PROYECTO :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA
ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA
DISTRITO: : ACORIA
FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA
PRECIO
ESPECIFICA
UNID
CANT
PERIO.
PARCIAL
SUB TOTAL
MUNICIPALIDAD
DISTRITAL DE
ACORIA
COSTO DIRECTO
2.6.2.2
2. 6. 2. 2. 3.
TOTAL
MDP
UNIT
295,579.24
295,579.24
4.58
7,328.00
HH
480.00
3.75
1,800.00
HH
2,800.00
3.20
8,960.00
OPERARIO
HH
OFICIAL
PEON
18,088.00
18,088.00
270,115.30
270,115.30
MATERIALES DE CONSTRUCCION
ELEMENTOS DE ACERO
6,682.30
kg
100.00
kg
200.00
kg
60.00
4.20
252.00
var.
65.00
21.68
1,409.20
var.
62.00
37.80
2,343.60
var.
150.00
9.45
1,417.50
m3
6.50
60.00
390.00
m3
3.00
60.00
180.00
m3
3.00
90.00
270.00
m3
6.50
85.00
552.50
m3
60.00
70.00
4,200.00
bls
405.00
23.50
9,517.50
133.00
21.00
2,793.00
55.00
14.00
770.00
55.00
19.00
1,045.00
6.00
24.00
144.00
1.00 230,500.00
230,500.00
4.20
4.20
420.00
840.00
AGREGADOS
5,592.50
CEMENTO
CEMENTO PORTLAND TIPO I (42.5 kg) (PUESTO EN OBRA)
9,517.50
4,608.00
PINTURAS
PINTURA LATEX COLOR A ELEGIR (BALDES X 4LT)
144.00
und
EQUIPOS ESPECIALES
230,500.00
AMBULANCIA
LADRILLOS
8,250.00
8,250.00
1.00
8,250.00
4.00
7.50
30.00
OTROS
YESO EN BOLSAS DE 25 kg
278.00
bls
25.00
BROCHAS N 10
DISCOS PARA CORTADORAS DE FIERRO
2.00
4.00
12.00
48.00
10.00
15.00
150.00
50.00
4,543.00
PAR
10.00
8.50
85.00
3.00
80.00
240.00
12.00
10.00
120.00
11.00
24.00
264.00
BOTAS DE JEBE
PAR
11.00
20.00
220.00
PAR
2.00
420.00
840.00
PAR
11.00
10.00
110.00
6.00
25.00
150.00
6.00
30.00
180.00
2.00
115.00
230.00
4.00
16.00
64.00
COMBAS DE 12 LB + MANGO
2.00
50.00
100.00
3.00
185.00
555.00
CILINDROS X 50 GLN
2.00
50.00
100.00
NIVEL DE MANO
2.00
20.00
40.00
CINTA DE SEGURIDAD X 50 m.
rll
1.00
100.00
100.00
MARTILLOS
4.00
35.00
140.00
CORDEL X 100 m.
rll
2.00
10.00
20.00
MANGERA DE 3/4"
100.00
5.00
500.00
6.00
40.00
240.00
PLOMADA
3.00
15.00
45.00
1.00
200.00
200.00
6,250.00
ALMACENAMIENTO DE MATERIALES
ALQUILER DE LOCAL PARA ALMACEN
150.00
MES
1.50
100.00
150.00
glb
1.00
400.00
400.00
SERVICIOS DE TERCEROS
CARTEL DE OBRA DE 3.20 X 4.80 CON GIGANTOGRAFIA
400.00
3,300.00
hm
80.00
hm
hm
80.00
50.00
est
1.00
est
1.00
25.00
10.00
10.00
2,000.00
800.00
500.00
1,400.00
1,000.00
1,400.00
1,000.00
FLETE
2,400.00
6,250.00
PRESUPUESTO ANALITICO
SUB GEN
GEN
T. TRANS
ORGANISM
O
PROYECTO :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA
ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA
DISTRITO: : ACORIA
FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA
PRECIO
ESPECIFICA
UNID
CANT
PERIO.
PARCIAL
SUB TOTAL
2. 6. 2. 2. 3. 6 COSTO DE CONSTRUCCION
COSTO
DIRECTO
POR ADM
DIRECTA - OTROS
2.6.2.2
2. 6. 2. 2. 3.
1,125.94
GASOLINA DE 90 OCT.
GLN
80.00
13.00
1,040.00
OTROS SERVICIOS
Glb
1.00
85.94
85.94
UND CANT.
P.UNIT
21,467.60
21,467.60
1,250.00
PETROLEO 2D
gln
100.00
12.50
1,250.00
2.00
8.00
16.00
MATERIALES DE ESCRITORIO
VINIFAN T/ OFICIO
PAPEL LUSTRE
1,125.94
2,049.60
COMBUSTIBLE
799.60
plg
15.00
0.50
7.50
ARCHIVADOR DE PALANCA
3.00
4.00
12.00
mll
2.00
25.00
50.00
mll
0.50
80.00
40.00
FASTENER
cja
1.00
5.00
5.00
1.00
25.00
25.00
1.00
8.00
8.00
CUADERNO DE CARGOS
1.00
10.00
10.00
FOLDER MANILA
40.00
0.50
20.00
SOBRE MANILA
30.00
0.50
15.00
GRAPAS X 5000
cj
1.00
3.00
3.00
CLIPS
cj
1.00
1.50
CLIPS MARIPOSA
cj
1.00
7.00
7.00
TONER
1.00
270.00
270.00
REGLA DE 30 CM
2.00
0.30
0.60
PORTAMINAS
2.00
10.00
20.00
1.50
1.00
doc.
4.00
6.00
24.00
mll
0.50
300.00
150.00
caja
u
1.00
1.00
40.00
50.00
40.00
50.00
MES
2.00
4,500.00
9,000.00
MES
1.50
2,500.00
3,750.00
ALMACENERO (1.00)
MES
1.50
800.00
1,200.00
MES
1.50
900.00
1,350.00
2.00
230.00
460.00
30.00
15.00
450.00
mes
1.50
1,500.00
2,250.00
MES
2.00
200.00
400.00
2.00
100.00
200.00
1.00
200.00
200.00
Glb
1.00
158.00
158.00
PAPEL CARBON
KARDEX
LAPICEROS TINTA SECA MARCA PILOT
USB. 4GB
2. 6. 2. 2. 3. 5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS
25.00
25.00
18,460.00
910.00
SERVICIO DE MOVILIDAD
ALQUILER DE CAMIONETA PICK UP 4 X 4
2,250.00
958.00
SUPERVISION
MDP
2.6.2.2
2. 6. 2. 2. 3.
TOTAL
UNIT
11,323.10
11,323.10
328,369.94
328,369.94
97.50
u
1.00
8.00
8.00
20.00
10.00
mll
0.50
ARCHIVADOR DE PALANCA
1.00
4.50
4.50
1.00
25.00
25.00
USB 4 GB
1.00
50.00
50.00
SUPERVISOR DE OBRA
mes
1.50
4,000.00
6,000.00
MEDICO
glb
1.00
2,500.00
2,500.00
TECNICO MECANICO
Glb
1.00
2,500.00
2,500.00
Glb
1.00
225.60
225.60
11,000.00
225.60
TOTAL S/.
COSTO DIRECTO
GASTOS GENERALES
295,579.24
21,467.60
SUB TOTAL
317,046.84
SUPERVISION
PRESUPUESTO TOTAL
11,323.10
328,369.94
465,452.45
169,873.21
64,952.90
-205,162.40
38.56
35.60
#REF!
#REF!
46,051.61
37,236.20
15,768.60
#REF!
14,000.00
-2,676.90
PRESUPUESTO ANALITICO
SUB GEN
GEN
T. TRANS
ORGANISM
O
PROYECTO :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA
ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA
DISTRITO: : ACORIA
FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA
PRECIO
ESPECIFICA
UNID
CANT
PERIO.
PARCIAL
SUB TOTAL
MUNICIPALIDAD
DISTRITAL DE
ACORIA
COSTO DIRECTO
2.6.2.2
2. 6. 2. 2. 3.
TOTAL
MDP
UNIT
295,569.34
295,569.34
4.58
7,328.00
HH
480.00
3.75
1,800.00
HH
2,468.00
3.20
7,897.60
OPERARIO
HH
OFICIAL
PEON
17,025.60
17,025.60
272,177.80
272,177.80
MATERIALES DE CONSTRUCCION
ELEMENTOS DE ACERO
6,682.30
kg
100.00
kg
200.00
kg
60.00
4.20
252.00
var.
65.00
21.68
1,409.20
var.
62.00
37.80
2,343.60
var.
150.00
9.45
1,417.50
m3
6.50
60.00
390.00
m3
3.00
60.00
180.00
m3
3.00
90.00
270.00
m3
6.50
85.00
552.50
m3
60.00
70.00
4,200.00
bls
405.00
23.50
9,517.50
133.00
21.00
2,793.00
55.00
14.00
770.00
55.00
19.00
1,045.00
6.00
24.00
144.00
1.00 230,500.00
230,500.00
4.20
4.20
420.00
840.00
AGREGADOS
5,592.50
CEMENTO
CEMENTO PORTLAND TIPO I (42.5 kg) (PUESTO EN OBRA)
9,517.50
4,608.00
PINTURAS
PINTURA LATEX COLOR A ELEGIR (BALDES X 4LT)
144.00
und
EQUIPOS ESPECIALES
230,500.00
AMBULANCIA
LADRILLOS
10,312.50
8,250.00
1.25
10,312.50
4.00
7.50
30.00
OTROS
YESO EN BOLSAS DE 25 kg
278.00
bls
25.00
BROCHAS N 10
DISCOS PARA CORTADORAS DE FIERRO
2.00
4.00
12.00
48.00
10.00
15.00
150.00
50.00
4,543.00
PAR
10.00
8.50
85.00
3.00
80.00
240.00
12.00
10.00
120.00
11.00
24.00
264.00
BOTAS DE JEBE
PAR
11.00
20.00
220.00
PAR
2.00
420.00
840.00
PAR
11.00
10.00
110.00
6.00
25.00
150.00
6.00
30.00
180.00
2.00
115.00
230.00
4.00
16.00
64.00
COMBAS DE 12 LB + MANGO
2.00
50.00
100.00
3.00
185.00
555.00
CILINDROS X 50 GLN
2.00
50.00
100.00
NIVEL DE MANO
2.00
20.00
40.00
CINTA DE SEGURIDAD X 50 m.
rll
1.00
100.00
100.00
MARTILLOS
4.00
35.00
140.00
CORDEL X 100 m.
rll
2.00
10.00
20.00
MANGERA DE 3/4"
100.00
5.00
500.00
6.00
40.00
240.00
PLOMADA
3.00
15.00
45.00
1.00
200.00
200.00
4,850.00
ALMACENAMIENTO DE MATERIALES
ALQUILER DE LOCAL PARA ALMACEN
150.00
MES
1.50
100.00
150.00
glb
1.00
400.00
400.00
SERVICIOS DE TERCEROS
CARTEL DE OBRA DE 3.20 X 4.80 CON GIGANTOGRAFIA
400.00
3,300.00
hm
80.00
hm
hm
80.00
50.00
est
1.00
est
1.00
25.00
10.00
10.00
2,000.00
800.00
500.00
500.00
500.00
500.00
500.00
FLETE
1,000.00
4,850.00
PRESUPUESTO ANALITICO
SUB GEN
GEN
T. TRANS
ORGANISM
O
PROYECTO :"MEJORAMIENTO Y EQUIPAMIENTO DEL ESTABLECIMIENTO DE SALUD DEL C.P. DE CHUPACA - DISTRITO DE ACORIA - HUANCAVELICA
ENT. EJEC. : MUNICIPALIDAD DISTRITAL DE ACORIA
DISTRITO: : ACORIA
FINANCIA : MUNICIPALIDAD DISTRITAL DE ACORIA
PRECIO
ESPECIFICA
UNID
CANT
PERIO.
PARCIAL
SUB TOTAL
2. 6. 2. 2. 3. 6 COSTO DE CONSTRUCCION
COSTO
DIRECTO
POR ADM
DIRECTA - OTROS
2.6.2.2
2. 6. 2. 2. 3.
1,515.94
GASOLINA DE 90 OCT.
GLN
110.00
13.00
1,430.00
OTROS SERVICIOS
Glb
1.00
85.94
85.94
UND CANT.
P.UNIT
21,486.80
21,486.80
2,500.00
PETROLEO 2D
gln
200.00
12.50
2,500.00
2.00
8.00
16.00
MATERIALES DE ESCRITORIO
VINIFAN T/ OFICIO
PAPEL LUSTRE
1,515.94
3,299.60
COMBUSTIBLE
799.60
plg
15.00
0.50
7.50
ARCHIVADOR DE PALANCA
3.00
4.00
12.00
mll
2.00
25.00
50.00
mll
0.50
80.00
40.00
FASTENER
cja
1.00
5.00
5.00
1.00
25.00
25.00
1.00
8.00
8.00
CUADERNO DE CARGOS
1.00
10.00
10.00
FOLDER MANILA
40.00
0.50
20.00
SOBRE MANILA
30.00
0.50
15.00
GRAPAS X 5000
cj
1.00
3.00
3.00
CLIPS
cj
1.00
1.50
CLIPS MARIPOSA
cj
1.00
7.00
7.00
TONER
1.00
270.00
270.00
REGLA DE 30 CM
2.00
0.30
0.60
PORTAMINAS
2.00
10.00
20.00
1.50
1.00
doc.
4.00
6.00
24.00
mll
0.50
300.00
150.00
caja
u
1.00
1.00
40.00
50.00
40.00
50.00
MES
2.00
4,000.00
8,000.00
MES
1.50
2,000.00
3,000.00
ALMACENERO (1.00)
MES
1.50
800.00
1,200.00
MES
1.50
900.00
1,350.00
2.00
230.00
460.00
30.00
15.00
450.00
mes
mes
1.50
1.50
1,000.00
700.00
1,500.00
1,050.00
MES
2.00
200.00
400.00
2.00
100.00
200.00
1.00
200.00
200.00
Glb
1.00
377.20
377.20
PAPEL CARBON
KARDEX
LAPICEROS TINTA SECA MARCA PILOT
USB. 4GB
2. 6. 2. 2. 3. 5 COSTO DE CONSTRUCCION POR ADM DIRECTA - SERVICIOS
25.00
25.00
17,010.00
910.00
SERVICIO DE MOVILIDAD
ALQUILER DE CAMIONETA PICK UP 4 X 4
ALQUILER DE MOTOCICLETA
2,550.00
1,177.20
SUPERVISION
MDP
2.6.2.2
2. 6. 2. 2. 3.
TOTAL
UNIT
11,313.10
11,313.10
328,369.24
328,369.24
97.50
u
1.00
8.00
8.00
20.00
10.00
mll
0.50
ARCHIVADOR DE PALANCA
1.00
4.50
4.50
1.00
25.00
25.00
USB 4 GB
1.00
50.00
50.00
SUPERVISOR DE OBRA
mes
1.50
4,000.00
6,000.00
MEDICO
glb
1.00
2,500.00
2,500.00
TECNICO MECANICO
Glb
1.00
2,500.00
2,500.00
Glb
1.00
215.60
215.60
11,000.00
215.60
TOTAL S/.
COSTO DIRECTO
GASTOS GENERALES
295,569.34
21,486.80
SUB TOTAL
317,056.14
SUPERVISION
PRESUPUESTO TOTAL
11,313.10
328,369.24
465,452.45
169,883.11
64,952.90
-207,224.90
38.56
35.60
#REF!
#REF!
46,051.61
37,236.20
15,749.40
#REF!
14,000.00
-2,686.90
TOPOGRAFO
TRAZO Y REPLANTEO INICIAL
TRAZO Y REPLANTEO DURANTE LA EJECUCION DE LA OBRA
93.204
310.68
EQUIPOS
497.024
699.03
253.008
162.918
245.43
165.6
530.496
4216.8
2713.7915
4090.5
2760
8841.6
179.2
64
42.67
98.46
256
426.66
8.96
3.2
2.13
4.92
12.8
21.34
BUZON
BUZON
BUZON
BUZON
BUZON
BUZON
644
216
184
613.34
896
1120
299.04
86.4
85.44
284.4
346.56
433.2
1188.351
497.088
1180.584
396
1553.4
62.136
15.534
38.835
11.88
46.602
HASTA
HASTA
HASTA
HASTA
HASTA
HASTA
1.50
2.00
3.00
4.00
5.00
6.00
M.O.
11317.089
6664.621
MATERIALESTOTAL
590.228
1009.71
1599.94
4469.808
2876.7095
4335.93
2925.6
9372.096
23980.14
188.16
67.2
44.8
103.38
268.8
448
943.04
302.4
269.44
897.74
1242.56
1553.2
6328.72
1250.487
512.622
1219.419
407.88
1600.002
4990.41
FEBRERO
11102.77
TOTAL
22205.54
18885
44323.8
370.2
20246.1
283
6661
6880
8482.5
1401
46706.8
93413.6
63546
1200
1200
41702.51
3500
1000
6083.51
21500
569
1600
7000
450
4061
2231
450
300
1080
42902.51
89866.02
69860
571.5
571.5
571.5
1143
4335
206628.16
156626
2.6.2.3.5.3
2.6.2.3.5.4
2383
800
1583
2.6.2.3.5.5
2.6.2.3.5.6
3583
MARZO
ABRIL
11102.77
11102.77
97700.58
26453.24
54920.9
64098.83
5603.23
151076.2
ESPECIFICA
DENOMINACION
2.6.2.3.5.3
2.6.2.3.5.4
2.6.2.3.5.5
2.6.2.3.5.6
PIM
18,885.00
63,546.00
69,860.00
4,335.00
S/. 156,626.00
EJECUTADO
AL 12/04/2010
SALDO
AL 12/04/2010
ESPECIFICA
HABILITADORA
11,102.77
45,305.80
46,963.51
571.50
7,782.23
18,240.20
22,896.49
3,763.50
8,625.00
5,761.00
S/. 103,943.58
S/. 52,682.42
S/. 14,386.00
ESPECIFICA
HABILITADA
7,569.00
6,817.00
PIM
MODIFICADO
26,454.00
54,921.00
64,099.00
11,152.00