SUMMARY.
15/4 Down pipes, 4" to 6" dia G.I old or decayed, L.ft 3.90
removed from existing building and stacked. L.m 12.80
22/6 Gutter, Eaves, removed and stacked from roofs of L.ft 2.40
single story buildings. L.m 7.90
23/6 Gutter, Eaves removed from roofs of two storeyed L.ft 3.60
buildings and stracked. L.m 11.80
26/7 Lime plastering shipped and debris cleared away. Sqr 139.00
27/4 Rendering cement, chipped and debris cleared away Sqr 416.00
from brick walls and floors. m2 45.00
28/8 Rendering cement, chipped and debris cleared away Sqr 625.00
from cement concrete floors and walls. m2 67.00
30/8 Roof, removing tiles and timber stacking serviceable Sqr 719.00
material and cleaning debris in two storeyed building. m2 77.00
33/9 Rubble masonry in lime demolished rubble stacked and Cube 778.00
debris cleared away m3 275.00
34/9 Tiles glazed demolished and debris cleared away. Sqr 741.00
35/10 Tiles calicut or half round, removed from roof of Sqr 195.00
single storey buildings and stacked. m2 21.00
43/12 Cement plastering, soffit chipped and debris cleared Sq.ft 542.00
away. m2 58.00
m3 73.00
2/15 Cement concrete 1:3:6 (2") upto one cube shuttering Cube 21388.00
paid for seperately. m3 7558.00
3/15 Cement concrete 1:2 1/2:5 (1") above one cube Cube 22842.00
(shuttering paid for seperately). m3 8071.00
4/16 Cement concrete 1:2 1/2:5 (1") upto one cube Cube 23583.00
(shuttering paid for seperately). m3 8333.00
5/16 Cement concrete 1:2:4 (3/4") above one cube Cube 24675.00
(shuttering paid for seperately). m3 8719.00
6/16 Cement concrete 1:2:4 (3/4") upto one cube Cube 25416.00
(shuttering paid for seperately). m3 8981.00
13/19 Lintol cement concrete 1:2:4 (3/4") 9"x6" (Reinforcement L.ft 162.00
paid seperately). L.m 531.00
14/20 Lintol cement concrete 1:2:4 (3/4") 9"x9" )Reinforcement L.ft 218.00
paid seperately). L.m 715.00
23/24 Supr stone, cement concrete 1:2:4 (3/4") for door posts
supplied and fixed. No 29.00
29/26 Cement concrete 1:2:4 (3/4") in beams in ground floor Cube 26700.00
(reinforcements shuttering and finishes paid for seperately) m3 9435.00
using mixer and vibrator.
32/26 Shuttering for floor slab concrete and dismantling. Sqr 3988.00
m2 429.00
33/27 Shuttering for column shaft and diamantling (for column Sq.ft 60.00
9"x9"x4" 4 ft heigh I.e 4 1/2" ft box). m2 646.00
36/28 Cement concrete lintols as per Item (71) in 1st floor. Cube 27419.00
m3 9689.00
37/28 4" thick R..C.C 1:2:4 (3/4") in first floor slab (reinforcement Sqr 8838.00
and shuttering paid seperately) using mixer and vibrator. m2 951.00
BLOCK MASONRY
1 Cement sand block in 1:6 mix in cement Cube 16630.00
sand 1:5 mix m3 5876.00
2 4" thick cement sand block 1:6 mix masonry Sqr 6081.00
in cement sand 1:5 mix m2 655.00
4/31 Brick work in cement mortar 1:5 in piers (in ground floor). Cube 18559.00
m3 6558.00
6/31 Brick work 4 1/2" thick in cement mortar 1:5 above 1 square. Sqr 6593.00
m2 710.00
12/33 Extra over Item 2-5 and 9-11 for brick Cube 584.00
work from 1st floor level up 2nd floor. m3 206.00
14/34 Extra over Items 6-8 for brickwork from Sqrs 195.00
1st floor level to 2nd floor. m2 21.00
19/35 Coping, brick in cement 1:5 weathered and throated on L.ft 117.31
4 1/2" walls, cement renedered 1/2", 1:3 complete. L.m 384.00
20/35 Coping, brick in cement 1:5 weathered throated on 9" walls L.ft 164.00
and 1/2" cement rendered 1:3 complete. L.m 538.00
26/38 Drains brick in cement 1:5,6" average depth 9" wide and
cement rendered 1/2" thick 1:3 complete with expansion joints
as necessary, including necessary excavation (apron paid L.ft 217.00
for seperately). L.m 712.00
28/38 Steps 12" wide and 6" to 9" high masonary or brick work in
cement mortar 1:5 rendered 1/2" cement 1:2 with foundation L.ft 170.00
6" below ground. L.m 558.00
30/39 Brick work in cement and sand 1:8 in foundation and upto Cube 15894.00
D.P.C. m3 5616.00
31/40 Brick work in cement and sand 1:8 in super structure Cube 16357.00
in ground floor. m3 5780.00
MASON.
1/41 Random Rubble Masonary in cement mortar 1:5 above Cube 15823.00
1 cube. m3 5591.00
2/43 Exapansion joints in concrete floors filled with bitumen and L.ft 17.00
sand(to full depth of concrete and rendering). L.m 56.00
5/44 Floors, cement concrete 1:2 1/2:5(1") 3" cement rendered 1/2", Sqr 7868.00
1:2, with expansion joints filled with cement and sand. m2 611.00
12/46 Tiles glazed colour 6"x6" with all specials, supplied and S.ft 107.00
fixed to walls including raking plaster and bedding in m2 847.00
cement mortar 1:2.
25/145 Rendering cement 3/4", 1:2 with Pudlo 5lbs Sqrs 3228.00
to 100 lbs cement m2 347.00
29e/146 Plinth plastering 1/2" thick 1:3 cement and Sqrs 2303.00
sand with red cement floating m2 248.00
rubber fillets not exceeding 2'-0 crs fixed bothways Sqr 14911.00
Rate to include 2 coats tarnap to timber m2 1603.00
and 2 coats emulsion paint
to abestos sheet
30/70 - do - - do -
Sash only, in class 1 timber S.ft 252.00
fixed with brass furniture. m2 2717.00
32a/70 Battened sash only 1" to 11/8" thick in sp. S.ft 377.00
upper class timber/kempas fixed completed with m2 4061.00
brass fittings
138/102 Door frame 4"x3" in spl upper class timber/kempas S.ft 239.00
supplied and fixed in position m2 2575.00
140a/103 As per Item No 140 -do- -do- but with marine type S.ft 365.00
2'3"x6'9". m2 3927.00
142/104 Supplying and fixing Plywood door 1 1/4" thick S.ft 207.00
single (Ordinary finish) to the existing frame m2 2230.00
with brass fittings with mortice lock
143/104 -do- -do- plywood Marine type 1 1/4" thick S.ft 219.00
single hung to existing frame with fitting m2 2356.00
25/168 Painting New wood 1 Coat primer & 2 Coats Sqr 2114.00
Enamel paint m2 228.00
31a/170 Painting walls with 2 coats of weather shield paint Sqr 1118.00
( New work ) m2 120.00
6/128 - do - 6" - do -
- do - - do - No 185.00
29/132 - do - 4"x4" - do -
- do - - do - No 379.00
294/240 Pipes pvc 1" supplied & fixed 1000 type. L.ft 39.00
L.m 129.00
294a/240 pipes pvc 1" supplied & fixed 600 type. L.ft 28.00
L.m 92.00
Item Description Unit RATE (1st)
295/240 Pipes pvc 1 1/4" supplied & fixed 1000 type. L.ft 53.00
L.m 175.00
295a/240 Pipes pvc 1 1/4" supplied & fixed 600 type. L.ft 42.00
L.m 138.00
296a/241 pvc pipe 1 1/2" (1000 type) supplied & L.ft 65.00
fixed with out excavation. L.m 213.00
296b/241 pvc pipe 1 1/2" (600 type) supplied & L.ft 47.00
fixed with excavation. L.m 154.00
296c/240 pvc pipe 1 1/2" (600 type) supplied & L.ft 38.00
fixed with out excavation. L.m 126.00
297/241 Pipes pvc 2" (1000 type) supplied & fixed. L.ft 118.00
With excavation L.m 388.00
297a/241 pvc pipe 2" (1000 type) supplied & L.ft 110.00
fixed with out excavation. L.m 361.00
297b/241 pvc pipe 2" (600 type) supplied & L.ft 71.00
fixed with excavation. L.m 233.00
297c/241 pvc pipe 2" (600 type) supplied & L.ft 63.00
fixed with out excavation. L.m 206.00
310/243 Eaves gutters 6" square type pvc fixed L.ft 88.00
with PVC brackets. (1' - 6 " Crs) L.m 288.00
311/244 Down Pipe 3 1/2" Dia P.V.C Fixed with L.ft 81.00
Wooden Plug to wall etc. L.m 264.00
311a/244 PVC 4" ( 600 type ) pipe supplied and fixed on walls L.ft 227.00
L.m 743.00
20/248 Manhold 3' 6" x 2' 3" & 4' to 6' deep 9" thick No 13518.00
-do -do-
26/249 Wire dome for 2" pipe supplied and fixed no 85.00
18A/254 - Do - - do - - do -
- do - 6 Strands - do - - do - L.ft 214.00
- do - - do - - do - L.m 703.00
10/A Supplying & fixing 'H' iron 6" x 3" 6mm L.ft #N/A
with necessary cleats to housing props L.m #N/A
including 2 coats of anticorrosive painting
11/A Supplying & fixing ' H ' Iron 8" x 4" L.ft 81.00
(6mm) with necessary cleats -do- L.m 265.00
Item Description Unit RATE (1st)
12/A G.I. Gate with 12'-0" x 4'-6" hight 2 Nos sashes made
out of 1 1/2" dia G.I. heavy quality frame with
6mm M.S. rod welded 3" c/c both ways all as per
Drg. No. 409853 fixed with 9" x 9" RCC pillar in
1:2:4(3/4") concrete 4Y12 reinforced and R6 at 6" crs.
stirrups rate include for Excavation base concrete
footing R/F with
Y10 @ 8" c/c both way 5/8" thick 1:4 plastering 4 Nos. pintol
and stirrups locking divice barrel bolt etc. and 2 coats
Per cube
Per cube
Per Sqrs.
Per Sqrs.
Per square
Per Sash.
Per 6 S.ft.
Per Sqrs.
Per Sqrs.
Per Sqrs.
Per Sqrs.
Per Sqrs.
Per Cube.
Per Cube
Per Sqrs.
Per Sqrs.
Per Sqrs.
Per Sqrs.
1 Day 214 Carpenter 475.00 475.00
1 Day 257 Labourer 325.00 325.00
Allow for scaffolding 16.25 816.25
Over heads 114.28
Per square 930.53
Say Rs 931.00
Per m2 100.22
Say per m2 100.00
Per Sqrs.
Per Cube.
1 3/8 day 257 Labourer 325 446.88
1/3 no 24 Basket 52.5 17.50 464.38
Overheads 65.01
Per Cube 529.39
Say per cube 529.00
Per m3 186.93
Say per m3 187.00
2/13 Excavation in any soil except rock requiring
blasting part returnfill in and ram, and
surplus disposed of within site as directed.
Per Cube.
1 5/8 day 257 Labourer 325 528.13
1/3 no 24 Basket 52.5 17.50 545.63
Overheads 76.39
Per Cube 622.01
Say per cube 622.00
Per m3 219.79
Say per m3 220.00
4/14 Filling under floor with gravel or other
approved quality of filling, spread,
watered and well rammed in 3" layers
with available earth.
Per Cube.
1 3/4 day 257 Labourer 325 568.75
413 Allow for water 50 50.00
1/3 24 Basket 52.5 17.50 636.25
Overheads 89.08
Per Cube 725.33
Say per cube 725.00
Per m3 256.18
Say per m3 256.00
6/14 Filling under floor with gravel or other
approved quality of filling spread water
and rammed in 3" layers (material not
available at site).
Per Cube.
1 Cube 61 Earth 1850 1,850.00
2 day 257 Labourer 325 650.00
Allow for compactive 10% 65 65.00
413 Allow for water 50 50.00
1/3 24 Basket 52.5 17.50 2,632.50
Overheads 368.55
Per Cube 3,001.05
Say per cube 3,001.00
Per m3 1,060.42
Say per m3 1,060.00
No Qty Unit Code Description Unit Rate Rate Amount
7/15 External Filling.(Material not available at site)
Per Cube.
1 Cube 61 Earth 1850 1,850.00
1/2 day 257 Labourer 325 162.50
1/3 no 24 Basket 52.5 17.50 2,030.00
Overheads 284.20
Per Cube 2,314.20
Per Cube.
1/2 day 257 Labourer 325 162.50
1/3 no 24 Basket 52.5 17.50 180.00
Overheads 25.20
Per Cube 205.20
Say per Cube 205.00
Per m3 72.51
Say per m3 73.00
Per Cube.
Per Cube.
As in Item 1 18,111.00
Add 25% of Cost of labourer 650.00 18,761.00
Over heads 2,626.54
Per cube 21,387.54
Say per cube 21,388.00
Per m3 7,557.60
Say per m3 7,558.00
Per Cube.
Per Cube.
Per Cube.
As in Item 3 20,037.00
Add 25% of Cost of labourer 650.00 20,687.00
Over heads 2,896.18
Per cube 23,583.18
Say per cube 23,583.00
Per m3 8,333.22
Say per m3 8,333.00
Per Cube.
Per Cube.
As in Item 5 21,645.00
Add 25% of Cost of Labourer 650.00 22,295.00
Over heads 3,121.30
Per cube 25,416.30
Say per cube 25,416.00
Per m3 8,980.92
Say per m3 8,981.00
Per Cube.
23 Cwt 46 Cement 520.00 11,960.00
0.82 cube 138 3/4" Metal 8830.00 7,240.60
0.42 cube 197 Sand 2100.00 882.00
1 day 214 Mason 475.00 475.00
6 day 257 Labourer 325.00 1,950.00
1/3 day 97 Hire of mixure, vibrator etc. 4500.00 1,500.00
410 Allow for water 125.00 125.00
2/3 24 Basket 52.50 35.00 24,167.60
Over heads 3,383.46
Per cube 27,551.06
Say per cube 27,551.00
Per m3 9,735.34
Say per m3 9,735.00
Per cube.
Per Cube.
18 Cwts 46 Cement 520.00 9,360.00
0.6 Cube 197Sand 2100.00 1,260.00
1 Cube 1383/4" Metal 8830.00 8,830.00
1 Day 214Mason 475.00 475.00
6 Day 257Labourer 325.00 1,950.00
2/3 24 Basket 52.50 35.00
Allow for water and curing 125.00 125.00
1/3 Day 97 Hire ofmixer,vibrator,wagesof operator and fuel. 4500.00 1,500.00 23,535.00
Over heads 3,294.90
Per cube 26,829.90
Say per cube 26,830.00
Per m3 9,480.57
Say per m3 9,481.00
Per 2 Cube.
36 Cwts 46 Cement 520.00 18,720.00
1.2 Cube 197 Sand 2100.00 2,520.00
1.8 Cube 138 3/4" Metal 8830.00 15,894.00
2 1/2 Day 214 Mason 475.00 1,187.50
16 Day 257 Labourer 325.00 5,200.00
1 1/3 24 Basket 52.50 70.00
411 Allow for water and curing 250.00 250.00
2/3 Day 97 Hire of concrete mixer vibrators, Operators
Salary, fuel 4500.00 3,000.00
46,841.50
Over heads 6,557.81
Per 2 cube 53,399.31
Per cube 26,699.66
Say per cube 26,700.00
Per m3 9,434.63
Say per m3 9,435.00
Per Sqrs.
Per 80 S.ft
86 S.ft 57 Rubber planks ( 1/2 new cost) 20.00 860.00
2 Lbs 267a 2" Nails 36.50 73.00
1/8 Gal 147 Mould Oil 100.00 12.50
1/4 Day 214 Carpenter 475.00 118.75
1/4 Day 257 Labourer 325.00 81.25 1,145.50
overheads 160.37
Per 80 S.ft 1,305.87
per S,ft 16.32
Say per Sft 16.00
Say per m2 172.16
Per Cube.
18 Cwt 46 Cement 520.00 9,360.00
0.6 Cube 197 Sand 2100.00 1,260.00
0.9 Cube 138 Metal 8830.00 7,947.00
1 Day 214 Mason 475.00 475.00
6 Day 257 Labourer 325.00 1,950.00
410 Allow for water and curing 125.00 125.00
2/3 No 24 Basket 52.50 35.00
1/2 Day 97 Hire of mixer, vibrator, wages of operators & fuel 4500.00 2,250.00 23,402.00
Over heads 3,276.28
Per cube 26,678.28
Say per cube 26,678.00
Per m3 9,426.86
Say per m3 9,427.00
Per Cube.35
As per Item 35 in groung floor 23402.00 23,402.00
2 Day 257 Labourer 325.00 650.00 24,052.00
Over heads 3,367.28
Per cube 27,419.28
Say per cube 27,419.00
Per m3 9,688.69
Say per m3 9,689.00
8.0 Sqrs.
56 2/3 Cwt 46 Cement 520.00 29,466.67
3 Cube 138 Metal 3/4" 8830.00 26,490.00
2 Cube 197 Sand 2100.00 4,200.00
4 Day 214 Mason 475.00 1,900.00
25 Day 257 Labourer 325.00 8,125.00
411 Allow for water curing 375.00 375.00
1 Day 97 Hire of mixer vibrator operators wages and 4500.00 4,500.00
fuel
2 1/5 No 24 Basket 52.50 115.50 75,172.17
Over heads 10,524.10
Per 8 Sqrs 85,696.27
Per Sqrs 10,712.03
Say per Sqrs 10,712.00
Say Per m2 1,153.00
per cube 25,708.80
Say per cube 25,708.00
Per 10 L.ft
BLOCK MASONRY
1 Cement sand block in 1:6 mix in cement
sand 1:5 mix
Per Cube
Casting of blocks
12 Cwt 46 Cement 520.00 6,240.00
1 Cube 197 Sand fine 2100.00 2,100.00
3 Day 214 Mason 475.00 1,425.00
Per Sqr
Casting of blocks
3 Cwt 46 Cement 520.00 1,560.00
0.333 Cube 197 Sand 2100.00 699.30
1 Day 214 Mason 475.00 475.00
2 Day 257 Labourer 325.00 650.00
410 Allow for water for curing & mould 125.00 125.00
Masonry
1 Cwt 46 Cement 520.00 520.00
0.07 Cube 197 Sand 2100.00 147.00
1 Day 214 Mason 475.00 475.00
2 Day 257 Labourer 325.00 650.00
Allow for scaffolding 32.50 5,333.80
Overheads 746.73
Per sqr 6,080.53
Say per sqr 6,081.00
Per m2 654.52
Say per m2 655.00
Per Cube.
Per Cube.
Per Cube.
As in Item 2 14,754.75 14,754.75
1 1/2 Day 214 Mason 475.00 712.50
2 1/2 Day 257 Labourer 325.00 812.50 16,279.75
Over heads 2,279.17
Per cube 18,558.92
Say per Cube 18,559.00
Per m3 6,557.95
Say per m3 6,558.00
Per Sqrs.
Per Sqrs.
Per No.
1/2 Day 257
2 Labourer 325.00 325.00
190 No 41Bricks 5.70 1,083.00
3 C.ft 200
Sand 2100.00 63.00
0.52 Cwts 46Cement 520.00 270.40
1 Day 214
Mason 475.00 475.00
1 Day 257
Labourer 325.00 325.00
0.75 Cwts 46Cement( for rendering) 520.00 390.00
5 Cu.ft 200
Sand 2100.00 105.00
1/2 Day 214
Mason 475.00 237.50
allow for water 16.25
1 Day 257 Labourer 325.00 325.00 3,615.15
Over heads 506.12
Per No 4,121.27
Say per No 4,121.00
No Qty Unit Code Description Unit Rate Rate Amount
25/37 Drains, brick incement 1:5,9" average
depth 12" wide, and cement rendered
1/2" thick 1:2 complete with expansion
joints as necessary excavation (apron
paid for seperately).
Per Cube.
1450 No41 Bricks 5.70 8,265.00
Add 10% for breakage 826.50
2 1/3 Cwt 46 Cement 520.00 1,213.33
0.375 Cube 197 Sand 2100.00 787.50
3 Day 214 Mason 475.00 1,425.00
4 Day 257 Labourer 325.00 1,300.00
410 Allow for water 125.00 125.00 13,942.33
Over heads 1,951.93
Per cube 15,894.26
Say per cube 15,894.00
Per m3 5,616.25
Say per m3 5,616.00
Per Cube.
1450 No 41 Bricks 5.70 8,265.00
Add 10% for breakage 826.50
2 1/3 Cwt 46 Cement 520.00 1,213.33
3/8 Cube 197 Sand 2100.00 787.50
3 Day 214 Mason 475.00 1,425.00
5 Day 257 Labourer 325.00 1,625.00
410 Allow for water 125.00 125.00
Allow for scaffolding 5% of labour 81.25 81.25 14,348.58
Over heads 2,008.80
Per cube 16,357.39
Say per cube 16,357.00
Per m3 5,779.86
Say per m3 5,780.00
Per Cube.
As per Item 31 Per cube 14,348.58 14,348.58
1 1/2 Day 257 Labourer 325.00 487.50
Allow for extra scaffolding and water 5% of labour 24.38 24.38 14,860.46
Over heads 2,080.46
Per cube 16,940.92
Per Cube.
As per Item No. 31 14,348.58 14,348.58
4 1/2 Day 257 Labourer 325.00 1,462.50
Allow for extra scaffolding 5% of labour 73.13 73.13 15,884.21
Over heads 2,223.79
Per cube 18,108.00
Say per cube 18,108.00
Per m3 6,398.59
Say per m3 6,399.00
Per Cube.
Per Cube.
Per 10 L.ft
Per Sqrs.
Per Square
As in Item 14 1,728.75
Add 25% on labour 121.88 1,850.63
Overheads 259.09
Per square 2,109.71
Say per square 2,110.00
Per m2 227.13
Per Sqrs.
Per Square
As in Item 16 1,505.15
Add 25% on labour 121.88 1,627.03
Overheads 227.78
Per square 1,854.81
Say per square 1,855.00
Per m2 199.66
Say per m2 200.00
Per Sqrs.
Per square
As in Item 18 2,447.25
Add 25% on labour 162.50 2,609.75
Overheads 365.37
Per sqr 2,975.12
Say per sqr 2,975.00
Per m2 320.24
Per Sqrs.
Per Sqrs
As in Item 20 2,187.25
Add 25% on labour 162.50 2,349.75
Overheads 328.97
Per sqr 2,678.72
Say per sqr 2,679.00
Per m2 288.34
Say per m2 288.00
Per Sqrs.
Per sqr
As in Item 18 2,447.25
12 lbs 191 Pudlo 32 384.00 2,831.25
Overheads 396.38
Per sqr 3,227.63
Say per sqr 3,228.00
Per m2 347.43
Say per m2 347.00
Per sqr
0.8 Cwt 46 Cement 520 416.00
0.05 Cube 200 Sand 2100 105.00
0.40 Bushel 126 Lime 257 102.80
2.0 Day 214 Mason 475 950.00
2.0 Day 257 Labourer 325 650.00
Allow for Scaffolding 32.50
Per Sqrs.
2.25 Cwts 46 Cement 520 1,170.00
11 Cu.ft 200 Sand 2100 231.00
1 1/4 Day 214 Mason 475 593.75
1 Gal 32 bitumen 347 347.00
2 1/2 Day 257 Labourer 325 812.50
412 Allow for fire wood and water 75 75.00 3,229.25
Over heads 452.10
Per square 3,681.35
Say per sqrs. 3,681.00
Per m2 396.23
Say per m2 396.00
Per Sqr
0.90 Cwt 46 Cement 520 468.00
5.0 C.ft 200 Sand 2100 105.00
0.75 Day 214 Mason 475 356.25
1.50 Day 257 Labourer 325 487.50 1,416.75
Overheads 198.35
Per sqr 1,615.10
Say per sqr 1,615.00
per m2 173.85
Per Sqr
Per 10 Lft
0.04 Cwt 46 Cement 520 20.80
0.5 Hrs 214 Mason 475 29.69
1.0 Hrs 257 Labourer 325 40.63
1.0 Cft 200 Allow for sand 2100 21.00 112.11
Overheads 15.70
Per 10 Lft 127.81
Per Lft 12.78
Say per Lft 13.00
Per Lm 41.92
Say per Lm 42.00
Per Sqrs.
1.5 Cu.ft 246 Timber for frames spl. Upper class 1250 1,875.00
21 S.ft 182 1" Planks (Ginnisappu) 50 1,050.00
3 Doz 40a Brass screw 1 1/2" 52.5 157.50
2 Nos 220 Spur. Stones 22.5 45.00
4 Nos 199 Rawl plugs and 2" screws 15 60.00
414 Allow for Dowels 25 25.00
3 Day 214 Carpenter 475 1,425.00
1.25 Day 257 Labourer 325 406.25
Fittings
3 no 119 T- hinges 10" 58 174.00
2 no 23 6" Barrel bolt 120 240.00
2 doz 40a 1 1/2" screws 52.5 105.00
0.5 doz 40d 1" screws 45 22.50
414 Allow sand paper 25 25.00 5,610.25
14% Over heads 785.44
Per 16.25 Sq.ft 6,395.69
Per Sq.ft 393.58
Say per S.ft 394.00
Per m2 4,234.30
Say per m2 4,234.00
101/92 - do - - do -
over 100 L.ft.
Per 100 L.ft
100 L.ft 193 Reepers 8 800.00
1 1/2 Hour 214 Carpenter 475 89.06
1 1/2 Hour 257 Labourer 325 60.94
1/4 Lbs 150 Nails 2" 34 8.50 958.50
Over heads 134.19
Per 100 L.ft 1,092.69
Per L.ft 10.93
Say Rs 11.00
Say per L.m 36.00
Per 6 sqrs
per'16.25 Sft
Per m2 152.32
Say per m2 152.00
Per m2 122.30
Say per m2 122.00
- do - - do -
45/173 - do - 2 coats.
Per square
1st coat as in Item 44 760.58 760.58
0.17 gal 260 Varnish 1756 298.52
4 Hour 214 Painter 475 237.50
414 Add for brushes etc 25 25.00 1,321.60
Over heads 185.02
Per square 1,506.62
Say per sqr 1,507.00
Per m2 162.18
Say per m2 162.00
- do - - do -
50/174 2 coats - do -.
Per 10 squares
1 3/4 Day 214 Painter 475 831.25
1 3/4 Day 257 Labourer 325 568.75
1 1/4 Bushel 216 Lime 270 337.50
1/2 Lb 85 Glue 86 43.00
413 Allow for brushes etc 50 50.00
1/2 Lb 269 Yellow Ochre 0 0.00 1,830.50
Over heads 256.27
Per 10 squares 2,086.77
Per square 208.68
Say Rs 208.00
Per m2 22.46
Say per m2 22.00
Per No
1 no 22 4" Brass barrel bolt 79 79.00
1/2 Doz 207a 1" screws brass 45 22.50
1/3 hr 214 Carpenter 475 19.79 121.29
6/128 - do - 6" - do -
- do - - do -
Per No
1 no 23 6" Brass barrel bolt. 120 120.00
Screws and labour as in Item 4 42.29 42.29 162.29
Over heads 22.72
Per No 185.01
Say Rs 185.00
29/132 - do - 4"x4" - do -
- do - - do -
Per No
1 Pair 95 4" x 4" hinges per pair 205 205.00
Screws and labour as in Item 27 127.50 127.50 332.50
Over heads 46.55
Per No 379.05
Say Rs 379.00
Per No
1 No 143 Mortice Lock (double) 790 790.00
1 Day 214 Carpenter 475 475.00 1,265.00
Over heads 177.10
Per No 1,442.10
Say Rs 1,442.00
Per 14 L.ft
23 s.ft 74 22 B.W.G sheets 55 1,265.00
4 hrs 215 Tinker cutting & bending to shape and 475 237.50
fixing in place
1 hr 214 Mason, caulking 475 59.38
5 hrs 257 Labour, assisting tinker and mason 325 203.13
413 Allow for cement sand etc 50 50.00
413 Allow for lead 50 50.00 1,865.00
Overheads 261.10
Per 14 L.ft 2,126.10
PerL.ft 151.86
Say per Lft 152.00
Per Lm 498.11
Say per L.m 498.00
Per 22 L.ft
72 S.ft 73 G.I. Sheets 75 5,400.00
1/2 day 214 Tinker 475 237.50
1/2 day 257 Labourer 325 162.50
413 Allow for nails, soldering materials etc 50 50.00
1/3 gal 232 Coaltar 90 30.00
4 hrs 257 Labourer 325 162.50
1 hrs 257 Labourer 325 40.63
2 hrs 214 Mason 475 118.75
4 hrs 257 Labourer 325 162.50
0.16 Cwts 46 Cement 520 83.20
1/6 Bus 216 Lime 270 45.00
1 Cu.ft 200 Sand 2100 21.00
2 hrs 257 Labourer 325 81.25 6,594.83
Overheads 923.28
Per 22 L.ft 7,518.10
Per L.ft 341.73
Say per L.ft 342.00
Per L.m 1,120.88
Say Per L.m 1,121.00
3 Hrs 214 Plumber ( removing basin, brackets and pipes ) 475 178.13
3 Hrs 257 Labourer ( to assist ) 325 121.88
1 Hrs 214 Mason ( making godd to walls and floor ) 475 59.38
1 Hrs 257 Labourer ( to assist ) 325 40.63
414 Allow for cement, lime etc. 25 25.00 425.00
Overheads 59.50
Per no. 484.50
Say 485.00
Per No 889.20
Say 889.00
Per No 866.40
Say Rs 866.00
Say Rs 785.00
1 no 211 Sink 24"x15"x8" with waste plug & chain 2100 2,100.00
413 Allow for transport 50 50.00
1/2 day 214 Plumber 475 237.50
1/2 day 257 labourer 325 162.50
414 Allow for cement 25 25.00 2,575.00
Over heads 360.50
Per No 2,935.50
Say Rs 2,936.00
Say Rs 234.00
Say Rs 126.00
311a/244 PVC 4" ( 600 type ) pipe supplied and fixed on walls
Per 24 L.ft
24 L.ft 168 PVC 4" ( 600 type ) pipe 48.5 1,164.00
Add 25% for specials & clips , plugs etc. 291.00
4 Hrs 214 Plumber 475 1,900.00
4 Hrs 257 Labourer 325 1,300.00
413 Allow for solvent cement 50 50.00
Allow for scaffolding 65.00 4,770.00
Over heads 667.80
Per 24 L.ft 5,437.80
Per L.ft 226.58
Say Rs 227.00
Per L.m 743.17
Say Rs 743.00
1/2 day 257 Labourer digging & transporting surplus 325 162.50
250 Nos. 41 Bricks 5.7 1,425.00
6 C.ft 136 1" Metal 8470 508.20
1/2 day 257 2 Labourers digging & transporting soil 325 325.00
500 Nos. 41 Bricks 5.7 2,850.00
0.10 Cube 136 1" Metal 8470 847.00
0.17 Cube 197 Sand 2100 357.00
3 1/4 Cwt 46 Cement 520 1,690.00
1 1/2 day 214 Mason 475 712.50
3 day 257 Labourer 325 975.00 7,756.50
Over heads 1,085.91
Per no 8,842.41
Say Rs 8,842.00
20/248 Manhold 3' 6" x 2' 3" & 4' to 6' deep 9" thick
-do -do-
1 day 257 2 labours digging & transporting soil 325 325.00
875 No 41 Bricks 5.7 4,987.50
0.1 Cube 136 1" Metal 8470 847.00
0.26 Cube 197 Sand 2100 546.00
4 1/2 Cwt 46 Cement 520 2,340.00
2 1/2 day 214 Mason 475 1,187.50
5 day 257 Labourer 325 1,625.00 11,858.00
Over heads 1,660.12
Per no 13,518.12
Say Rs 13,518.00
18A/254 - Do - - do - - do -
- do - 8 Strands - do - - do -
- do - - do - - do -
Per 100 L.ft
As in Item no 18 18,257.35 18,257.35
100 L.ft 20 Barbed wire 2.5 250.00
1 No 224 Straining balts 112 112.00
11 No 76a G I hooks 6.5 71.50
2.5 Hrs 257 Labourer 325 101.56 18,792.42
Overheads 2,630.94
Per 100 L.ft 21,423.36
Per L.ft 214.23
Say Rs 214.00
Per L.m 702.69
Say Rs 703.00
Per No 292.18
Say Rs 292.00
3.5 l.ft 347 0'-6" long cleats 3" x 3" x 1/4" 125 437.50
2 Nos. 376 9" x 9" 3/8" M.S.base plate 110 220.00
4 Nos. 96a 16 mm 9" Rag bolt 140 560.00
Cutting
0.5 Day 215 Black Smith 475 237.50
0.5 Day 257 Labourer 325 162.50
Hoisting & Placing
7.15 L.ft 392 Side vertical member (sash) 100D - 3502 148.7 1,063.21
7.15 L.ft 393 Vertical lock member 100D - 3503 A 160.9 1,150.44
3.57 L.ft 391 Bottom rail 100D - 3207 169 603.33
3.57 L.ft 390 Top rail 100D - 3203 129.1 460.89
3.57 L.ft 389 Mid Lock rail 100D - 3004 A 124.5 444.47
28.6 L.ft 387 Bead 100D - 1914 24.3 694.98
1 No 403 Lock (alpha) 750 750.00
1 Pair 402 Handle 350 350.00
1 No 404 Door closer 1645 1,645.00
23.24 S.ft 405 5mm glass tinted 60 1,394.40
17.87 L.ft 385 Door frame 70S - 3002 - 1 85 1,518.95
17.87 L.ft 386 Beading 70D- 1910 24.3 434.24
Allow 10% for rivets, gascut, rubber brass screws 1,050.99
21.12 S.ft Labour 68.13 1,438.80 12,999.68
14% Overheads 1,819.96
Per 21.12 Sq.ft. 14,819.64
Per Sft 701.69
Say per S.ft 702.00
Say per m2 7,550.00
Per 10 L.ft.
50 Channels 4" - do -
8 - do - - do -.
Per 10 L.ft.
Per Sqrs.
3 Earth wire
5 15 Amp. Plug.
6 Light Fitting.
7 5 Amp. Plug.
9 Calling Bell.
16 Hood lamp.
Say Rs #N/A
Per Post
2 End post and struct for Type barbed wire fence fixed
complete in cement concrete as per Drg. Of 68 of
1936
7 C.ft. 135 1 1/2" Metal 8020 561.40
3.75 C.ft. 138 3/4" Metal 8830 331.13
6 C.ft. 197 Sand 2100 126.00
1.75 Cwt. 46 Cement 520 910.00
0.32 Cwt. 140 M.S. Rods 4240 1,356.80
1 Lb. 31 14 B.W.G.Wire 40 40.00
3 Hrs. 214 Black Smith 475 178.13
6 Hrs. 257 Labourer 325 243.75
Allow formoulds 30 30.00
Allow for curing 30 30.00
0.5 Hrs. 257 Excavation foundation & Planting post 1/2 Hrs. 2 Lab 325 40.63 3,847.83
Overheads 538.70
Total cost 4,386.52
Say Rs.
Per Sqrs.
Per 3 tiles.
26 primer 1 coat.
h983
Rate Amount
0
0
211
Rate Amount
Rate Amount
PRICE LIST
Code No Description Unit Rate
1 1 1 1/2" dia. Pvc pipe 1000 type L.ft 42.00
20 24 Basket no 52.50
26 41 Bricks No 5.70
102 211 Sink 24"x15"x8" with waste plug & chain no 2100.00
149 353 Fillets (Class I local timber for beeding) L.ft 0.00
218 181a Planks 1" Sp. Upper Class Timber/Kempus sft 125.00
20 24 Basket no 50.00
26 41 Bricks No 2.60
149 353 Fillets (Class I local timber for beeding) L.ft 0.00
218 181a Planks 1" Special Upper Class Timber sft 94.00
102 211 Sink 24"x15"x8" with waste plug & chain no 1810.00
240
cleared away. m2
debris cleared. m2
and stacked. m2
- do - - do - No
- do - - do - No
15/4 Down pipes, 4" to 6" dia G.I old or decayed, L.ft
measured). L.m
cleared away. m2
building. m2
work, - do - - do - in two m2
storeyed building.
away. m2
1/15 Cement concrete 1:3:6 with 2" metel, above one cube Cube
3/15 Cement concrete 1:2 1/2:5 (1") above one cube Cube
4/16 Cement concrete 1:2 1/2:5 (1") upto one cube Cube
wide and 9" average depth, with 3" thick sides and base
or in situ.Size 1-6x0-6x0-6 No
m3
23/24 Supr stone, cement concrete 1:2:4 (3/4") for door posts
seperately). m3
m3
m3
m3
m3
m2
33/27 Shuttering for column shaft and diamantling (for column Sq.ft
m2
beam 20 ft long). m2
36/28 Cement concrete lintols as per Item (71) in 1st floor. Cube
m3
37/28 4" thick R..C.C 1:2:4 (3/4") in first floor slab (reinforcement Sqr
- do - - do - m2
and 9" average depth, 3" thick sides and base, inclusive of
1/2" cement rendering 1:3 with necessary expension, joints L.ft
BLOCK MASONRY
2/30 Brick work in cement mortar (1:5) above 1 cube (up to 1st Cube
floor level). m3
- do - m3
4/31 Brick work in cement mortar 1:5 in piers (in ground floor). Cube
m3
6/31 Brick work 4 1/2" thick in cement mortar 1:5 above 1 square. Sqr
m2
m2
12/33 Extra over Item 2-5 and 9-11 for brick Cube
20/35 Coping, brick in cement 1:5 weathered throated on 9" walls L.ft
No
25/37 Drains brick in cement 1:5,9" average depth 12" wide and
26/38 Drains brick in cement 1:5,6" average depth 9" wide and
28/38 Steps 12" wide and 6" to 9" high masonary or brick work in
cement mortar 1:5 rendered 1/2" cement 1:2 with foundation L.ft
30/39 Brick work in cement and sand 1:8 in foundation and upto Cube
D.P.C. m3
31/40 Brick work in cement and sand 1:8 in super structure Cube
in ground floor. m3
m3
m3
MASON.
1 cube. m3
m3
NO DESCRIPTION OF WORK UNIT
2/43 Exapansion joints in concrete floors filled with bitumen and L.ft
5/44 Floors, cement concrete 1:2 1/2:5(1") 3" cement rendered 1/2", Sqr
12/46 Tiles glazed colour 6"x6" with all specials, supplied and S.ft
mortar 1:1:4
Square. m2
m2
m2
17/143 Rendering cement 1/2", 1:3 upto 1 Square Sqr
m2
Square. m2
m2
Square. m2
m2
stone m2
groove. L.m
m2
m2
storey Building. No
30/56 Tiles calicut pattern supplied and laid Sqr
in any Building. m2
tiles. m2
screws L.m
m2
to abestos sheet
moulding. m2
cleared away. m2
renewed. L.m
30/70 - do - - do -
brass fittings
furniture. m2
brass furniture. m2
re-fixing. sash
timber/kempas. L.m
for seperately).
101/92 - do - - do - L.ft
hips etc. m2
- do - - do -. m2
work. m3
140a/103 As per Item No 140 -do- -do- but with marine type S.ft
2'3"x6'9". m2
142/104 Supplying and fixing Plywood door 1 1/4" thick S.ft
ground. Letter
- do - - do -. Letter
- do - - do -. Letter
paper, 1 coat. m2
Enamel paint m2
enamel paint. m2
wire brushing. m2
(new coat). m2
( New work ) m2
( New work ) m2
work. m2
2 coats - do - - do -. m2
45/173 - do - - do - Sqr
- do - 2 coats. m2
50/174 - do - - do - Sqr
2 coats - do -. m2
Item Description Unit
screws. No
6/128 - do - 6" - do -
- do - - do - No
29/132 - do - 4"x4" - do -
- do - - do - No
- do - - do - No
brass screws. No
51/137 Lock Mortice Vinion /concord single supplied
and fixed. No
and fixed. No
L.m
TINKER.
within site.
available at site).
m3
m3
Item Description Unit
& fixed. No
good. No
(Heavy quality). No
(Ceremics).meterial available No
plastic frames. No
plated. No
English make
plugs. No
L.m
L.m
294/240 Pipes pvc 1" supplied & fixed 1000 type. L.ft
L.m
294a/240 pipes pvc 1" supplied & fixed 600 type. L.ft
L.m
295/240 Pipes pvc 1 1/4" supplied & fixed 1000 type. L.ft
L.m
295a/240 Pipes pvc 1 1/4" supplied & fixed 600 type. L.ft
L.m
297/241 Pipes pvc 2" (1000 type) supplied & fixed. L.ft
L.m
gulley box. No
- do - - do -. No
20/248 Manhold 3' 6" x 2' 3" & 4' to 6' deep 9" thick No
-do -do-
'MISCELLANEOUS..
18A/254 - Do - - do - - do -
- do - 6 Strands - do - - do - L.ft
- do - - do - - do - L.m
^ ^ANGLE IRON
Item Description Unit
10mm tor steel welded to purlins where ever necessary and L.ft
-DO- -DO-
10/A Supplying & fixing 'H' iron 6" x 3" 6mm L.ft
11/A Supplying & fixing ' H ' Iron 8" x 4" L.ft
-do -
12/A G.I. Gate with 12'-0" x 4'-6" hight 2 Nos sashes made
6mm M.S. rod welded 3" c/c both ways all as per
Y10 @ 8" c/c both way 5/8" thick 1:4 plastering 4 Nos. pintol
m2
m2
m2
m2
glazed m2
m2
7/AL Al Single hung Door with panneled and S.ft
glazed m2
APPROVED B.S.R FOR THE FIRST HALF 0F 2003 IN TRINCOMALEE
DEMOLISHER.
RATE (1st)
973.00
344.00
778.00
275.00
247.00
26.60
1667.00
179.00
2408.00
259.00
281.00
30.20
304.00
33.00
371.00
556.00
57.00
86.00
3.90
12.80
12.00
RATE (1st)
18.00
59.00
278.00
30.00
371.00
16.90
182.00
2.40
7.90
3.60
11.80
14.20
153.00
139.00
416.00
45.00
625.00
67.00
524.00
56.00
719.00
77.00
1216.00
430.00
778.00
275.00
RATE (1st)
741.00
195.00
21.00
292.00
31.00
224.00
931.00
100.00
1125.00
121.00
2.40
7.90
3.60
11.80
542.00
58.00
CONCRETOR.
RATE (1st)
20647.00
7296.00
21388.00
7558.00
22842.00
8071.00
20840.00
7364.00
21353.00
7545.00
23583.00
8333.00
24675.00
8719.00
25416.00
8981.00
286.00
938.00
120.00
394.00
162.00
531.00
218.00
715.00
315.00
118.00
111.00
1195.00
79.00
850.00
27551.00
9735.00
29.00
24048.00
8498.00
26830.00
9481.00
27571.00
9742.00
28682.00
10135.00
26700.00
9435.00
27441.00
9696.00
28552.00
10089.00
3988.00
429.00
60.00
646.00
16.00
172.16
43.00
463.00
26678.00
9427.00
27419.00
9689.00
8838.00
951.00
10712.00
1153.00
0.00
0.00
463.00
1518.00
16630.00
5876.00
6081.00
655.00
BRICKLAYER.
RATE (1st)
16820.00
5943.00
17690.00
6251.00
18559.00
6558.00
6593.00
710.00
6982.00
752.00
584.00
206.00
195.00
21.00
117.31
384.00
164.00
538.00
4121.00
329.00
1079.00
217.00
712.00
170.00
558.00
15894.00
5616.00
16357.00
5780.00
16941.00
5986.00
18108.00
6399.00
RATE (1st)
15823.00
5591.00
16379.00
5788.00
APPROVED B.S.R FOR THE FIRST HALF OF 2003 IN TRINCOMALEE
PAVIOR.
RATE (1st)
7.00
23.00
17.00
56.00
7868.00
611.00
107.00
847.00
128.00
1378.00
125.00
1350.00
APPROVED B.S.R FOR THE FIRST HALF OF 2003 IN TRINCOMALEE
PLASTERER.
RATE (1st)
12.00
39.00
20.00
66.00
1971.00
212.00
2110.00
227.00
1716.00
185.00
1855.00
200.00
2790.00
300.00
2975.00
320.00
2493.00
268.00
2679.00
288.00
587.00
63.00
3228.00
347.00
30.00
98.00
51.00
167.00
2601.00
280.00
3681.00
396.00
2348.00
253.00
1615.00
174.00
1681.00
181.00
13.00
42.00
2303.00
248.00
APPROVED B.S.R FOR THE FIRST HALF 2003 IN TRINCOMALEE
ROOFER.
RATE (1st)
10298.00
1109.00
4705.00
506.00
78.00
256.00
49.00
161.00
149.00
489.00
28.00
24.00
2750.00
296.00
185.00
20.00
370.00
40.00
2649.00
285.00
RATE (1st)
95.00
310.00
42.00
452.00
11.00
36.00
12087.00
1299.68
14211.00
1530.00
RATE (1st)
14911.00
1603.00
10874.00
1171.00
1018.00
109.46
92.00
10.00
16.00
54.00
394.00
4234.00
252.00
2717.00
509.00
5472.00
377.00
4061.00
RATE (1st)
479.00
5155.00
416.00
4474.00
425.00
4568.00
487.00
5244.00
171.00
67.00
304.00
997.12
12.00
41.00
11.00
36.00
14294.00
1539.00
12093.00
1302.00
436.00
15387.00
1861.00
65672.00
504.00
5425.00
239.00
2575.00
2152.00
321.00
3458.00
365.00
3927.00
207.00
2230.00
219.00
2356.00
RATE (1st)
42.00
50.00
70.00
741.00
80.00
1415.00
152.00
2114.00
228.00
1405.00
151.00
616.00
66.00
1136.00
122.00
534.00
58.00
607.00
65.00
957.00
103.00
1118.00
120.00
625.00
67.00
698.00
75.00
1049.00
113.00
1210.00
130.00
253.00
27.00
460.00
50.00
867.00
93.00
1507.00
162.00
120.00
12.90
208.00
22.00
APPROVED B.S.R FOR THE FIRST HALF OF 2003 IN TRINCOMALEE
BRASS FOUNDER.
RATE (1st)
138.00
185.00
170.00
154.00
102.00
300.00
379.00
277.00
128.00
56.00
869.00
1442.00
2066.00
3728.00
601.00
128.00
123.00
126.00
121.00
APPROVED B.S.R FOR THE FIRST HALF OF 2003 IN TRINCOMALEE
IRON MONGER.
RATE (1st)
298.00
636.00
60.00
199.00
37.00
124.00
RATE (1st)
152.00
498.00
342.00
1121.00
572.00
1875.00
EXCAVATOR.
RATE (1st)
529.00
187.00
622.00
220.00
725.00
256.00
3001.00
1060.00
2314.00
818.00
205.00
73.00
APPROVED B.S.R FOR THE FIRST HALF OF 2003 IN TRINCOMALEE
PLUMBER.
RATE (1st)
165.00
231.00
2979.00
485.00
889.00
612.00
6891.00
2022.00
866.00
232.00
619.00
2061.00
785.00
599.00
2936.00
410.00
293.00
234.00
267.00
280.00
433.00
463.00
538.00
1005.00
#N/A
320.00
13.00
42.00
20.00
65.00
39.00
129.00
28.00
92.00
53.00
175.00
42.00
138.00
73.00
65.00
213.00
47.00
154.00
38.00
126.00
118.00
388.00
110.00
361.00
71.00
233.00
63.00
206.00
88.00
288.00
81.00
264.00
227.00
743.00
357.00
1171.00
627.00
5097.00
8842.00
13518.00
797.00
85.00
533.00
611.00
246.00
250.00
341.00
485.00
744.00
713.00
302.00
557.00
86.00
457.00
RATE (1st)
4.20
13.80
808.00
901.00
4818.00
208.00
683.00
214.00
703.00
292.00
111.00
RATE (1st)
121.00
397.00
145.00
474.00
173.00
569.00
363.00
1192.00
403.00
1323.00
455.00
1491.00
41.00
49.00
453.00
1485.00
#N/A
#N/A
81.00
265.00
21610.00
RATE ANALYSIS FIRST HALF OF 2003 IN TRINCOMALEE
RATE (1st)
353.00
3797.00
610.00
6569.00
143.00
1544.00
735.00
7906.00
733.00
7885.00
702.00
7550.00
700.00
7528.00
Code No Description Unit Rate
1 1 1/2" dia. Pvc pipe 1000 type L.ft 38.50
2 1 1/2" dia. Pvc pipe 600 type L.ft 25.00
3 1 1/4" dia. Pvc pipe 1000 type L.ft 26.00
4 1 1/4" dia. Pvc pipe 600 type L.ft 18.50
5 1" dia. Pvc pipe 1000 type L.ft 17.00
6 1" dia. Pvc pipe 600 type L.ft 10.50
7 1/2" dia. Pvc pipe 1000 type L.ft 6.30
8 2" dia. Pvc pipe 1000 type L.ft 67.00
9 2" dia. Pvc pipe 600 type L.ft 40.50
10 3/4" dia. Pvc pipe 1000 type L.ft 11.30
11 4" dia. Sewerage (SS) 250 type L.ft 48.50
12 4" dia. Sewerage (SS) 400 type L.ft 75.00
12b Anticorrosive paint gal 1085.00
13 Asbestoes flat sheet 1.2m x 1.2m S.ft 13.30
14 Asbestoes ridges Pairs 267.00
15 Asbestos corr. Sheet S.ft 21.35
19 Bamboos L.ft 120.00
20 Barbed wire L.ft 1.45
22 Barrel bolt 4" Brass oxidised no 75.00
23 Barrel bolt 6" Brass oxidised no 115.00
24 Basket no 50.00
25 Beading L.ft 4.00
31 Binding wire 14 B.W.G. lbs 36.00
32 Bitumen Gal 330.00
35 Board 1" thick (timber) S.ft 45.00
36 Brass Bib Tap 1/2" No 130.00
40a Brass screws 1 1/2" Doz 50.00
40c Brass screws 3/4" Doz 30.00
40d Brass Screws 1" Doz 39.00
41 Bricks No 2.60
44 Castm. stays h. qual 10" brass oxidised No 90.00
45 Castm.fast. Brass oxi. H. qlty ,mort.plate No 90.00
46 Cement CWT 345.00
47 Center pivot hinges br.oxi.h.qual. ( 4 pieces ) Set 45.00
50 Closet low level pedestal type (complete ceremic) No 3900.00
57 Distember Lbs 0.00
60 Draw rings 1 1 /2 dia. no 25.00
61 Earth ( Gravel Filling) Cube 590.00
63 Emulsion Paint ( Weather shield ) gal 1704.00
64 Emulsion Paint Lit 1345.00
65 Enamel Paint Lit 1698.00
66 Fanlight catch Brass oxi. Heavy qality No 30.00
70 Calicut pattern flat tiles No 11.00
73 G.I 20 B.W.G Sheets S,ft 65.00
74 G.I. 22 B.W.G.Flat sheet Sft 50.00
76a G.I.Hook 5/16"x4 1/4" no 6.00
77 Ginisappu timber 3/4" thick S.ft 50.40
81 Glass panes obscured(3mm) S.ft 45.00
81a Glass Panes Tinted (5mm) S.ft 60.00
85 Glue lbs 86.00
90 Gulley Box PVC 6" no 550.00
91 Half round tiles No 5.00
91a Bras Sancy 1 1/4" Doz 43.00
91b Cistern ceremic no 1400.00
91c Cistern plastic no 1150.00
94 Hinges 4"x3" Brass oxidised Pair 130.00
95 Hinges 4"x4" Brass oxidised Pair 195.00
95a Hinges 4"x2 1/2" Brass oxidised Pair 110.00
97 Hire of mixtur, vibrator, wages of operator Day 2520.00
98 Hold fast no 17.50
117 Iron screws 2" Doz 0.00
119 Iron T.hinges 10" No 58.00
120 Brass T hinges 10" Pair 0.00
123 Joists Class II 4" x 2" L.ft 7.50
126 Lime -Slaked Bushel 257.00
127 Limpet washers No 1.00
135 Metal 1 1/2" Cube 3500.00
136 Metal 1" Cube 3750.00
137 Metal 2" Cube 3350.00
138 Metal 3/4" cube 4100.00
139 Metal 6" to 9" cube 2000.00
140 Mild steel cwt 1773.00
141 Mirror with fittings no. 390.00
142 Mortice Lock Concord No 425.00
143 Mortice Lock Vinion double No 750.00
144 Lock Night Latch Bird No 275.00
145 Mortice lock Union English single leaver No 1500.00
146 Mortice lock Union English double leaver no. 2660.00
147 Mould oil gal 100.00
147a Mouldings L.ft 4.00
150 Nails 2" (GI) Ibs 30.00
153 Nails 3/4" (GI) lbs 30.00
157 P.V.C. end cap (Gutter Cap) no 38.00
158 P.V.C. gutter joint lb. 44.00
159 P.V.C. metre joint no 142.00
160 P.V.C. running head no 102.00
161 P.V.C.gutter 6" L.ft 37.00
162 P.V.C.Inspection joint 4" (110mm) No 350.00
163 P.V.C.Inspection "Y" joint 4" (110mm) no. 415.00
164 P.V.C.Bend (11Deg) - 4" (110mm) no. 110.00
165 P.V.C.Bend (22Deg) - 4" (110mm) no. 113.00
166 P.V.C.Bend (60Deg) - 4" (110mm) no. 190.00
167 P.V.C.Bend (88 Deg) - 4" (110mm) no. 310.00
168 P.V.C.Pipe 4" 600 type L.ft. 48.50
169 P.V.C.Pipe 4" 400 type L.ft. 60.00
171 Paint oil Enamel gal 1698.00
181 Planks 1 1/4" Sft 96.00
181a Planks 1" Special Upper Class Timber sft 94.00
182 Planks 1" Class II s.ft 45.00
182b Planks 3/4" sq.ft. 90.00
183 Plastic cistern low level (Plastic ) no 1150.00
184 Plugs no. 2.00
186 Plywood door 2"-3" x 6'-9" no. 0.00
187 Plywood door 2'-3" x 6'-9" ( Marine) no 1490.00
188 Plywood door ord 2'-9" x 6'-9" no 1467.00
189 Pressed Tiles 8" x 8" no. 0.00
190 Primer gal 1485.00
191 Pudlo cement lbs 30.00
192 Red cement lbs 148.00
193 Reepers L.ft 8.00
193a Reepers Cl.II 2"x1" L.ft 8.00
194 Ridge tile no. 23.00
196 Rim lock 6" 2 leaves Brase No 425.00
197 River Sand Cube 1700.00
198 Drive screws and washers no. 6.00
198a Ring 1 1/2" Brass no 25.00
199 Rawl plugs & 2" Screws No 15.00
200 Sand Fine cube 1500.00
205 Sash bars 1 1/2"x1 1/2" L.ft. 8.00
207 Screws 1 1/2" doz. 0.00
207a Screws 1" brass Doz 0.00
207b Screws 2" doz 66.00
211 Sink 24"x15"x8" with waste plug & chain no 1810.00
214 Skilled labour Gr.Il day 450.00
215 Skilled labour Gr.I day 500.00
216 Slacked lime Bushel 0.00
218 Soap tray no 164.00
220 Spur stones no. 10.00
222 Squating pan with trap no 700.00
224 Staining Bolts no. 40.00
225 Staples Doz 20.00
227 Stop cock L.D model 1/2" no 77.00
228 Stop cock L.D model 1 1/4" no. 0.00
232 Tar Gal 0.00
232a Tiles 1'-0"x1'-0" floor no 65.00
236 Tiles 6" x 6" white no 0.00
236a Tiles 6"x6" colour no 13.40
236b Tiles 4"x4" white no 0.00
236c Tiles 4"x4" colour no 5.75
245 Timber purlins c.ft. 1036.00
248 Tooth brush holder cromium plated no 100.00
249 Tor steel cwt 2084.00
250 Towel Trail holder chromium plated no 275.00
255 transport 1 st Mile 1 mile 0.00
1002 transport every additional Miles 1mile 0.00
257 Unskilled labour day 300.00
260 Varnish gal 1673.00
263 Wash basin 22"x16" no. 1473.00
264 1/2" Nut & Washers No 3.00
267a Wire nails 2" lbs 30.00
268 Wood plugs no 0.00
268a Wood preservative gal 300.00
269 Yellow ocare lbs 0.00
270 Wire dome for 2" pipe No 60.00
300 2"X2" Class II Battens Lft 17.50
301 3/8" dia 18" Bolts,Nuts & Washers No 12.00
302 Grey Cement Kg 7.50
303 Rawl Plugs and Screws No 0.00
304 Culicut Tiles No 0.00
308 Stopcock LD Model 1/2" (Plastic) No 0.00
309 Stopcock LD Model 3/4" (Plastic) No 104.50
310 Stopcock LD Model 1" (Plastic) No 143.00
311 Stopcock LD Model 1 1/4" (Plastic) No 213.33
312 Stopcock LD Model 1 1/2" (Plastic) No 291.50
313 Stopcock LD Model 2" (Plastic) No 354.20
314 Shower Rose 6" No 95.00
317 pvc gutter brackets No 9.20
318 Solvent cement 50g Tin 43.00
319 Steel Rods 1/4" dia Lbs
320 Cost of Junction No
321 Earth Pipe 2"x5' No
322 Plug with Switch (clipsal) No
323 3/.036 wire m
324 Sunk box No
325 Screws Brass 1 1/2"x10" No
326 Earth wire 7/.029 m
327 Wiring clips and panel pins (Allow)
328 Round plug No
329 Ceiling rose No
330 Holder No
331 Flexible wire m
332 Screw 1/2"x6 No
333 Switch clipsal No
334 1/.044 wire m
335 Sunk box No
336 Brass screws 1 1/2"x6 No
337 Brass screws 1 1/2"x10 No
338 Brass screws 1 1/4"x6
339 Brass screws 2"x10
340 Brass screws 1"x 6
341 Brass screws 2"x10
342
343
344 Angle iron 2"x2"x1/4" L.ft 55.50
345 Angle iron 1 1/2"x1 1/2"x1/4" L.ft 42.75
346 Angle iron 2 1/2"x2 1/2"x1/4" L.ft 79.00
347 Angle iron 3"x3"x1/4" L.ft 99.35
348 Making holes on angle iron No 5.00
349 H - iron 6"x3" (6mm) L.ft 265.00
350 H - iron 8"x4" (6mm) L.ft 280.00
351 1" x 1/4" Flat iron L.ft 13.75
352 1/2"x1" Bolts & Nuts No 6.00
353 Fillets (Class I local timber for beeding) L.ft 0.00
354 Fillets 1/2" x 1/2" L.ft 3.00
355 Ball valve 1/2" No 90.00
356 Ball valve 3/4" No 145.00
357 Cistern only ceremice No 1400.00
357a Cistern plastic No 1150.00
358 Fittings ( For commode & cistern ) Item 350.00
359 Seat cover ( Double ) No 350.00
360 Brackets (For cistern ) Item 54.00
361 Flush bend No 35.50
362 Tightning hook bolts No
363 4" Sandcrete Block No 0.00
364 110mm PVC "T" Junction No 526.00
365 110mm PVC "Y" Joint No 500.00
366 50mm Bottle trap No 150.00
367 110mm PVC Inspection Bend No 370.00
368 63mm PVC "Y" Joint No 0.00
369 110mm PVC Elbow No 287.00
370 PVC down pipe 3 1/2" Length 317.00
371 PVC socket 3 1/2" No 0.00
372 PVC elbow 3 1/2" No 61.00
373 PVC clips 3 1/2" No 9.00
374 1 1/4" x 1/4" Flat iron Lft 20.00
375 1/2" (12mm) Bolt & Nut No 6.00
376 9" x 9" 3/8" M.S. plate No 110.00
377 1/2' x 1 1/2" Rag bolt No 6.00
378 2" x 1/4" Flat iron L.ft 35.00
ALUMINIUM MEMBERS
379 70S-1002-1 L.ft 64.60
380 70S-1102-1 L.ft 44.50
381 70S-1202-1 L.ft 46.40
382 70S-1402-1 L.ft 52.90
383 70S-1503-A L.ft 78.10
384 70S-1704-A L.ft 79.40
385 70S-3002-1 L.ft 85.00
386 70D-1910 L.ft 24.30
387 100D-1914 L.ft 24.30
388 100D-1917 L.ft 32.80
389 100D-3004-A L.ft 124.50
390 100D-3203 L.ft 129.10
391 100D-3207 L.ft 169.00
392 100D-3502 L.ft 148.70
393 100D-3503-A L.ft 160.90
394 CA-1001 L.ft 84.30
395 CA-1002 L.ft 134.20
396 CA-2001-A L.ft 88.90
397 PT-5153 L.ft 15.50
398 PT-5154 L.ft 30.50
399 PT-5157 L.ft 56.30
400 P-1113 L.ft 40.75
401 80S-1801 L.ft 57.85
402 BD-1066 ( Handle ) Pair 350.00
403 Lock ALPHA No 750.00
404 Door Closer No 1645.00
405 5mm thick tinted glass S.ft 60.00
406 6mm thick Plywood sheet ( ordinary ) S.ft 20.85
407 Formica sheet S.ft 18.00
408 Rubber Beading for Aluminium fittings L.ft 3.00
409 Welded mesh S.ft 10.00
Allowing of water
410 Type 1 Sum 125.00
411 Type 2 Sum 250.00
412 Type 3 Sum 75.00
413 Type 4 Sum 50.00
414 Type 5 Sum 25.00
415 Allowance type 1 Sum 100.00
416 Allowance type 2 Sum 150.00
417 Allowance type 3 Sum 10.00
418 Allowance type 4 Sum
419 Allowance type 5 Sum
420 Allowance type 6 Sum