance between the actual and optimal burn mark location. Divide this value in half. (Refer to the example on the next page)

4.

Use metric drill bits to reposition the collimator while maintaining the original diameter. Remember to keep the drill bits perpendicular to the angled target port when you insert them into the collimator opening to make the adjustments. (Refer to Illustration 7-28 and the example, on the next page.)

Example: The burn mark is 2mm too high, and the collimator diameter is 6mm. To shift the collimator down 1mm: 1. 2. 3. 4. 5. 6. Loosen the bottom collimator blade. Insert a 7mm drill bit into the opening, move the bottom blade against the bit and tighten into place. Loosen the top collimator blade. Insert a 6mm drill into the opening and move the top blade against the bit. Tighten the top collimator blade. Return to 7-10, on page 235.

240

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-28 TARGET COLLIMATOR

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

7-10-2

Install the Collimator and Resize the Opening


Follow this procedure only if the collimator blades are loose or you added another target option to the system during installation.

WARNING

RADIATION! WEAR GLOVES AND PROTECTIVE EYEWEAR WHEN YOU OPEN THE TARGET SHIELD DOOR AND REMOVE THE PAPER. ALWAYS MEASURE THE ACTIVITY WHEN YOU OPEN THE SHIELD AND VACUUM CHAMBER DOORS.
1. 2. 3. 4. Press VENT on the CSC panel to release vacuum. Click SYSTEM OFF on BEAM CONTROL page to shutdown the MINItrace cyclotron in an orderly manner. Remove Paper Burner target from the target bayonet mount. Refer to Illustration 7-29. Attach the collimator adjustment tool to the bayonet mount. The 3mm center pin slides in and out of the adjustment tool.

Chapter 7 Start-up and Calibration Sequence

241

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-29 COLLIMATOR ADJUSTMENT TOOL

GE HEALTHCARE REV 5

Bayonet mount fits target mounting plate 3mm pin slides in and out during adjustment

5. 6.

Use a 3mm allen wrench to loosely fasten the collimator blades into place. Use calipers to measure interior diameter of the collimator. Start with the standard collimator opening of 6mm in diameter.

7.

Slide the center pin in and out of the tool while you make the adjustment. Slide the pin into the tool to check the center of the collimator blade opening. Slide the pin out while you reposition the blades.

8. 9.

After you size the collimator opening, remove the collimator adjustment tool, and replace it with the paper burner target. Close the vacuum chamber door.

10. Place a new paper target into the paper burner, and close the shield door. 11. Press PUMP on CSC panel to start vacuum. 12. Display the MAGNET SYSTEM page. 13. Click ON to turn on the magnet. 14. Set the current to 132 Amps. (Type in a value, dont use the arrows.) Make sure current goes up to 150, stays there, then goes back to the set value. Otherwise the beam may not reach the target.

242

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 15. Display the BEAM CONTROL page. Password: scxscx

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

16. When Vacuum is OK on the BEAM CONTROL page, click RF NORMAL . 17. Click GAS ON. 18. Click IS ON. Use the same IS current as before.

19. Return to Step 34 on page 238. (7-10)

Chapter 7 Start-up and Calibration Sequence

243

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-11

Functional Test
Follow the instructions in this section to test the normal system operation, from the MASTER. Use this test to verify that the system is ready for the final series of performance demonstrations, prior to customer acceptance of the system. The test procedure is almost the same for both single and dual beam. Where it is necessary the procedure is divided into individual single and dual beam instructions.

7-11-1

Required Equipment
One vial filled with H216O (sterile distilled water) One empty vial Needles and Luel Connectors Dose calibrator (placed in the hotcell)

7-11-2

Radiation License
1. Check Appendix H or the copy of the site Radiation License. You cannot proceed with this section until the customer has this license.

7-11-3

Inspection
2. Inspect and verify the following: The hot cell provided by customer is complete. The dose calibrator is installed in the well. The exhaust in the Hot cell works. There is nothing in the hot cell to effect the exhaust. A negative pressure exists in the hot cell. Exhaust should be "ON" at all times during and after dose delivery to hot cell.

7-11-4

Operator Report
A production report automatically prints after each production. To make a test print, click on OPERATOR REPORT in the Main menu to open the Operator Report Window.

ILLUSTRATION 7-30 CLICK ON OPERATOR REPORT

244

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-31 OPERATOR REPORT WINDOW

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

3. 4.

Type something into the operator report window, as a test. Click on SAVE AND PRINT REPORT to test the printer.

7-11-5

Test Procedure
5. Single beam: Connect the output tefzel tube from the F18 target(s) to a vial. Insert a ventilation needle far enough into the top of the vial to allow the helium overpressure to escape, but not so far that the water from the target escapes.

Chapter 7 Start-up and Calibration Sequence

245

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Dual beam: Connect the output tefzel tubes from target 1 and 6 to a vial.

GE HEALTHCARE REV 5

Insert a ventilation needle far enough into the top of the vial to allow the helium overpressure to escape, but not so far that the water from the target escapes.

6.

Place the vial(s) in the dose calibrator and close the hotcell door. The dose calibrator should be calibrated for N13 Ammonia.

7.

Refer to Illustration 7-32. Make sure the LTF has one vial of H216O (sterile distilled) water

ILLUSTRATION 7-32 LIQUID TARGET FILLER WITH VIAL OF H216O ON A SINGLE BEAM SYSTEM

8.

If necessary, turn on the MASTER, and Login: Login: MINItrac Password: mini000

Refer to Illustration 7-33. When the MASTER successfully completes the applications start-up, it displays the Main menu and highlights all the active selections. In the Illustration 7-33 example, the Switch Screen selection is inactive. On the actual screen, each active selection appears in a colored box. (This colored area is also referred to as "the button.")

246

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-33 MASTER MAIN MENU

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

9. ILLUSTRATION 7-34 CLICK ON SYSTEM STATUS

Refer to Illustration 7-35. Click on SYSTEM STATUS to open the corresponding window Illustration 7-35.

ILLUSTRATION 7-35 SYSTEM STATUS WINDOW

10. Refer to Illustration 7-36. Click on MAINTENANCE in the Main menu to open the Maintenance Functions window.

Chapter 7 Start-up and Calibration Sequence

247

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION 7-36 CLICK ON MAINTENANCE

GE HEALTHCARE REV 5

11. Refer to Illustration 7-37. Click on CYCLOTRON in the Maintenance Functions window to display the selections. Click on START UP to set the cyclotron to standby mode. ILLUSTRATION 7-37 CLICK ON MINITRACE

12. Check the Cyclotron information in the System Status window (Illustration 7-38) for an indication that the Magnet is starting to ramp.

248

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-38 SYSTEM STATUS WINDOW

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

13. Refer to Illustration 7-39. Click on TRACER on The Maintenance Functions menu to open the Target Selection window. ILLUSTRATION 7-39 CLICK ON TRACER

14. Single Beam: Select (1) 18F-F to run the target maintenance on the corresponding 18F- target. The number in parentheses represents the actual target position on the cyclotron, usually position 1 for the 18F- target. If your system has multiple 18F- targets, repeat this maintenance test on each one.

Chapter 7 Start-up and Calibration Sequence

249

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5 Make sure that the target is connected.You can do that from the drop-down menu CONNECT/DISCONNECT on the tracer page.

Dual Beam: Select target (1) 18F-F to run the target maintenance on the corresponding target and do the same for target (6) 18F-F. Make sure that the targets are connected. You can do that from the drop down menu CONNECT/DISCONNECT on the tracer page.

15. Important: DO NOT USE H218O (extremely expensive, heavy water used to produce 18F-) Use H216O (sterile distilled water) Single beam: Refer to Illustration 7-40. Click on HANDLE TARGET(S) to display a drop-down menu. Select FILL WITH H2(16)O.

Dual beam: Click on HANDLE TARGET(S) to display a drop-down menu. Select FILL WITH H2(16)O for both target 1 and 6.

ILLUSTRATION 7-40 MASTER SCREEN TARGET MAINTENANCE

To run a production on a single beam system follow Step 16 to Step 22. To run a production on dual beam system, follow Step 23 to Step 33. Single Beam: 16. When the magnet reaches its configured current of approximately 130A, select PRODUCTION from the Main menu, to open the Operator Signature and Media Supply windows. ILLUSTRATION 7-41 SELECT PRODUCTION

250

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 17. Type/enter or select the following at the Operator Signature window: Signature: Type/enter the default, PET (unless you changed or deleted it). Password: Type/enter the default, pet (unless you changed or deleted it). (Remember : UNIX based software is upper/lower case sensitive.) Current: Set the current to 10 A. Time: Change the production time to 5 minutes.

18. Click on OK to start preparing for the production. 19. When the button activates, and the system starts to beep, click START IRRADIATION. 20. When the production finishes, select DELIVERY and record the time. The product is delivered to output 1.

21. Check the reading from the dose calibrator and correct for decay and rest activity. 22. Perform several shorter productions on H216O water to condition the new targets. Gradually increase the target current and production time up to 20A and 20 minutes. The SAT yield should equal approximately 5 mCi/A for a new and conditioned F18 target when producing N13 on H216O. Dual beam: 23. When the magnet reaches its configured current of approximately 130A, select PRODUCTION from the Main menu, click on target 1 in the selection drop down menu to open the Operator Signature and Media Supply windows. 24. Type/enter or select the following at the Operator Signature window: Signature:Type/enter the default, PET (unless you changed or deleted it). Password: Type/enter the default, pet (unless you changed or deleted it). (Remember : UNIX based software is upper/lower case sensitive.) Current: Set the current to 10 A. Time: Change the production time to 5 minutes.

25. Click on OK to start preparing for the production. 26. When the button activates and the system starts to beep, click START IRRADIATION 27. When the time recording for T1 production has started, and the magnet tuning sequence has finished: Select PRODUCTION from the main menu. Click on target 6 in the selection drop down menu to open the Operator Signature and Media Supply windows.

Chapter 7 Start-up and Calibration Sequence

251

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

28. Type/enter or select the following at the Operator Signature window: Signature:Type/enter the default, PET (unless you changed or deleted it). Password: Type/enter the default, pet (unless you changed or deleted it). (Remember : UNIX based software is upper/lower case sensitive.) Current: Set the current to 10 A. Time: Change the production time to 5 minutes.

29. Click on OK to start preparing for the production. 30. When the button activates and the system starts to beep, click START IRRADIATION. 31. When production finishes, select DELIVERY for both target 1 and 6. The product is delivered to output 1.

32. Check the reading from the dose calibrator and correct for decay and rest activity. 33. Run several shorter productions on H216O water to condition the new targets. Gradually increase the target current and production time up to 20A and 20 minutes. The SAT yield should equal approximately 5 mCi/A for a new and conditioned F18 target when producing N13 on H216O. 34. Refer to Illustration 7-37. Select MINITRACE on the Maintenance functions menu. 35. Refer to Illustration 7-37. Select MINItrace SHUT DOWN. 36. When the Magnet current reaches zero, close the Status window. 37. Rinse, empty and dry the targets. See direction 2232995-100, Standard Operation Procedure (SOP) for MINItrace 18F- standard target. 38. Select EXIT on the Main menu to log out from the MASTER station. Functional Test successfully completed.

252

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5 ILLUSTRATION 7-42 MASTER SCREEN -TARGET MAINTENANCE

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Chapter 7 Start-up and Calibration Sequence

253

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

7-12

FDG Micro Lab


Refer to Direction # 2102963

254

Chapter 7 Start-up and Calibration Sequence

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX A CABLES
Refer to Illustration A-1. The MINItrace system cables in Crate 7 and 8 are currently grouped into 10 runs. Table A-2 on page 257 contains the list of component designator definitions. The Basic Cable Block Diagram (Drawing CAC000-51003-00-3) shows the destinations of all the cables that run between subsystems. Refer to this drawing to run all the cables that arrive with one end still terminated in the CSC. ILLUSTRATION A-1 GROUP CABLE INTERCONNECT (MIS MAP) DIAGRAM
Group 10

MASTER

CSC
Group 1a/ 1b

Group 6

CCAB

RFPG
Group 7

CYCL
Group 4
Group 9

Group 3 Group 5

Group 2

Radiation shield

TSC

Group 8

Appendix A Cables

255

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Refer to Table A-1 . Each cable group arrives packed in a separate box, in Crate 7 and 8. Due to the lengths and number of cables in Group 1, it arrives in two separate boxes. TABLE A-1 CABLE CRATE AND BOX LOCATIONS MIS Group # 1a 1b 2 3 4 5 6 7 8 9 10 Crate: Box Location 7: J Already mounted in the CSC (crate 7) Already mounted on lamps/engine (crate 7) 8: G 8: J 8: H 8: I 8: J 8: K Already mounted on magnet (crate 6) 8: L

256

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

A-1

Component Designators

TABLE A-2 COMPONENT DESIGNATORS Designator CCAB CIC CSC Description Control Cabinet Customer Interface Connector Cyclotron Support Cabinet Notes Electronics cabinet: GCU, PSARC, PSMC Signal source for customer warning lights, alarms and interlocks Cabinet attached to Right Rear (fixed) shield: supports the Vacuum, Target Cooling, Secondary Water Cooling, Radiation Shield Drive systems and CIC The interface between the customer supplied compressed air and chilled water inputs, and the MINItrace system. MINItrace Cyclotron, vacuum system (Diffusion pump, roughing vacuum pump) and Target system (Targets, Target cooling unit and LTF/support gasses) In CCAB: interface between the MASTER and the cyclotron In RFPG In TSC: extracts and delivers liquids to the (18F-) Fluorine and (13N) Ammonia Targets The computer interface between the operator and cyclotron Customer Supplied Line In w/ Circuit Breakers (and Emergency Stop/Panic Switch) Service PC: used to start up and maintain the system In CSC: supplies power to the vacuum system pumps, the helium compressor(s) and RSDU In CCAB Magnet Power Supply Electronics Cabinet: SCU, GSPU, TPSU and TAU Opens and Closes the Shield doors In RFPG In CSC: Distributes cooling water to the magnet and power supplies In RFPG Delivers cooling water and Helium to the targets In RFPG

CSP

Cyclotron Supply Panel

CYCL GCU GSPU LTF

Cyclotron General Control Unit Grid Screen Power Unit Liquid Target Filler

MASTER MDP MSS PDU PSARC PSMC RFPG RSDU SCU SWCU TAU TCM TPSC

The Master System Mains Distribution Panel MINItrace Service System Power Distribution Unit Ion Source Power Supply Power Supply Magnet Coils Radio Frequency Power Generator Radiation Shield Drive Unit Source and Control Unit Secondary Water Cooling Unit Tube Amplifier Unit Target Cooling Manifold Tube Power Supply Unit

Appendix A Cables

257

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Designator TSC VCU

Description Target Support Cabinet Vacuum Control Unit

Notes Cabinet attached to Left Rear (fixed) shield: supports the Liquid Target Fillers and Helium Cooling Compressor(s) In CSC: Controls and monitors evacuation of the magnet chamber

258

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

A-2

Cable List
This section contains a list of the cables shipped in Crate 7 and 8. If the cable ships with one end attached to a subsystem, it will not appear in this list. Drawing CAC000-5100300-3 (Cable Block Diagram) shows the subsystem interconnections.

TABLE A-3 CABLE INTERCONNECTIONS Cable Part Number. length in meters 904780. 6 904781. 6 904779. 6 907534. 5 907569. 6 907570. 6 907571. 5 From Unit CSC Sub system ASC Board, P4 ASC Board, P6 ASC Board, P1 TPG, IKR Type D25P To Unit CYCL (Target side) CYCL (Target side) CYCL (Target side) CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) Subsystem Acc.Conn. Board, P1 (on TCM) Acc.Conn. Board, P2 (on TCM) Acc.Conn. Board, P3 (on TCM) Penning Cell (on Diff Pump) Pirani Cell 1 (on Diff Pump) Pirani Cell 2 (on Diff Pump) BV, 7 pole Plug (on Diff Pump) Type D25S

Installed

MIS map Run# 1a

1a

CSC

D25P

D25S

1a

CSC

D37P

D37S

1b

CSC

SHV

SHV

1b

CSC

TPG, TPR1

Amp. C91E P Amp. C91E P Open 1 - 22 2 - 24 3 - 28 4 - 31 5 - 28 6 - 32 Y/G - NC Open 1 - 22 2 - 25 3 - 29 4 - 33 5 - 29 6 - 34 Y/G - NC

Amp. C91E S Amp. C91E S Open 1-1 2-2 3-3 4-4 5-5 6-6 Y/G - NC Open 1-1 2-2 3-3 4-4 5-5 6-6 Y/G - NC

1b

CSC

TPG, TPR2

1b

CSC

TS, BV

1b

907572. 5

CSC

TS, RV

CYCL (Vacuum side)

RV, 7 pole Plug (on Diff Pump)

Appendix A Cables

259

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Installed

MIS map Run# 1b

Cable Part Number. length in meters 907573. 3.6

From Unit CSC Sub system TS, VV Type Open 1 - 23 2 - 27 Y/G - NC Open 1 - 23 2 - 26 Y/G - NC Open 1 - 37 2 - 35 3 - 37 4 - 36 Y/G - NC Open 1 - 38 2 - 30 Y/G - NC Open 1CON1:2 2CON1:4 3CON1:6 Y/G - 7 Open 1CON3:2 2CON3:4 Y/G TS:5 Open 1-6 2-7 Y/G - NC

To Unit CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) Subsystem VV, 3 pole Plug (on Diff Pump) Type Open 1-1 2-2 Y/G - NC Open 1-1 2-2 Y/G - NC Open 1-3 2-4 3-5 4-6 Y/G - NC Open 1-1 2-2 Y/G - NC Power Socket 1-1 2-2 3-3 Y/G - PE

1b

907574. 3.8

CSC

TS, HVV

HVV, 3 pole Plug (on Diff Pump)

1b

907575. 5

CSC

TS, HVV SW

HVV, Sw, 7 pole Plug (on Diff Pump)

1b

907576. 4.3

CSC

TS, DP TSW

CYCL (Vacuum side) CYCL (Vacuum side)

DP Temp Switch (on Diff Pump)

1b

907578. 5

CSC

CON 1

RP Power Plug

1b

907580. 5

CSC

CON 3

CYCL (Vacuum side)

DP 4 pin Plug (on Diff Pump)

Open 1-2 2-3 Y/G - 4

1b

907803. 4.8

CSC

ASC Board, PC3:6

CYCL (Vacuum side)

Magnet coil Temp Sw (on Diff Pump)

Open 1-1 2-4 Y/G - NC

260

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Installed

MIS map Run# 2

Cable Part Number. length in meters 907583. 3

From Unit CSC Sub system ASC Board, PC4:6 Type Open 1-6 2-7 3-8 4-9 Y/G - NC

To Unit Rad. Shield Subsystem Right SW Type Open 1 - right sw:4 2 - left sw:3 3 - left sw:7 4 - right sw:8 Y/G - NC Open 1 - + (plus) 2-(minus) Y/G - NC Open 1 - + (plus) 2-(minus) Y/G - NC Open 1-1 2-2 Y/G - 0 SHV

907584. 4

CSC

ASC Board, PC5:1

Open 1-1 2-2 Y/G - NC Open 1-3 2-4 Y/G - NC Open 1 - 10 2-8 Y/G - 6 SHV

Rad. Shield

Left Motor

907585. 3

CSC

ASC Board, PC5:3

Rad. Shield

Right Motor

907586. 3

CSC

ASC Board, PC5:10

Rad. Shield

Info. Lamps

907866. 14 907808. 17 907808. 17 904774. 17 904774. 17 904775. 17

CCAB

PSARC JHV1 PSMC +

CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side) CYCL (Vacuum side)

IS Filter Box P1

CCAB

Cable Shoe L44 Cable Shoe L44 Cable Shoe L44 Cable Shoe L44 Cable Shoe L44

Magnet +

Cable Shoe L44 Cable Shoe L44 Cable Shoe L44 Cable Shoe L44 Cable Shoe L44

CCAB

PSMC +

Magnet +

CCAB

PSMC -

Magnet -

CCAB

PSMC -

Magnet -

CCAB

PSMC GRND

Magnet GRND

Appendix A Cables

261

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Installed

MIS map Run# 4 4

Cable Part Number. length in meters 907881. 4.5 907582. 9

From Unit CSC CSC Sub system PE Screw CON 4 Type Cable Shoe Open 1CON4:2 2CON4:4 Y/G TS:4 Open 1CB5:2 2 - TS:10 Y/G TS:11

To Unit TSC TSC Subsystem PE Screw He Comp 1 Power plug Type Cable Shoe Power Socket 1-1 2-2 Y/G - PE

908535. 6

CSC

CB5:2

TSC

FAN

Wire terminal 1- Fast-on tab 1 2 - Fast-on tab 2 Y/G - PE Screw

NEVER shorten the SKA cable. It must remain forty meters long in order to maintain proper RF feedback. 5 6 907868. 40 907896. 13 904767. 10 904768. 10 904769. 10 904770. 10 904771. 10 907809. 13 RFPG CSC SCU SKA Cover Plate, MSS Conn Board, P7 Conn Board, P2 Conn Board, P3 Conn Board, P5 Conn Board, P8 Input Module BNC D9S CYCL CCAB Vacuum Tank GCU, P3 BNC D9P

6 6 6 6 6 6

CSC CSC CSC CSC CSC CSC

D25S D37P D25S D37S D37S Open 1 - L1 2 - L2 3 - L3 4-N Y/G GRND

CCAB CCAB CCAB CCAB CCAB CCAB

GCU, P13 GCU, P14 GCU, P15 GCU, P17 GCU, P18 MDC CB CSC

D25P D37S D25P D37P D37P Open 1 - L1 2 - L2 3 - L3 4-N Y/G GRND

262

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Installed

MIS map Run# 7 7 7

Cable Part Number. length in meters 904765. 5 904766. 5 907810. 8

From Unit CCAB CCAB CCAB Sub system GCU, P9 GCU, P10 MDC CB RFPG Type D37S D15S Open 1- Not connected 2 - L2 3 - L3 4-N Y/G GRND D25S D25S D9S

To Unit RFPG RFPG RFPG Subsystem SCU SK G SCU SK H TPSU TB 1 Type D37P D15P Open 1- Not connected 2 - L2 3 - L3 4-N Y/G GRND

8 8 9

907869. 13 907870. 13 907550. 2

TSC TSC CYCL

Relay Board P1 Relay Board P2 Single Extract. Motor P1 (next to target ports) Filter Board P1 above target ports Roof Connector TAU P27

CCAB CCAB CYCL (Target side)

GCU, P19 GCU, P20 Acc Conn Board, P4

D25P D25P D9P

907857. 2.2

CYCL

D9S

CYCL (Target side)

Acc. Conn Board, P7

D9P

10

904772. 40 907867

CCAB RFPG

BNC EIA 1 5/8" (RF Cable)

MASTER CYCL (Vacuum side)

Transceiver Vacuum Tank

BNC EIA 1 5/8"

Appendix A Cables

263

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

A-3

Cable Matrix

TABLE A-4 CABLE PART ORDER NUMBER MATRIX MIS mapRun# 1a 1a 1a 1b 1b 1b 1b 1b 1b 1b 1b 1b 1b 1b 1b 2 2 2 2 3 3 3 3 3 3 4 4 4 Cable Part Number (Label on Cable) XKA011 31001 xx 3 (729124) XKA011 31001 xx 3 (729124) XKA016 31001 xx 3 (729125) XKA110 31001 xx 3 (729148) CAC200 36020 xx 4 CAC200 36021 xx 4 CAC200 36022 xx 4 CAC200 36023 xx 4 CAC200 36024 xx 4 CAC200 36025 xx 4 CAC200 36026 xx 4 CAC200 36027 xx 4 CAC200 36029 xx 4 CAC200 36031 xx 4 CAC200 36049 xx 4 CAC200 36034 xx 4 CAC200 36035 xx 4 CAC200 36036 xx 4 CAC200 36037 xx 4 XKA110 31001 xx 3 (729148) CAC000 36020 xx 4 CAC000 36020 xx 4 CAC000 36023 xx 4 CAC000 36023 xx 4 CAC000 36024 xx 4 CAC200 36053 xx 4 CAC200 36033 xx 4 CAC200 36055 xx 4 Cable Part Order Number 904780. 6 904781. 6 904779. 6 907534. 5 907569. 6 907570. 6 907571. 5 907572. 5 907573. 3.6 907574. 3.8 907575. 5 907576. 4.3 907578. 5 907580. 5 907803. 4.8 907583. 3 907584. 4 907585. 3 907586. 3 907866. 14 907808. 17 907808. 17 904774. 17 904774. 17 904775. 17 907881. 4.5 907582. 9 908535. 6

264

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

MIS mapRun# 5 6 6 6 6 6 6 6 7 7 7 8 8 9 9 10

Cable Part Number (Label on Cable) XKA102 31001 xx 3 (901500) XKA001 31001 xx 3 (729121) XKA011 31001 xx 3 (729124) XKA016 31001 xx 3 (729125) XKA011 31001 xx 3 (729124) XKA016 31001 xx 3 (729125) XKA016 31001 xx 3 (729125) CAC000 36021 xx 4 XKA016 31001 xx 3 (729125) XKA006 31001 xx 3 (729123) CAC000 36022 xx 4 XKA011 31001 xx 3 XKA011 31001 xx 3 (729124) XKA001 3100 xx 3 (729121) CAC205 31101 xx 3 (907857) XKA100 31001 xx 3 (729141)

Cable Part Order Number 907868. 40 907896. 13 904767. 10 904768. 10 904769. 10 904770. 10 904771. 10 907809. 13 904765. 5 904766. 5 907810. 8 907869. 13 907870. 13 907550. 2 907857. 2.2 904772. 40

Appendix A Cables

265

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

266

Appendix A Cables

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX B CONNECTORS
B-1 Swagelok Tube Fitting Connections
The 1/16", 1/8" and 3/8" lines use Swagelok Tube Fittings. This section contains a set of installation instructions for all three sizes. The connections are the same for all the types of pipes and tubes used on the system. However, the size of the pipe or tube determines whether you tighten the nut 270o (3/4 turn) or 450o (1 and 1/4 turn). Note: If you havent used a Swagelok tube fitting before, take one apart and examine the pieces. (Look for the shoulder, inside the Swagelok body) Put the fitting back together, and follow the instructions to insert the hose. Stop after Step 5 to examine your work. After you make a couple of connections, youll get a feel for the process, and wont have to check the clearance on the ferrules each time. 1. 2. Make sure the end of the pipe or tube is round, has an even edge, and is free from burrs. Refer to Illustration B-1. The pre assembled Swagelok connector consists of a body, two ferrules and a nut. The back ferrule fits into the front ferrule, and the both ferrules nest inside the nut. There is also a tube insert to secure the tube connection.

ILLUSTRATION B-1 SWAGELOK TUBE FITTING (3/8" SIZE)

Tube insert front Tube insert Swagelok Body

Front Ferrule Back Ferrule

Nut

3.

Push the tube insert into the tube until the insert front and tube end are in line.Illustration B-2

ILLUSTRATION B-2 SWAGELOK TUBE INSERT FITTING

Appendix B Connectors

267

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 4.

GE HEALTHCARE REV 5

Loosen the nut, without removing it from the body, and push the tube or piping into the back of the nut, through both ferrules, until it just reaches the shoulder in the Swagelok body. Then back off a millimeter or two. The end of the tube should clear the front ferrule by 2 or 3mm, but should not touch the shoulder in the Swagelok body. (Illustration B-1 and Illustration B-3) To check the clearance, remove the nut and push on the hose to expose the ferrules. The hose end should extend 2 or 3mm beyond the end of the front ferrule. If OK, pull the hose and ferrules back into the nut and reattach it to the Swagelok body.

5.

ILLUSTRATION B-3 HOSE CLEARANCE EXAMPLES

Bad: Not enough clearance

OK: Hose extends 2mm past the end of the front ferrule

ILLUSTRATION B-4 SWAGELOK COMPONENTS IN CORRECT ORIENTATION

After you OK the hose clearance, pull the ferrules back into the nut.

6. 7.

Tighten the nut until it feels finger tight. Make a reference mark on the tube at the 6 oclock position.

268

Appendix B Connectors

GE HEALTHCARE REV 5 8.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Hold the fitting body steady with one wrench and tighten the nut with another wrench: IF the pipe/tube has a 1/16" or 1/8" diameter, tighten the nut 270o (3/4 turn) IF the pipe/tube has a 3/8" diameter, tighten the nut 450o (1 and 1/4 turn)

ILLUSTRATION B-5 SWAGELOK FITTING CONNECTED TO 3/8" PU LINE

Appendix B Connectors

269

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-6 EXAMPLES OF SWAGELOK TUBE FITTINGS

GE HEALTHCARE REV 5

Helium Compressor

Magnet Cooling Lines

270

Appendix B Connectors

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

B-2

PEEK Connections
The 18F- and 13N Target systems use PEEK tubes between the Liquid Target Filler and the Target. The LTF also has additional PEEK tubing and connections. Usually, the 1/16" PEEK tube uses the same Swagelok connectors as the 1/16" Tefzel tubes (B-1), but the PEEK tubes also use connections like the one shown in Illustration B-7 to provide a quick method to disconnect the Target from the LTF. The LTF vials also use needles with a similar fitting.

ILLUSTRATION B-7 ALTERNATE PEEK TUBING CONNECTION

Insert tube here

1. 2. ILLUSTRATION B-8 PEEK TUBING CONNECTIONS

Insert the line into the connector, until it passes the shoulder inside the tip, and extends beyond the outer tip of the connector by a millimeter or two. Screw the threaded end of the connector into the coupling (or threaded LTD component).

Tube extends 1 or 2mm past tip

Screw threaded tips into coupling

ILLUSTRATION B-9 TARGET PEEK CONNECTIONS

Target Current sensor (from Target Cooling Unit)

PEEK connectors

Appendix B Connectors

271

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

B-3

RF Cable
The RF cable consists of a hollow inner copper conductor centered within a hollow outer copper conductor, and held in place with a spiral plastic spacer. Both conductors have corrugated ribs that act as threads. The RF cable arrives in a coil, usually with a connector attached to at least one end. IF the cable has a connector attached to both ends, return to section 4-1-3. IF you must attach one or both connectors, follow the instructions in this section.

Note: You must take two restrictions into consideration to determine the length of the RF cable. 1. 2. The cable may only be cut in increments of 1.41 meters (including the connectors) You may not make a bend in the cable with a radius of less than 180mm (single bend) or 550mm (multiple bends).

Read all the information in the entire RF cable section (Section B-3-1 through B-3-3) at least once before you remove the ty-wraps and run the RF cable. For best results: Decide how to run and suspend or support the cable from the RFPG to the top of the Cyclotron shield. Most MINItrace systems have the electronics cabinets in the same room as the Cyclotron, so the run should be fairly short and straight. Measure the length of the planned cable run and round it up to the nearest segment. Measure and cut the cable to length. Cover the unfinished end, to prevent any dirt or debris from entering the cable. The finished end should have about 50mm of insulation removed from the cable (about 20mm above the connector). Attach this end to the RFPG cabinet connection. Run the RF cable from the RFPG to the top of the MINItrace shield. Dont make the RFPG connection until after you finish the cable end at the magnet. Insert the unfinished cable end into the shield first, then attach the connector.

272

Appendix B Connectors

GE HEALTHCARE REV 5 ILLUSTRATION B-10 COILED CABLE

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Sharper bends than this become permanent. Make a curve in the cable to negotiate a sharp turn, or follow an alternate route.

B-3-1

Determine the RF Cable Length


Normally, the run between the RFPG cable and MINItrace Cyclotron is fairly short and straight, because the electronics cabinets are usually located in the same room as the Cyclotron. If the cabinets are located in a different room, you may have to make some extra bends in the cable. Refer to Illustration B-10. Examine the coiled cable before you cut the ty-wraps. If you make bends in the cable with a sharper turn, the bends become permanent. So, rather than bending the cable around a corner, you must curve the cable around it. (REMEMBER to add the excess length of this curve to the cable measurement.) Note: To negotiate a really sharp turn, you may have to make a cut in the cable, and insert a 90o connector. If this is the case, call the factory in Uppsala for advice and information. IF possible, make a dry run and measure the distance on the RF cable. Otherwise, use string (rope) or one of the other cables to make the run and measure the distance. Refer to Illustration B-10. If you make any bends with a smaller radius than these loops, the bend becomes permanent. Plan every bend carefully.

To determine the final cable length: 1. Measure the exact metric length of the cable run you plan to follow, from the connector on the RFPG cabinet to the connector on the magnet (Illustration B-11), including the extra wide curves and loops needed to negotiate corners or complex penetrations. Round this figure up to the nearest 1.41meter increment 3. Ex: 5.64, 7.05, 8.46, 9.87, 11.28, 12.69... up to a maximum length of 25.38m

2.

Measure the cable one more time, and cut the cable to length.

Appendix B Connectors

273

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-11 RF CABLE CONNECTION TO MAGNET

GE HEALTHCARE REV 5

B-3-2

Locate and Disassemble the Connector


Locate the RF Cable connector. The connector ships, pre-assembled, in a plastic bag, along with a set of generic instructions. This section contains the specific instructions for this application. The connector consists of: A termination sleeve that fits over the outer conductor and rests against the cable insulation. A threaded socket that screws into the inner conductor. An inner subassembly that fits over the inner conductor and threaded socket. (You do not have to remove the inner subassembly from the connector head when you disassemble the connector.) An o-ring gasket seal between the termination sleeve and connector head. A flanged connector head that slides over the inner subassembly and fastens to the termination sleeve with six cap head screws. Six cap head screws and washers, and one left-threaded screw and copper washer. Two black plastic plugs and a copper gasket (not used).

274

Appendix B Connectors

GE HEALTHCARE REV 5 ILLUSTRATION B-12 RF CABLE CONNECTOR


Termination sleeve

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Connector head (with inner subassembly)

Gasket seal (o-ring)

Remaining hardware

Threaded socket

Left-threaded screw These screws held the assembly together during shipment

1. 2. 3. 4.

Remove the connector, instructions and bag of hardware from the plastic bag. Use a 5mm allen wrench to remove the two cap head screws that hold the assembly together. Remove the left threaded (5mm) cap head screw from the connector head, and remove the threaded socket from the center interior of the connector head. Locate and remove the following items from the installation gang box: 35mm pipe jig (See Illustration B-13) Hacksaw Flanging tool (Refer to Illustration B-14) Adhesive bandages and ointment (See Caution)

CAUTION

The edges of the RF cable are sharp enough to cut flesh and tear clothes. Take care when you handle or cut the conductors, or attach and remove the flanging tool.

Appendix B Connectors

275

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-13 PIPE JIG


Outer view Insert hacksaw blade in slot for clean, straight cut, 35 mm from the edge of the insulator.

GE HEALTHCARE REV 5

35mm from inner shoulder to slot Insert hacksaw blade in slot for clean, straight cut, 35 mm from the edge of the insulator.

Inner view

Slide this end over the insulator

This shoulder butts against the insulator.

ILLUSTRATION B-14 FLANGING TOOL

Cutter Adjustment wheel

You may have to trim the inner conductor before this bar will slip all the way into the notch and lock into place. Flanging wheel

276

Appendix B Connectors

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

B-3-3

Attach the Connector to the Cable


Cut the Cable to its Finished Length The actual length of the RF cable equals the distance from the outer connector edge to outer connector edge. So, the first step is to cut 80mm (8cm) off the unfinished edge, to compensate for the length added to the cable by the connector head. 1. 2. 3. Measure 80mm from the unfinished edge of the cable and mark the cable for cutting. Measure 55mm from the cut mark, and evenly wrap a piece of masking tape around the cable, so the upper edge meets the 55mm mark. Cut the cable at the mark you made 80mm from the unfinished edge. 4. Try to make a straight (perpendicular) cut. If possible, stuff a cloth into the cable opening and/or tilt the cable downward so the debris (swarf) created while cutting stays out of the interior of the cable.

After you make the cut, tap the cable against a solid surface to remove any chips from the interior of the conductors.

ILLUSTRATION B-15 UNFINISHED CABLE END WITH 55MM GUIDE


80mm cut 55mm Guide - Remove insulation back to edge of tape.

Remove the Insulation from the Outer Conductor 1. Remove the cable insulation from the newly cut edge, to the masking tape at the 55mm mark. Using the tape as a guide, take a knife or razor blade and trim the insulation as evenly as possible along the edge of the tape, and as perpendicular as possible to the outer conductor. The goal is to create an even and solid edge to butt against the termination sleeve.

2.

Clean the sticky black adhesive substrate (glue) off the outer conductor with solvent. If available, use a heat gun to loosen (and melt) the adhesive. Take care not to warp the remaining insulation with the heat gun.

Appendix B Connectors

277

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-16 RF CABLE WITH INSULATION REMOVED AND OUTER CONDUCTOR CUT TO LENGTH

GE HEALTHCARE REV 5

Remove adhesive residue with solvent

Cut the Outer Conductor to Length 1. After you clean the adhesive from outer conductor, tap the cable against a solid surface to remove any debris from the interior, then gently clamp the cable into the vise. Refer to Illustration B-13. Slip the pipe jig over the end of the cable, and slide it down the outer conductor until the inner shoulder rests firmly against the edge of the insulation. Insert the hacksaw blade into the slot, and cut through the outer conductor. Keep turning the jig and, if necessary, adjusting the hacksaw blade, to trim away the excess 20mm of outer conductor, while leaving the inner conductor intact. Use diagonal cutters to trim back any excess spiral plastic spacer. Refer to Illustration B-17. When you finish, the outer conductor should measure 35mm from insulation to outer edge. The inner conductor should now stick out an additional 20mm from the outer edge of the outer conductor.

2.

3. 4. 5. 6.

ILLUSTRATION B-17 CUT OUTER CONDUCTOR TO 35MM

Trim outer conductor back to 35mm

Leave inner conductor alone

Attach the Termination Sleeve to the Cable 1. Refer to Illustration B-18. Slide the Termination Sleeve over the end of the cable, until the threads in the outer edge engage the corrugated ribs of the outer conductor. Then, screw the termination sleeve onto the outer conductor, until the inner edge of the sleeve rests against the cable insulation.

278

Appendix B Connectors

GE HEALTHCARE REV 5 ILLUSTRATION B-18 TERMINATION SLEEVE ON RF CABLE


The corrugated ribs of the outer conductor act as threads. The Terminator sleeve screws onto the outer conductor.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

2.

Refer to Illustration B-14. The Flanging tool has a flanging wheel and a cutting bit attached to the knurled assembly on the handle. Pull up on the knurled assembly and rotate it to position the flanging wheel as close to the collar as possible. (Later, you will rotate the cutter into position to trim away the excess copper from the outer conductor) Refer to Illustration B-14 and Illustration B-19. The collar of the flanging tool has 4mm cap head captive screws. Slip the collar of the flanging tool over the end of the cable, and attach it to the Termination Sleeve with the captive screws

3.

ILLUSTRATION B-19 ATTACH FLANGING TOOL TO TERMINATION SLEEVE

Notch on collar

Adjustment wheel

4.

Refer to Illustration B-20. Slowly swing flanging assembly upward, and see if you can slip the bar on the assembly into the notch on the collar. (If you followed the instructions, you probably cant.) Trim away a millimeter or two of the inner conductor with the hacksaw, and try again. When you finish, the inner conductor should rest against the flanging assembly and the bar should drop into the collar. Dont fasten the bar into place yet.
Appendix B Connectors 279

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-20 DETAIL OF INNER CONDUCTOR AND FLANGING ASSEMBLY

GE HEALTHCARE REV 5

If it interferes, trim outer conductor until bar on flanging assembly fits into collar notch. (See Detail)

Swing flanging assembly upward and lock into notch on collar with thumb screw

Adjust this notched wheel to move the flanging wheel against or away from the conductor.

Tighten knurled screw to lock bar Flanging assembly must be parallel to collar in order for bar to slip into notch on collar and lock into place.

5.

Refer to Illustration B-20 and Illustration B-21. Turn the notched wheel at the bottom of the flanging assembly to position the flanging wheel between the inner and outer conductors. Then drop the bar into the notch on the collar. Carefully tighten the knurled screw on the bar to snug the assembly into place. When you finish: The inner conductor should just rest against the flanging assembly. The flanging assembly should be parallel to the collar/termination sleeve. The flanging wheel should be positioned between the inner and outer conductors, with the edge resting lightly against the outer conductor. (Notched wheel adjusts position) The bar should fit all the way into the notch on the collar, perpendicular to both the collar and the flanging assembly.

280

Appendix B Connectors

GE HEALTHCARE REV 5 ILLUSTRATION B-21 EXTREME CLOSE-UP OF FLANGING WHEEL

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Position flanging wheel between inner and outer conductor before locking flanging assembly bar into place.

The flanging wheel presses the edge of the outer conductor against the Termination Sleeve to fasten it into place.

6.

Refer to Illustration B-20 and Illustration B-21. Turn the handle slowly and smoothly. As you turn the handle, the flanging tool folds the outer conductor back against the Termination Sleeve without splitting the conductor. Then, it presses the conductor firmly against the Termination Sleeve, which in turn presses the Termination Sleeve firmly against the insulation. If necessary, adjust the notched wheel to change the relationship between the flanging wheel and the outer conductor (increase or decrease the pressure.)

7. 8.

Continue to turn the handle and adjust the notched wheel until the flanging wheel has completely flattened the outer conductor against the Termination Sleeve. Loosen the screw and temporarily slip the flanging tool bar out of the notch on the collar. Pull up on the knurled section of the flanging assembly and rotate the flanging wheel out of the way, and the cutting bit into its place. Reattach the bar to the collar, and adjust the notched wheel until the cutting bit rests against the folded back portion of the conductor.

9.

10. Refer to Illustration B-22.Turn the handle slowly and smoothly. The cutting bit trims excess material away from the flanged portion of the conductor as you turn the handle. The edge is still sharp, so take care. 11. After you trim excess copper from the flanged edge, you may remove the flanging tool from the Termination Sleeve. Loosen the knurled screw, remove the bar from the notch in the collar, and let the flanging assembly hang from its hinge. Loosen the 4mm cap head screws to detach the flanging tool from the Termination Sleeve. Move the flanging wheel back into its position nearest the collar, to set the flanging tool up for the next connector, before you return the tool to the box.

Appendix B Connectors

281

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-22 TRIM EXCESS COPPER FROM CONDUCTOR

GE HEALTHCARE REV 5

Finish the Connector Assembly 1. Refer to Illustration B-23. Use the hacksaw to trim the inner conductor to extend 11mm from the outer edge of the Termination Sleeve/flanged end of the outer conductor. Shake any debris (swarf) out of the cable.

ILLUSTRATION B-23 TRIM THE INNER CONDUCTOR TO LENGTH

11mm from outer edge of termination sleeve to outer edge of inner conductor

Remove dents and bends from inner conductor

2. 3.

Use a pair of pliers to remove any burrs, dents and bends from the edge of the inner conductor. Refer to Illustration B-24. Screw the Threaded Socket into the inner conductor. The narrow end of the socket is notched, to accommodate a flat blade screwdriver.

282

Appendix B Connectors

GE HEALTHCARE REV 5 4.

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Use a flat blade screwdriver to adjust the Threaded Socket, until the outer edge extends 23mm from the outer edge of the Termination Sleeve.

ILLUSTRATION B-24 SCREW THREADED SOCKET INTO CENTER CONDUCTOR

Use a flat blade screwdriver to adjust height of Threaded Socket.

23mm from tip of Threaded Socket to outer edge of Termination Sleeve

5.

Refer to Illustration B-25. After you adjust the height of the Threaded Socket, use a small hammer, or a roll punch and hammer, to evenly fold the edges of the inner connector over the shoulder of the Threaded Socket. Keep working around the circumference of the socket, until the inner conductor is evenly hammered into place.

ILLUSTRATION B-25 FOLD INNER CONDUCTOR OVER THREADED SOCKET

Use a hammer to fold the inner conductor against the socket shoulder. OR Use a hammer and roll pin punch. (see picture below)

O-ring fits into this groove

Appendix B Connectors

283

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6. 7.

GE HEALTHCARE REV 5

Remove the o-ring gasket from the parts bag, and slip it into the groove beneath the outer lip of the Termination Sleeve. Slide the Connector Head over the Termination Sleeve and Threaded Socket assembly and align the holes in the Connector Head with the threaded holes on the Termination Sleeve. Slide a steel washer down the shaft of each of the six 5mm cap head screws. Fasten the Connector Head to the Termination Sleeve, and use your fingers to start the screws, and barely fasten them into place.

8.

Use a 5mm allen wrench to cross-tighten the screws: Tighten down one screw, then tighten down the screw directly opposite it (180o). Continue to fasten down each pair of screws, until all three sets are firmly fastened. (When you tighten one set of screws, the other two sets will become loose until youve completely clamped the Connector Head to the Termination Sleeve, and compressed the gasket.) When all three sets of screws feel tight, try each screw in turn, until you have "tightened" your way once around the circumference of the Connector Head. Try the first screw again, and if it moves, tighten once more in the opposite direction around the circumference of the Connector Head.

9.

Slide the copper washer down the shaft of the left-threaded screw, and insert it into the center of the connector head, and into the Threaded Socket you inserted into the inner conductor.

10. After you firmly tighten the left-threaded screw, remove the two black plugs from the parts bag, and insert them into the threaded holes in the Termination Sleeve. (All you should have left over is a copper gasket.) ILLUSTRATION B-26 FINISHED CABLE
Gas fitting not used; you may remove it if it gets in the way when you run the cable.

284

Appendix B Connectors

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Expose the Conductor at the RFPG End of the Cable If you had to attach both connectors to the raw RF cable, you must expose 50mm of the outer conductor at the RFPG end of the cable to make the grounding connection at the top of the cabinet. If the cable arrived with one connector attached, the conductor should already be exposed at the finished end. Attach the end with the exposed conductor to the RFPG cabinet connector after you make the connection at the magnet end. 1. 2. 3. Measure and mark the first cut line 20mm from the edge of the connector. Measure and mark the second cut line 70mm from the edge of the connector. Evenly wrap a piece of masking tape around the cable and along the edge of each cut mark, exposing the 50mm of insulation you will remove from the cable.

ILLUSTRATION B-27 EXPOSE THE CONDUCTOR AT THE RFPG END OF THE CABLE
20mm cut line 70mm cut line

Remove 50mm of the insulation to expose the outer conductor

4.

Using the pieces of tape as a guide, take a knife or razor blade and trim the insulation as evenly as possible along the edge of each tape, and as perpendicular as possible to the outer conductor. Remove all the insulation from the 50mm area between the two pieces of tape. Clean the sticky black adhesive substrate (glue) off the outer conductor with solvent. If available, use a heat gun to loosen (and melt) the adhesive. Take care not to warp the remaining insulation with the heat gun.

5. 6.

7. 8.

Remove the tape and fasten the finished cable to the RFPG cabinet connector. Refer to Illustration B-28. Fit the grounding collar plates around the cable, and make sure they fit against the exposed conductor. If necessary, trim back any excess insulation until only exposed conductor makes contact with the grounding collar.

9.

Return to Section 4-1-3 on page 99 to install the RF cable.

Appendix B Connectors

285

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 ILLUSTRATION B-28 MAKE SURE THE GROUNDING COLLAR FITS AGAINST THE CONDUCTOR

GE HEALTHCARE REV 5

When Complete

RF Cable Finished Final Cable Length _____________m

286

Appendix B Connectors

GE HEALTHCARE REV 5 Notes and Comments:

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Appendix B Connectors

287

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

288

Appendix B Connectors

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX C GCS CONFIGURATION VALUES


Use the tables in this appendix to create a hard copy of the configuration values that were established during the staging and testing of this system at the manufacturing facility. Display the configuration pages on the service pc (MSS) and copy the systems parameters into the Actual Value column in the corresponding table. Then, if anything happens to corrupt the system configuration (and backup floppy diskette) you can use these values to restore the system.

Date these values were recorded: ________________________________________ Values recorded by: __________________________________________________ TABLE C-1 TABLE OF NOMINAL ACCELERATOR CONTROL SYSTEM VALUES Parameter Pressure set [psi] Max variance [psi] Max leak pressure [psi] Max pressure [psi] Min pressure [psi] Fill time [s] Stabilize time [s] Empty time [s] Flush time [s] Leak time [s] Dry time [min] Transport time [s] Active trap time [min] (1) F 150 10 5 400 35 10 5 120 30 20 (2) C 20 20 400 80 10 5 30 20 10 (3) O 30 20 400 80 5 5 5 20 (4) N 10 5 150 45 10 5 120 30 30 (6) F 150 10 5 400 35 10 5 120 30 20 -

Startup I probe [uA] Startup I [mA] IS life length [Ah]

Loss probe/foil [%] Loss foil/target [%] Extr. foil wear [mAh]

I psmc [A]

Appendix C GCS Configuration Values

289

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 TABLE C-2 TABLE OF ACTUAL ACCELERATOR CONTROL SYSTEM VALUES

GE HEALTHCARE REV 5

Parameter Pressure set [psi] Max variance [psi] Max leak pressure [psi] Max pressure [psi] Min pressure [psi] Fill time [s] Stabilize time [s] Empty time [s] Flush time [s] Leak time [s] Dry time [s] Transport time [s] Active trap time [min]

(1) F

(2) C

(3) O

(4) N

(6) F

Startup I probe [uA] Startup I [mA] IS life length [Ah]

Loss probe/foil [%] Loss foil/target [%] Extr. foil wear [mAh]

I psmc [A]

290

Appendix C GCS Configuration Values

GE HEALTHCARE REV 5 TABLE C-3 ACCELERATOR CONFIGURATION PARAMETERS Parameter Magnet System itop thold istep iproton increasing current Maximum limit for magnet current Description

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Typical Value

Actual Value

150A 60s 1.00A/s 133.00A 40.mA

Time to stay at maximum current during Magnet ramp-up Ramping speed Current during proton production Compensation for temperature changes in the magnet during long production runs from the Master (every 20 minutes)

RF System U Dee scan start pos p (freq) Dee scale phase set Ion Source System is operation time is life length max arc current 2Ah 1000Ah 1300mA 2000mA (future) 100mA Scaling factor for the conversion of DEE voltage read signal into true kilovolts and displayed to the operator Operating DEE voltage during proton production 35kV 75% 225 -5.0 deg

startup arc current Extraction System i probe start up probe/ foil loss max foil/ target loss max Global ethernet port number master TCP IP addr Foil Diary maximum foil wear Maximum foil lifetime Ethernet port number (Check/etc/services on master) Master System TCP/IP address (Check/etc/hosts on master) Maximum current for the Flip-in probe at Ion Beam start up Maximum Ion Beam loss between Flip-in probe and active foil Maximum Ion Beam loss between Active Foil and Active Target

15A 80% 20%

3456 192.0.4.30

1.0mAh

Appendix C GCS Configuration Values

291

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

292

Appendix C GCS Configuration Values

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX D MINITRACE GAS PURITY AND PRESSURE SETTINGS


This appendix contains the list of currently available MINItrace target system options. Recommended: Highlight the option(s) on your system, to determine what gases and pressures should be present. TABLE D-1 GAS PURITY, PRESSURE, PRESSURE RANGE FOR AUXILIARY SYSTEM

Auxiliary System Ion Source

Gas H2

Purpose Operation gas

Quality (Minimum purity) 5.0

Pressure MPa (bar) (psi) (or flow, ml/ min) 0.5 MPa (5 bar) (73 psi)

MPa (bar) (psi) 0.02MPa (0.2 bar) (29 psi)

Utilizes Supply Panel? Yes

Note Pressure range determined by using a frit and setting hydrogen pressure on the regulator. -

All targets

He

Cooling

4.5

0.15 MPa (1.5 bar) (22 psi)

0.05 MPa (0.5 bar) (7 psi)

Yes

TABLE D-2 GAS PURITY, PRESSURE, PRESSURE RANGE FOR TRACER SYSTEM Quality (Minimum purity) 5.5 Utilizes Supply Panel? Yes

Tracer systems
18 -

Gas He

Purpose Transport gas

Pressure* (flow) Note: Regulator provided by GE! 0.5 MPa [5 bar] [73 psi] 2.5 MPa [25 bar] [363 psi]

Pressure range 0.2 MPa [2 bar] [29 psi]

Note Tube from bottle splits in two lines by means of extra regulator on Supply Panel.

18F-

He

Operation

5.5

OG: 0.1 MPa [1 bar] [14 psi]

Yes

Appendix D MINItrace Gas Purity and Pressure Settings

293

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

Tracer systems
13N-NH 3

Gas CH4 (Meth ane)

Purpose Operation transport

Quality (Minimum purity) 5.5

Pressure* (flow) 0.4 MPa [4 bar] [58 psi]

Pressure range -0.1 MPa +0.2 MPa -1 bar +2 bar -14 psi +29 psi

Utilizes Supply Panel? Yes

Note Long tubing and vertical distance between cyclotron and Radiochemistry System may require higher pressure. -

11

CO2

1%O2 /N2

Target gas

1% O2: 3.5 N2 : 5.5

0.9 MPa *) [9 bar] [130 psi] 0.3 MPa [3 bar] [45 psi] (Flow: 400 ml/min) 0.9 MPa *) [9 bar] [130 psi] 0.3 MPa [3 bar] [44 psi] (Flow: 400 ml/min) 0.15 MPa (1.5 bar) (22 psi)

0.1 MPa [1 bar] [15 psi] 0.1 MPa [1 bar] [15 psi] (50 ml/min) 0.1 MPa [1 bar] [15 psi] 0.1 MPa [1 bar] [14 psi] (50 ml/min) 0.05 MPa (0.5 bar) (7 psi)

Yes

N2

Transport gas

5.5

Yes

Set pressure to 2.5 bar and adjust the flow with the needle valve. Very expensive gas.

H215O

1%O2 / N2
15

Target gas

1% O2: 3.0
15

No

N2 : 3.0

5%H2 + Ar

Transport gas

H2 : 3.0 Ar : 5.5

Yes

Adjust pressure to achieve correct flow. Pressure range 23 bar. -

All targets

He

Cooling

4.5

Yes

294

Appendix D MINItrace Gas Purity and Pressure Settings

GE HEALTHCARE REV 5 Notes and Comments:

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Appendix D MINItrace Gas Purity and Pressure Settings

295

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

GE HEALTHCARE REV 5

296

Appendix D MINItrace Gas Purity and Pressure Settings

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX E DAILY RECORDS LOG


This appendix contains tables to record daily system readings as you start-up the system. Enter todays date and record the requested information into the corresponding columns. Save the table on the LAST page of this appendix (Table E-3 ) for use as a master, to make additional copies of the table, if you need them.

Appendix E Daily Records Log

297

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

298

Appendix E Daily Records Log

GE HEALTHCARE REV 5 TABLE E-1 DAILY RECORDS LOG SWCU BP1 Gauge SWCU BP2 Gauge SWCU BP3 Gauge

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Todays Date

SWCU Cooling Temperature (from CSC panel)

SWCU Conductivity (from CSC panel)

Appendix E Daily Records Log

299

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes or Comments:

GE HEALTHCARE REV 5

300

Appendix E Daily Records Log

GE HEALTHCARE REV 5 TABLE E-2 DAILY RECORDS LOG SWCU BP1 Gauge SWCU BP2 Gauge SWCU BP3 Gauge

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Todays Date

SWCU Cooling Temperature (from CSC panel)

SWCU Conductivity (from CSC panel)

Appendix E Daily Records Log

301

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes or Comments:

GE HEALTHCARE REV 5

302

Appendix E Daily Records Log

GE HEALTHCARE REV 5 TABLE E-3 DAILY RECORDS LOG SWCU BP1 Gauge SWCU BP2 Gauge SWCU BP3 Gauge

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Todays Date

SWCU Cooling Temperature (from CSC panel)

SWCU Conductivity (from CSC panel)

Appendix E Daily Records Log

303

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes or Comments:

GE HEALTHCARE REV 5

304

Appendix E Daily Records Log

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX F POWER ON/OFF SEQUENCES


This appendix contains the recommended system power on and power off sequences. Use these sequences after successfully completing the Chapter 6 instructions.

F-1

Power ON
1. Check mains power: - R-S - R-T - S-T __________VAC __________VAC __________VAC

- R-N - S-N - T-N

_________VAC _________VAC _________VAC

2.

Switch on power to each of the following MINItrace components: - CCAB - Circuit breaker on the MDP_______ - RFPG - Circuit breaker on the MDP_______ - CSC - Circuit breaker in the CCAB _______ - MASTER - Power switch on the back of the computer_______

3.

After the Master System boots up, push reset on the GCU (General Control Unit) to load the corresponding software.

4.

Start the water cooling pump for the vacuum system from the CSC COOLING panel. - Press the ON button to start the water cooling pump

5.

Press PUMP on the VCU (Vacuum Control Unit) to start the vacuum system. - After 20-40 minutes the vacuum pressure should read less than 4.0x10-5mbar.

Appendix F Power ON/OFF Sequences

305

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 6.

GE HEALTHCARE REV 5

Logon to the Master System as the operator, and make your tracer. - Please enter your user name: MINItrac - Please enter your password: mini000

306

Appendix F Power ON/OFF Sequences

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

F-2

Power OFF
1. Place the MINItrace system into OFF mode: a. b. From the Service PC: Display one of the system pages and select SYSTEM OFF. Exit to DOS from the Main Menu, then turn off the MSS.

2.

To log off the Master and return to the login prompt: a. -orb. Click on the EXIT sign in the MINItrace desktop toolbar, at the bottom of the screen. Click on EXIT in the MINItrace function toolbar, at the top of the screen.

3.

To SHUT DOWN the MASTER system. a. Login as root: * Please enter your user name: root * Please enter your password: gemsrot b. c. d. If necessary, open a Unix terminal window. (One should automatically open for you.) Type/enter: shutdown -h now When the screen prompts: Program terminated ok e. You may safely turn off the Master system.

4.

Press VENT to release vacuum.

5.

Press OFF on the VCU.

6.

Wait at least 2 hours, to let the diffusion pump cool down. - If possible, leave the cooling pumps on longer than two hours, to help the diffusion pump cool down as much as possible, before shutting down the pumps.

Appendix F Power ON/OFF Sequences

307

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 7. Switch off the water cooling pump from the CSC COOLING panel.

GE HEALTHCARE REV 5

- Press the OFF/RESET button to turn OFF the water cooling pump

8.

Switch off power at each of the following MINItrace components: - MASTER - Power switch on the back of the computer - CSC - Circuit breaker in the CCAB - CCAB - Circuit breaker on the MDP - RFPG - Circuit breaker on the MDP

System Power OFF sequence completed.

308

Appendix F Power ON/OFF Sequences

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

APPENDIX G RFPG TRANSFORMER TAPS


G-1 Introduction
This instruction provides the information to determine the mains selection, in order to configure the RFPG taps to a particular mains supply The RFPG cabinet has only one transformer, the EHT Transformer T1, which requires its taps to be set. The EHT Transformer T1 is a three phase transformer, located in the TPSU, and accessed from the bottom front or rear panels of the RFPG. The EHT transformer is used to generate the anode voltage for the power amplifier tube. All the other RFPG components are powered from the mains transformer in the Control Cabinet (CCAB). This appendix does NOT address the tapping of the CCAB transformer. If the mains voltage is low (108 V 132 V phase to neutral) you must change the mains circuit breaker SW1, and the mains filter FL1 in the RFPG, before you can set the EHT Transformer taps.

Appendix G RFPG Transformer Taps

309

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-2

Measure the Site Main Voltage


DANGER THIS PROCEDURE REQUIRES THE MEASUREMENT OF DANGEROUS MAINS VOLTAGES. THE TPSU GENERATES LETHAL VOLTAGES OF UP TO 8KV DURING NORMAL OPERATION. ALWAYS CONNECT THE GROUND STICK TO THE HIGH VOLTAGE FUSE, F1 BEFORE YOU TOUCH ANY RFPG COMPONENT.

ILLUSTRATION G-1 GROUND STICK LOCATION

HV fuse

Ground stick

TB4

Filter FL1

G-2-1

Measure the Incoming Power


1. 2. 3. Open the lower rear panel of the RFPG. Find the TB4 terminal blocks, located in the left rear side of the TPSU. Use a digital voltmeter, with better than 1.5% accuracy on r.m.s. a.c. voltage for this measurement. At the TB4 terminal blocks, measure the phase voltages, L1 N, L2 N and L3 N. Neutral N is not required for the RFPG EHT transformer, so some installations may not have a neutral connected to TB4. If so, measure the line voltages L1 L2, L2 L3 and L1 L3. Calculate the phase voltages by dividing the line voltage values by 3

310

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-2-2

Determine the Average Voltage and Fluctuations


1. 2. Record the three phase voltages as VPL1, VPL2 and VPL3. Use the following formula to calculate the average phase voltage VPA . VPL1 + VPL2 + VPL3 VPA = ________________ 3 3. Record this value. Attempt to obtain information about the loading of the installation mains supply, so you can take measurements during peak and minimum loads. From the results determine minimum and maximum values VPAMIN and VPAMAX. Use the following formula to calculate VPAMEAN VPAMEAN = (VPAMIN + VPAMAX)/2 5. VPAMEAN equals the mean value of the mains voltage. - Preferably the minimum and maximum values of the mains voltage should not differ by more than 5% from the mean value. - Section elect tapping configuration according to section 3 of this instruction.

4.

Appendix G RFPG Transformer Taps

311

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-3

Set the Taps


WARNING ENSURE THE RFPG IS ISOLATED FROM THE MAINS BEFORE ATTEMPTING TO SET THE TAPS. Open TPSU front cover and check, using a screwdriver, that all terminal screws on terminal block TBL 1, TBL 2 and TBL 3 are tightened. Loose screws might cause bad connections.

CAUTION

G-3-1

Overview
Notice All Mains voltage values refer to voltages from phase to neutral. 1. 2. 3. Refer to Table G-1 . Use the value VPAMEAN, calculated in the previous section. Find the nearest value to VPAMEAN in the Table G-1 . Proceed to the corresponding "Tapping Configuration" figure which provides the information to configure the transformer. - A configuration could entail the fitting of up to 5 links per terminal block. The links are supplied attached to the RFPG. Please retain the spare links in case the mains supply changes and a new configuration is required. - Furthermore, for each particular mains voltage, terminals have to be chosen on the transformer for the incoming phase leads. Notice Read Section G-4 before proceeding further.

TABLE G-1 TAPPING CONFIGURATION TABLE VPA BAND VPAL - VPAH 108 - 116 116 - 124 124 - 132 197 - 212 208 - 222 212 - 227 222 - 237 232 - 248 238 - 254 247 - 269 269 - 285 285 - 305 Tapping Configuration Figure Number TC1 (page 315) TC2 (page 316) TC3 (page 318) TC4 (page 319) TC5 (page 320) TC6 (page 321) TC7 (page 322) TC8 (page 323) TC9 (page 324) TC10 (page 325) TC11 (page 326) TC12 (page 327)

VPAMEAN 112 120 128 205 215 220 230 240 246 258 277 295

Configuration (A//B)-(D//E) A//B (A//B)+(D//E) A+B-C A+B-C+D A+B-D-E A+B-D A+B A+B+D A+B+C-D-E A+B+C A+B+C+D+E

Where // means in parallel + means in series additive (boost) - means in series subtractive (buck)
312 Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-4

Procedure to Replace SW1 and FL1


Follow the procedure in this section to replace circuit breaker, SW1, and Mains filter, FL1, for higher current operation. If the VPAMEAN is such that its nearest value is 112, 120 or 128 V then the circuit breaker SW1 at the front of the TPSU must be changed to a higher rating, or it will continually trip. You must also change the Mains filter, FL1, to a higher rating. Notice Refer to parts list CAC223-36005-xx-4 for the circuit breaker SW1 part information. Refer to parts list CAC223-36000-xx-4 for mains filter FL1 part information.

Please follow the instructions in Section G-4-1 through G-4-3 to replace SW1 and FL1.

G-4-1

Procedure
Follow the procedure in this section to remove the circuit breaker and the filter from the TPSU, and replace them with a circuit breaker and a filter with a different current rating. The wiring is already specified for the high current rating.

G-4-2

Replace Circuit Breaker SW1 WARNING ENSURE THE RFPG IS ISOLATED FROM MAINS.
1. 2. 3. 4. 5. 6. 7. 8. Remove the lower front panel of the RFPG by turning the screws of a turn ccw. Locate SW1 on the switch mounting board of the TPSU. Refer to picture 1 at the end of this instruction. Remove the wires from SW1 by releasing the screws identified as 1, 3, 5, 2, 4, and 6 in the figure. Slacken, but do not remove, screws identified as D in figure 1. Slide back the holding brackets and remove SW1. SW1 replacement is rated at 70 - 100A and not 35 - 50A as the one just removed. Put the new switch in position on the switchboard. Push the securing brackets tight against SW1 and re-tighten screws D. Reconnect the wires as follows: a. b. c. d. e. f. To SW1 terminal 2 connect the wire connecting to CON 1 terminal 1. To SW1 terminal 4 connect the wire connecting to CON 1 terminal 3. To SW1 terminal 6 connect the wire connecting to CON 1 terminal 5. To SW1 terminal 1 connect the wire connecting to TB1 terminal 2. To SW1 terminal 3 connect the wire connecting to TB1 terminal 4. To SW1 terminal 5 connect the wire connecting to TB1 terminal 6.

Appendix G RFPG Transformer Taps

313

MINItrace INSTALLATION MANUAL DIRECTION 223294-100 g. 9. Check that all terminations are securely tightened.

GE HEALTHCARE REV 5

Adjust the new circuit breaker for a minimum thermal trip current of 70 A. The adjusting screw is located below the lever. Follow the adjustment instructions on the front of the circuit breaker.

G-4-3

Replace Filter FL1 WARNING ENSURE THE RFPG IS ISOLATED FROM MAINS.
1. Open the lower rear panel of the TPSU.

DANGER

THE TPSU GENERATES LETHAL VOLTAGES OF UP TO 8KV DURING NORMAL OPERATION. ALWAYS CONNECT THE GROUND STICK TO THE HIGH VOLTAGE FUSE, F1 BEFORE YOU TOUCH ANY RFPG COMPONENT.
2. 3. 4. 5. Locate the mains filter FL1. Refer to picture 1 at the end of this instruction. Disconnect 3 leads at the terminals marked L1, L2 and L3 and 3 leads at the terminals L1, L2 and L3. Disconnect protective ground leads on both sides of the filter. Loosen four screws which keep the filter fixed to the TPSU. Remove the filter. Ring crimp terminals on the protective ground leads need to be replaced. Crimp terminals suitable for 10mm2 cable and 8mm bolts shall be fitted. 6. FL1 replacement is rated at 70 A and not 36 A as the one just removed. Put the new filter in position and fasten it to the TPSU. The line side of the filter to face TB4. There are mounting holes which will fit to the new filter. At the terminal blocks of the filter connect 3 leads to L1, L2 and L3 on the line side and and 3 leads to L1, L2 and L3 on the load side. Tighten securely at the terminal blocks. Connect protective ground leads on both sides of the filter as well.

7.

314

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-5

Set the Taps to the TC1 Configuration


TC1:108 116 V Phase to Neutral.

ILLUSTRATION G-2 TC1 TAP CONFIGURATION

VPA Band

VPAL 108 - VPAH 116

Configuration (A//B) - (D//E) 1. TABLE G-2 Link 1 2 3 4 5 2. From 3 5 11 19 21 To 7 9 25 23 27 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-17 - Phase L2 from CON 2-3 to TBL2-17 - Phase L3 from CON 2-1 to TBL3-17. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change.

3.

For this mains voltage the circuit breaker SW1 and the filter FL1 have to be changed, as a higher current rating is needed. Refer to Section G-4.

Appendix G RFPG Transformer Taps

315

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-6

Set the Taps to the TC2 Configuration


TC2: 116 124 V phase to neutral.

ILLUSTRATION G-3 TC2 TAP CONFIGURATION

VPA Band

VPAL 116 - VPAH 124

Configuration A//B 1. TABLE G-3 Link 1 2 3 4 5 From 3 5 N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-11 - Phase L2 from CON 2-3 to TBL2-11 - Phase L3 from CON 2-1 to TBL3-11 Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 9 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

316

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5 3.

MINItrace INSTALLATION MANUAL DIRECTION 223294-100 For this mains voltage the circuit breaker SW1 and the filter FL1 have to be changed, as a higher current rating is needed. Refer to Section G-4.

Appendix G RFPG Transformer Taps

317

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-7

Set the Taps to the TC3 Configuration


TC3: 124 132 V phase to neutral.

ILLUSTRATION G-4 TC3 TAP CONFIGURATION

VPA Band

VPAL 124 - VPAH 132

Configuration (A//B) - (D//E) 1. TABLE G-4 Link 1 2 3 4 5 2. From 3 5 11 19 21 To 7 9 17 23 25 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-27 - Phase L2 from CON 2-3 to TBL2-27 - Phase L3 from CON 2-1 to TBL3-27 Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change.

3.

For this mains voltage the circuit breaker SW1 and the filter FL1 have to be changed as higher current rating is needed. Refer to Section G-4.

318

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-8

Set the Taps to the TC4 Configuration


TC4: 197 212 V phase to neutral.

ILLUSTRATION G-5 TC4 TAP CONFIGURATION

VPA Band

VPAL 197 - VPAH 212

Configuration A+B-C 1. TABLE G-5 Link 1 2 3 4 5 From 5 11 N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-13 - Phase L2 from CON 2-3 to TBL2-13 - Phase L3 from CON 2-1 to TBL3-13 Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. End of TC4.
Appendix G RFPG Transformer Taps 319

Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

To 7 15

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-9

Set the Taps to the TC5 Configuration


TC5: 208 - 226 V phase to neutral.

ILLUSTRATION G-6 TC5 TAP CONFIGURATION

VPA Band

VPAL 208 - VPAH 226

Configuration A+B-C+D 1. TABLE G-6 Link 1 2 3 4 5 From 5 11 13 N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-21 - Phase L2 from CON 2-3 to TBL2-21 - Phase L3 from CON 2-1 to TBL3-21 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 15 17 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC5.

320

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-10

: Set the Taps to the TC6 Configuration


TC6: 212 227 V Phase to NEUTRAL.

ILLUSTRATION G-7 TC6 TAP CONFIGURATION

VPA Band

VPAL 212 - VPAH 227

Configuration A+B-D-E 1. TABLE G-7 Link 1 2 3 4 5 From 5 11 17 N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-23 - Phase L2 from CON 2-3 to TBL2-23 - Phase L3 from CON 2-1 to TBL3-23 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 21 27 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC6.

Appendix G RFPG Transformer Taps

321

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-11

Set the Taps to the TC7 Configuration


TC7: 222 237 V phase to neutral.

ILLUSTRATION G-8 TC7 TAP CONFIGURATION

VPA Band

VPAL 222 - VPAH 237

Configuration A+B-D 1. TABLE G-8 Link 1 2 3 4 5 From TBL-5 TBL-11 N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-17 - Phase L2 from CON 2-3 to TBL2-17 - Phase L3 from CON 2-1 to TBL3-17 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To TBL-7 TBL-21 Links on TBL1, TBL2 and TBL3 on the EHT Transformer:

End of TC7.

322

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-12

Set the Taps to the TC8 Configuration


TC8:232 248 V phase to neutral.

ILLUSTRATION G-9 TC8 TAP CONFIGURATION

VPA Band

VPAL 232 - VPAH 248

Configuration A+B 1. TABLE G-9 Link 1 2 3 4 5 From 5 N/A N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-11 - Phase L2 from CON 2-3 to TBL2-11 - Phase L3 from CON 2-1 to TBL3-11 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 Links on TBL1, TBL2 or TBL3 on the EHT Transformer.

End of TC8.

Appendix G RFPG Transformer Taps

323

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-13

Set the Taps to the TC9 Configuration


TC9: 238 254 V phase to neutral.

ILLUSTRATION G-10 TC9 TAP CONFIGURATION

VPA Band

VPAL 238 - VPAH 254

Configuration A+B+D 1. TABLE G-10 Link 1 2 3 4 5 From 5 11 N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-21 - Phase L2 from CON 2-3 to TBL2-21 - Phase L3 from CON 2-1 to TBL3-21 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 17 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC9.

324

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-14

Set the Taps to the TC10 Configuration


TC10: 247 269 V phase to neutral.

ILLUSTRATION G-11 TC10 TAP CONFIGURATION

VPA Band

VPAL 247 - VPAH 269

Configuration A+B+C-D-E 1. TABLE G-11 Link 1 2 3 4 5 From 5 11 15 19 N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer: - Phase L1 from CON 2-5 to TBL1-23 - Phase L2 from CON 2-3 to TBL2-23 - Phase L3 from CON 2-1 to TBL3-23 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 13 21 27 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC10.

Appendix G RFPG Transformer Taps

325

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

G-15

Set the Taps to the TC11 Configuration


TC11: 269 285 V Phase to Neutral.

ILLUSTRATION G-12 TC11 TAP CONFIGURATION

VPA Band

VPAL 269 - VPAH 285

Configuration A+B+C 1. TABLE G-12 Link 1 2 3 4 5 From 5 11 N/A N/A N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer. - Phase L1 from CON 2-5 to TBL1-15 - Phase L2 from CON 2-3 to TBL2-15 - Phase L3 from CON 2-1 to TBL3-15 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 13 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC11.

326

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

G-16

: Set the Taps to the TC12 Configuration


TC12: 285 305 V Phase to Neutral.

ILLUSTRATION G-13 TC12 TAP CONFIGURATION

VPA Band

VPAL 285 - VPAH 305

Configuration A+B+C+D+E 1. TABLE G-13 Link 1 2 3 4 5 From 5 11 15 21 N/A N/A means not required for this mains configuration. 2. Connection of mains phases to TBL1, TBL2 and TBL3 on the EHT transformer. - Phase L1 from CON 2-5 to TBL1-27 - Phase L2 from CON 2-3 to TBL2-27 - Phase L3 from CON 2-1 to TBL3-27 3. Neutral links from TBL1-1 to TBL2-4 and TBL2-1 to TBL3-4 are configured at the factory. Same configuration for all mains voltages. Do not change. To 7 13 17 23 Links on TBL1, TBL2 or TBL3 on the EHT Transformer:

End of TC12.

Appendix G RFPG Transformer Taps

327

MINItrace INSTALLATION MANUAL DIRECTION 223294-100

GE HEALTHCARE REV 5

328

Appendix G RFPG Transformer Taps

GE HEALTHCARE REV 5

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

APPENDIX H START-UP CERTIFICATE


CAUTION The Mains input power is site dependent. Expect an input voltage of 208VAC, 380VAC, 415VAC or 480VAC. If necessary, change the system tap settings to accommodate the facility power.

TABLE H-1 SUBSYSTEM POWER CHECKS Subsystem/ Component RFPG Mains Input L1-L2 Mains Input L2-L3 Mains Input L3-L1 +5V +/- 0.1V +15V +/- 0.5V -15V +/- 0.5V +24V +/- 1V CCAB Mains Input L1-L2 Mains Input L2-L3 Mains Input L3-L1 +15V +/- 0.3V -15V +/- 0.3V +24V +/- 1V VAC VAC VAC VDC VDC VDC VAC VAC VAC VDC VDC VDC VDC Parameter Measurement Unit

Appendix H Start-Up Certificate

329

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 TABLE H-2 RFPG MEASUREMENTS Measurement Module Parameter Unit Typical Standby ----0 0 ----0 0 0 0 0 7.8 0.15 -250 -109 750 25 7.6 -------Actual Standby --------

GE HEALTHCARE REV 5

RFPG Status H- (35kV) 0h 1h

DEE Volts Ref. DEE Volts Read 1 DPA Reflected Power Load Tuning Error RF Forward Voltage RF Reflected Voltage DPA RF Forward Voltage Forward Power Reflected Power Anode Voltage Anode Current Grid Voltage Grid Current Screen Voltage Screen Current Heater Voltage

V V V V VRMS VRMS VRMS kW kW kV A V mA V mA VRMS

330

Appendix H Start-Up Certificate

GE HEALTHCARE REV 5 TABLE H-3 CCAB/PSMC Water Flow

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Water PSMC Water Flow 4-8L/min TABLE H-4 CCAB/PSMC Interlocks Interlock Name Panic Button/Door Magnet Temperature Magnet Water Flow PSMC Water Flow PSMC Temperature TABLE H-5 CCAB/PSMC CURRENT AND VOLTAGE READINGS Parameter Voltage Read PS Current Setting PSS Current PSS Voltage Read PSS Coil Voltage Ripple Unit A A A VDC VDC VAC

Pass/Fail

Pass/Fail

10A

130A Typical Value 68 130 130 68 68 0.3

130A Actual Value

Appendix H Start-Up Certificate

331

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 TABLE H-6 WATER FLOW SETTINGS AT THE WATER MANIFOLD Circuit RFPG MAGNET RF1 RF2 TARGET (S) (S= Single) TARGET (D) (D= Dual) PSMC VACUUM I-S Minimum 4 8 8 2 2 3 0.7 Average >15 5-6 10-12 10-12 3 3 4-8 4 1

GE HEALTHCARE REV 5

Final Setting

TABLE H-7 WATER COOLING SYSTEM READINGS Parameter BP1 Expansion Vessel BP2 Main Pump Pressure BP3 Vacuum Cooling Pump BT1 System Temperature BT1 Alarm Level BT2 Cooling Water Out Temperature BF10 Deionizer Flow BQ1 Conductivity S cm-1 Unit bar bar bar
o

Typical Value 0.5 4 1 20 25 20 Paddle wheel motion 0.2

Actual Value

oC oC

332

Appendix H Start-Up Certificate

GE HEALTHCARE REV 5 TABLE H-8 CONTROL SYSTEM READINGS Parameter MSS Software Version GCU Software Version TABLE H-9 VACUUM SYSTEM READINGS Parameter Heating Time (START to diffusion pump OK) Pump down time (Diffusion pump OK to vacuum OK) Backing Pressure (A1) (Two days after vacuum startup) Tank Pressure (B1) (Two days after vacuum startup) WCU water temperature TABLE H-10 FUNCTIONAL TEST READINGS Parameter Delivery Time Target #1 Delivery Time Target #2 Delivery Time Target #3 Delivery Time Target #4 Delivery Time Target #5 Delivery Time Target #6

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100

Version

Typical Value <30min ~15min 2.0 x 10-3 2.0 x 10-7 20oC

Actual Value

Reading

Unit seconds seconds seconds seconds seconds seconds

Appendix H Start-Up Certificate

333

MINItrace INSTALLATION MANUAL DIRECTION 2232994-100 Notes and Comments:

GE HEALTHCARE REV 5

334

Appendix H Start-Up Certificate

www.gehealthcare.com GE Healthcare Husbyborg S-752 28 Uppsala SWEDEN

TRADEMARKS Ascarite(II) is a registered trademark of Arthur H. Thomas Co. Sicapent is a registered trademark of E. Merck. Swagelok is a registered trademark of Swagelok Co. Teflon and Tefzel are registered trademarks of E.I. du Pont de Nemours & Co. Sun Ultra station, Sunblade and OpenWindows are trademarks of Sun Microsystems, Inc. WARRANTY AND LIABILITY GE Healthcare (GEHC) does not accept liability for injury to personnel or damage to equipment that may result from misuse of this equipment, failure to observe the hazard notices contained in this manual, or failure to observe federal, state and/or local regulations. Whilst every effort has been made to ensure the technical accuracy of this manual, the information contained herein is subject to change without notice. GEHC makes no warranty of any kind with regard to this material. GEHC shall not be liable for errors contained herein, or for incidental or consequential damages arising from the use of the equipment described in this manual.

A General Electric Company - going to market as GE Healthcare. Copyright 2007 by General Electric Company. All rights reserved. Property of GE. No Rights Licensed - Do not duplicate. Disclosure to Third Parties Prohibited.

Вам также может понравиться