Вы находитесь на странице: 1из 5

HP HP0-M46

HP Application Lifecycle Management


Version: Demo 4.0

HP HP0-M46 Exam QUESTION NO: 1 What does HP Sprinter's Storyboard feature do? A. enhances test results with screen captures of the application under test, taken during the test run B. enables testers to design tests by capturing, annotating, and assembling a sequence of screen captures of the application under test C. provides a movie editing toolbox for extracting, annotating, and assembling a sequence of screen captures after a test run D. enables testers to view a guiding sequence of annotated screen captures during their test run via the Storyboard sidebar Answer: A Explanation:

QUESTION NO: 2 How is a set of data defined in an Excel report? A. SQL queries on the project database B. SQL queries on the management database C. Data Grid view from the Testing module D. Data Grid view from the Dashboard module Answer: A Explanation:

QUESTION NO: 3 Which type of data can be added to a Dashboard page? A. releases B. requirements C. reports D. graphs Answer: D Explanation:

www.exactquestions.com

HP HP0-M46 Exam

QUESTION NO: 4 What does the pie chart in the Coverage Analysis window display? A. only the number of passed tests regarding the current cycle B. the full test coverage for the test set, grouped according to test status C. only the number of passed tests regarding the current requirement D. the full test coverage for the requirement, grouped according to test status Answer: D Explanation:

QUESTION NO: 5 From which tabs in the Test Lab module can you add tests to a test set? (Select two.) A. Testing Tree tab B. Requirements Tree tab C. Test Plan Tree tab D. Releases Tree tab E. Cycle Tree tab Answer: B,C Explanation:

QUESTION NO: 6 What are the advantages of clearly and correctly defining requirements at the front end of a project? (Select three.) A. sets clear expectations between stakeholders B. improves the automated test performance C. provides stakeholders with guidelines of what the priorities are D. cuts waste and eliminates unnecessary expenditure E. allows integration with external tools F. eases the association between test sets and cycles Answer: A,C,D

www.exactquestions.com

HP HP0-M46 Exam Explanation:

QUESTION NO: 7 What is the implication of having a direct link between a defect and a test? A. The defect is directly linked to the related Test Run. B. The defect is indirectly linked to the related Requirement. C. The defect is indirectly linked to the related Test Set. D. The defect is directly linked to the related Test Instance. Answer: B Explanation:

QUESTION NO: 8 What can you do by creating a new Requirement Type? (Select two.) A. define a new KPI B. define which fields are required C. associate the new requirement with a Cycle D. define a Rich Text Template E. define new requirement coverage status Answer: B,D Explanation:

QUESTION NO: 9 Which entities can be linked to a defect? (Select two.) A. Cycles B. Releases C. Reports D. Defects E. Tests Answer: D,E www.exactquestions.com 4

HP HP0-M46 Exam Explanation:

QUESTION NO: 10 What are supported test types out-of-the-box? (Select three.) A. LOAD_TEST B. CAPACITY_TEST C. BLACK-BOX_TEST D. LR-SCENARIO E. QUICKTEST_TEST F. MANUAL Answer: D,E,F Explanation:

www.exactquestions.com

Вам также может понравиться