EVACUATION OF 3 MW OF POWER FROM M/s. LAXMI ORGANICS LTD.

TQ: ALEPHTA, DIST : PUNE LOAD FLOW STUDY FOR THE YEAR 2013-14 EVACUATION OF 20 MW OF POWER FROM M/S JAYHIND 2 SUGARFACTORY,NAGANSUR, TQ: AKKALKOT, DIST : SOLAPUR 1 3 4 Evacuation of Power on 220 KV level from Bagase based Co-Genration project of M/s. Shri Sant Tukaram SSK Ltd.,Kasarsai,Daruimbare, Tq- Mulshi, Dist-Pune.

EHV POWER SUPPLY TO EXTENT OF 25 MVA FOR M/S VODAFONE SHARED SERVICES LTD. LOAD FLOW STUDY FOR THE YEAR 2015-16 EVACUATION OF 12 MW 5 POWER FROM CO-GEN PLANT BY M/s. BHAIRAVNATH SUGAR WORKS Ltd. AT LAVANGI , TQ: NIMBONI, DIST: SOLAPUR 6 LOAD FLOW STUDY FOR : EVACUATION OF 12.5 MW POWER FROM 7 BAGASSE BASED POWER PROJECT BY 8 EVACUATION OF 12.5 MW POWER FROM BAGASSE BASED POWER 9 PROJECT BY M/s. JAYWANT SUGAR Ltd. AT DHAWARWADI,DIST: KARAD LOAD FLOW STUDY FOR CO-GEN PROJECT OF M/s. DATTA SAHAKARI ASURLE PORLE, TQ : PANHALA, DIST : KOLHAPURKARKHANA AT VILLAGE, YEAR 2013-14 EVACUATION OF POWER FROM PROPOSED 12.5 MW BAGASSE BASED PLANT OF M/s. SHIVRATN UDYOG LTD., TQ : ALEGAON, DIST : SOLAPUR LOAD FLOW STUDY FOR THE YEAR 2014-15 EVACUATION OF 7.5 MW POWER FROM M/S. UTOPION SUGAR PVT. LTD. AT VILLAGE KACHAREWADI, TQ-MANGALWEDHA, DIST : SOLAPUR Evacuation of 2 x 40 MW Hydro Gen. at KDPH-II ....Year 2013-14 Case - I : Construction of Karad(400/220 KV) to 220 KV KDPH-II ( In Plan this Line is connected to KDPH-I ...year 2013-14) Construction of Second CKT of the same EVACUATION OF (388 X 2) MW OF POWER FROM M/S. PIONEER GAS LTD. LOAD FLOW STUDY FOR THE YEAR 2012-13 CASE 5 : WITH PIONEER GEN (388X2 MW)+ PIONEER LOAD 120 MW

ESTABLISHMENT OF 220/132/33 KV SUB-STATION AT KESURDI, DIST: SATARA LOAD FLOW STUDY FOR THE YEAR 2015-16

LOAD FLOW STUDY FOR - ESTABLISHMENT OF 220 KV SUB-STATION

AT ABITGHAR, DIST-THANE. YEAR 2014-15

ESTABLISHMENT OF 132/33 KV SUB-STATION AT CHIMANGAON GOTA,TQ:KOREGAON, DIST : SATARA LOAD FLOW STUDY FOR THE YEAR 2014-15 CASE ; WITH 132/33 KV CHIMANGAON GOTA S/SN.

ESTABLISHMENT OF 400/220 KV HINJEWADI S/STN. LOAD FLOW STUDY FOR THE MODIFICATION IN THE SCOPE OF WORK. YEAR 2014-15

ESTABLISHMENT OF 132/33 KV KAVATHE YAMAI S/S, DIST PUNE LOD FLOW STUDY FOR THE YEAR 2014-15 CASE : WITH SUB-STATION

ESTABLISHMENT OF 132/33 KV SUB-STATION AT NHAVARE,TQ: SHIRUR, DIST : PUNE LOAD FLOW STUDY FOR THE YEAR 2016-17 CASE : WITH SUB-STATION

LOAD FLOW STUDY FOR - ESTABLISHMENT OF 220 KV SUB-STATION AT ULHASNAGAR, DIST-THANE. YEAR 2014-15

Construction of 220 KV MC line from 400 KV Chandrapur II to Chandrapur MIDC via Tadali S/s.

ESTABLISHMENT OF 220 KV S/S AT WADA-II LOAD FLOW STUDY FOR THE YEAR 2013-14 CASE : WITH SUB-STATION

Installation of 4th transformer, 50 MVA at 220/22 KV Mahapes/s. under Vashi Zone.

System Study Report for-Construction of 220 KV M/c line from 400 KV Chandrapur-II to Chandrapur MIDC via 220 KV Tadali., for the year 2013-14.
Modifiaction in Alkud 28.06

Installation of 4th transformer, 50 MVA at 220/22 KV Mahapes/s. under Vashi Zone. Inclusion of schemes in STU Plan & load flow study thereof. directives received from Principal Secretary
220 KV Bridgesto ne

132 KV Chakan

Minutues of coordination meeting held on 05-07-2013 between MSETCLMSEDCL- MIDC.authorities .

18.07 220 KV Kopri(Vira r-E)

220 KV

Chikhal Dongri(Virar-W)

New Proposed S/s. New Proposed S/s.

System Study Report for- Establishment of 400/220 KV HinjewadiIII sub-station-Modifications in the approved 400 KV JejuriHinjewadi D/c line there of
13.08 20.08

4.09 23.09

System Study for 400/220 KV Kudus S/stn. for the year 2014-15.
22.1

System Study for 400/220 KV Kudus S/stn. for the year 2014-15.
22.1

17.05

12.07

16.07 400 KV 220 KV 220 KV 100/22 KV Hinjewadi- Hinjewadi- Pal(Dombi Mohane (Phase-III) (Phase-II) vali-E)

220 KV 220 KV Kaman(V Abitghar asai-E)

220 KV Manor

220 KV Viraj

132 KV Chakan

220 KV 400 KV 220 KV 220 KV Bridgesto Hinjewadi- Hinjewadi- Pal(Dombi ne (Phase-III) (Phase-II) vali-E)

New New New New Augmenta Augmenta Augmenta Augmenta Augmenta Proposed Proposed Proposed Proposed tion tion tion tion tion S/s. S/s. S/s. S/s.

24.08

31.05

True friendship comes when the silence between two people is comfortable. A friendship that can end never really began http://www.quotesdaddy.com/tag/Friendship/2 The difference between friendship and love is how much you can hurt each other

Name-Rajesh Chandra Prasad Post-Assistant Engineer CPF-02373882 Section-STU Sr. No Load Flow study carried out from *August 2013 to Sept 2013 New Sub-stations Establishment of 132/33 KV Substation at Shamsherpur Dist. Nandurbar

Modification/Construction of lines 1 2 System Study for construction of 132 KV Wani-Pandharkawda DC Link Line Provision of LILO of 132 KV Indapur- Ujani -Shinamara Transmission line for erection of Make up water pump house of NTPC at Ujani. *On Job Induction Level traininig from 12.03.2013 to 02.08.2013