Puntos a Tratar. Introduccin Foundation FieldBus. Topologas de una red Foundation FieldBus. Componentes de una red Foundation FieldBus. Conexionado en una red Foundation FieldBus. Diagnostico sobre una red Foundation FieldBus. Muestra fsica de hardware y software Foundation FieldBus.
I/Os 4-20mA
Fieldbus
Fieldbus
POINT TO POINT!
POINT TO BUS!
BUS TO BUS!
V010 Processautomation
Hart?
Aplica para reas Seguras ( Clase I Div. 2) Aplica para reas peligrosas (Clase I Div. 1) FOUNDATION fieldbus esta diseado para un control continuo y complejo. Maneja 32 Instrumentos a lo largo de la Red Control de campo. Soporta diagnostico avanzado y manejo de activos.
Ahorro en:
Cableado Ensamble Proyecto Arranque
Hart?
10
Cual protocolo?
11
Cual protocolo?
12
Segment Design:
Segment A
Discretionary
Segment B
Generic Introduction
13
Arquitectura FF
14
Soluciones en Conectividad
Foundation Fieldbus
http://www.fieldbus.org/
16
V010 Processautomation
17
V010 Processautomation
Proceso. Arquitectura Basica Criticidad de lazo. Ubicacin de los equipos. Ramas del sistema. Corrientes de las ramas. Ruta de los cables. Tiempo macro-ciclo. Comicionamiento, elctrico, electrnico, tierras. Seleccin de cableado. Protecciones.
18
Arquitectura bsica
19
V010 Processautomation
T POWER CONDITIONER
El total de la longitud del segmento se limita a 1900 mts. El total del segmento se calcula por: Total de la longitud del segmento= Truncal + Disparos Truncal = 680m Disparos = 50 + 20 + 20 + 60 + 120 = 270m Total de la longitud del segmento = 950m
T
Tree Topology
Junction box
Terminator
Trunks
Spurs
Daisy Chain
21
Generic Introduction
Terminador
Spurs
Class 1 Division 2
DPC System
QD
Gland Box
Div 2
NEMA 4
Non-Hazardous Area
Multi-Barrier FISCO Power Supply
Proposito General
Clase I,Div 2
CAU
DIS CON BEFOR
Clase I, Div 2
Clase I, Div 1
CAU
DIS CON BEFOR
CAU
DIS CON BEFOR
Clase I, Div 1
Div 2
Div 1
Div 2 Terminator
Div 1
Tipos de Cable
Cable Type Type A Type B Description Shielded, twister pair Multi-twister-pair with shield Multi-twister-pair without shield Multi-core, without twister pairs and having an overall shield Size #18 AWG #22 AWG Max Length 1900 m (6232 ft) 1200 m (3936 ft)
Type C
#26 AWG
Type D
#16 AWG
Multi-Point Grounding
Alternative Grounding
28
Generic Introduction
NIVEL 3
Fisher
Fisher
30
V010 Processautomation
Diagnstico del Bus HSE FF-Function blocks FF-Alarmas DTM DD Diagnsticos Avanzados Diagnsticos Continuos y en Lnea
Fieldbus structure:
Maintenance
HSE FD
4 Power Conditioner
32
V010 Processautomation
Fieldbus structure:
Maintenance
4 Power Conditioner
33
V010 Processautomation
35
36
Redundant Voltage Supply Supply of 2 FF Segments 500 mA per Segment Diagnostic DIN Rail Mounting, IP20 switchable Terminator
37
Input: 19,230 VDC Output:12,4 V ;120mA (IIC) bzw. 265 mA (IIB) Fieldbus repeater Switchable Terminator on System side Fieldbus Fix Terminator on Field side Switchable Systemside powered Zone 2
38
39
DPC Modulerack
Flexible by modularity Support 4 redundant segments Mix redundant and not redundant segments on the same modulerack Shielding concept Shield clamp Shield bus Shield terminal High availability Redundant power supply Overvoltage protection Passive modulerack
40
Backplane DPC-49-1RMB
Backplane for two DPC-49-IPS1 modules to built a H1-segment Redundant H1-power supply Removable terminal blocks with screw connection Small footprint Separate case grounding and shield grounding Diagnostic on board Alarm contact
41
Voltage drops and current consumption are no issue High power 800 mA at 28 V. Extending lifetime and availability Redundancy through load sharing On board LED diagnostics
42
Aluminium Diecasting 4,6,8 Spurs Cage clamps Minifast 7/8 oder Eurofast M12 connection switchable Terminator changeable short circuit protection flex. Grounding Voltage monitoring Current monitoring
43
Diagnostics and alarming in realtime field device Up to 16 segments per field device Enabling system integration using open industry standards Proactive Diagnostics physical diagnostics protocol statistics
44
Aluminium Diecasting, Steanless Steel 4,6,8,12 Spurs Cage clamps or removable pressure clamps Minifast 7/8 oder Eurofast M12 connection switchable Terminator changeable short circuit protection flex. Grounding Voltage monitoring Current monitoring
45
IP20
IP67
46
Installation in explosion hazardous areas (zone 1) EEx e power supply Central and local segment structure 4 or 8 intrinsically safe EEx ia outputs each 40 mA Galvanic isolation: Trunk Spurs Spurs Spurs (MBD48/49) FISCO and entity conform outputs Short-circuit protected spurs with current limit Short-circuit indication via LEDs Fieldbus Switchable terminating resistors Degree of protection IP66
47
Fieldbus indicator
Fieldbus indicator for FF or PA displaying up to 3 Process values Bargraph Listener, non Field Device Adsress 5-Number 30mm high Display administrable displaying cycle 10 mA power consumption easy to use
Installation:
Zone 1
Zone21 IP66
48
FF/PA Cable
RKFV
RSCV
50
Terminating resistors
100 Ohm 1 mF
51
Field-wireable connectors
Variants: M12 und 7/8 Straight and angel Coupling nut in stainless steel or AL eloxiert Complete shielded
52
End caps
M12
7/8
Variants: M12 und 7/8 Material stainless steel With and without
53
Customized multibarrier
54